Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

Document Update List

Brief Explanation Issue Date Issue #

- This practice is instead of & replaces the practice #


PR-NS-1412-332.
- The main change is using small trenching in April, 2010 G 3
secondary network.

31 ‫من‬2
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

‫اموحخــُيــبح‬
CONTENTS

Error! Bookmark
................................
not defined. ...... ................................ ‫ انغرض‬00/1
Error! Bookmark
................................
not defined.. ................................ ‫ مجبل انعمم‬00/2
................................
...............4 ................................................................ ‫ انمسئىنيبت‬00/3
.................
................................
5 ................................................................ ‫ انتعريفبت‬00/4
................................
..........5 ................................................................ ‫ تفبصيم انعمم‬00/5
............................
................................................................
11 ‫ انمىاصفبت وانقيبسبت‬00/6
...........................
................................
26 ................................ ‫ حسبة انتكهفة انتقذيرية‬00/7
............................
................................................................
27 ‫ انمىاد ووحذات انشجكة‬00/8
................................
28 ................................................................
.... ‫ األسبنيت انمرتجطة‬33/9

1.00 PURPOSE..................................... Error! Bookmark not defined.


2.00 SCOPE .......................................... Error! Bookmark not defined.
3.00 RESPOSBILITIES ..................................................................... 4
4.00 DEFINITIONS ........................................................................... 5
5.00 WORK DETAILS & DESCRIPTION ....................................... 5
6.00 SPECIFICATIONS & MEASUREMENTS ............................ 11
7.00 CALCULATION OF ESTIMATED COST ............................ 26
8.00 MATERIALS & PLANT UNITS ............................................ 27
8/00 ASSOCIATED PRACTICES ............................................................... 28

31 ‫من‬3
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

1.00 PURPOSE ‫ امغـرض‬00/1


 This practice details guidelines and necessary ‫ ُغح ٍذا األشنُة اإلرضابااح امنئاج ُاإليخٔبتابح‬
requirements for installation of outside palnt in new ‫امغرُرٔج مخوأا امضتلج امخبرتٔاج يآ اموخػػابح‬
un-built areas before asphalting like other services, ‫ قتل ؿونٔبح امشننخج‬،‫امتأاث امخٓ مه ٔظنَب امـوراى تـا‬
‫ مخشَٔل شرؿج إاخبل امخاواج‬،ِ‫أشُث تبمخاوبح األخر‬
to ease and expedite service provision when
buildings are constructed and not to be compelled
‫ؿيا قٔبه اموتبيٓ يٓ اموخػػ ُؿاه اإلغػرار إلتارا‬
to re-dig the roads.
.ِ‫ينرٔبح ورث اخر‬
 The practice is intended to avoid digging & delay to ٓ‫ َٔاف األشنُة مخنباْ ؿونٔبح امينر ُخنباْ امخأخٔر ي‬
provide services to subscribers, and STC shall try to ‫ ُؿنّ اإلخظابتح امشاـُأج‬،‫خقأه امخاوج منوضخرلٔى‬
coordinte closely with the municipalities, ‫امشـٓ تتأج ُامخيشٔق اماائه وؾ امتناأبح ُاموضاخرلٔى‬
.‫ُوبملٓ ُوػُرْ اموخػػبح مخيقٔق ذمك امَاف‬
subscribers, land owners and developers to achieve
this goal.
 In applying this system STC will make a big leap ‫ تخػتٔق ٍذا اميؼبه خلُى اإلخظبتح امشـُأج قا خػاح‬
towards being ready to provide services to the ‫خػُث لتٔرث ييُ اإلشخـااا ُتبٍزٔاج خقاأه امخاواج‬
customer without delay because of outside plant or ‫منوضخرلٔى اُى خأخٔر تشتة امضتلج امخبرتٔج أُ اميبتج‬
ُ‫ ُلذمك خُئر إولبئج خاؿٔه املٔتل امذابيُْ أ‬.‫مينرٔبح‬
need for digging. This will also provide ability to
augment the secondary network and perform any
ْ‫ اُى أ‬،‫إترا ظٔبيج وخّ وب لبيح ٍيبك يبتج ماذمك‬
necessary maintanance when needed without any
‫خأخٔر أُ وغبٔقج منوُاػئى أُ خشتة يٓ اؿبقج ميرلاج‬
delay or causing inconveniences to the public, or
.‫امشٔر ُامورُر اميبختج وى شنتٔبح أؿوبل امينرٔبح‬
disturbance to traffic usually caused by digging
works.

2.00 SCOPE ‫ وجـبل امعوـل‬00/2


This system can be applied also, using ducts in ‫ٔولى خػتٔق ٍذا اميؼبه ُإشخخااه امقيُاح يٓ امضتلج امذبئُج‬
secondary network, in existing served areas in urban ‫تبمويبػق اموخاُوج يبمٔبً تبمواى يٓ امويبػق امخٓ ٔقرر ئَب‬
.‫خينٔذ ويػقج لتٔيج تأاث تبشخخااه ػرٔقج امقيُاح‬
areas where it is decided to use ducts in new cabinet
area.

3.00 RESPONSIBILITIES ‫ اموشئُميـبح‬00/3


- Access design Engineers in the districts. .‫ وَياشٓ خظؤه امضتلج امخبرتٔج تبمويبػق‬-

- Access Vendors' Engineers .‫ وَياشٓ وقبُمٓ امضتلج امخبرتٔج‬-

31 ‫من‬4
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

4.00 DEFINITIONS ‫ امخعريفــبح‬00/4

Abbreviation Description ‫امُصف‬


HH Handhole, a concrete box with one or ‫يخيج خنخٔص يٓ ضلل ظياُق وى امخرشابيج تطػاب‬
two covers used as point of entry for
cables to cabinet or DP. ‫ خشخخاه ماخُل املُاتل امّ املتٔيج‬،‫ُايا أُ غػب ٔى‬
The two cover HH is used for pulling
.‫أُ يقػج امخُزٔؾ‬
& jointing cables; usually placed in
front of cabinets; and the one cover ‫ذاح امطػب ٔى خشخخاه مشاية ُخُظأل ملُاتال‬
HH is for cable pulling & is placed in
front of DPs. .‫ُخُغؾ ؿباث أوبه املتٔيج‬
PB Pulling Box or A one cover HH placed ‫ ٍُُ يخيج خنخٔص تطػب ُايا خُغؾ‬،‫ظياُق شية‬
in front of DPs for pulling &
distributing cables, ّ‫اوبه يقػج امخُزٔؾ خشخخاه مشية اشلك امخاوج اما‬
.‫ؿنتج اموضخرك‬

A concrete base placed behind the HH ‫قبؿاث خرشبئج خُغؾ خنف يخيج امشاية مخرلٔاة‬
DP Base
for installation of DP .‫يقػج امخُزٔؾ‬

USW Underground Service Wire .‫شنك امخاوج ااخل امقيبث‬


Identification Mark, placed at the end ‫ؿلوج خـرٔف خُغؾ ؿيا يَبٔج قيابث شانك خاواج‬
IM of service wire duct for loaction
identification .‫اموُظل منوضخرك مخيأا وُقـَب‬
SWAT Strategic Work Administration Tool
Integrated Customer Management
ICMS
System
Facility Rule based Automated Model
Management Environment: A
designing tool base on AutoCAD
FRAMME
drawings; shows plans exchange by
exchange & can provide work detail
e.g. plant units.
Geo Spatial Communication: A
Designing tool base on AutoCAD
GCOM drawings; shows plans as an overall
view and provide coordinates for plant
locations.
DP Distribution Point
BSW Buried Service Wire

5.00 PROCEDURES, WORK STEPS, ‫ اإلجراءاح ُخظـُاح امعوـل ُامُصـف‬00/5

31 ‫من‬5
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

DESCRIPTION & DETAILS ‫ُامخفبصيل‬


5.01 GENERAL
 Design of civil works requirements shall be such

that it covers expected growth and service
requirements for at least 5 years. This should be
done by studying OSP, OPF and Fundamental
Plan data and take them into consideration.

