Professional Documents
Culture Documents
Research, Faisalabad.
Department of Civil Engineering
SUBMITTED TO
2019-UET-NFC-FD-CIVIL-22
Title Of Project:
Design of a Turbine according to the site conditions and power
requirements.
1- Problem Statement
At a given site the average available head for a turbine and the Average monthly
discharge is given in the table below.
Section A B
N R/10 R/20
M R/25 R/40
2- Objectives
My Roll no. is 22
Section A B
= 1479.5 – 28.54
Input Data:
Efficiency= 80 to 87 %
A. Select which type of turbine is to be installed, give the reasons for this.
Turbines are selected on base of:
Head
Specific speed
I selected the impulse turbine.
Reason
According to my roll no. I got the available head is 643.4m and specific speed 5.88.
So these conditions lying in Impulse Turbine.
60𝑈
D= 𝜋𝑁
2- Diameter of Jet:
O
d =√𝜋
⁄4×𝑉
1450.96
d =√𝜋⁄
4×112.34
d =4.05mm
Also Lying Between In D/15 to D/6.
3- Number of buckets:
𝐷
Nb =15 +
2𝑑
Nb = 15
4- Width of buckets:
Wb = 5d =5 × 4.05=20.05
Wb =20.05mm
5- Depth of buckets:
Db= 4.86mm
𝑁√𝑃
Ns = 5⁄
𝐻
4
200√9158
Ns = = 5.88
643.45⁄4
Ns=5.98
C-Find the monthly and total power generated in the year
Firstly we determine the power of every month.
January.
Po =𝛾𝑄𝐻
=65-1.865
Po =47.4 kw
Feb.
January.
Po =𝛾𝑄𝐻
=90 -2.965
Po=70.5kw
Mar.
Po =𝛾𝑄𝐻
=130 -3.465
Po =112.5 kw
Apr.
Po =𝛾𝑄𝐻
=176-3.665
Po=163.3kw
May.
Po =𝛾𝑄𝐻
=225-4.415
Po =232kw
Jun.
Po =𝛾𝑄𝐻
=385-6.215
Po=443.4 kw
Jul.
Po =𝛾𝑄𝐻
=462-7.665
Po = 586.7 kw
Aug.
Po =𝛾𝑄𝐻
=575-8.265
Po = 843.12kw
Sep.
Po =𝛾𝑄𝐻
=405-8.665
Po=488.5kw
Oct.
Po =𝛾𝑄𝐻
=230-5.365
Po =250.4 kw
Nov.
Po =𝛾𝑄𝐻
=110-2.565
Po=96.5kw
Dec.
Po =𝛾𝑄𝐻
=76-1.965
Po= 60.7kw
Total power of year
= 1479.5 – 28.54
Input Data:
Po= 9158Kw