Professional Documents
Culture Documents
PROJECT: Ref:N/A
The Construction of the Hot Leaching Compaction Plant
Comments
Paint shall be cured to check DFT and dry to handle
before any process for shipping see attached photo 1
2 – MANUFACTURER PROPOSAL :
INSP 003 En
GM SI 101 Copyright Bureau Veritas 04/2011
Paint not dry to handle(see Photo1)
INSP 003 En
GM SI 101 Copyright Bureau Veritas 04/2011