Gama Construction

DR No. 0

External Damage Report Rev. 0


Date: 18/11/2023
Project Name : Project Code :
Work Type: Str. ✘ Arch. ✘ Roads. ✘ Mech. ✘ Elec. ✘ surv
Location : Parcel 1.3.1 - Zone 01 - Road ( )
Subject : Issue for Damage landscape & street works cause Garbage truck.
Description of Damage:

This report include damage of the following Details :


1- planting Works : (2) Ground Cover area Lantana / (4) khaya tree.
2- Irrigation Networks : (1) Gr pipes for Ground Cover Area / (4) Gr Rings for khaya tree &(16)
Dripper.
3- Electrical Works : (1) Street Lighting pole with light fixture containing base and all
accessroiess / (3) street lighting Cables between lighting Poles.
4- Interlock & Curbstone works : (10 m') Curbstone / (20 m2 interlock)
Causes of Damage:
Service Garbage truck Driver in Parcel 1.3.1 with below following Details.

Driver Name :
Company Name :
Garbage truck Details :

Other Category (include in Details).

Damage Occurred : 18 / 11/ 2023


Damage Time Occurred : 7 AM
Damage By : Garbage truck Driver.
Damage Location : Parcel 1.3.1 Zone 01 - Road ( ).
Issued By : Gama team are made site investigation with CGP secuirty Team .

Corrective Action .

Corrective : There must be immediate and quick response to repair pipes & fittings which
destroyed and lost before starting the other works.
As a matter of advice ,you sholud make investigation for lost fittings.