3 phase 400 V AC is applied on the H.V winding and shorted the L.V side and measure the current in the HV .
mΩ mΩ mΩ
1
2
AT 10 KV Reading P.F %
S.No: Bushing Test KV Test Mode Milli Amps Watts Measured
Meter Meter
Reading Reading
UST-
1 1U
Measure R
UST-
2 1V
Measure R
UST-
3 1W
Measure R
UST-
4 1N
Measure R
Test
AT KV Reading
Mode P.F %
S.No: Bushing Test KV Milli Amps Watts
Meter Meter
Measured
Reading Reading
UST-
1 1U
Measure R
UST-
2 1V
Measure R
UST-
3 1W
Measure R