Date: 13 FEB.2023
Request no.: MIR-CSCEC-12-D01-ME-HD-0701-00
Project no. & title: E18066-0200S - The Central Business District of the New Administrative Capital of Egypt
1. Material / equipment
Description : Fabricated Galvanized Steel Duct (APRTMENT LINER & MISSING PARTS-8F-FCU-LOW)
Materials submittal ref. no. : MAT-CSCEC-12-ME-HD-0041-00 Date : 16/08/2021
Bill of quantities ref. no. : 233113-METAL DUCT
Quantity : Fabricated Galvanized Steel : AS PER ATTACHED DELIVERY NOTE ( 210 KG)
2. Manufacturer's details
Manufacturer : CSCEC
Model no.: Serial no. :
Country of origin: Egypt
Date of ARRIVAL on Site : 12/2/2023
STORAGE Location : DO1
Submitted by : LI JIAN MING Signature : LI JIAN MING
3. Inspection report
Yes/No Initials
Physical damage ? Yes No
Details given above correct ? Yes No
Conform with approved submission ? Yes No
Accessories/ spare parts included ? Yes No
Contractor shall follow manufacturer and SMACNA recommendations regarding the
Details :installation
procedures.
- storing and handling shall be as supplier recommendation and specs any damaging due
to bad storing is sole contractor responsibility to change without extra cost or time
Remarks:
--Final approval based on the quality of collecting duct and installation and leak test
-Final approval based on acoustic and noise criteria to be in acceptance limits
Ahmed Adel -Reda elsayed - 27/02/2023
Satisfactory Unsatisfactory
S-PRC-SS-02(F36) Rev 1
Transmittal Of Documents
Date: 13 JUN. 2021
Request no: PRQ-CSCEC-12-D01-ME-HD-0001-02
Project No. & Title:E18066-0200S - The Central Business District of the New Administrative Capital of Egypt
1. Document type
2. Submittal details
Contract doc. Ref. &
Item no. Description of items submitted/ quantity Ref.
compliances
PRE-QULIFICATION DOCUMENTS FOR METAL DUCT
1
FABRICATION WORKSHOP
Approved
HSE comments: The COSHH assessment for the
chemicals substances should be attached.
Approved as noted
CODE: Approved as noted
Mechanical: Refer to comments on the attached file.
Rejected
Others
2. Manufacturer / supplier:
Company Name : Kandil(Galva&Kama)Coating
Address : Obour City - Industrial Zone Area # (5,6,9,8B) - Block 13035 Postal Code Cairo- Egypt
Local agent : Kandil(Galva&Kama)Coating
3. Delivery :
Country of origin :
Availability Egypt
We certify that the above submitted items have been reviewed in detail and are correct and in strict conformity with the contract drawings and specifications
except as otherwise stated; also that the material sources indicated above have been reviewed in detail and that they will supply the submitted items in conformity
with the above and deliver same timely.
359018MB 02112926 DX51D 0.600 1,250 4.01 4.05 0.045 0.021 0.26 0.001 0.001 0.033 238 320 27.0 47 Pass 286 Pass
359018MC 02112926 DX51D 0.600 1,250 4.075 4.115 0.045 0.021 0.26 0.001 0.001 0.033 238 320 27.0 63 Pass 290 Pass
359018MD 02112926 DX51D 0.600 1,250 3.44 3.48 0.045 0.021 0.26 0.001 0.001 0.033 238 320 27.0 59 Pass 285 Pass
359490A 16656 DX51D 0.800 1,250 4.1 4.14 0.105 0.013 0.291 0.012 0.018 0.030 327 383 31.9 58 Pass 286 Pass
359490B 16656 DX51D 0.800 1,250 4.28 4.32 0.105 0.013 0.291 0.012 0.018 0.030 327 383 31.9 56 Pass 286 Pass
359526A 2151925 DX51D 0.800 1,250 4.335 4.375 0.050 0.009 0.163 0.004 0.012 0.033 311 362 33.3 48 Pass 288 Pass
359526B 2151925 DX51D 0.800 1,250 4.34 4.38 0.050 0.009 0.163 0.004 0.012 0.033 311 362 33.3 48 Pass 287 Pass
359526C 2151925 DX51D 0.800 1,250 4.39 4.43 0.050 0.009 0.163 0.004 0.012 0.033 311 362 33.3 46 Pass 287 Pass
359526E 2151925 DX51D 0.800 1,250 3.7 3.74 0.050 0.009 0.163 0.004 0.012 0.033 311 362 33.3 47 Pass 288 Pass
359609A 2112925 DX51D 0.600 1,250 4.13 4.17 0.047 0.021 0.12 0.003 0.006 0.044 300 358 31.5 63 Pass 290 Pass
359609B 2112925 DX51D 0.600 1,250 4.08 4.12 0.047 0.021 0.12 0.003 0.006 0.044 300 358 31.5 61 Pass 289 Pass
359609C 2112925 DX51D 0.600 1,250 4.045 4.085 0.047 0.021 0.12 0.003 0.006 0.044 300 358 31.5 59 Pass 284 Pass
359609D 2112925 DX51D 0.600 1,250 3.935 3.975 0.047 0.021 0.12 0.003 0.006 0.044 300 358 31.5 58 Pass 282 Pass
359609E 2112925 DX51D 0.600 1,250 3.84 3.88 0.047 0.021 0.12 0.003 0.006 0.044 300 358 31.5 59 Pass 283 Pass
361141A 21224766 DX51D 0.600 1,250 4.035 4.075 0.040 0.006 0.213 0.007 0.011 0.042 287 343 36.5 45 Pass 286 Pass
Production schedule of air ducts
Project: CBD APRTMENT LINER & MISSING PARTS-8F-FCU-LOW
Package/Bdg/Lev: P2/D01/L-8 2B-M-B4
Draw No:SHD-CSCEC-12-D01-ME-HD-04-GL-00-0807-0000-00 Static pressure:LOW ; 2/12/2023
Length(m GALVANIZATI
No. Type Thick(m Specification Connectio Coil NO. Quantity Area(m2) Density(k Weight(kg Tag No.