 The design shall be shall be accomplished by



considering ultimate pairs, and by referring to
forecast practices and forecasts for the
neighbouring and adjacent areas.
 A lot, 10x10 m of minimum, is reserved for x 
installation of all electronic cabinets. If a lot is not
specified a suitable location in public locations
shall be chosen if possible for installation of
electronic cabinets.
 Large size DPs (20 pairs & 30 pairs) are to be 
used so that the service can cover large area to
minimize the number of handholes (pulling
boxes) and thus minimize the cost.
 Civil works shall be designed and issued to 
Implementation, and cables shall be designed for
the whole area and kept under cabinet number
till work is required. At that time the part to be
executed is taken and displayed in the Framme
and issued to Implementation.
 When service is required, secondary cable is laid 
to the subscriber’s location making joints in all
locations in the route and pull cables to all
Pulling Handholes, cover cable ends at each
uninstalled DP locations which shall not installed
till service is required.
 All future civil works designs for the route shall 
be considered; like extending the route to the end
of the plan to connect to the new plans in future
to avoid any digging at all. As seen in the

31 ‫من‬6
‫‪Network Sector - Design‬‬
‫‪Doc. Number: GL – 621211 – 03 - 06‬‬ ‫رقى انىثُقح‪ :‬أر – ‪31 - 30 -116166‬‬
‫‪Issue #: 3 - Issue Date: April, 2010G‬‬ ‫تارَخ اإلصذار‪ :‬جًادي األول ‪6306‬هـ‬ ‫‪– 0‬‬ ‫رقى اإلصذار‪:‬‬

‫‪drawings in Figure # (1).‬‬

‫اموخظظ‬
‫اموقشه‬

‫املتييج‬ ‫وخظظبح وشخقتنيج‬


‫وخُقعج في ٍذا االخجبً‬
‫‪MH‬‬ ‫‪MH‬‬

‫قيُاح ُغرفج خفخيص خشخخده‬


‫قيُاح خشخخده مخدوج‬ ‫مخدوج امخُشع اموشخقتني‬
‫اموخظظ امحبمي‬

‫ضلل رقه (‪)1‬‬

‫‪5.02 THE DUCTS‬‬ ‫‪ 02/5‬امقيـُاح‬

‫‪‬‬ ‫‪110 mm Ducts‬‬ ‫‪ ‬قيُاح ‪ 110‬ونه‬


‫‪ When a primary feeder route passes through the‬‬ ‫‪ ‬يٓ يبمج ُتُا وشبر لٔتل امخطذٔج اإلتخاائٓ ااخل‬
‫‪plan, 8 duct conduit system is laid between‬‬ ‫اموخػػ ٔخه خوأا ‪ 8‬قيُاح تٔى غرف امخنخٔص موقبتنج‬
‫‪manholes to meet future expansions & needs.‬‬ ‫أْ خوأااح أُ خُشـبح قا خػرأ يٓ اموشخقتل‪.‬‬
‫‪ Four ducts are laid between HH connecting‬‬ ‫‪ ‬خواا ارتؾ قيُاح تٔى يخيبح امشية امخٓ خرتػ تٔى‬
‫‪Electronic cabinets to Copper cabinets for‬‬ ‫املتبئى اتملخرُئج ُامييبشٔج ُذمك تشخخااه املُاتل‬
‫‪primary & secondary cables.‬‬ ‫اتُمٔج ُامذبئُج‪.‬‬

‫‪7‬من ‪31‬‬
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 Spare ducts should be available to accommodate ‫ ٔتة خُير قيُاح إيخٔبػٔج مخوأا لُاتل امضتلج‬
cables for any unforeseen service demand in ٓ‫ ُي‬،‫امذبئُج موقبتنج أْ ػنتبح خاوج يٓ اموشخقتل‬
future. At end of distribution where smaller ‫يَبٔج وشبر امخُزٔؾ ٔلخنٓ تقيبث رئٔشٔج ُاياث قػر‬
.‫ونه ئد ٔخه إشخخااه لُاتل ذاح أيتبه ظطٔرث‬111
cables are terminated, one 110 mm main duct
will be enough.
 110 mm diameter PVC duct Poke outs shall be ‫ ٔخه ؿول إوخااااح ػرئج ميَبٔبح امقيُاح امرئٔشٔج‬
placed in main duct ends for future DPs and ‫ ونه) موقبتنج اإليخٔبتبح اموشخقتنٔج إليضب‬111 ‫(قػر‬
service wires installations, in the direction of .ٓ‫يقبػ امخُزٔؾ ُأشلك امخاوج يٓ اختبً اميوُ امـوراي‬
development growth.
 Two or four ducts 110 mm in diameter are ‫ ونه يشة اميبتج‬111‫ ٔخه ُغؾ قيبخٔى أُ أرتـج قػر‬
placed from the HH in front of the cabinet to ‫وى يخيج امخنخٔص اوبه املتٔيج إمّ يخيبح امشية أوبه‬
each HH in front of the DPS, and between these ‫تطرع‬ ‫ ُذمك‬،‫يقبػ امخُزٔؾ ُتٔى يخيبح امشية‬
.ُْ‫شية املٔتل امذبي‬
HHs for pulling secondary cables.

 PVC and Corrugated Polyethylene ducts (PEC) ‫ ُٔولى‬PVC ‫ونه وى يُؽ‬111 ‫ خشخخاه امقيُاح قػر‬
can be used for 110 mm in the secondary ‫) إذا لبيح وخُيرث‬PEC( ‫إشخخااه امقيُاح امووُتج‬
network if available. Two ducts shall be installed, ‫مخوأا امضتلج امذبئُج تاتً ؿى امقيُاح امتلشخٔلٔج‬
‫ ونه‬111 ‫ ئد ٔخه خوأا قيبث رئٔشٔج قػر‬، )PVC(
one empty duct for the main copper cable and
the other equipped with 3 sub ducts to meet
‫ ُاألخرِ وتَزث تذلد‬،ٓ‫يبرغج مشية املٔتل امييبش‬
future requirements for pulling of copper or
‫قيُاح يرؿٔج ألْ خُشـبح وشخقتنٔج منلُاتل امييبشٔج‬
fibre cables .
.‫أُ خوأااح أمٔبف تظرٔج‬
 The secondary network ducts are numerated as ٓ‫ ٔخه خرقٔه قيُاح امضتلج امذبئُج لوب ٍُ وـوُل تٌ ي‬
in the primary network. .‫امضتلج اتتخاائٔج‬
 50 mm Ducts ‫ ونه‬51 ‫ قيُاح‬
 Small or mini ducts 50 mm in diameter are ‫ ونه وى يُؽ امتُمٓ أذٔنٔى‬51 ‫ خوا قيُاح ظطٔرث‬
placed from HHs in front of DPs to each ّ‫ُذمك مورُيخَب ُشَُمج خوأاٍب وى يخيبح امشية ام‬
subscriber location for pulling USWs. ّ‫ ُخشخخاه مخوأا أشلك امخاوج ام‬،‫وُقؾ لل وضخرك‬
.‫ؿنتج اموضخرك‬
 The ducts shall have only one bend if the route is ‫ ت خزٔا ؿاا امذئبح (امننبح) تبمقيبث ؿى ُاياث اذا لبى‬
longer than 150m, and tow bends if the route is ‫ ُاذيخٔى اذا لبى ػُل‬،‫ه‬151 ‫ػُل اموشبر الذر وى‬
less than 150m, and the bend shall be 4 meteres ‫ وخر‬4 ‫ه ُخلُى ذئج امننج تقػر‬151 ‫اموشبر اقل وى‬
.‫ؿنّ األقل‬
in diameter minimum.

 BSW location shall be in boundary line and each ‫ ٔلُى وُقؾ قيبً شنك امخاوج منوضخرك ؿيا امخقب ياُا‬
subscriber shall have a separate BSW duct laid ‫امونلٔج ُٔلُى ملل وضخرك قيبث خبظج مشنك امخاوج‬
from the HH/ pulling box to the boundary line, ‫ امشية امّ يَبٔج امقػـج وبؿاا‬/‫خوا وى يخيج امخنخٔص‬
‫اموضخرلٔى ؿيا يقػج امخُزٔؾ ئخه خوأا قيبخٔى مشنك‬
except subscribers at the DP, where 2 BSW ducts
shall be placed from DP base to boundary line.
.‫امخاوج امّ ياُا امونلٔج تٔيَوب‬

31 ‫من‬8
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 The mini ducts are arranged and numbered from ‫ ونه تا اً وى‬51 ‫ ٔخه خرخٔة ُخرقٔه قيُاح شنك امخاوج‬
left to right & from top to buttom; and the ‫ ُوى األؿنّ إمّ األشنل ُٔلُى‬،‫امٔشبر إمٓ امٔؤى‬
number of the service wires shall be the same as .‫رقه شنك امخاوج ينس رقه امقيبث اموواا تَب‬
the duct.
 The ducts shall be assigned to subscribers facing ‫ ٔخه خخظٔط امقيُاح موُاقؾ اموضخرلٔى تا اً وى‬
the DP & starting from far left and serially to the ّ‫اقظّ امٔشبر تبختبً يقػج امخُزٔؾ خشنشنٔبً امّ اقظ‬
right side as shown in Figure (2). .)2( ‫ يشة وب ٍُ وُغح تبمضلل رقه‬،‫امٔؤى‬

