Disciplice BP BERAU LTD.

Document Number
TGH-070-CAL-CV-BEI-0006
Civil
Project/PO No.
Author's Org. 4420002420A/4613
Next Revision Date
Berca Engineering
International NA

TANGGUH WET FLARE AND DRY FLARE TIP REPLACEMENT


PROJECT

PIPE RACK 186-PRK-4006 - STRUCTURE AND FOUNDATION


CALCULATION

PT. BERCA ENGINEERING


INTERNATIONAL

Company Approval

Name Title Date Signature


Sunardo P&M Project Manager
Donny ButarButar P&M Engineering Manager
Luigi Kanigara BP Engineer

Technical Approval
Rev Date Prep. By Issue Description
Approval Authority

C02 14-Sep-22 NMA Re Issued for Construction HR DBN/SD


C01 9-Mar-22 NMA Issued for Construction HR DBN/SD
B01 8-Dec-21 NMA Issued for Company Approval HR DBN/SD
A01 29-Sep-21 NMA Issued for Company Review HR DBN/SD
Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Description of Change

ENGINEERING
NO DESCRIPTION/REF. CLIENT COMMENTS BY BY
RESPONSE
Add TGH-900-PRC-IN-50001
1 Sect. 2. Painting Specification on the LK Incorporated NMA
reference documents table

Add GP 04-20 Civil Engineering on


2 Sect. 2. LK Incorporated NMA
the codes and standars

Add GP 04-20 Civil Engineering on


3 Sect. 2. LK Incorporated NMA
the codes and standars

Add GP 04-20 Civil Engineering on


4 Sect. 2. LK Incorporated NMA
the codes and standars

Add ASTM A307 and ASTM


5 Sect. 2. LK Incorporated NMA
F3125/F3125M

Revise structural concrete and


6 Sect. 3. LK Incorporated NMA
delete for pile

Check Properties for anchor bolt,


7 Sect. 3. LK Incorporated NMA
HS bolt and weld electrode

Optimize steel porfile and use


8 Sect. 8.1 LK Incorporated NMA
brace if necessary

9 Sect. 8.2 Optimize footing size LK Incorporated NMA

Update pipe stress Analysis (PSA)


10 Sect. 10.1 and explain which load case will be LK Incorporated NMA
used.

All Structure changed based on


11 General LK Incorporated NMA
Pipe Stress Analysis

Adding natural frequency in


12 General LK Incorporated NMA
Document

Adding attachment from PSA


13 General LK Incorporated NMA
report
Cases keep not to
be separated to
Where is taken from? eficiency the space,
14 Sect. 10.1.2 LK NMA
this should be in a separate table however each
cases has been
added description.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 2 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

ENGINEERING
NO DESCRIPTION/REF. CLIENT COMMENTS BY BY
RESPONSE
Change the method for checking
15 Sect. 10.4 deflection at column from story drift LK Incorporated NMA
to sway displacement
For bolt connection add interaction
diagram of tension-
16 Sect. 10.5 LK Incorporated NMA
shear (curve) and ensure the
loads are under the curve
Soil Data is refer to
Doc. No. TEP-900-
SDY-CV-BP4-0015
"Civil Study For
Foundation
Engineering
Recommendations
Explain where these data taken For Bog,
17 Soil Data LK NMA
from Desalination,
Tankage Flare,
Access To Jetty,
Interconnecting
Middle Road And
Interconnecting
Pipe Rack ORF To
Train-Utility"
Check calculation for wind and
18 General LK Incorporated NMA
blast load combination

Based on TEP-900-
SPE-CV-BP4-0002 "
Project Specification
for Wind Load Design
Criteria", wind
direction for
Check application of wind load, transversal direction
19 General LK NMA
refer to standard will be used only on
side of the maximum
pipe size. For
longitudinal direction,
the wind load is
applied on the
average of pipes

Ensure for the lowest ground is


20 General LK Incorporated NMA
equal with modelling in staad pro

21 General Check the displacement LK Incorporated NMA

Incorporated, it is
Is it possible to change size of possible and WH 250
22 General LK NMA
column to be WH 250 for column will be
used

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 3 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

ENGINEERING
NO DESCRIPTION/REF. CLIENT COMMENTS BY BY
RESPONSE

Check which properties will be


22 Sect. 8.1 LK Incorporated NMA
used as bracing

22 Sect. 8.1 Show the missing member property LK Incorporated NMA

22 Sect. 8.1 Check slenderness of bracing LK Incorporated NMA

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 4 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