m) ON
m) n Type g/m2) )
1 Straight 0.6 785*400 TDF Liner 359609D 450 1 1.07 5.64 6.62 FCU-D03-02 277
2 Shoe 0.6 350*350/350*350 TDF 359609D 473 1 0.66 5.64 4.11 FCU-D03-02 278
3 Offset 0.6 350*350 TDF 359609D 490 1 0.69 5.64 4.26 FCU-D03-02 275
4 Reducer 0.8 800*255/350*350 TDF Liner 388103B 310 1 0.65 6.86 4.94 FCU-D03-02 275
5 Elbow 0.6 350*350 TDF Liner 359609D 650 1 0.91 5.64 5.65 FCU-D03-01 275
6 Straight 0.6 350*350 TDF Liner 359609D 320 1 0.45 5.64 2.78 FCU-D03-01 277
7 Straight 0.6 785*350 TDF Liner 359609D 500 1 1.14 5.64 7.04 FCU-D03-01 275
8 Shoe 0.6 400*300/400*300 TDF 359609D 443 1 0.62 5.64 3.85 FCU-D03-01 275
9 Offset 0.6 300*400 TDF 359609D 600 1 0.84 5.64 5.21 FCU-D03-01 276
10 Reducer 0.8 800*250/500*350 TDF Liner 388103B 600 1 1.26 6.86 9.51 FCU-D03-01 278
11 Straight 0.6 450*300 TDF 359609D 1100 1 1.65 5.64 10.24 FCU-D03-01 276
12 Offset 0.6 200*200 TDF 359609D 610 2 0.98 5.64 6.06 FCU-D03-01 275
13 Straight 0.6 200*200 TDF 359609D 500 1 0.40 5.64 2.48 FCU-D03-01 278
14 Shoe 0.6 300*150/200*150 TDF 359609D 360 1 0.32 5.64 2.01 FCU-D03-01 275
15 Offset 0.6 200*200 TDF 359609D 870 1 0.70 5.64 4.32 FCU-D03-01 275
16 Straight 0.6 785*400 TDF Liner 359609D 450 1 1.07 5.64 6.62 FCU-D03-01 277
17 Shoe 0.6 350*350/350*350 TDF 359609D 473 1 0.66 5.64 4.11 FCU-D03-01 275
18 Offset 0.6 350*350 TDF 359609D 450 1 0.63 5.64 3.91 FCU-D03-01 276
19 Reducer 0.8 800*255/350*400 TDF Liner 388103B 420 1 0.89 6.86 6.69 FCU-D03-01 275
20 Elbow 0.6 350*400 TDF Liner 359609D 650 1 0.98 5.64 6.05 FCU-D03-01 276
21 Straight 0.6 850*235 TDF Liner 359609D 400 1 0.87 5.64 5.39 FCU-D03-01 277
22 Shoe 0.6 350*150/350*150 TDF 359609D 625 1 0.63 5.64 3.88 FCU-D03-01 276
23 Elbow 0.6 350*150 TDF 359609D 650 1 0.65 5.64 4.03 FCU-D03-01 276
24 Straight 0.6 350*150 TDF 359609D 390 1 0.39 5.64 2.42 FCU-D03-01 276
25 Reducer 0.8 865*200/400*200 TDF Liner 388103B 250 1 0.53 6.86 4.02 FCU-D03-01 276
26 Straight 0.6 400*200 TDF Liner 359609D 450 1 0.54 5.64 3.35 FCU-D03-01 277
Project No. P2&P6 Date 2/12/2023
Computed by Checked by
Results
Weight Area
Strait Duct 105 11
Elbow 15 2
Reducer 56 3
Take Off 34 5
Plenum 0
Ring 0 0
End Cap 0 0
R-Elsayed 26/9/2020
Comments - General -
1-Vibration and seismic controls calculations to be submitted.
2-Supports calculations to be submitted,hanger type and spacing will be according to approved hanger calculations.
3-Provide fire dampers at fire walls penetrations.
4-Fire dampers and cleaning filter must be accessible properly for maintenance.
5-For general notes refer to (D01-MH-0-00-01).
6-Duct routing location / level, HVAC equipment and accessories must be coordinated with other trades (contractor's responsibility).
7-Air balancing study by specialist (third party) to be submitted.
8-Air outlets locations to be coordinated with reflected ceiling drawings.
9-Separate composite shop drawings for mechanical shafts to be submitted (elevations and plans) showing risers distribution, fixation
and accessibility.
10-Provide aluminum screen for all duct opening.
11-Thermostat location/level to be coordinated with Arch. & Elec. Drawings.
12-Duct branches dimensions and locations per each apartment shall be according to approved shop drawings per each apartment.
13-Penetration details by specialist for fire/non-fire walls to be submitted.
14-The contractor is responsible for achieving specified noise criteria.
15-