Professional Documents
Culture Documents
Subject: Re: RFQ_CP System for LPG storage Bullets - Proposed Layout for TRU & Cable Routes by Indus - NPSL REF: INDUS:07/002
From: Fareed Khan <fareed.khan@nuricon.com>
Date: 8/7/2023, 1:52 PM
To: "Muhammad Raza(PLE)" <m.raza@toyota-indus.com>, Maqsood Temuri <maqsood.temuri@nuricon.com>
CC: "Farooq Ahmed(PE)" <farooq.ahmed@toyota-indus.com>, "Fahad I ikhar(PLE)" <fahad.i ikhar@toyota-indus.com>, IMC Plant Engineering
<imc.ple@toyota-indus.com>, "S. Ameen Hussain" <ameen.hussain@nuricon.com>, "muneer.ahmed@nuricon.com" <muneer.ahmed@nuricon.com>,
Mazhar Naeem <mazhar.naeem@nuricon.com>, Asif Siddiqui <Asif.siddiqui@nuricon.com>, Tariq Jameel <tariq.jameel@nuricon.com>, Yousuf - Nuricon
<mohammad.yousuf@nuricon.com>, "kashif.sarwar@nuricon.com" <kashif.sarwar@nuricon.com>
Raza Sb,
With reference to our following email and telecon of today, please note that we are arranging to send complete CP material (except TRU) at your site
today between 2pm to 4 pm through vehicle no. KC 7261 Driver name: Mr. Shabbir. Please see below details of our personnel and labour for necessary
arrangements:
Our Mr. Muneer will contact with you once they will reach at your place for further instruc ons.
Regards
Fareed Khan
Cell: 0300-8208054
Raza Sb,
Material is Ready except TRU (which will deliver later) and can deliver tomorrow or Monday. You need to arrange a proper place for safe storage of
material.
Regards
Fareed
Can you please inform when are you planning to deliver material?
Muhammad Raza
Email : m.raza@toyota-indus.com
1 of 72 8/7/2023, 2:08 PM