Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
31 من2
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
اموحخــُيــبح
CONTENTS
Error! Bookmark
................................
not defined. ...... ................................ انغرض00/1
Error! Bookmark
................................
not defined.. ................................ مجبل انعمم00/2
................................
...............4 ................................................................ انمسئىنيبت00/3
.................
................................
5 ................................................................ انتعريفبت00/4
................................
..........5 ................................................................ تفبصيم انعمم00/5
............................
................................................................
11 انمىاصفبت وانقيبسبت00/6
...........................
................................
26 ................................ حسبة انتكهفة انتقذيرية00/7
............................
................................................................
27 انمىاد ووحذات انشجكة00/8
................................
28 ................................................................
.... األسبنيت انمرتجطة33/9
31 من3
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
31 من4
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
A concrete base placed behind the HH قبؿاث خرشبئج خُغؾ خنف يخيج امشاية مخرلٔاة
DP Base
for installation of DP .يقػج امخُزٔؾ
31 من5
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
31 من6
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 رقى انىثُقح :أر – 31 - 30 -116166
Issue #: 3 - Issue Date: April, 2010G تارَخ اإلصذار :جًادي األول 6306هـ – 0 رقى اإلصذار:
اموخظظ
اموقشه
7من 31
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
Spare ducts should be available to accommodate ٔتة خُير قيُاح إيخٔبػٔج مخوأا لُاتل امضتلج
cables for any unforeseen service demand in ٓ ُي،امذبئُج موقبتنج أْ ػنتبح خاوج يٓ اموشخقتل
future. At end of distribution where smaller يَبٔج وشبر امخُزٔؾ ٔلخنٓ تقيبث رئٔشٔج ُاياث قػر
.ونه ئد ٔخه إشخخااه لُاتل ذاح أيتبه ظطٔرث111
cables are terminated, one 110 mm main duct
will be enough.
110 mm diameter PVC duct Poke outs shall be ٔخه ؿول إوخااااح ػرئج ميَبٔبح امقيُاح امرئٔشٔج
placed in main duct ends for future DPs and ونه) موقبتنج اإليخٔبتبح اموشخقتنٔج إليضب111 (قػر
service wires installations, in the direction of .ٓيقبػ امخُزٔؾ ُأشلك امخاوج يٓ اختبً اميوُ امـوراي
development growth.
Two or four ducts 110 mm in diameter are ونه يشة اميبتج111 ٔخه ُغؾ قيبخٔى أُ أرتـج قػر
placed from the HH in front of the cabinet to وى يخيج امخنخٔص اوبه املتٔيج إمّ يخيبح امشية أوبه
each HH in front of the DPS, and between these تطرع ُذمك،يقبػ امخُزٔؾ ُتٔى يخيبح امشية
.ُْشية املٔتل امذبي
HHs for pulling secondary cables.
PVC and Corrugated Polyethylene ducts (PEC) ُٔولىPVC ونه وى يُؽ111 خشخخاه امقيُاح قػر
can be used for 110 mm in the secondary ) إذا لبيح وخُيرثPEC( إشخخااه امقيُاح امووُتج
network if available. Two ducts shall be installed, مخوأا امضتلج امذبئُج تاتً ؿى امقيُاح امتلشخٔلٔج
ونه111 ئد ٔخه خوأا قيبث رئٔشٔج قػر، )PVC(
one empty duct for the main copper cable and
the other equipped with 3 sub ducts to meet
ُاألخرِ وتَزث تذلد،ٓيبرغج مشية املٔتل امييبش
future requirements for pulling of copper or
قيُاح يرؿٔج ألْ خُشـبح وشخقتنٔج منلُاتل امييبشٔج
fibre cables .