TABLE OF CONTENTS

1. INTRODUCTION 6
1.1. Background 6
1.2. Objectives 7
1.3. Terms, Definitions, and Abbreviations 8
2. CODE, STANDARD, AND REFERENCE DOCUMENT 9
3. QUALITY OF MATERIAL 10
4. UNIT WEIGHT OF MATERIAL 10
5. UNIT 11
6. COMPUTER SOFTWARE 11
7. LOAD COMBINATION 12
8. RESULT 16
9. CONCLUSION 35
10. CALCULATION 36
10.1. Load Case 36
10.2. Staad Pro Input 44
10.3. Steel Stress ratio 65
10.4. Deflection Check 68
10.5. Connection Design 70

ATTACHMENT
ATTACHMENT A FOUNDATION CALCULATION
ATTACHMENT B SOIL DATA
ATTACHMENT C PIPE STRESS ANALYSIS (PSA) REPORT

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 5 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

1. INTRODUCTION
1.1. Background
The Tangguh Flare System provides the safe disposal of waste hydrocarbon vapor and liquid streams from
the LNG process. The Tangguh flare system comprises a wet flare (086-FL- 1002), a dry flare (086-FL-
1001) and a tankage flare (086-FL-1003) for disposal operations. Wet and dry flare are independent
operation with different flare system characteristics with no spare, in addition dry and wet flare have
different flame characteristics therefore relying on operational surveillance and inspection of the flare tip to
optimize and schedule replacement. Drone inspections have been done in 2019 and have revealed
deterioration in the dry and wet flare tips condition.

Figure 1 shows inspection result for dry flare conditions as summarized below:
- The wind shield is tilted and deformed gap growth in 2019 compare to 2015.
- Crack in windshield.
- Crack and deformed flare tip were found in 2019.
- Weather proof deformed (086-TE-3102 and 086-TE-3104).
- Weather proof missing (086-TE-3103).

Figure 2 shows inspection result for wet flare conditions as summarized below:
- The wind shield is tilted.
- Deformed flare tip was found in 2019.
- Crack in the wind shield.
- Weather proofs in the pilot are broken and missing.

Regarding this condition, it is recommended to replace existing Dry Gas Flare Tip and Wet Gas Flare Tip.
In order to execute this project, FlareNet verification is required to be done during Dry Gas Flare Tip and
Wet Gas Flare Tip replacement.

Figure 1 – Dry Flare Inspection Result using Drone in 2019

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 6 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Figure 2 – Wet Flare Inspection Result using Drone in 2019

The strategy for the replacement will be done by constructing two (2) jumper lines to connect existing flare
headers (Wet Flare and Dry Flare) to TEP flare future connections and conducting hot tap and stopple for
both wet flare (36”) and dry flare (34”) at downstream existing KO Drum. No train shutdown expected
during replacement works. This option can be seen at Figure 3 for schematic on dry flare system and
similar concept for wet flare system.

Figure 3 – Tie-in Location for Train-1/2 and Train-3 Interconnecting Line

1.2. Objectives
The Objective of this document is intended to present the Pipe Rack 186-PRK-4006 - Structure and
Foundation Calculation.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 7 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

1.3. Terms, Definitions, and Abbreviations


The following terms, definitions, and abbreviation are applicable to and are utilised throghout this
document.
Table 1.1 – Contractual Defined Terms and Definitions

Terms or Definition Meaning

COMPANY BP p.l.c., and associate or subsidiary or other organization acting as


owner, purchaser, or customer as designated at purchase order.
CONTRACTOR The selected company who has agreed to perform the work on the
terms and conditions in the contract.

Table 1.2 – Technical Acronyms and Abbreviations

Accronym or Abbreviation Meaning

DL Dead load
LL Live load
W Wind load
EQ Earthquake load
P Piping Load
BL Blast Load
α Lean angle
H Height
B Width
t Thickness
A Area
I Inertia
Z Section modulus
σ Bending stress
E Elastic modulus
δ Deflection or settlement
qz Velocity pressure
G Gust effect factor
Cp Pressure coefficients
z Seismic zone factor
I Importance factor
R Numerical coefficient factor
Vs Design base shear
T Tension force
V Shear force
M Moment force
n Total number of bolts
db Bolt diameter
w Weld thickness
F Force
c Concrete cover
Ørebar Rebar diameter designed
β1 Block stress depth factor

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 8 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Accronym or Abbreviation Meaning

ρ Reinforcement ratio
nr Number of rebar
s Rebar spacing
bo Pseudocritical section
γ Unit weight of material
Fy Yield strength
fc' Concrete compressive strength

