You are on page 1of 9

BANYU URIP PROJECT

[DOCUMENT TITLE]
BANYU URIP GAS COMMERCIALIZATION
PROJECT

IDBC-BR-XXXXX-XXXX-XXXX [DOC NO]

DBN/SD

Rev Rev Date Description Prepared By Reviewed By Approved By


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
2 of 21

REVISION MODIFICATION LOG

Revision Section Description

HOLD LIST
Revisio
Section Description
n

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
3 of 21

TABLE OF CONTENTS
1. INTRODUCTION...........................................................................................................4
2. PURPOSE AND SCOPE..............................................................................................4
3. REFERENCES..............................................................................................................5
4. DEFINITIONS................................................................................................................5
5. ABBREVIATION...........................................................................................................6
6. UNIT OF MEASUREMENT [IF REQUIRED]...............................................................6
7. PROCESS DESCRIPTION [IF REQUIRED]................................................................7

LIST OF FIGURES
Figure 1 Banyu Urip Field....................................................................................................................... 4
Figure 6-1: Simplified Schematic for BUGC to Pertagas........................................................................7

LIST OF TABLES
Table 1. Unit of Measurement................................................................................................................ 6

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
4 of 21

1. INTRODUCTION
ExxonMobil Cepu Limited (EMCL) (COMPANY) intended to develop Banyu Urip Gas
Commercialization (BUGC) Project.

Figure 1 Banyu Urip Field

The AGRU feed forecast will be increased from 22 MMSCFD to 39 MMSCFD, with
22 MMSCFD utilized for CPF Fuel Gas and and 17 MMSCFD for sales to Pertagas.
This project is intended to construct a sweet gas compressor system and gas
dehydration system to supply gas to meet water content of less than 10 lb/mmscf and
a minimum pressure of 4500 kPag at outlet custody meter. Sour Gas system upgrade
is also required to maintain AGRU treated gas specification.
2. PURPOSE AND SCOPE
This document is intended to provide XXXXXXXX

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
5 of 21

3. REFERENCES

3.1 Code and Standard


No. Document Number Document Title
1.
2.
3.
4.
5.
6.
7.
8.

3.2 Company Supplied Technical Document


No. Document Number Document Title
9.
10.
11.
12.
13.
14.
15.
16.

4. DEFINITIONS
COMPANY is ExxonMobil Cepu Limited.
CONTRACTOR is PT. BERCA ENGINEERING INTERNATIONAL, shall mean
firm or corporation as the executor of the PROJECT.
PROJECT is Banyu Urip Gas Commercialization.
SWEET GAS is treated gas coming out of AGRU to be dehydrated and
compressed.

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
6 of 21

5. ABBREVIATION
AGRU Acid Gas Removal Unit
AGE Acid Gas Enrichment
AMB Ambient
CSO Car Seal Open
CSC Car Seal Close
GOI Government of Indonesia
ID Internal Diameter
KO Knocked Out
LP Low Pressure
NPS Nominal Pipe Size
PSV Pressure Safety Valve
PVRV Pressure Vacuum Relief Valve

6. UNIT OF MEASUREMENT [IF REQUIRED]


The following unit of measurement shall be used in the PROJECT’s engineering
deliverables. Main unit of measurement to be used is Metric Unit following existing
Banyu Urip specification.

Table 1. Unit of Measurement


Application Unit Abbreviations

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
7 of 21

7. PROCESS DESCRIPTION [IF REQUIRED]


Banyu Urip Gas Commercialization (BUGC) facility consists of following:
a. Compressor Facility
Consist of BUGC suction scrubber, BUGC 1st stage compressor, BUGC
Interstage cooler, BUGC interstage scrubber, BUGC 2nd stage compressor,
BUGC discharge cooler and BUGC discharge scrubber.

b. Dehydration unit
Consist of BUGC Glycol Contactor Filter Coalescer, BUGC Glycol Contactor and
BUGC Glycol Scrubber.

c. BUGC Custody Metering

Figure 6-2: Simplified Schematic for BUGC to Pertagas

BUGC facility will receive about 14 MMSCFD sweet gases from existing Banyu Urip
AGRU @ 820 kPag and 46 ºC (normal condition). Gas still consists of 100 ppm H2S
(Max).In order to comply with sales gas specification as specify in Table 7-2, gas
shall be compressed up to 4600 kPag and reduce moisture content (< 10 lb/MMSCF)
via dehydration unit.

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
8 of 21

APPENDIX 1

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title


BANYU URIP PROJECT
TITLE
:
DOCUMENT NUMBER REV REVISION DATE PAGE
9 of 21

APPENDIX 2

IDBC-BR-XXXXX-XXXX-XXX Rev X Document Title

You might also like