.أُ خوأااح أمٔبف تظرٔج
The secondary network ducts are numerated as ٓ ٔخه خرقٔه قيُاح امضتلج امذبئُج لوب ٍُ وـوُل تٌ ي
in the primary network. .امضتلج اتتخاائٔج
50 mm Ducts ونه51 قيُاح
Small or mini ducts 50 mm in diameter are ونه وى يُؽ امتُمٓ أذٔنٔى51 خوا قيُاح ظطٔرث
placed from HHs in front of DPs to each ُّذمك مورُيخَب ُشَُمج خوأاٍب وى يخيبح امشية ام
subscriber location for pulling USWs. ّ ُخشخخاه مخوأا أشلك امخاوج ام،وُقؾ لل وضخرك
.ؿنتج اموضخرك
The ducts shall have only one bend if the route is ت خزٔا ؿاا امذئبح (امننبح) تبمقيبث ؿى ُاياث اذا لبى
longer than 150m, and tow bends if the route is ُاذيخٔى اذا لبى ػُل،ه151 ػُل اموشبر الذر وى
less than 150m, and the bend shall be 4 meteres وخر4 ه ُخلُى ذئج امننج تقػر151 اموشبر اقل وى
.ؿنّ األقل
in diameter minimum.
BSW location shall be in boundary line and each ٔلُى وُقؾ قيبً شنك امخاوج منوضخرك ؿيا امخقب ياُا
subscriber shall have a separate BSW duct laid امونلٔج ُٔلُى ملل وضخرك قيبث خبظج مشنك امخاوج
from the HH/ pulling box to the boundary line, امشية امّ يَبٔج امقػـج وبؿاا/خوا وى يخيج امخنخٔص
اموضخرلٔى ؿيا يقػج امخُزٔؾ ئخه خوأا قيبخٔى مشنك
except subscribers at the DP, where 2 BSW ducts
shall be placed from DP base to boundary line.
.امخاوج امّ ياُا امونلٔج تٔيَوب
31 من8
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
The mini ducts are arranged and numbered from ونه تا اً وى51 ٔخه خرخٔة ُخرقٔه قيُاح شنك امخاوج
left to right & from top to buttom; and the ُوى األؿنّ إمّ األشنل ُٔلُى،امٔشبر إمٓ امٔؤى
number of the service wires shall be the same as .رقه شنك امخاوج ينس رقه امقيبث اموواا تَب
the duct.
The ducts shall be assigned to subscribers facing ٔخه خخظٔط امقيُاح موُاقؾ اموضخرلٔى تا اً وى
the DP & starting from far left and serially to the ّاقظّ امٔشبر تبختبً يقػج امخُزٔؾ خشنشنٔبً امّ اقظ
right side as shown in Figure (2). .)2( يشة وب ٍُ وُغح تبمضلل رقه،امٔؤى
ٍُيىاقغ انًشتزك
1 2 3 4 5 6 7 8 9 10 11 12
فتحة السحب
Pulling Hole
31 من9
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
5.03 CABINETS
املتبئى03/5
The electronic cabient base shall not be
ت ٔخه خرلٔة قبؿاث املتٔيج اتملخرُئج إت ؿيا خاوج
installed till the area is to be served because
اموخػػ ُذمك مـاه وـريج يُؿٔج ُيته املتٔيج اموشخخاه
the type and size of the cabent to be used in
future is not know. .وشخقتل
A HH is to be installed opposite the proposed ٔخه خرلٔة يخيج امخنخٔص وقبتل امولبى موقخرح مقبؿاث
location for electronic cabinet, and ducts one املتٔيج اتملخرُئج ُخوا قيُاح تػُل وخر يٓ إختبً قبؿاث
ne meter long shall be laid towards the base of .املتٔيج اموقخريج
the proposed cabinet.