ٍُ‫يىاقغ انًشتزك‬

‫قاعدة نقطة التوزيع‬


DP Base

1 2 3 4 5 6 7 8 9 10 11 12

‫فتحة السحب‬
Pulling Hole

‫قناة الكيبل الثانوي‬ ‫قنوات سلك الخدمة‬


Secondary Duct 3 7 USW Duct
8
2 6 10
9
1 5 11
4 12

)2( ‫ضلل رقه‬

31 ‫من‬9
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

5.03 CABINETS
‫ املتبئى‬03/5
 The electronic cabient base shall not be
‫ ت ٔخه خرلٔة قبؿاث املتٔيج اتملخرُئج إت ؿيا خاوج‬
installed till the area is to be served because
‫اموخػػ ُذمك مـاه وـريج يُؿٔج ُيته املتٔيج اموشخخاه‬
the type and size of the cabent to be used in
future is not know. .‫وشخقتل‬

 A HH is to be installed opposite the proposed ‫ ٔخه خرلٔة يخيج امخنخٔص وقبتل امولبى موقخرح مقبؿاث‬
location for electronic cabinet, and ducts one ‫املتٔيج اتملخرُئج ُخوا قيُاح تػُل وخر يٓ إختبً قبؿاث‬
ne meter long shall be laid towards the base of .‫املتٔيج اموقخريج‬
the proposed cabinet.
 When the number of electronic cabinets is
‫ ؿيا زٔباث ؿاا املتبئى امأللخرُئج ؿى لتٔيخٔى ٔخه‬
more than one, the design should consuder
‫امخظؤه ؿنّ اشبس ُتُا غريج اخظبتح خيُْ املتبئى‬
use of a communication room to
accommodate the electronic cabinets. .‫اتملخرُئج‬

 The cabinets to be used are 1200 pairs, specs. ‫ خٓ اس‬:‫ زُر وُاظنج رقه‬1211 ‫ خشخخاه املتبئى شـج‬
TS-3002, and 2400 pairs, specs. TS-3004, ٓ‫ خ‬:‫) زُر وُاظنج رقه‬2411( ‫ُاملتبئى‬ 3112
only. .‫ يقػ‬3114‫اس‬

31 ‫من‬10
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 The precast concrete base for the copper


‫ خرلة قبؿاث املتٔيج امييبشٔج امخرشبئج اموشتقج امظة‬
cabinet shall be installed during construction
‫خلل خينٔذ األؿوبل اموائج ُخلُى قبؿاث املتٔيج ولظقج‬
of civil works, and the base shall be in
contact with the HH. .‫منخيج امخنخٔص‬

5.04 HANDHOLE ‫ فخحج امخفخيص‬04/5


 The HH shall be adjacent to and in contact ‫ خلُى يخيج امخنخٔص ولظقج مقبؿاث املتٔيج امييبشٔج‬
with cabinet base and the primary cabentes ‫ُخاخل املُاتل اتتخاائٔج وى األوبه ُخخرر املُاتل‬
shall enter from the front and secondary from ‫امذبئُج وى امتُاية ُٔلُى امخظؤه ؿنّ أشبس ُتُا‬
.‫امرظٔف‬
the side and the HH shall be placed in the
sidewalk (curb).
 The Handhole shall be placed adajacent to the
ً‫ خُغؾ يخيج امخنخٔص وؾ ينرٔج امقيُاح تبختب‬
trench in curb side, and the cabinet base shall
‫امرظٔف ُ خُغؾ قبؿاث املتٔيج ولظقج ميبئػ يخيج‬
be placed adjacent to the HH as shown in
Figure (3). .)3( ‫امخنخٔص يشة وب ٍُ وُغح تبمضلل رقه‬

 The HH infront of the cabinet base and the ‫ خينذ يخيج امخنخٔص اموقبتنج مقبؿاث املتٔيج امييبشٔج‬
protection posts shall be installed during civel ‫ُأؿواث يوبٔج املتٔيج خلل خينٔذ إيضب اح األؿوبل‬
works execution. .‫اموائج‬
 The Handholes are numbered sericlly from ‫ ٔخه خرقٔه يخيبح امخنخٔص خشنشنٔب وى املتٔيج تبمظٔطج‬
the cabinet as follows (## “HH” -XXX .)"‫ "رقه املتٔيج‬xxx – " ‫ "رقه امنخيج‬##( :‫امخبمٔج‬
“Cabinet”)

:‫قٔبشبح يخيج امخنخٔص ُوشبيبخَب وى امينرٔج ُقبؿاث املتٔيج‬

‫حذود انًهكُح‬

‫ مهم‬100

‫ مهم‬310 ‫قبعدث املتييج اميحبشيج‬

‫ مهم‬900 ‫فتحة تفتيش‬


‫بغطاءين‬

31 ‫من‬11 ‫سم‬40 ‫حفرية عرض‬


Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

)0( ‫شكم رقى‬

5.05 PULLING HOLE (PH) & DP CONCRETE


BASE
‫ فخحـج امشحة ُ قبعدث يقظج امخُزيع‬05/5
 A Pulling hole is designed infront of each DP for ‫ ٔخه خظؤه يخيج امشية أوبه لل يقػج خُزٔؾ مطرع‬
pulling cables between DPs & service wires to the ‫شية املُاتل تٔى يقبػ امخُزٔؾ ُشية أشلك امخاوج‬
subscribers. .‫إمّ اموضخرلٔى‬
 DP location shall be in the boundary line between ‫ ٔلُى وُقؾ يخيج امشية ُقبؿاث يقػج امخُزٔؾ ؿيا امخقب‬
two neighbours. .‫ياُا امونلٔج تٔى امتبرٔى‬
 When designing consider use of minimum number ‫ ٔتة ؿيا امخظؤه وراؿبث خقنٔل ؿاا يخيبح امشية‬
of pulling holes by choosing suitable locations to ‫ُذمك تبخخٔبر امولبى امويبشة مخاوج التر ؿاا وى امقػؾ‬
serve large number of lots through one PH placed ‫ تئد خُغؾ يخيج امشية يٓ راس‬،‫تنخيج شية ُاياث‬
‫امتنُك مخاوج تؤؾ قػؾ امتنُك اذا لبى امتنُك ظطٔر‬
at the upper side of a block to serve all lots in the
block. If the block contains large number of lots,
‫ُخُغؾ يخيج امشية يٓ ويخظف امتنُك وى امتَخٔى اذا‬
PH are placed in the middle of the block in both
.‫لبى امتنُك لتٔر‬
sides.

31 ‫من‬12
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 In commercial areas one pulling box is placed to ‫ يٓ امويبػق امختبرٔج خُغؾ يخيج شية ُاياث مخاوج‬
serve 2 locations (2 DPs), DP base is cancelled and 111 ً‫لل وُقـٔى ُخنطّ قبؿاث يقػٌ امخُزٔؾ ُخوا قيب‬
one meter duct with duct connector is laid to the ‫ونه تػُل وخر وزُاث توُظل امقيُاح ُغػب شا وى‬
‫يخيج امشية تختبً ياُا امونلٔج ُذمك مطرع وا قيبث‬
subscriber boundary so that the subscriber shall
join a 110mm duct during bulduing construction
.‫ ونه وى قتل اموضخرك ؿيا تا امـوراى‬111
and the is blocked.
 Two cover PH are used for cabl jointing and ‫ خشخخاه يخيبح امشية تطػب ٔى ٔـول ئَب ُظنج لُاتل‬
reducing cable size to smaller sizes so that the ‫مٔخه شية ايتبه ظطٔرث وى املُاتل مخطذٔج يقػج‬
cable can be bent and pulled to the DP. The 2- ‫امخُزٔؾ يٓ ينس يخيج امشية ُيخيبح امشية امخبمٔج‬
‫تطػب ُايا مشَُمج ذيٓ املٔتل اموطذْ ميقػج امخُزٔؾ‬
cover PH feeds the DP at the loction and the
following two DPs, as shown in Figure 4.
)4( ‫يشة وبٍُ وُغح تبمضلل رقه‬
 It is preferred that PH should be in curb and shell ‫ ٔنغل ُغؾ يخيج امشية يٓ امرظٔف ُٔتة أى خلُى‬
be in level with the curb. Concrete lean shell be ‫ورخنـج تبرخنبؽ امرظٔف ُٔخه ُغؾ خرشبيج يُل‬
placed arround the PH for protection when the ٓ‫يخيبح امشية ميوبٔخَب وشخقتل وى امخلشٔر ُامخنف ي‬
‫ ُخلُى‬،‫يبمج ؿاه خينٔذ امرظٔف إذيب خػُٔر اموخػػ‬
curb is built during execution of civil works.
When the PH is out the curb, it should be in level
.‫وؾ اإلشننح يٓ يبمج لُيَب خبرر امرظٔف‬
with the asphalt.
 A pre-cast DP base shall be constructed with same ‫ ٔخه إؿااا قبؿاث يقػج امخُزٔؾ وشتقج امظة توقٔبس قبؿاث‬
size of current DP. The bases of DPs shall be ‫ ُٔتة خرلٔة قُاؿا يقػبح‬،‫يقػج امخُزٔؾ اميبمٔج‬
installed during construction of civil works, then .‫امخُزٔؾ خلل خينٔذ إيضب اح األؿوبل اموائج‬
the cables and BSWs shall be pulled before
installing and fixing the DPS.

