RESEARCH FAISALABAD
Subject: “Project Management”
PBL Assignment:
Submitted By:
Session: 2020, Semester: 5th, Section: A, Dept: Civil
Group Members:
20-CLE-14 Kamran Ahmad Raza
20-CLE-16 Zeeshan Ali Raza
20-CLE-20 Qasim Ali
20-CLE-24 Hassan Tahir
Submitted To:
Engr. Usman Shahid
Project Detail:
“ESTABLISHMENT OF SPORTS COMPLEX AT FAISALABAD CITY”
Contractor Alam Khan Brothers, Lhr
Consultant ES Consultants, Lhr
Date of Commencement 23-03-2018
Completion Period 18 Months
Cost of Project 487.45 Million
Contractor Amount 359.40 Million
Project Manager:
Name Engr. Usman Ali
Designation PM (Project Manager)
Experience 10 Years
PM Team at site:
CM Shoaib DAE
Chief Surveyor Waheed Ahmad Sajid DAE
Surveyor Mia Nazeer DAE
Site In charge Ali Zaman DAE
Site Engineer ASAD Bsc Engineer
Admin Javad Engineer Bsc Engineer 2018 NFC
Material In charge Waheed-ullah DAE
Budget Detail:
Release for 2017-18 50.00 Million (Utilized)
Release for 2018-19 37.00 Million (Utilized)
Release for 2019-20 30.00 Million (Utilized)
Release for 2020-21 30.66 Million (Utilized)
Release for 2021-22 30.00 Million (Utilized)
Release for 2022-23 100.00 Million
Total:
Total Amount Release 278.82 Million
Total Utilization 204.32 Million
CFY:
Funds Available for CFY 100 Million
Total Utilization for CFY 25.50 Million (25%)
Payment:
Payment made to the Consultant 13.1 Million
Payment made to the Contractor 191.22 Million (approx.)
Progress:
Physical Progress (Grey Structure) 80%
Financial Progress 42%
Reason for delaying in Project:
This project began in 2018 and has been postponed until 2022.
The total duration is approximately 3.5 years, so the main reason for the delay is
Covid-19 or corona era.
In this process this project is delayed due to over cost run factor and all government
departments are not interconnected directly with contractor.
So there will be a large gap in construction site and it will result in late payment of
employees and the construction site is almost going to close phase.
Check Bill
Note on MB
Role Of PM in Project:
FDA Drawing Acquire – Wooden Floor
PM changes PVC (PU) Flooring referred by PM