When the number of electronic cabinets is
ؿيا زٔباث ؿاا املتبئى امأللخرُئج ؿى لتٔيخٔى ٔخه
more than one, the design should consuder
امخظؤه ؿنّ اشبس ُتُا غريج اخظبتح خيُْ املتبئى
use of a communication room to
accommodate the electronic cabinets. .اتملخرُئج
The cabinets to be used are 1200 pairs, specs. خٓ اس: زُر وُاظنج رقه1211 خشخخاه املتبئى شـج
TS-3002, and 2400 pairs, specs. TS-3004, ٓ خ:) زُر وُاظنج رقه2411( ُاملتبئى 3112
only. . يقػ3114اس
31 من10
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
The HH infront of the cabinet base and the خينذ يخيج امخنخٔص اموقبتنج مقبؿاث املتٔيج امييبشٔج
protection posts shall be installed during civel ُأؿواث يوبٔج املتٔيج خلل خينٔذ إيضب اح األؿوبل
works execution. .اموائج
The Handholes are numbered sericlly from ٔخه خرقٔه يخيبح امخنخٔص خشنشنٔب وى املتٔيج تبمظٔطج
the cabinet as follows (## “HH” -XXX .)" "رقه املتٔيجxxx – " "رقه امنخيج##( :امخبمٔج
“Cabinet”)
حذود انًهكُح
مهم100
31 من12
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
In commercial areas one pulling box is placed to يٓ امويبػق امختبرٔج خُغؾ يخيج شية ُاياث مخاوج
serve 2 locations (2 DPs), DP base is cancelled and 111 ًلل وُقـٔى ُخنطّ قبؿاث يقػٌ امخُزٔؾ ُخوا قيب
one meter duct with duct connector is laid to the ونه تػُل وخر وزُاث توُظل امقيُاح ُغػب شا وى
يخيج امشية تختبً ياُا امونلٔج ُذمك مطرع وا قيبث
subscriber boundary so that the subscriber shall
join a 110mm duct during bulduing construction
. ونه وى قتل اموضخرك ؿيا تا امـوراى111
and the is blocked.
Two cover PH are used for cabl jointing and خشخخاه يخيبح امشية تطػب ٔى ٔـول ئَب ُظنج لُاتل
reducing cable size to smaller sizes so that the مٔخه شية ايتبه ظطٔرث وى املُاتل مخطذٔج يقػج
cable can be bent and pulled to the DP. The 2- امخُزٔؾ يٓ ينس يخيج امشية ُيخيبح امشية امخبمٔج
تطػب ُايا مشَُمج ذيٓ املٔتل اموطذْ ميقػج امخُزٔؾ
cover PH feeds the DP at the loction and the
following two DPs, as shown in Figure 4.
)4( يشة وبٍُ وُغح تبمضلل رقه
It is preferred that PH should be in curb and shell ٔنغل ُغؾ يخيج امشية يٓ امرظٔف ُٔتة أى خلُى
be in level with the curb. Concrete lean shell be ورخنـج تبرخنبؽ امرظٔف ُٔخه ُغؾ خرشبيج يُل
placed arround the PH for protection when the ٓيخيبح امشية ميوبٔخَب وشخقتل وى امخلشٔر ُامخنف ي
ُخلُى،يبمج ؿاه خينٔذ امرظٔف إذيب خػُٔر اموخػػ
curb is built during execution of civil works.
When the PH is out the curb, it should be in level
.وؾ اإلشننح يٓ يبمج لُيَب خبرر امرظٔف
with the asphalt.
A pre-cast DP base shall be constructed with same ٔخه إؿااا قبؿاث يقػج امخُزٔؾ وشتقج امظة توقٔبس قبؿاث
size of current DP. The bases of DPs shall be ُٔتة خرلٔة قُاؿا يقػبح،يقػج امخُزٔؾ اميبمٔج
installed during construction of civil works, then .امخُزٔؾ خلل خينٔذ إيضب اح األؿوبل اموائج
the cables and BSWs shall be pulled before
installing and fixing the DPS.
