RE-CONSTRUCTION OF WASHROOM

EXISTING MEASUREMENTS FOR


- SPORTS JUNIOR SEC
ROOM

WINDOW
(4X4)ft

Work Work
8’ 4” 5’ 10” 8’ 9”
 Addition of Brick Wall, Plaster on  Addition of Door
both Side (Height 6’10” Length  Removal of Commodes, Basin &
5’10”) Sanitary Accessories.
 Aluminum Window and Exhaust  Tile Work on Damage Floor
Fan on Duct

8’ 5”
7’ 9”
KITCHEN WASHROOM 7’ 8”

DOOR = 2’2”
DOOR = 2’2”

DOOR = 2’2”
Work Arch Height = 6’ 10”
 Remove of Door & Seal with Brick Wall
DOOR = 2’2”
 Add Division Brick Wall Between two Commodes
(Length 3ft / Height 5ft)
 Addition of 1 Door
 Basic Sanitary Fitting, Sewer Line Connect with Manhole.
 Addition of Indian Commode, Use Existing Western
Commode & Basin
 Addition of Steps for Entrance
 Fix of Tile Work on floor (Demolished Area)
RE-CONSTRUCTION OF WASHROOM FOR JUNIOR SEC

Work Work
Addition of Brick Wall, Plaster on both Side (HeightAddition
6’10” Length
of Door5’10”)
Aluminum Window and Exhaust Fan on Duct Removal of Commodes, Basin & Sanitary Accessories.
Tile Work on Damage Floor

DOOR = 2’2”
DOOR = 2’2”
Arch Height = 6’ 10”

Work
Remove of Door & Seal with Brick Wall
Add Division Brick Wall Between two Compound
Addition of 3 Doors
Basic Sanitary Fitting, Sewer Line Connect with Manhole.
Addition of Indian Commode, Use Existing Western Commode & Basin
Addition of Steps for Entrance
Fix of Tile Work on floor (Demolished Area)