2. CODE, STANDARD, AND REFERENCE DOCUMENT


2.1. Reference Documents
Table 2.1 – Reference Documents

No. Document No. Title

1. TGH-090-CAL-PP-BEI-0001 Pipe Stress Analysis Interconnecting Dry Flare Line


2. TGH-090-CAL-PP-BEI-0002 Pipe Stress Analysis Interconnecting Wet Flare Line
Piping General Arrangement Interconnecting (New Pipe
3. TGH-090-DWG-MP-BEI-0002
Rack-Around Tie-In Train 1/2)
4 900-SPE-CV0-001 Detailed Engineering Design Data for Civil and Structure
5 TEP-900-SOR-HS-BP4-0001 Blast Requirement for Equipment, Piping and Structures
6 TEP-900-DBS-HS-BP4-0001 Blast Resistant Structural Design Criteria
Civil Study For Foundation Engineering Recommendations
For Bog, Desalination, Tankage Flare, Access To Jetty,
7 TEP-900-SDY-CV-BP4-0015
Interconnecting Middle Road And Interconnecting Pipe Rack
ORF To Train-Utility
8 TGH-900-PRC-IN-50001 Painting Specification
9 TEP-900-SPE-CV-BP4-0002 Project Specification for Wind Load Design Criteria

2.2. Codes and Standards


The reference documents listed in Table 4, unless otherwise stipulated, the applicable version of these
documents, including relevant appendices and supplements, are the latest revision published at the
effective date of the ongoing project.
Table 2.2 – Codes and Standards

No. Codes / Standards No. Title

1. GP 04-20 Civil Engineering


2. UBC 97 Uniform Building Code
3. AISC 360-16 Spesification for Structural Steel Building
4. AWS D1.1 Structural Welding Code Steel, American Welding Society
5 ASCE 7-10 Minimum Design Loads for Buildings and Other Structures
Design of Blast-Resistant Buildings in Petrochemical
6. ASCE 41088
Facilities
7. ASCE 59-11 Blast Protection of Buildings
8. ASTM A36/A36M Standard Specification for Carbon Structural Steel
Standard Specification for Pipe, Steel, Black and Hot-Dipped
9. ASTM A53/A53M
Zinc-Coated Welded and Seamless
10. UFC 3-340-02 Structures to Resist The Effect of Accidental Explosions

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 9 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 2.2 – Codes and Standards (continued)

No. Codes / Standards No. Title

Standard Specification for Carbon Steel Bolts, Studs, and


11. ASTM A307
Threaded Rod 60 000 PSI Tensile Strength
Standard Specification for High Strength Structural Bolts,
Steel and Alloy Steel, Heat Treated, 120 ksi (830 MPa) and
12. ASTM F3125/F3125M 150 ksi (1040 MPa) Minimum Tensile Strength, Inch and
Metric Dimensions

13. JIS G 3101 Standard for Rolled Steels for General Structure
14. JIS G 3106 Standard for Rolled steels for welded structure
15. JIS G 3112 Steel Bar for Concrete Reinforcement
Building Code Requirements for Structural Concrete and
16. ACI 318
Commentary

3. QUALITY OF MATERIAL
Table 3.1 – Quality of Material

Material Strength

Structural Concrete fc' = 28.00 MPa


Levelling Concrete fc' = 10.00 MPa
Reinforcing : Deformed Bar, JIS G3112 SD390 fy = 390.00 MPa
Plain Round Bar, JIS G3112 SR235 fy = 235.00 MPa
Structural Steel, ASTM A 36 or JIS G3101 Grade SS400
For thickness 16 mm or under fy = 245.00 MPa
For thickness over 16 mm up to 40 mm fy = 235.00 MPa
fu = 400.00 MPa
Ft all
Fv all =
= 141.00
94.00 MPa
MPa
Anchor Bolt ASTM A307 Grade B fu = 414.00 MPa
fy = 248.40 MPa
ft all = 310.00 MPa
fv all = 165.60 MPa
HS Bolt, ASTM A 325 ft all = 620.00 MPa
fv all = 372.00 MPa
Weld Electrode E70xx Fu = 483.00 MPa
Fv all = 144.90 MPa

4. UNIT WEIGHT OF MATERIAL


Table 4.1 – Unit Weight of Material

Material Unit Weight

Reinforced Concrete (gc) 23.50 kN/m³


Lean Concrete (gpc) 22.00 kN/m³
Steel (gs) 77.00 kN/m³
Soil (gso) 17.66 kN/m³
Operating Liquid (gL(o)) 10.60 kN/m³
Water (gL) 9.81 kN/m³
Sand Gravel (gg) 15.00 kN/m³

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 10 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

5. UNIT
All Units are in SI Unit

6. COMPUTER SOFTWARE
For calculate this document use Staad Pro, AFES and Microsoft Excel.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 11 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

