Agenda
• 模块化的定义和操作
• 澳洲设计准则及规范
• 合格供应商的评定
• 数据包的管理
• 作
QA和QC工作
• 降低2000单元30%的费用
02/2012
5
Modularization
odu a a o
02/2012
6
02/2012
7
Modularization Planning
• Understand the linkage between:
• Engineering
• Select module yard
• Procurement, Material delivery
• Module fabrication
• Transport
• Module Installation
02/2012
8
• Hook-up
oo up access for
o ccranage,
a age, scaffolding
sca o d g
etc
02/2012
9
• Land transport
• Sea transport
• Lifting study
study, where applicable
02/2012
10
• Pre-qualify
q y fabrication yyards
• Assessment areas
Safety
Facility
Engineering Capability
Construction Capability
Contractual
Financial
ZPMC
Changxin Yard 02/2012
11
Assembly of
beams & girders Installation of
to make a panel vertical columns
and bracing
Installation of
equipment, piping,
E&I then next
After painting, erect upper floor panel
panel on top of the
saddles
Panel byy
panel to the
top floor
02/2012
12
• Mechanical – Installation,
Installation alignment and pre-commission
pre commission
02/2012
13
Punch List
02/2012
14
P O Testing
Pre-Op T ti
Module Fabrication
02/2012
15
02/2012
16
02/2012
17
Electrical Module
Equipment Module
02/2012
18
Final New
Location Caledonia
EPCM HTJV (Hatch
Sep. 4, 2009
Company & Technip JV)
No. of
15
Modules
Weight
30s KT
(M-ton)
Site
60 members June 22
22, 2010
T
Team
Scope of Full module
Work fabrication
Module COOEC
Yard Qingdao Yard
During 26 Months
02/2012
19
02/2012
20
Engineering
g ee g Capab
Capability
y
02/2012
Engineering - Qualification 21
02/2012
Engineering - Functions and Capability 22
02/2012
Engineering – Design Codes 23
02/2012
Engineering – Recent Projects 24
02/2012
25
Document Management
g System
y
02/2012
26
02/2012
27
• H t h’ web-based
Hatch’s bb dDDocumentt M
Managementt S
System
t (DMS)
• Third p
party
y application
pp ((Open
p Text)) p
product called Content Server re-
named for use by Hatch
02/2012
28
02/2012
29
02/2012
China Procurement Organization 30
Global China
Procurement/ Procurement
Technical Support Manager
02/2012
31
02/2012
31
China Sourcing Value 32
02/2012
China Sourcing by Project Location 33
02/2012
34
02/2012
China Sourcing Risk Profile 35
Vendor Risks
China
Quality management
25
20
Engineering standards Planning and control
15
10
5
Communication 0 Employees qualification
Finance
02/2012
36
VQS Definition
02/2012
Vendor Prequalification 37
02/2012
Risk Mitigation – Methods and Tools 38
• Vendor pre-qualification
• Pre-inspection alignment meetings
• A
Assess supply
l point
i t capability
bilit & capacity
it
Equipment
• Facilitate knowledge sharing workshops complexity rating
• Review vendor quality plans & procedures calculator
Manhour Calculate
Calculator Level of
Surveillance
02/2012
39
China
C a Sou
Sourcing
c g
Experience
July 2013
02/2012
40
02/2012
China
QSLIC Mg Smelter I
Imported
t d Technology
T h l From
F Western
W t
Construction completed in 2014
42
China
QSLIC CaC2 Furnace W ld largest
World l t CaC2
C C2 Furnaces
F
Construction start August, 2013
02/2012
Modules – Nickel Plant 43
Client: Glencore
02/2012
Modules - LNG 44
Client: Chevron
P j t Gorgon
Project: G Project
P j t
02/2012
Modules – Process Plant 45
Client: Eramet
P j t Maboumine
Project: M b i Project
P j t
02/2012
46
Electricals
Equipment: 10MVA
10MVA, 500KVA and 3.3KVA
3 3KVA
Electrical Transformer, IEC standard
Client: BHPB
02/2012
47
Drum Scrubber
Client: BHPB
02/2012
48
Metallic Piping
Project: N/A
02/2012
49
Pipe Spools
Client: BHPB
02/2012
50
Structural Steel
02/2012
Stackers and Reclaimers 51
02/2012
Shiploader 52
Supplier: ZPMC
02/2012
Material Handling Equipment 53
Anglo
g Sishen South – Stacker / Reclaimer
3000 tph Stacker / Reclaimer
02/2012
54
Ball Mill
02/2012
55
Client: QNI
Q
Project: YEP
Project Country:
Co ntr A Australia
stralia
02/2012
5
56
Steel Pontoons
Equipment: Pontoons,
Pontoons 2000 tonne
Client: QIT
Project: N/A
02/2012
57
Rail Equipment
Client: MMG
02/2012