‫كىاتم ثاَىَح‬
‫تأحجاو اصغز‬
DP DP DP
‫وصهح‬
‫كىاتم‬

ٌ‫كُثم ثاَى‬
‫تحجى كثُز‬

‫فتحح خفخيص تغظبءيى‬ ‫فتحح خفخيص‬ ‫فتحح خفخيص‬


‫خغذي يقظج امخُزيع ُيقبظ امخُزيع امخبميج‬ ‫تغظبء ُاحد‬ ‫تغظبء ُاحد‬

)4( ‫ضلل رقه‬

‫ اموُاصفبح ُامقيبشبح‬00/6
6.00 SPECIFICATIONS &
MEASUREMENTS

31 ‫من‬13
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

6.01 THE DUCTS ‫ امقيــُاح‬01/6


 The entire secondary network shall be ducted at a ‫ خلُى امضتلج امذبئُج تبملبول ااخل قيُاح ؿنّ ؿوق‬
depth of 600 mm, and a layer of fine sand is placed ،‫ خُغؾ ػتقج وى امرول اميبؿه اشنل امقيُاح‬،‫ ونه‬611
below the ducts then covered with normal ‫ ونه ُٔخه‬211 ‫ذه خراه تخرتج ؿبأج ؿنّ ضلل ػتقبح‬
ْ‫ ُٔغؾ ضرٔػ خيذٔر‬.‫الَب تٔااً تبشخخااه ولبئى خبظج‬
backfilling compacted carefully with special tools
in 200mmm thick layers. A warning tape shall be
)5( ‫ أيؼر امضلل رقه‬،‫ ونه‬411 ‫خبط ؿنّ ؿوق‬
placed at 400 mm depth. See drawings in Figure
(5).
 The width of secondary cables shall be 200 mm, ،‫ ونه‬211 ‫ ٔلُى ينرٔج لُاتل امضتلج امذبيُْ تـرع‬
and the width of the trench for BSW shall be 100- ‫ لوب‬،‫) ونه‬151 – 111( ‫ُؿرع ينرٔج أشلك امخاوج‬
150) mm as shown in practice # GL-621211-02-02 ،)12-12-621211 – ‫وُغح تبألشنُة رقه (ار‬
."‫"إرضبااح خظؤه امينرٔبح امظطٔرث‬
"Small Trench Design Guidelines".

 Spacers are used between the 110 mm ducts every ‫ونه‬111 ‫ٔشخخاه ويؼه امقيُاح لل وخرٔى تٔى امقيُاح‬ 
2 meters to organice the ducts in trench. Two .‫ُذمك منويبيؼج ؿنّ اموشبيبح تٔى امقيُاح يٓ امينرٔج‬
spacers are used with 4 ducts construction, one ‫ٔشخخاه ويؼؤى يٓ يبمج ُتُا ارتؾ قيُاح اياٍوب تٔى‬
‫ ُُٔغؾ امويؼه ااخل خنػج‬،‫امقيُاح ُاتخر اشنل امقيُاح‬
below & the other between the ducts. If the ground
is watery, the spcaers are embeded in cement mix.
.‫اشويخٔج اذا لبيح اترع رخُث‬
 ِConcrete is used in road crosses and in special ‫ خشخخاه امخرشبيج ؿيا خقبػـبح امػرق ُاميبتح امخبظج‬
cases depending on the desiner’s judgement taking ‫ُامخٓ خـخوا ؿنّ خقأر اموظوه وؾ وراؿبث ؿاه زٔباث‬
in consideration not to increase the cost .‫امخلننج تضلل وخل‬
tremendously.
Ground Level

400 mm 400 mm
600 mm

Warning Tape @ 400 mm 710 mm


785 mm
850 mm
925 mm

75 mm

75 mm

Plastic Duct Spacers

 In locations where trench for primary and ٓ‫يٓ اموُاقؾ امخٓ ٔيخبر ئَب ينرٔج مقيُاح املٔتل اإلتخاائ‬ 
secondary cables are required at the same time ّ‫)وـبً يٓ ينرٔج ُاياث ؿن‬5‫ُغـَوب‬
( ‫ضلل رقه‬
‫ُاملٔتل امذبئُج ٔخه‬
they should be placed in a common trench at the .‫ أْ وخر‬،ٓ‫ؿوق املٔتل اإلتخاائ‬
depth of primary cable.

31 ‫من‬14
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 The ducts are fixed firmly & sealed tightly to the ‫ ٔخه خذتٔح امقيُاح ؿنّ يبئػ يخيبح امشية تظُرث ويلوج‬
HH /PH walls using suitable sealing material. .‫تئشخخااه وُاا خذتٔح ُشا ويبشتج‬

 Pulling ropes/wires (1 in the drawing Figure 6) ،‫ ٔخه خوأا يتبل شية ااخل تؤؾ امقيُاح امخٓ خه ُغـَب‬
are palced in all installed ducts and the ducts ‫ ٔتة‬،‫ُٔخه شا أػرايَب تئيلبه تبشخخااه شاااث ويلوج‬
are closed firmly with plugs (2 in thedrawing) ‫ وى‬1 ٓ‫ُغؾ شنك امشية ااخل تؤؾ امقيُاح (لوب ي‬
in both ends to fix the ropes and protect and ‫ تبمرشه) وى لل‬2( ‫ ُوى ذه ُغؾ شاااث‬،)6 ‫امرشه تبمضلل‬
duct from being blocked, as shown in pictures ‫امتَخٔى ؿنّ شنك امشية مخذتٔخٌ ُيوبٔج امقيبث وى اتيشااا‬
in Figure (6). .)6( ‫يشة وبٍُ وُغح تبمظُر يٓ امضلل رقه‬

)6( ‫ضلل رقه‬

 The trench for cable ducts & USWs are placed ّ‫ ٔلُى تـا ينرٔج قيُاح املُاتل ُقيُاح أشلك امخاوج ؿن‬
one metre from property line & at a depth of 60 ‫ ُخُغؾ‬،‫ شه‬61 ‫تـا وخر وى ياُا امونلٔج ُؿنّ ؿوق‬
cm. The USW & cable ducts shall be placed in ‫قيُاح املُاتل امذبئُج ُ قيُاح أشلك امخاوج يٓ ينرٔج‬
‫ ُيٓ يبمج إشخخااه قيُاح شنك يقػ خُغؾ يٓ ؿوق‬.‫ُاياث‬
one trench. In case of using USW only, the trench
depth will be 50 cm to reduce the costs.
.‫ شه‬51
 Two ducts 110mm in diammeter & 60 cm long, ‫ونه وى لل يخيج شية إمّ وُقؾ‬111 ‫ ٔخه خوأا قيبخٔى قػر‬
are placed from each Pulling Box to the DP ‫ ُخشخخاه إياِ امقيبخٔى مشية‬،ّ‫يقػج امخُزٔؾ أوبه اموتي‬
location, one duct is used for pulling cable and .‫املٔتل امذبيُْ ُاألخرِ مشية أشلك امخاوج‬
the other for pulling BSWs.
 When placing the small ducts for USWs, they are ،‫ ؿيا شية قيُاح اشلك امخاوج ٔخه رتػَب تـغَب تتـع‬
tied together before placing in trench so that they ،‫قتل ُغـَب يٓ امينرٔج يخّ ت خيذيٓ تظُرث خؤاْ مطنقَب‬
will not bend in a way that they are blocked. .‫ُٔخه خذتٔح يتبل شية األشلك تلل قيبث وؾ غػب امقيبث‬
Pulling ropes & wires shall be fixed firmly by the
cover at the duct end.