7. LOAD COMBINATION

Table 7.1 - Factored Load Combination


Seismic Load Seismic Load Seismic Load Blast Load Blast Load
Dead Load Piping Load Wind Load
Combo No. (Operating 1) (Operating 2) (Empty) (SLB) (DLB)
LOAD CASE
DL PE PO1 PO2 PT Wz Wx EZO1 EXO1 EZO2 EXO2 EZE EXE BLz BLx BLz BLx
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
LC 1111 1.4 1.4
OPERATING
PERMANENT LC 1112 1.4 1.4
TESTING LC 1121 1.2 1.2
LC 1131 0.9 0.9 1.0
LC 1132 0.9 0.9 1.0
EMPTY + WIND
LC 1133 0.9 0.9 -1.0
LC 1134 0.9 0.9 -1.0
LC 1141 1.2 1.2 1.0
LC 1142 1.2 1.2 1.0
LC 1143 1.2 1.2 1.0
LC 1144 1.2 1.2 1.0
TEMPORARY (WIND) OPERATING + WIND
LC 1145 1.2 1.2 -1.0
LC 1146 1.2 1.2 -1.0
LC 1147 1.2 1.2 -1.0
LC 1148 1.2 1.2 -1.0
LC 1151 1.2 1.2 0.6
LC 1152 1.2 1.2 0.6
TESTING + WIND
LC 1153 1.2 1.2 -0.6
LC 1154 1.2 1.2 -0.6
LC 1161 0.774 0.774 1.0 0.3
LC 1162 0.774 0.774 1.0 -0.3
LC 1163 0.774 0.774 -1.0 0.3
LC 1164 0.774 0.774 -1.0 -0.3
TEMPORARY (SEISMIC) EMPTY + SEISMIC
LC 1165 0.774 0.774 0.3 1.0
LC 1166 0.774 0.774 0.3 -1.0
LC 1167 0.774 0.774 -0.3 1.0
LC 1168 0.774 0.774 -0.3 -1.0
(*) PO1 = Piping load taken from load case 2 in Piping Stress Analysis
PO2 = Piping load taken from load case 3 in Piping Stress Analysis

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 12 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 7.1 - Factored Load Combination (continued)


Seismic Load Seismic Load Seismic Load Blast Load Blast Load
Dead Load Piping Load Wind Load
Combo No. (Operating 1) (Operating 2) (Empty) (SLB) (DLB)
LOAD CASE
DL PE PO1 PO2 PT Wz Wx EZO1 EXO1 EZO2 EXO2 EZE EXE BLz BLx BLz BLx
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
LC 1171 1.33 1.33 1.0 0.3
LC 1172 1.33 1.33 1.0 -0.3
LC 1173 1.33 1.33 -1.0 0.3
LC 1174 1.33 1.33 -1.0 -0.3
OPERATING 1 + SEISMIC
LC 1175 1.33 1.33 0.3 1.0
LC 1176 1.33 1.33 0.3 -1.0
LC 1177 1.33 1.33 -0.3 1.0
LC 1178 1.33 1.33 -0.3 -1.0
TEMPORARY (SEISMIC)
LC 1179 1.33 1.33 1.0 0.3
LC 1180 1.33 1.33 1.0 -0.3
LC 1181 1.33 1.33 -1.0 0.3
LC 1182 1.33 1.33 -1.0 -0.3
OPERATING 2 + SEISMIC
LC 1183 1.33 1.33 0.3 1.0
LC 1184 1.33 1.33 0.3 -1.0
LC 1185 1.33 1.33 -0.3 1.0
LC 1186 1.33 1.33 -0.3 -1.0
LC 1191 0.76 0.76 0.76
OPERATING + BLAST LC 1192 0.76 0.76 0.76
(SLB) LC 1193 0.76 0.76 0.76
LC 1194 0.76 0.76 0.76
TEMPORARY (BLAST)
LC 1195 0.68 0.68 0.68
OPERATING + BLAST LC 1196 0.68 0.68 0.68
(DLB) LC 1197 0.68 0.68 0.68
LC 1198 0.68 0.68 0.68
(*) PO1 = Piping load taken from load case 2 in Piping Stress Analysis
PO2 = Piping load taken from load case 3 in Piping Stress Analysis

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 13 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 7.2 - Unfactored Load Combination


