PROCESS DOCUMENT
Arjowiggins - Wipro
Load Creation: 4
Shipment selection: 5
Pack Confirmation 12
Introduction:
The Process document is to understand the step by step process of order progression
on Gelida warehousing. The warehousing process involves advanced warehousing
concepts.
The Order progression with status and the process name is summarized below:
GW Process Document 1
Sensitivity: Internal & Restricted
Process Status Application Menu/ Scheduler
Order creation Order Status P4210
500 - 515
Order acknowledgement Order status R5542565 Scheduled batch
515 - 527
Creation of Vehicle Plan VP status 20 P55T0010 G55HGWDCL
Creation of Load. Load status 20 Add button
Select Shipments Shipment Status 10
GW Process Document 2
Sensitivity: Internal & Restricted
Process Status Application Menu/ Scheduler
580 - 620
Sales update Sales order status R42800 Scheduled batch
620 - 999
Vehicle type
Plan description
Loading location and
Carrier number.
Loading Location:
For Gelida warehouse, the loading location defined is ‘EX-99-’
Carrier Number:
The Carrier number is also a common one – ‘2636109’
Once VP creation is completed the next step is to create the Load number for the VP.
*Container number and seal ref*
GW Process Document 3
Sensitivity: Internal & Restricted
Load Creation:
The key thing we need to be aware of before creating a load is if the order which we are
going to load comes under Overseas or European.
If the Load is for an overseas order ‘FO’ type. The Zone number needs to be specified as
‘FXX’
Apart from Overseas other orders can have a blank Zone number.
There is no other key field to be added during load creation as all the information’s are
captured from the VP.
Once the load is created the next process is to add the sales order shipments to the Load.
After the shipments are selected for a load, Load sequence needs to be defined
mandatorily on the below screen.
GW Process Document 4
Sensitivity: Internal & Restricted
Shipment selection:
Shipments can be selected on any basis, such as
origin, destination / dates / etc.
GW Process Document 5
Sensitivity: Internal & Restricted
Once the shipment is selected, we will see a Green tick near the selected
shipments.
Vehicle approval is a key step on the warehousing process, below are the main validations
which needs to be done before a vehicle should be approved.
After the approval of Vehicle Plan, the VP status moves to 30, the load status moves to 30
and the sales orders associated to the VP will be progressed to 535/527 status.
During this process a Pick request will also be generated automatically. This can be
validated on the table F4600. Pick requests generated will be at the status 200.
GW Process Document 6
Sensitivity: Internal & Restricted
Incase not a fixed pick replenishment will be generated, and the stock will be moved to the
Fixed pick location of the item.
After the Pick suggestion is create the status of the pick requests will be moved to 220.
This process creates the pick suggestion on the table F4611. Pick suggestion status will be
340.
After the Process pick requests is completed the next step on the process is ‘Pick
confirmation’.
Once the VP & Pick requests are created pallet planning needs to be generated.
This can be done from the same VP application. Browse to load screen.
GW Process Document 7
Sensitivity: Internal & Restricted
This will move to the pallet planning screen with VP and load details. To generate the
pallet planning, Select Form Exit -> Generate pallet planning.
Once the pallet planning is generated the table F55T0060 will be populated.
Pallet planning for Stock order lines and Hot pick lines have 2 different processes.
GW Process Document 8
Sensitivity: Internal & Restricted
Pallet Planning for Normal stock lines.
The Generated pallet planning needs to be processed now; this can be processed based on
the need.
The lines on the pallet summary can be planned to a single pallet or multiple pallets based
on the need.
This will take us to the planning details screen where we can provide the number of pallets
through which we split the order. In below example the whole order quantity 12000 SH is
split across 2 pallets as P1 6000 and P1 6000.
After the split pallet is completed the table F55T0061 will be recorded with the details.
GW Process Document 9
Sensitivity: Internal & Restricted
Once the split pallet details are entered and OK is pressed.
This will bring us to the previous screen where the planning details will now be refreshed
with 2 lines.
This process would generate 2 Unique pallets to hold the stock. Such as
This is the only process where the stock and the hot pick line processing differs.
The difference is only the lines which needs to have same Pallet needs to be consolidated
and planned.
GW Process Document 10
Sensitivity: Internal & Restricted
Consolidate pallet screen.
Pick Confirmation
Before we start the pick confirmation process, there needs to be a validation done on Pick
suggestion and sales order lines.
All the sales order lines which needs to go through this VP needs to be at 535 status.
The Pick suggestion entry on the table F4611 has the details of location and lot details
from where the item will be transferred to the loading location. This is pick needs to be
now confirmed from the application.
Select the Pick from the order. Row exit -> Confirm.
GW Process Document 11
Sensitivity: Internal & Restricted
Once the Pick is confirmed we will see a Green tick near the Pick task number as
below.
Once the confirmation is done.
Select Process button from Exit bar to complete the process. This will progress the sales
order to the status 540/535.
In addition, the loading location and lot will be updated to the sales order line.
Pack Confirmation
Once the pick is confirmed we need to next update the pallet height of the generated
pallets.
GW Process Document 12
Sensitivity: Internal & Restricted
Browse to pallet planning details screen and select Row exit -> update pallet height.
We can generate labels for pallets by selecting Row exit -> Labels. This is generated
through the batch mentioned below:
The sales order status will be moved to 560/540. Pallet details will be updated on the sales
order detail line as below:
This will also update the pallet planning detail table F55T0061 with packed quantity.
Once this is completed before next step of VP confirmation few validations need to be
done.
Load charges should be validated on the below screen. Row exit from VP application.
Order lines should be validated if they all are at status 560 before the VP confirmation.
Incase if any order lines are not at status 560 we need to process them if not, VP
confirmation will be failed, and VP status will be stuck at status 47.
GW Process Document 13
Sensitivity: Internal & Restricted
Vehicle plan confirmation:
This will be final step of the warehousing process. Once all the other processes are
completed the VP needs to be confirmed.
This can be done from the VP application Row exit -> Confirm Vehicle.
This will move the VP to the status 50 and sales order line status to 575/560.
GW Process Document 14
Sensitivity: Internal & Restricted
Knowledge Base of Common issues:
1. Item availability error in VP process:
Process - After an order is added to a VP and approved if a change is made to the order
or if it is cancelled.
The related shipment will be removed from the VP. But the Pick requests need to be
cancelled manually.
This Pick requests being open has commitments to the stock hence shows item
availability errors.
Point to be noted – When item availability errors occur, for a VP, and if the order in
VP are amended, the related Pick requests need to be validated and cancelled.
Process – After VP creation process is completed, when order hot pick location is
committed, there is a chance of split line creation.
GW Process Document 15
Sensitivity: Internal & Restricted
Assuming Line 1.000 of an order has quantity 1000 SH, when Hot pick location is
committed to order, this might split the order to 2 lines 1.000 – 500 SH and 1.001 –
500 SH.
In this case the split line 1.001 will have a different shipment number from parent line
1.000.
During pallet planning, not all order lines are at status 535, it is observed by users the
split line is missing from the planning process.
Point to be noted – It is to be validated after hot pick location commitment, all split
lines with different shipment numbers are allocated to the pallet planning.
GW Process Document 16