6.02 DP CONCRETE BASE ‫ قبعدث يقظج امخُزيع‬02/6

31 ‫من‬15
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 The concrete base is ploaced adjacet to the ‫ خُغؾ قبؿاث يقػج امخُزٔؾ امخراشبئج ولظقج منخيج‬
pulliung hole, or at a distance from it & a ‫ ونه‬111 ‫ أُ ؿنّ وشبيج ويَب ُخوا قيُاح قػر‬،‫امخنخٔص‬
connecting pipes are installed between the two. ‫تٔيَوب‬
 The DP base shall be 10-20 cm from the property ‫ شه وى ياُا‬21-11 ‫ خلُى قبؿاث يقػج امخُزٔؾ ؿنّ تـا‬
line. .‫امونلٔج‬
 In case the HH is placed in the curb and the base
‫ يٓ يبمج ُغؾ يخيج امخنخٔص ؿنّ امرظٔف خرلة قبؿاث‬
is installed adjacent to PH placed with the curb
‫يقػج امخُزٔؾ مظق امنخيج تئد ٔلُيب يٓ ارخنبؽ شػح‬
level as shown in Figure (7).
.)7( ‫امرظٔف لوب وُغح تبمضلل رقه‬

 In case the HH is outside the curb it is placed in ٓ‫ خُغؾ ي‬،‫ يٓ يبمج ُغؾ يخيج امخنخٔص خبرر امرظٔف‬
the trench and 110 mm ducts are laid from the Ph ّ‫ ونه وى امنخيج إم‬111 ‫ ُخُظل قيُاح قػر‬،‫امينرٔج‬
to the DP base as shown in drawing in Figure (8).
.)8( ‫قبؿاث يقػج امخُزٔؾ يشة وبٍُ وُغح تبمضلل رقه‬

 The DP base and the HH shall be 20 cm from


‫ شه‬21 ‫ خلُى قبؿاث يقػج امخُزٔؾ ُيخيج امخنخٔص تبرخنبؽ‬
ground level, or at asphalt level.
.‫وى شػح األرع ُؿنّ وشخُِ امشننخج‬

 The Length of the ducts between the base and the


‫ ٔلُى ػُل امقيُاح ُيق اموشبيج وى امقبؿاث إمّ ظياُق‬
PH shall be according to the distance between
them.
.‫شية املُاتل‬

31 ‫من‬16
‫‪Network Sector - Design‬‬
‫‪Doc. Number: GL – 621211 – 03 - 06‬‬ ‫رقى انىثُقح‪ :‬أر – ‪31 - 30 -116166‬‬
‫‪Issue #: 3 - Issue Date: April, 2010G‬‬ ‫تارَخ اإلصذار‪ :‬جًادي األول ‪6306‬هـ‬ ‫‪– 0‬‬ ‫رقى اإلصذار‪:‬‬

‫نقطة وزيع قا ة‬
‫‪Pillar DP‬‬

‫دود‬
‫ال ت ك‬

‫سط ا رض‬
‫(ال صيف)‬

‫‪ 077‬مل‬
‫قاعدة نقطة التوزيع‬
‫فتحة‬
‫الت تي‬

‫‪022‬ملم‬

‫شكم رقى (‪)7‬‬

‫نقطة و يع قا ة‬
‫‪Pillar DP‬‬

‫د‬
‫ت‬

‫سط‬
‫( سل )‬

‫‪ 700‬مل‬
‫قاعد نقطة لتو يع‬
‫لت تي‬ ‫فتحة‬

‫قط ‪110‬‬ ‫قنو‬


‫مل‬
‫‪200‬مل‬

‫شكم رقى (‪)8‬‬

‫‪17‬من ‪31‬‬
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

 The base of the pillar DP shall be of lean concrete. .‫ خلُى قبؿاث يقػج امخُزٔؾ وى امخرشبيج امـبأج‬
 The dimensions of the base, as shown in drawings ‫ خلُى قٔبشبح امقبؿاث لوب وُغيج تبمرشُوبح يٓ امضلل‬
in Figure # (9) & (10), shall be: :ٓ‫ ؿنّ امييُ امخبم‬،)11( ‫) ُرقه‬9( ‫رقه‬
1. Outside Dimensions: 35cmx30cm x 70 cm
)‫ شه (اترخنبؽ‬75x31x35 :‫ امقٔبشبح امخبرتٔج‬.1
)‫ شه (اترخنبؽ‬71x21x25 :‫ امقٔبشبح امااخنٔج‬.2
(Height).
2. Inside Dimensions: 25 cm x 20 cm x 70 cm
.‫ ونه تَج يخيج امخنخٔص‬115 ‫ خُتا يخيخبى قػر‬
(Height)
.‫ خُتا وشبؤر أشنل امقبؿاث مخذتٔح يقػج امخُزٔؾ‬
 There are 2 openings 115 mm in diameter in the
side towards the DP.
 Screw are placed at the bottom of the base to fix the DP.
 A concrete slap is to be placed on DP base so that it ‫ ُٔغؾ غػب أشويخٓ مقبؿاث يقػج امخُزٔؾ ملٓ ت ٔشا‬
will not be blocked. .‫ختُٔف امقبؿاث‬

145 mm

200 250 mm

750 mm
350 mm

250 mm

300
750 mm mm

350 mm
115
)
(
250 mm
45
350 mm mm
65
mm 94 mm
200 mm
95
125 mm
mm

78 mm

20
mm
30
50
mm mm
20
mm

)9( ‫انشكم رقى‬

31 ‫من‬18
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

)63( ‫انشكم رقى‬

6.03 COPPER CABINET BASE ‫ قبعدث املتييج اميحبشيج‬03/6


 The cabinet concrete base shall be of dimensions ‫ خلُى امقبؿاث امخراشبئج منلتٔيج تبمقٔبشبح اموُغيج‬
as shown in the drawing below, (Figure # 11). .)11 ‫ (امضلل رقه‬،ً‫تبمرشه أايب‬
‫ ُٔه‬21 ‫) ؤطب تبشلبل تـا‬27.5( ‫ قُث امخرشبيج‬
 Concrete strength 27.5 MPa @ 21 days.
ّ‫ األشلك ؿن‬،‫ ونه‬2 ‫ ٔخه خقُٔج امخرشبيج تضتلج شنك‬
 Structure to be reinforced with wire mesh – 2
mm. Wires on 10 mmcenters. The mesh to be
‫ ونه وى امشػح‬41 ‫ ُخُغؾ ؿنّ تـا‬،‫ ونه‬11 ‫وشبيبح‬

placed 40 mm from outside surface. .ٓ‫امخبرت‬

 20 mm dia. Bolts to fix the cabinet to the concrete ‫ ونه مخرلٔة املتٔيج ؿنّ امقبؿاث‬21 ‫ أرتـج وشبؤر قػر‬
base. .‫امخراشبئج‬
 The bolts are 100 mm long, 70 mm embeded in 31ُ ،‫ ونه ااخل امخرشبيج‬71 ،‫ ونه‬111 ‫ اموشبؤر تػُل‬
concrete & 30 mm above the surface. .‫ونه تبرزث‬

31 ‫من‬19
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

310 150 454 150


100 110 100

300

1300 1300

200 200

250 250

754

618
68 68

73

110 164 310


20 mm dia. Bolt
73

754

)11( ‫امضلل رقه‬

6.04 TWO COVER HANDHOLE (HH) ‫ فخحج امخفخيص تغظبءيى‬04/6


 The HH shall be made of pre-cast concrete with
‫ خلُى يخيج امخنخٔص وى امخرشبيج اموشتقج امظة وذتخبً تَب‬
cover frames fixed on it, and provided with
‫ ُخـول يخيبح يٓ تشه امنخيج مُغؾ امقيُاح‬، ‫ٍٔلل امطػب‬
openings as per design for cable entrance, see
drawings in Figure # (12). .)12( ‫يشة امخظبؤه اموُغيج تبمرشُوبح يٓ امضلل رقه‬

 A Sump is made at the bottom of the two


cover HH & PH to drain water out. Brackets & ‫ ٔخه إؿااا يخيٌ يٓ قبؽ يخيج امخنخٔص ُيخيج امشية تطػب ٔى‬
cable supports are also installed to support the ‫ لوب ٔخه خرلٔة يُاول منلٔتل‬،ً‫مخظرٔف امؤب‬
cables.
 The specification for the concrete & reinforcing ‫ خلُى وُاظنبح امخرشبيج ُيأا امخشنٔح منخيج امخنخٔص‬
steel bars of handholes & pulling boxes shall be :ٓ‫ُيخيج امشية ؿنّ امييُ امخبم‬
as follows:
1. Reinforcement bars are 14 mm diameter ،‫ونه‬14 ‫ قغتبى يأا امخشنٔح وى اميُؽ اموترُه تقػر‬.1

