Weekly HSE Walkthrough Report

MISK, DAR AL RIYADH & ADVACON

Reference:
Subject: Weekly HSE Walkthrough Report
Walk No.: (04)
Date:
Venue: MiSK – South and secondary Road Project
Time: 8:30 AM – 11:00 AM

Attendees: MiSK HSE Engineer


DAR Al Riyadh (Consultant):
Ata Ul Mohsin
HSE MANAGER

ADVACON CONTRACTING COMPANY (Contractor):

Sikandar - HSE Lead


Imran - HSE Supervisor
Younus - HSE Officer
Tayeb – HSE Officer
Umair - HSE Officer
Waqas – Site Engineer
Umair – Site Engineer
Shah Zaib – HSE Coordinator
Kice: Site Incharge
Ali – Site Supervisor
Rajesh-Site Engineer
Raja-Construction Manager

Page 1 of 6
Sr. No Description Date Raised Action Date Status

Weekly HSE walkthrough conducted Jointly by


DAR HSE representatives with ADVACON
construction, Logistic and Site HSE teams at MiSK
South Road Project PHASE 1,2 3 4

01 07 SEP 2023 Info

Discussed Site issues related to the observations


noted during the walkthrough regarding daily
housekeeping, hard barriers and signage
installation at appropriate areas fire extinguisher
conditions ,electrical cable and cable management
practice, drinking water condition, welfare facilities,
site HSE Communication hazards, risks and
control measures and best practices as per the
MiSK HSE Standards have been discussed and
highlighted to make the work safe and improve
safety performance at the workplace with initiatives
actions and proactive measures.

02 19 OCT 2023 19 OCT 2023 Open

Page 2 of 6
Route to equipment was not barricade also not
assigned the flagman with the equipment to control
the neay by traffic in Phase 03.

22 OCT 2023 22 OCT 2023 Closed

Area around the equipment barrication done and


signages installed.

Page 3 of 6
19 OCT 2023 19 OCT 2023 Open

Observed a smoking shelter without a fire extinguisher in


Phase 01.

22 OCT 2023 22 OCT 2023 Closed

Fire extinguisher provided.

Page 4 of 6
19 OCT 2023 19 OCT 2023 Open

Jerry can used to store the fuel kept close to the rest
shelter in the phase 01 also fuel stored in the cold drink
bottle in phase 4.

22 OCT 2023 22 OCT 2023 Closed

All flammable materials removed from the rest shelter.

(Note: Risk and control measures of All the above observations were discussed and agreed with
Contractor’s HSE and Site Representatives during the Site Walkthrough).

Report Prepared By:

ATA UL MOHSIN
DAR Al Riyadh- HSE Manager