SCOPE OF WORK:

UNIT: CU.M
OUTPUT: 20 CU.M PER HOUR
A. LABOR
DESIGNATION: # OF PERSON # HRS HOURLY RATE
1. UNSKILLED LABORER 3 1 76.25
SUBTOTAL A.

B. EQUIPMENT

NAME AND CAPACITY # OF UNITS # OF HOURS HOURLY RATE


1. BACKHOE(0.80CU.M) 1 1 1537
2. DUMP TRUCK(12CU.YD) 2 1 1420
MINOR TOOLS(.10XLABORCOST)
SUBTOTAL B.
DIRECT COST
DIRECT COST PER CUM
AMOUNT
228.75
228.75

AMOUNT
1537
2840
22.875
4399.875
4628.625
231.43125
SCOPE OF WORK:
UNIT: CU.M
OUTPUT: 1.20 CU.M PER HOUR
A. LABOR
DESIGNATION: # OF PERSON # HRS HOURLY RATE
1. UNSKILLED LABORER 3 1 76.25
SUBTOTAL A
B. EQUIPMENT

NAME AND CAPACITY # OF UNITS # OF HOURS HOURLY RATE


1. PLATE COMPACTOR 1 0.5 123
2. MINOR TOOLS (0.10XLABORCOST
SUBTOTAL B
C. MATERIALS

NAME AND SPECIFICATION UNIT QUANTITY UNIT COST


1. GRAVEL WITH 10% ALLOWANCE CU.M 1.32 1979
SUBTOTAL C

DIRECT COST
DIRECT COST PER CU.M
AMOUNT
228.75
228.75

AMOUNT
61.5
22.875
84.375

AMOUNT
2612.28
2612.28

2925.405
2437.8375
SCOPE OF WORK:
UNIT: CU.M
OUTPUT: 3.72 CU.M PER HOUR
A. LABOR
DESIGNATION: # OF PERSON # HRS
1. UNSKILLED LABORER 6 1
2. SKILLED LABORER 2 1
SUBTOTAL A
B. EQUIPMENT
NAME AND CAPACITY # OF UNITS # OF HOURS
1. CONCRETE VIBRATOR 2 1
2. PUMPCRETE 1 0.27
3. MINOR TOOLS (.10XLABORCOST)
SUBTOTAL B
C. MATERIALS

NAME AND SPECIFICATION UNIT QUANTITY


1. READY MIX CONCRETE CU.M 4.09
SUBTOTAL C
HOURLY RATE AMOUNT
76.25 457.5
100 200
657.5

HOURLY RATE AMOUNT


91.25 182.5
2076 560.52
65.75
808.77

UNIT COST AMOUNT


6500 26585
26585

DIRECT COST 28051.27


DIRECT COST PER CU.M 7540.66397849462
SCOPE OF WORK:
UNIT: KILOGRAM
OUTPUT: 143.438 KG/HR
A. LABOR
DESIGNATION: # OF PERSON # HRS
1. UNSKILLED LABORER 12 1
2. SKILLED LABORER 3 1
SUBTOTAL A
B. EQUIPMENT
NAME AND CAPACITY # OF UNITS # OF HOURS
1. BAR CUTTER 1 0.5
2. BAR BENDER 1 0.5
3. MINOR TOOLS (.10XLABORCOST)
SUBTOTAL B
C. MATERIALS

NAME AND SPECIFICATION UNIT QUANTITY


1. REBAR KG 157.7818
2. TIE WIRE KG 23.66727
SUBTOTAL C
HOURLY RATE AMOUNT
76.25 915
100 300
1215

HOURLY RATE AMOUNT


219.75 109.875
351.5 175.75
121.5
407.125

UNIT COST AMOUNT


65 10255.817
102 2414.06154
12669.87854
DIRECT COST 14292.00354
DIRECT COST PER KG 99.6388930408957
SCOPE OF WORK:
UNIT: SQM
OUTPUT: 7.125 SQM PER HOUR
A. LABOR

DESIGNATION: # OF PERSON # HRS


1. UNSKILLED LABORER 4 1
2. SKILLED LABORER 2 1
SUBTOTAL A

B. EQUIPMENTS

C. MATERIAL

NAME AND SPECIFICATION UNIT QUANTITY


1. CEMENT BAGS 3.72
2. SAND CU.M 7.8375
SUBTOTAL C
HOURLY RATE AMOUNT
76.25 305
100 200
505

UNIT COST AMOUNT


261 970.92
544 4263.6
5234.52

DIRECT COST 5739.52


DIRECT COST PER SQM 805.546666666667
SCOPE OF WORK: 100 MM CHB REIN
UNIT: SQM
OUTPUT: 3.825 SQM PER HOUR
A. LABOR

DESIGNATION: # OF PERSON # HRS


1. UNSKILLED LABORER 2 1
2. SKILLED LABORER 2 1
SUBTOTAL A

B. EQUIPMENT

NAME AND CAPACITY # OF UNITS # OF HOURS


1. ONE BAGGER MIXER 1 1
SUBTOTAL B

C. MATERIAL

NAME AND SPECIFICATION UNIT QUANTITY


1. CHB SQM 3.825
2. CEMENT SQM 3.825
3. SAND SQM 3.825
4. REBAR SQM 3.825
5. TIE WIRE SQM 0.57375
SUBTOTAL C
HOURLY RATE AMOUNT
76.25 152.5
100 200
352.5

HOURLY RATE AMOUNT


137 137

UNIT COST AMOUNT


20 76.5
261 998.325
544 2080.8
65 248.625
102 58.5225
3462.7725
DIRECT COST 3815.2725
DIRECT COST PER SQM 535.476842105263
SCOPE OF WORK: 150 MM CHB REIN
UNIT: SQM
OUTPUT: 3.18 SQM PER HOUR
A. LABOR

DESIGNATION: # OF PERSON # HRS


1. UNSKILLED LABORER 2 1
2. SKILLED LABORER 2 1
SUBTOTAL A

B. EQUIPMENT

NAME AND CAPACITY # OF UNITS # OF HOURS


1. ONE BAGGER MIXER 1 1
SUBTOTAL B

C. MATERIAL

NAME AND SPECIFICATION UNIT QUANTITY


1. CHB 3.18
2. CEMENT 3.18
3. SAND 3.18
4. REBAR 3.18
5. TIE WIRE 0.477
SUBTOTAL C
HOURLY RATE AMOUNT
76.25 152.5
100 200
352.5

HOURLY RATE AMOUNT


137 137

UNIT COST AMOUNT


25 79.5
261 829.98
544 1729.92
65 206.7
102 48.654
2894.754
DIRECT COST 3247.254
DIRECT COST PER SQM 455.754947368421