31 ‫من‬20
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

deformed steel bars of 500 MPa minimum. .‫ ؤطب تبشلبل‬511 ‫ُقُث‬


2. All concrete to be 27.5 MPa compressive ‫ خلُى تؤؾ امخرشبيبح وى األشويح امذْ ٔـػٓ تقُث‬.2
ّ‫ ُٔيخُِ يظ‬،‫ ُٔه‬28 ‫ ؤطب تبشلبل تـا‬27,5 ‫غطػ‬
strength at 28 days type cement, minimum size
aggregate 15 mm.
.‫ ونه ؿنّ األقل‬15 ‫توخُشػ يته‬
3. Minimum reinforcement bars surfaces:
‫ خُغؾ قغتبى يأا امخشنٔح يٓ ويخظف اميبئػ‬.3
4. Reinforcement bars spacing 100 – 150 mm
‫ ونه وى‬151 – 111 ‫ اموشبيبح تٔى قغتبى امخشنٔح‬.4
center to center.
.‫امورلز إمّ امورلز‬
5. Moisture and soil salt resistant additives shall be
‫ خغبف وُاا وقبُوج منرػُتج ُأولح امخرتج يٓ خنػج‬.5
included in the concrete mix.
.‫األشويح‬
6. The outer concrete surfaces of the Hand holes &
Pulling Boxes shall be painted with protective ‫ ٔخه ػنٓ األتشبه األشويخٔج امخبرتٔج منخيبح امخنخٔص‬.6

layers of but amine. .‫توباث امقبر امـبزل‬


 The two cover HH is used for cable jointing to ‫ خشخخاه يخيج امخنخٔص تطػب ٔى ؿيا ؿول ُظلح منلُاتل‬
reduce to smaller size easier for pulling and ‫ ُمشية‬،‫مخنع يخّ ٔشَل شيتَب ُإاخبمَب يقبػ امخُزٔؾ‬
bending into the DP; and also for pulling .‫أشلك امخاوج منوضخرلٔى‬
service wires to the subscribers.
 The two cover HH shall be made of pre-cast ‫ خلُى يخيبح امخنخٔص وى امخرشبيج اموشتقج امظة وذتخًب تَب‬
concrete with cover frame fixed to it, and shall ‫ ُخلُى تينس قٔبشبح يخيج امخنخٔص أوبه‬، ‫ٍٔلل امطػب‬
be of the same dimensions as the HH, but ‫املتٔيج ُملى خيخُْ تبمتَخٔى ؿنّ أرتـج يخيبح ماخُل‬
‫ ُلذمك‬.‫ ُشخج يخيبح ألشلك امخاوج‬،‫املُاتل امرئٔشٔج‬
contains 4 ducts in two sides for cable entry &
6 mini ducts for service wires to the
‫خيخُْ يخيخٔى تَج يقػج امخُزٔؾ ماخُل املٔتل ُإخر‬
subscribers. It has also two ducts toward the
12 ‫ أيؼر امرشُوبح تبمضلل رقه‬.‫ماخُل أشلك امخاوج‬
DP for cable & service wires, see the drawings
.ً‫أايب‬
in Figure # 11 below.

31 ‫من‬21
‫‪Network Sector - Design‬‬
‫‪Doc. Number: GL – 621211 – 03 - 06‬‬ ‫رقى انىثُقح‪ :‬أر – ‪31 - 30 -116166‬‬
‫‪Issue #: 3 - Issue Date: April, 2010G‬‬ ‫تارَخ اإلصذار‪ :‬جًادي األول ‪6306‬هـ‬ ‫‪– 0‬‬ ‫رقى اإلصذار‪:‬‬

‫هيكم انغطبء من‬


‫غطاء فتحح انسحة‪ /‬انتفتُش‬ ‫غطاء فتحح انسحة‪ /‬انتفتُش‬
‫ج‬ ‫‪ 11‬سى ‪ 11 x‬سى‬ ‫‪ 11‬سى ‪ 11 x‬سى‬
‫يٍ انحذَذ انزهز‬ ‫ج‬
‫انحذَذ انًجهفٍ‬
‫‪900‬‬ ‫‪ 033‬يهى‬ ‫يٍ انحذَذ انزهز‬

‫مهم‬

‫ب‬
‫قساو فاصم تٍُ انغطاءٍَ تطىل ‪ 11‬سى وػزض ‪ 1‬سى‬

‫انجذار‬
‫‪ 6113‬يهى‬
‫انخرسبني‬
‫‪ 6013‬يهى‬
‫فتحة انسحت‬
‫‪ 6113‬يهى‬
‫أو انتفتيش‬

‫غطاء‬
‫غطاء‬
‫فتحة جهة انكجينة‬
‫‪ 60‬سم ‪ 20 x‬سم‬ ‫ارتفاع ‪ 6333‬يهى‬

‫‪51‬‬
‫سم‬
‫‪ 61‬سى‬
‫فتحة تصريف انميبه‬
‫‪ 20 x 20‬سم ‪ ،‬ثعمق ‪ 10‬سم‬

‫‪22‬من ‪31‬‬
‫‪Network Sector - Design‬‬
‫‪Doc. Number: GL – 621211 – 03 - 06‬‬ ‫رقى انىثُقح‪ :‬أر – ‪31 - 30 -116166‬‬
‫‪Issue #: 3 - Issue Date: April, 2010G‬‬ ‫تارَخ اإلصذار‪ :‬جًادي األول ‪6306‬هـ‬ ‫‪– 0‬‬ ‫رقى اإلصذار‪:‬‬

‫يُظز انحائط انذاخهٍ نفتحح انتفتُش جهح انكثُُح‪ ،‬وته فتحح ‪ 13‬سى ‪ 13 x‬سى نسحة انكىاتم إنً انكثُُح‬

‫‪1550 mm‬‬ ‫‪900 mm‬‬

‫‪1350 mm‬‬ ‫‪700 mm‬‬


‫‪1250 mm‬‬ ‫‪600 mm‬‬

‫‪50 mm‬‬

‫‪50 mm‬‬
‫‪50 mm‬‬

‫‪800 mm‬‬
‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬
‫‪150 mm‬‬ ‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬ ‫‪150 mm‬‬ ‫‪mm‬‬ ‫‪mm‬‬
‫‪mm‬‬ ‫‪mm‬‬ ‫‪mm‬‬ ‫‪mm‬‬ ‫‪1000 mm‬‬

‫‪50 mm‬‬
‫‪50 mm‬‬

‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬


‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬ ‫‪Dim115 .‬‬
‫‪mm‬‬ ‫‪mm‬‬
‫‪mm‬‬ ‫‪mm‬‬ ‫‪mm‬‬ ‫‪mm‬‬

‫‪150 mm‬‬ ‫‪150 mm‬‬

‫ة‬ ‫ر‬
‫ويعر امحبئظ امداخني اموعبلس موُقع‬ ‫ا م ل ت ي يج‬ ‫ويعر جبيتي )يويى ُيشبر (‬
‫املتييج ُتٌ ‪ 8‬فخحبح قظر ‪ 115‬ونه‬ ‫يُط ‪ 4‬فخحبح قظر ‪ 115‬ونه مُطع‬
‫)احخيبظيج ( مُطع قيُاح قظر ‪ 110‬ونه‬ ‫قيُاح قظر ‪ 110‬ونه مشحة املُاتل‬
‫عيد امحبجج‬
‫انشكم رقى ‪12‬‬

‫‪6.05 ONE COVER HH‬‬ ‫‪ 05/6‬فخحج امخفخيص تغظبء ُاحد‬


‫‪ One cover Pulling Hole is used to for pulling‬‬ ‫‪ ‬خشخخاه مشية املُاتل ئد ٔيخُْ امظياُق تبمتَخٔى ؿنّ‬
‫‪cables, it contains 4 ducts on both sides for cable‬‬ ‫أرتـج يخيبح ماخُل املُاتل امرئٔشٔج‪ُ ،‬شخج يخيبح ألشلك‬
‫‪entry and siox mini ducts for service wires, and‬‬ ‫امخاوج‪ُ .‬لذمك ٔيخُْ يخيخٔى تَج يقػج امخُزٔؾ ماخُل‬
‫املٔتل ُإخر ماخُل أشلك امخاوج ُأرتؾ يخيبح تبمتاار‬
‫& ‪two ducts in the DP direction : one for cable‬‬
‫‪the other for service wires. It has also four ducts‬‬
‫اموـبلس تشخخااوَب يٓ خنرٔؾ منوشبراح ُخُزٔؾ املُاتل‬
‫‪in the opposite wall for cable branching and‬‬
‫تبمزُأب ُامخقبػـبح ُمشية املُاتل منتَج األخرِ وى‬
‫‪distribution of cables in corners & crossing to the‬‬
‫امضبرؽ‪( .‬أيؼر امرشُوبح تبمضلل رقه ‪.)13‬‬
‫‪other side of the street. (See the drawings in‬‬
‫‪Figure #12).‬‬