كىاتم ثاَىَح
تأحجاو اصغز
DP DP DP
وصهح
كىاتم
ٌكُثم ثاَى
تحجى كثُز
اموُاصفبح ُامقيبشبح00/6
6.00 SPECIFICATIONS &
MEASUREMENTS
31 من13
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
Spacers are used between the 110 mm ducts every ونه111 ٔشخخاه ويؼه امقيُاح لل وخرٔى تٔى امقيُاح
2 meters to organice the ducts in trench. Two .ُذمك منويبيؼج ؿنّ اموشبيبح تٔى امقيُاح يٓ امينرٔج
spacers are used with 4 ducts construction, one ٔشخخاه ويؼؤى يٓ يبمج ُتُا ارتؾ قيُاح اياٍوب تٔى
ُُٔغؾ امويؼه ااخل خنػج،امقيُاح ُاتخر اشنل امقيُاح
below & the other between the ducts. If the ground
is watery, the spcaers are embeded in cement mix.
.اشويخٔج اذا لبيح اترع رخُث
ِConcrete is used in road crosses and in special خشخخاه امخرشبيج ؿيا خقبػـبح امػرق ُاميبتح امخبظج
cases depending on the desiner’s judgement taking ُامخٓ خـخوا ؿنّ خقأر اموظوه وؾ وراؿبث ؿاه زٔباث
in consideration not to increase the cost .امخلننج تضلل وخل
tremendously.
Ground Level
400 mm 400 mm
600 mm
75 mm
75 mm
In locations where trench for primary and ٓيٓ اموُاقؾ امخٓ ٔيخبر ئَب ينرٔج مقيُاح املٔتل اإلتخاائ
secondary cables are required at the same time ّ)وـبً يٓ ينرٔج ُاياث ؿن5ُغـَوب
( ضلل رقه
ُاملٔتل امذبئُج ٔخه
they should be placed in a common trench at the . أْ وخر،ٓؿوق املٔتل اإلتخاائ
depth of primary cable.
31 من14
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
The ducts are fixed firmly & sealed tightly to the ٔخه خذتٔح امقيُاح ؿنّ يبئػ يخيبح امشية تظُرث ويلوج
HH /PH walls using suitable sealing material. .تئشخخااه وُاا خذتٔح ُشا ويبشتج
Pulling ropes/wires (1 in the drawing Figure 6) ، ٔخه خوأا يتبل شية ااخل تؤؾ امقيُاح امخٓ خه ُغـَب
are palced in all installed ducts and the ducts ٔتة،ُٔخه شا أػرايَب تئيلبه تبشخخااه شاااث ويلوج
are closed firmly with plugs (2 in thedrawing) وى1 ُٓغؾ شنك امشية ااخل تؤؾ امقيُاح (لوب ي
in both ends to fix the ropes and protect and تبمرشه) وى لل2( ُوى ذه ُغؾ شاااث،)6 امرشه تبمضلل
duct from being blocked, as shown in pictures امتَخٔى ؿنّ شنك امشية مخذتٔخٌ ُيوبٔج امقيبث وى اتيشااا
in Figure (6). .)6( يشة وبٍُ وُغح تبمظُر يٓ امضلل رقه
The trench for cable ducts & USWs are placed ّ ٔلُى تـا ينرٔج قيُاح املُاتل ُقيُاح أشلك امخاوج ؿن
one metre from property line & at a depth of 60 ُخُغؾ، شه61 تـا وخر وى ياُا امونلٔج ُؿنّ ؿوق
cm. The USW & cable ducts shall be placed in قيُاح املُاتل امذبئُج ُ قيُاح أشلك امخاوج يٓ ينرٔج
ُيٓ يبمج إشخخااه قيُاح شنك يقػ خُغؾ يٓ ؿوق.ُاياث
one trench. In case of using USW only, the trench
depth will be 50 cm to reduce the costs.
