You are on page 1of 3

Commercial Incident Details Page 1 of 3

Report Title: Commercial Incident Details


Run Date and Time: 27/10/2023 15:35:55 Central European Summer Time
Run by: Samuel Alves
Table name: u_commercial_incident

Commercial Incident

Number: CINC0019314 Opened: 27/10/2023 15:27:29


Technical Incident: Commercial Incident Date: 27/10/2023
HSE Case: Escalation Level: 1st
Root Cause: Status: Work in Progress
Requester: Samuel Alves Cancel reason:
Register Type: Non-compliant product or service On hold reason:
Detected in: Nordex facility Main Component:
Production site: BR-PS Concrete Tower Plant Lagoa Sub Component:
do Barro Failure type:
Windpark Id: Assignment group: Concrete Tower Quality
Other Nordex location: Assigned to: Samuel Alves
Windpark Id Service Phase: false Watch list:
External facility: Change Request:
External facility Facility Type:
External Facility not found: false
External Facility (not listed):
Company: NORDEX BRASIL
Product/Service: Service
Service Supplier:
Service Supplier not found: true
Service Supplier (not listed): IRAPURU OPERADOR LOGÍSTICO
Priority factor: 1
HSE Impact: 1 – No Impact
Affected fleet:
PM Impact:
Service Impact:
Operations Impact: 1 – Low
Generic Impact:
FAUF:

Short description:
FEI RE IN CABO PERDIDO NO TRANSPORTE
Description:

Run By : Samuel Alves 27/10/2023 15:35:55 Central European Summer Time


Commercial Incident Details Page 2 of 3

Olá prezados. Registro aqui não conformidade ocorrida na fábrica de torres em Lagoa do Barro-PI, projeto Feijão.

No dia 26/10/2023 nossa equipe de suprimentos nos passou informações acerca de um cabo perdido no processo transporte até a fábrica cuja descrição é
1kV 1x95mm² Al Øhilo>1,7mm LIGHTING SYSTEM CABLE e código AW 1032459.

Este material deve ser reposto o mais breve para que não sejamos afetados e os custos imputados ao causante, neste caso o operador logístico.

Em anexo temos o comprovante de saída do material da Nortel assinado pelo motorista e nota fiscal correspondente.

Commercial Validation

Generic CI: No Involved Supplier:


Grade of CI: Minor Involved Supplier not found: true
Technical Issue: Involved Supplier not listed: IRAPURU OPERADOR LOGÍSTICO
Type of CI: External Involved department:
Origin: Internal quality plan
Related documents:

Economic Validation

Sum of Concept type value: Currency for Economic Assessment:


Deviation Type: Non Quality Deviation

General

Claim initiated: true Claim income in mentioned currency:


Claim successful: false

Summary:

Tags/Topics:

Additional comments:

Work notes:

Blade information

Blade Type: De-moulding date:


Blade Number:

Management System

Audit: Involved area:


Country: Root Cause - System:
Type of Incident: Corrective Actions, Due Date and
Responsible:

Run By : Samuel Alves 27/10/2023 15:35:55 Central European Summer Time


Commercial Incident Details Page 3 of 3

Related List Title: Commercial Incident Task List


Table name: u_commercial_incident_task
Query Condition: Commercial Incident = CINC0019314
Sort Order: Number in ascending order

1 Commercial Incident Tasks

▲ Number Short description Description Status Assignment group Assigned to Escalation Task

CITASK0009232 Correção Compra do material New Concrete Tower false


e realocação dos Quality
custos ao causante.

Run By : Samuel Alves 27/10/2023 15:35:55 Central European Summer Time

You might also like