‫‪23‬من ‪31‬‬
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

800 mm

800 mm

‫هيكم غطبء فتحة انتفتيش‬


‫غطاء فتحة التفتيش‬ ‫ سم‬70 x 70 ‫ قيبس خبرجي‬-
‫ سم‬65 x 65 ‫قيبس‬ ‫ سم‬60 x 60 ‫ قيبس داخهي‬- ‫منظر علوي لفتحة تفتيش‬

800 mm 800 mm

700 mm 700 mm
600 mm 600 mm

50 mm

260 mm
50mm Dim. 55 mm 470 mm
470 mm

800 mm

50mm Dim .
Dim . Dim . 115 mm
115 mm 115 mm

100mm 50 mm
Dim . Dim .
Dim .
115 mm 115 mm
115 mm

50mm 50mm 50 mm

100 mm

31 ‫من‬24
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

800 mm

700 mm
600 mm

470 mm

Dim . Dim .
115 115
mm mm

100mm
Dim . Dim .
115 115
mm mm

50mm
50mm

13 ‫امضلل رقه‬

HH Cover ‫غػب يخيج امخنخٔص‬


 The Fram for the HH cover shall be of ‫ قبئه‬،‫ ٔلُى ٍٔلل امطػب ٔى منخيج امخنخٔص وى اميأا اموتننى‬
galvanized iron, right angled corners, and
dimensions of: 70 x 135 cmm (outside) & 60x125 ‫ شه‬125x61 ُ ،)ٓ‫ شه (خبرت‬135x 71 ‫امزُأب قٔبس‬
cm (inside). .)ٓ‫(ااخن‬
 The frame of the Pulling Box cover shall also be ‫ قبئه‬،‫يخيج امشية وى اميأا اموتننى‬ ‫ ٔلُى ٍٔلل غػب‬
of galvanized iron, with outside dimensions of 70 .)ٓ‫ شه (ااخن‬61x61 ُ ،)ٓ‫ شه (خبرت‬71x 71 ‫امزُأب قٔبس‬
cm x 70 cm, and inside dimensions of 60 cm x 60
cm.
 The cover for the HH & PH shall be 65 cm x 65 ،‫ شه‬65x65 ‫ ٔلُى امطػب منخيج امخنخٔص ُيخيج امشية تقٔبس‬
cm in size, with a thickness of 5 cm. .‫ شه‬5 ٓ‫تشوك يُام‬
 The cover shall be of two types: -: ‫ ٔلُى امطػب وى يُؿٔى‬
1. Medium Duty: to be placed in main roads ‫ ئد ُٔغؾ يٓ امػرق ُٔلُى‬،‫ مألؿوبل اموخُشػج‬.1
& streets, and shall be made of Ductile .‫وظيُؿبً وى اميأا اماالخبٔل‬
‫ ُٔلُى وى اميأا‬،‫ مألؿوبل امخنٔنج ٔرلة يٓ األرظنج‬.2
Iron.
2. Light Duty: To be pla1ced in walkways,
.‫امزٍر‬
and shall be made of Cast Iron.
 The Cover shall weigh 50 – 55 Kg. .‫ لٔنُتراه‬55 – 51 ٓ‫ ٔلُى ُزى امطػب يُام‬

 The covers shall have Prizing Holes for lifting ‫) وى يخيج‬Prizing Slots( ٌ‫يخيبح مريـ‬ ‫ ٔلُى تبمطػب‬
the cover and open the Pulling Box. .‫امخنخٔص ؿيا يخيَب‬
 The cover shall have new STC logo and name in ‫ ٔلُى ؿنّ امطػب ضـبر اتخظبتح امشـُأج امتأا ُأشه‬

31 ‫من‬25
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

both Arabic & English. .‫اتخظبتح امشـُأج تبمـرتٔج ُاإليتنٔزٔج‬

6.06 SERVICE WIRE DUCT LOCATION


POST
‫ عوُد خعريف وُقع يَبيبح أيتُة شنك‬06/6
‫امخدوج‬
 The post is of galvanized steel pipe 5-6 mm in ،‫) شه‬6.5(‫ قػر‬،‫ امـوُا ؿتبرث ؿى أيتُة وى اميأا اموتننى‬
diameter, 80 to70 cm in length. .‫ شه‬71 ‫ُػُل‬
 The upper part is flattened to place an ‫ ُخذتح ؿنٌٔ مُيج‬،)‫ شه‬21 – 15( ّ‫ ٔشػح يٓ امتز األؿن‬
aluminum Plate marker, to write on it “USW”,
ُ‫ أ‬،‫ ٔلخة ؿنَٔب شنك امخاوج‬،‫امخـرٔف اموـائج وى األموُئُه‬
on to engrave “BSW” writing directly on the
."USW ٓ‫ٔلخة ؿنّ األيتُة تػرٔقج امينر "شنك خاوج أرغ‬
post.
.‫ ٔػنّ امـوُا تبمنُى األظنر‬
 The post is painted with yellow colour.
،‫ شه‬31 ‫ ٔذتح امـوُا يٓ األرع تخنػج أشويخٔج ؿنّ ؿوق‬
 The post is fixed at a depth of 30 cm in the
.‫) شه وى شػح األرع‬71( ‫ُٔلُى ؿنّ ارخنبؽ‬
ground using lean concrete mix, and is 50-70 cm
‫ ؿيا امخقب ياُا‬،‫يٓ يَبٔج قيبث شنك امخاوج‬ ‫ ُٔغؾ امـوُا‬
above the ground level.
‫ ُٔشية أيتُة شنك امخاوج إمّ ااخل امـوُا تبرخنبؽ‬،‫امونلٔج‬
 The marker post is placed at the end of BSW
‫ تـا شا يَبٔج امقيبث تئيلبه مغوبى ؿاه ايشاااٍب‬،‫ شه‬31
pipe which is raised 30 cm inside the post after
.‫تبمضُائة‬
closing its end firmly to prevent dirt entry and
blockage
 Ducts for USWs are extended 30 cm above ،‫ شه وى شػح األرع‬31 ‫ خوا أػراف قيُاح أشلك امخاوج‬
ground, and identification marks are fixed in ‫ ُخذتٔح ؿلوبح خـرٔنٔج مخيأا‬،‫ُخواا امّ ااخل ؿلوج امخـرٔف‬
these locations to identify ducts’ ends locations ‫ ُذمك تئاخبل يَبٔج امقيبث ااخل أيتُة‬،ً‫وُقؾ اميَبٔبح وشخقتل‬
.)14 ‫امـلوج (أيؼر امضلل رقه‬
in future.The end of the BSW tube pipe is
inserted inside the marker, (See Figure # 14).

31 ‫من‬26
‫‪Network Sector - Design‬‬
‫‪Doc. Number: GL – 621211 – 03 - 06‬‬ ‫رقى انىثُقح‪ :‬أر – ‪31 - 30 -116166‬‬
‫‪Issue #: 3 - Issue Date: April, 2010G‬‬ ‫تارَخ اإلصذار‪ :‬جًادي األول ‪6306‬هـ‬ ‫‪– 0‬‬ ‫رقى اإلصذار‪:‬‬

‫منظر جانبي‬
‫للعمود‬

‫‪ 15‬سم‬
‫‪BSW‬‬
‫سهك خذيح‬
‫يذفىٌ‬

‫‪USW‬‬
‫يسد طرف أنبوب‬
‫الخدمة‬ ‫سلك‬
‫عدم‬ ‫لضمان‬
‫انسداده بالشوائب‬
‫(‪ )70‬ســــــم‬

‫فيما بعد‪.‬‬

‫سطح األرض‬

‫يثبت العمود بصبة‬


‫‪ 02‬ســم‬

‫أسمنتية سمك ‪ 02‬سم‬

‫تثبت قناة سلك الخدمة داخل‬


‫العمود بارتفاع النهاية ‪ 02‬سم‬
‫عن سطح األرض‪.‬‬

‫امضلل رقه ‪14‬‬

‫‪27‬من ‪31‬‬
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

‫ حشبة امخلنفج امخقديريج‬00/7 7.00 CALCULATION OF ESTIMATED


COST
‫ ٔخه يشبة خلننج أؿوبل امرتػ لوب ٍُ وختؾ يٓ يشبة‬  Calculation of the cost of connecting network

.‫امضتلج األُمٔج‬ works is done as used for the primary network.