. شه51
Two ducts 110mm in diammeter & 60 cm long, ونه وى لل يخيج شية إمّ وُقؾ111 ٔخه خوأا قيبخٔى قػر
are placed from each Pulling Box to the DP ُخشخخاه إياِ امقيبخٔى مشية،ّيقػج امخُزٔؾ أوبه اموتي
location, one duct is used for pulling cable and .املٔتل امذبيُْ ُاألخرِ مشية أشلك امخاوج
the other for pulling BSWs.
When placing the small ducts for USWs, they are ، ؿيا شية قيُاح اشلك امخاوج ٔخه رتػَب تـغَب تتـع
tied together before placing in trench so that they ،قتل ُغـَب يٓ امينرٔج يخّ ت خيذيٓ تظُرث خؤاْ مطنقَب
will not bend in a way that they are blocked. .ُٔخه خذتٔح يتبل شية األشلك تلل قيبث وؾ غػب امقيبث
Pulling ropes & wires shall be fixed firmly by the
cover at the duct end.
31 من15
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
The concrete base is ploaced adjacet to the خُغؾ قبؿاث يقػج امخُزٔؾ امخراشبئج ولظقج منخيج
pulliung hole, or at a distance from it & a ونه111 أُ ؿنّ وشبيج ويَب ُخوا قيُاح قػر،امخنخٔص
connecting pipes are installed between the two. تٔيَوب
The DP base shall be 10-20 cm from the property شه وى ياُا21-11 خلُى قبؿاث يقػج امخُزٔؾ ؿنّ تـا
line. .امونلٔج
In case the HH is placed in the curb and the base
يٓ يبمج ُغؾ يخيج امخنخٔص ؿنّ امرظٔف خرلة قبؿاث
is installed adjacent to PH placed with the curb
يقػج امخُزٔؾ مظق امنخيج تئد ٔلُيب يٓ ارخنبؽ شػح
level as shown in Figure (7).
.)7( امرظٔف لوب وُغح تبمضلل رقه
In case the HH is outside the curb it is placed in ٓ خُغؾ ي، يٓ يبمج ُغؾ يخيج امخنخٔص خبرر امرظٔف
the trench and 110 mm ducts are laid from the Ph ّ ونه وى امنخيج إم111 ُخُظل قيُاح قػر،امينرٔج
to the DP base as shown in drawing in Figure (8).
.)8( قبؿاث يقػج امخُزٔؾ يشة وبٍُ وُغح تبمضلل رقه
31 من16
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 رقى انىثُقح :أر – 31 - 30 -116166
Issue #: 3 - Issue Date: April, 2010G تارَخ اإلصذار :جًادي األول 6306هـ – 0 رقى اإلصذار:
نقطة وزيع قا ة
Pillar DP
دود
ال ت ك
سط ا رض
(ال صيف)
077مل
قاعدة نقطة التوزيع
فتحة
الت تي
022ملم
نقطة و يع قا ة
Pillar DP
د
ت
سط
( سل )
700مل
قاعد نقطة لتو يع
لت تي فتحة
17من 31
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
The base of the pillar DP shall be of lean concrete. . خلُى قبؿاث يقػج امخُزٔؾ وى امخرشبيج امـبأج
The dimensions of the base, as shown in drawings خلُى قٔبشبح امقبؿاث لوب وُغيج تبمرشُوبح يٓ امضلل
in Figure # (9) & (10), shall be: :ٓ ؿنّ امييُ امخبم،)11( ) ُرقه9( رقه
1. Outside Dimensions: 35cmx30cm x 70 cm
) شه (اترخنبؽ75x31x35 : امقٔبشبح امخبرتٔج.1
) شه (اترخنبؽ71x21x25 : امقٔبشبح امااخنٔج.2
(Height).
2. Inside Dimensions: 25 cm x 20 cm x 70 cm
. ونه تَج يخيج امخنخٔص115 خُتا يخيخبى قػر
(Height)
. خُتا وشبؤر أشنل امقبؿاث مخذتٔح يقػج امخُزٔؾ
There are 2 openings 115 mm in diameter in the
side towards the DP.
Screw are placed at the bottom of the base to fix the DP.
A concrete slap is to be placed on DP base so that it ُٔغؾ غػب أشويخٓ مقبؿاث يقػج امخُزٔؾ ملٓ ت ٔشا
will not be blocked. .ختُٔف امقبؿاث
145 mm
200 250 mm
750 mm
350 mm
250 mm
300
750 mm mm
350 mm
115
)
(
250 mm
45
350 mm mm
65
mm 94 mm
200 mm
95
125 mm
mm
78 mm
20
mm
30
50
mm mm
20
mm
31 من18
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
20 mm dia. Bolts to fix the cabinet to the concrete ونه مخرلٔة املتٔيج ؿنّ امقبؿاث21 أرتـج وشبؤر قػر
base. .امخراشبئج
The bolts are 100 mm long, 70 mm embeded in 31ُ ، ونه ااخل امخرشبيج71 ، ونه111 اموشبؤر تػُل
concrete & 30 mm above the surface. .ونه تبرزث
31 من19
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
300
1300 1300
200 200
250 250
754
618
68 68
73
754
31 من20
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
31 من21
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 رقى انىثُقح :أر – 31 - 30 -116166
Issue #: 3 - Issue Date: April, 2010G تارَخ اإلصذار :جًادي األول 6306هـ – 0 رقى اإلصذار:
مهم
ب
قساو فاصم تٍُ انغطاءٍَ تطىل 11سى وػزض 1سى
انجذار
6113يهى
انخرسبني
6013يهى
فتحة انسحت
6113يهى
أو انتفتيش
غطاء
غطاء
فتحة جهة انكجينة
60سم 20 xسم ارتفاع 6333يهى
51
سم
61سى
فتحة تصريف انميبه
20 x 20سم ،ثعمق 10سم
22من 31
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 رقى انىثُقح :أر – 31 - 30 -116166
Issue #: 3 - Issue Date: April, 2010G تارَخ اإلصذار :جًادي األول 6306هـ – 0 رقى اإلصذار:
يُظز انحائط انذاخهٍ نفتحح انتفتُش جهح انكثُُح ،وته فتحح 13سى 13 xسى نسحة انكىاتم إنً انكثُُح
50 mm
50 mm
50 mm
800 mm
Dim115 . Dim115 .
150 mm Dim115 . Dim115 . Dim115 . Dim115 . 150 mm mm mm
mm mm mm mm 1000 mm
50 mm
50 mm
ة ر
ويعر امحبئظ امداخني اموعبلس موُقع ا م ل ت ي يج ويعر جبيتي )يويى ُيشبر (
املتييج ُتٌ 8فخحبح قظر 115ونه يُط 4فخحبح قظر 115ونه مُطع
)احخيبظيج ( مُطع قيُاح قظر 110ونه قيُاح قظر 110ونه مشحة املُاتل
عيد امحبجج
انشكم رقى 12
23من 31
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
800 mm
800 mm
800 mm 800 mm
700 mm 700 mm
600 mm 600 mm
50 mm
260 mm
50mm Dim. 55 mm 470 mm
470 mm
800 mm
50mm Dim .
Dim . Dim . 115 mm
115 mm 115 mm
100mm 50 mm
Dim . Dim .
Dim .
115 mm 115 mm
115 mm
50mm 50mm 50 mm
100 mm
31 من24
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
800 mm
700 mm
600 mm
470 mm
Dim . Dim .
115 115
mm mm
100mm
Dim . Dim .