‫ اموػُر‬/‫ يٓ يبمج خقبشه أؿوبل امرتػ تٔى امضرلج ُاموبمك‬  If the connection network is divided between STC

‫امضرلج‬ ‫يظٔة‬ ‫وى‬ ‫املُاتل‬ ‫خلبمٔف‬ ‫خلُى‬ ً‫اائوب‬ and the Developer, the cost of the cables is always

‫ُإذا مه خلخول يشتج اتخظبتح وى امخلبمٔف يئيَب خخيول‬ born by STC. If the ratio of the cost to be born by

‫تزئٔبح وى األؿوبل اموائج مئى الخوبل اميشتج اموقررث‬


STC is not reached, STC has to take part of the
civil works till ratio is attained and the Developer
.‫مَب ُٔخيول اموػُر تقٔج األؿوبل‬
shall born the rest of the works.

‫يخحونَب اموظُر ُييفذٍب وع‬


‫خظُير اموخظظ‬
MH MH MH MH
3 4 5 6

‫نقط بدء الربط‬


‫المخطط‬

MH MH MH MH MH MH
MH
1 2 3 4 5 6

‫خخحونَب االخصبالح املُاتل ُجزء وى االعوبل امودييج‬


MH MH ‫توب يخيبشة وع يشتخَب‬
1 2

16 ‫امضلل رقه‬

‫ خه يشبة أؿوبل امضتلج امذبئُج تبشخخااه تيُا امضتلج‬  Calculation of secondary network is done by using

31 ‫من‬28
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

ّ‫امخبظج تبموخػػبح امتأاث ُٔخه خقشٔه ويبػق املتٔيج إم‬ plant units for new areas, and cabinet areas are

:‫األيُاؽ امخبمٔج‬ divided into to the followimg:


1- Residential 400 – 700 sgaure meters.
‫ وخر ورتؾ‬711 – 411 ٓ‫شلي‬ .1
2- Residentail 700 – 1000 sg. Meters.
‫ وخر ورتؾ‬1111 – 711 ٓ‫شلي‬ .2
3- Buildings (3-4 storeys).
)‫ ااُار‬4 - 3(‫ؿوبئر‬ .3
4- Residential & Commercial (shops+2 storey
)‫ شليٓ اُرٔى‬+ ‫شليٓ ختبرْ (ويلح‬ .4
residential) .
)‫ختبرْ (ولبخة ُوـبرع‬ .5
5- Commercial (offices & shops).
‫وشخُاؿبح‬ .6
6- Warehouses.
‫وظبيؾ‬ .7
7- Factories.

‫ اموُاد ُُحداح امضتلج‬00/8 8.00 MATERIALS & PLANT UNITS


 Following is shown plant units used for installation
‫ يُغح ئوب ٔنٓ ُيااح امضتلج اموشخخاوج يٓ خوأا‬
of secondary network cable in ducts. Refer to the
‫ ُٔخه امرتُؽ أليااد‬،‫امضتلج امذبئُج ااخل قيُاح‬
latest issues of Plant Unit Lists at the time of
‫إظااراح قبئوج ُيااح امضتلج منخألا وى األشـبر‬ planning the secondary network to obtain the right
.‫امظئيج امشبئاث ؿيا خينٔذ امضتلج امذبئُج‬ prices.

‫ح‬ ‫ امخفبصيــل‬/ ‫امُصـف‬ ‫امشـعر‬


‫رقه امُحدث‬
S# Plant Unit # Description / Details Price SR

1 2111
.‫ شه‬41 ‫ ؿرع‬،‫ شه‬51 ‫ غػب‬،‫ينرٔج لُاتل‬ ‫ رٔبل منوخر‬14
Trench, 50 cm & Backfill
.‫ شه‬41 ‫ ؿرع‬،‫ شه‬61 ‫ غػب‬،‫ينرٔج لُاتل‬
2 2113 ‫ رٔبل منوخر‬17
Trench, 60 cm & Backfill
.‫ شه‬41 ‫ ؿرع‬،‫ شه‬111 ‫ غػب‬،‫ينرٔج لُاتل‬
3 2114 ‫ رٔبل منوخر‬21
Trench, 100 cm
.‫ شه‬41 ‫ ؿرع‬،‫ شه‬121 ‫ غػب‬،‫ينرٔج لُاتل أمٔبف‬
4 2115 ‫ رٔبل منوخر‬27
Trench, 120 cm
‫خُرٔا ُخرلٔة قيبث تٓ يٓ شٓ ُاياث يٓ ينرٔج ونخُيج‬
5 2151 ‫ رٔبل منوخر‬8
Supply & install 110 mm PVC duct in open trench
‫ وه يٓ ينرٔج ونخُيج‬32 ‫خُرٔا ُخرلٔة قيبث تُمٔذنٔى ُاياث‬
6 2157 ‫ رٔبل منوخر‬4
Supply & install 32 mm PE duct in open trench
‫ ونه يٓ ينرٔج ونخُيج‬51 ‫خُراْ ُخرلٔة قيبث تُمٔذنٔى ُاياث‬
7 2154 ‫ رٔبل منوخر‬5
Supply & install 50 mm PE duct in open trench
.‫خُرٔا ُخرلٔة ظياُق شية (يخيج خنخٔص) تطػب ُايا‬
8 1418 )‫ رٔبل (ؿاا‬1511
Supply & Install 1-cover Pulling Box
.‫خُرٔا ُخرلٔة ظياُق شية (يخيج خنخٔص) تطػب ٔى‬
9 1419 )‫ رٔبل (ؿاا‬2511
Supply & Install 2-cover Pulling Box (Handhole)
‫شية شنك امخاوج يٓ قيُاح يبرغج‬
11 2319 ‫ رٔبل منوخر‬3
Install BSW in empty duct

31 ‫من‬29
‫‪Network Sector - Design‬‬
‫‪Doc. Number: GL – 621211 – 03 - 06‬‬ ‫رقى انىثُقح‪ :‬أر – ‪31 - 30 -116166‬‬
‫‪Issue #: 3 - Issue Date: April, 2010G‬‬ ‫تارَخ اإلصذار‪ :‬جًادي األول ‪6306‬هـ‬ ‫‪– 0‬‬ ‫رقى اإلصذار‪:‬‬

‫شية شنك امخاوج يٓ قيُاح وضطُمج‬


‫‪11‬‬ ‫‪2339‬‬ ‫‪ 4‬رٔبل منوخر‬
‫‪Install BSW in occupied duct‬‬
‫خُرٔا ُخرلٔة امقبؿاث امخرشبئج ميقػج امخُزٔؾ‬
‫‪12‬‬ ‫‪1911‬‬ ‫‪ 251‬رٔبل (ؿاا)‬
‫‪Supply & Install DP Concrete Base‬‬
‫خُرٔا ُخرلٔة ؿبوُا خـرٔف شنك امخاوج‬ ‫‪ 81‬رٔبل (ؿاا)‬
‫‪13‬‬ ‫‪2235‬‬
‫‪Supply & Install BSW Marker Post‬‬

‫‪30‬من ‪31‬‬
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – ‫ أر‬:‫رقى انىثُقح‬
Issue #: 3 - Issue Date: April, 2010G ‫هـ‬6306 ‫ جًادي األول‬:‫تارَخ اإلصذار‬ – 0 :‫رقى اإلصذار‬

‫ األشبمية امورختظج‬00/9 9.00 ASSOCIATED PRACTICES


‫ "إجزاءاخ وشزوط يشاركح أصحاب‬:161/603-3306   0031-170.125: “Procedures & Conditions For
‫انًخططاخ فٍ تُفُذ انشثكح انخارجُح فٍ انًخططاخ انسكاَُح‬ Participation of Land Owners In OSP
."‫انجذَذج‬
Installations in New Unbuilt Areas”.
‫ إرضبداح خصويه امحفريبح امصغيرث‬:02-02-621211 – ‫ار‬ Gl-621211-02-02: Small Trenches Design
Guidelines.
.‫ إرضبداح خصويه امقيُاح‬:05-03-621211 – ‫ار‬ GL-6212111-03-05: Ducts Design Guidelines.

31 ‫من‬31