115 115
mm mm
50mm
50mm
13 امضلل رقه
The covers shall have Prizing Holes for lifting ) وى يخيجPrizing Slots( ٌيخيبح مريـ ٔلُى تبمطػب
the cover and open the Pulling Box. .امخنخٔص ؿيا يخيَب
The cover shall have new STC logo and name in ٔلُى ؿنّ امطػب ضـبر اتخظبتح امشـُأج امتأا ُأشه
31 من25
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
31 من26
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 رقى انىثُقح :أر – 31 - 30 -116166
Issue #: 3 - Issue Date: April, 2010G تارَخ اإلصذار :جًادي األول 6306هـ – 0 رقى اإلصذار:
منظر جانبي
للعمود
15سم
BSW
سهك خذيح
يذفىٌ
USW
يسد طرف أنبوب
الخدمة سلك
عدم لضمان
انسداده بالشوائب
( )70ســــــم
فيما بعد.
سطح األرض
27من 31
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
اموػُر/ يٓ يبمج خقبشه أؿوبل امرتػ تٔى امضرلج ُاموبمك If the connection network is divided between STC
امضرلج يظٔة وى املُاتل خلبمٔف خلُى ًاائوب and the Developer, the cost of the cables is always
ُإذا مه خلخول يشتج اتخظبتح وى امخلبمٔف يئيَب خخيول born by STC. If the ratio of the cost to be born by
MH MH MH MH MH MH
MH
1 2 3 4 5 6
16 امضلل رقه
خه يشبة أؿوبل امضتلج امذبئُج تبشخخااه تيُا امضتلج Calculation of secondary network is done by using
31 من28
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
ّامخبظج تبموخػػبح امتأاث ُٔخه خقشٔه ويبػق املتٔيج إم plant units for new areas, and cabinet areas are
1 2111
. شه41 ؿرع، شه51 غػب،ينرٔج لُاتل رٔبل منوخر14
Trench, 50 cm & Backfill
. شه41 ؿرع، شه61 غػب،ينرٔج لُاتل
2 2113 رٔبل منوخر17
Trench, 60 cm & Backfill
. شه41 ؿرع، شه111 غػب،ينرٔج لُاتل
3 2114 رٔبل منوخر21
Trench, 100 cm
. شه41 ؿرع، شه121 غػب،ينرٔج لُاتل أمٔبف
4 2115 رٔبل منوخر27
Trench, 120 cm
خُرٔا ُخرلٔة قيبث تٓ يٓ شٓ ُاياث يٓ ينرٔج ونخُيج
5 2151 رٔبل منوخر8
Supply & install 110 mm PVC duct in open trench
وه يٓ ينرٔج ونخُيج32 خُرٔا ُخرلٔة قيبث تُمٔذنٔى ُاياث
6 2157 رٔبل منوخر4
Supply & install 32 mm PE duct in open trench
ونه يٓ ينرٔج ونخُيج51 خُراْ ُخرلٔة قيبث تُمٔذنٔى ُاياث
7 2154 رٔبل منوخر5
Supply & install 50 mm PE duct in open trench
.خُرٔا ُخرلٔة ظياُق شية (يخيج خنخٔص) تطػب ُايا
8 1418 ) رٔبل (ؿاا1511
Supply & Install 1-cover Pulling Box
.خُرٔا ُخرلٔة ظياُق شية (يخيج خنخٔص) تطػب ٔى
9 1419 ) رٔبل (ؿاا2511
Supply & Install 2-cover Pulling Box (Handhole)
شية شنك امخاوج يٓ قيُاح يبرغج
11 2319 رٔبل منوخر3
Install BSW in empty duct
31 من29
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 رقى انىثُقح :أر – 31 - 30 -116166
Issue #: 3 - Issue Date: April, 2010G تارَخ اإلصذار :جًادي األول 6306هـ – 0 رقى اإلصذار:
30من 31
Network Sector - Design
Doc. Number: GL – 621211 – 03 - 06 31 - 30 -116166 – أر:رقى انىثُقح
Issue #: 3 - Issue Date: April, 2010G هـ6306 جًادي األول:تارَخ اإلصذار – 0 :رقى اإلصذار
31 من31