Seismic Load Seismic Load Seismic Load Blast Load Blast Load
Dead Load Piping Load Wind Load
Combo No. (Operating 1) (Operating 2) (Empty) (SLB) (DLB)
LOAD CASE
DL PE PO1 PO2 PT Wz Wx EZO1 EXO1 EZO2 EXO2 EZE EXE BLz BLx BLz BLx
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
LC 2111 1.0 1.0
OPERATING
PERMANENT LC 2112 1.0 1.0
TESTING LC 2121 1.0 1.0
LC 2131 0.6 0.6 0.6
LC 2132 0.6 0.6 0.6
EMPTY + WIND
LC 2133 0.6 0.6 -0.6
LC 2134 0.6 0.6 -0.6
LC 2141 1.0 1.0 0.45
LC 2142 1.0 1.0 0.45
LC 2143 1.0 1.0 0.45
LC 2144 1.0 1.0 0.45
TEMPORARY (WIND) OPERATING + WIND
LC 2145 1.0 1.0 -0.45
LC 2146 1.0 1.0 -0.45
LC 2147 1.0 1.0 -0.45
LC 2148 1.0 1.0 -0.45
LC 2151 1.0 1.0 0.36
LC 2152 1.0 1.0 0.36
TESTING + WIND
LC 2153 1.0 1.0 -0.36
LC 2154 1.0 1.0 -0.36
LC 2161 0.9 0.9 0.7 0.21
LC 2162 0.9 0.9 0.7 -0.21
LC 2163 0.9 0.9 -0.7 0.21
LC 2164 0.9 0.9 -0.7 -0.21
TEMPORARY (SEISMIC) EMPTY + SEISMIC
LC 2165 0.9 0.9 0.21 0.7
LC 2166 0.9 0.9 0.21 -0.7
LC 2167 0.9 0.9 -0.21 0.7
LC 2168 0.9 0.9 -0.21 -0.7
(*) PO1 = Piping load taken from load case 2 in Piping Stress Analysis
PO2 = Piping load taken from load case 3 in Piping Stress Analysis

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 14 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 7.2 - Unfactored Load Combination (continued)


Seismic Load Seismic Load Seismic Load Blast Load Blast Load
Dead Load Piping Load Wind Load
Combo No. (Operating 1) (Operating 2) (Empty) (SLB) (DLB)
LOAD CASE
DL PE PO1 PO2 PT Wz Wx EZO1 EXO1 EZO2 EXO2 EZE EXE BLz BLx BLz BLx
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17
LC 2171 0.9 0.9 0.7 0.21
LC 2172 0.9 0.9 0.7 -0.21
LC 2173 0.9 0.9 -0.7 0.21
LC 2174 0.9 0.9 -0.7 -0.21
OPERATING 1 + SEISMIC
LC 2175 0.9 0.9 0.21 0.7
LC 2176 0.9 0.9 0.21 -0.7
LC 2177 0.9 0.9 -0.21 0.7
LC 2178 0.9 0.9 -0.21 -0.7
TEMPORARY (SEISMIC)
LC 2179 0.9 0.9 0.7 0.21
LC 2180 0.9 0.9 0.7 -0.21
LC 2181 0.9 0.9 -0.7 0.21
LC 2182 0.9 0.9 -0.7 -0.21
OPERATING 2 + SEISMIC
LC 2183 0.9 0.9 0.21 0.7
LC 2184 0.9 0.9 0.21 -0.7
LC 2185 0.9 0.9 -0.21 0.7
LC 2186 0.9 0.9 -0.21 -0.7
LC 2191 1.0 1.0 0.7
OPERATING + BLAST LC 2192 1.0 1.0 0.7
(SLB) LC 2193 1.0 1.0 0.7
LC 2194 1.0 1.0 0.7
TEMPORARY (BLAST)
LC 2195 1.0 1.0 0.7
OPERATING + BLAST LC 2196 1.0 1.0 0.7
(DLB) LC 2197 1.0 1.0 0.7
LC 2198 1.0 1.0 0.7
(*) PO1 = Piping load taken from load case 2 in Piping Stress Analysis
PO2 = Piping load taken from load case 3 in Piping Stress Analysis

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 15 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

8. RESULT
8.1. Steel Structure
8.1.1. Structural Modeling

Table 8.1 - List of Property


No. Symbol Steel Property Remarks
1 R1 WH 250 H250x250x9x14 Column (R1)
2 R2 SH 300 H300x150x6.5x9 Beam (R2)

R3 2L 75 L75X75X6 LD Vertical Brace


3
(R3)
Horizontal
4 R4 WH 125 H125x125x6.5x9 Brace (R4)

03

02

01

Figure 8.1– Upper Structure 3D View

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 16 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

A
C03

02

01

Figure 8.2– Node Number

EL +26.950
EL +26.600

EL +20.500

2850 EL +15.500

B A
Figure 8.3– Section 01 (Member Number)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 17 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

EL +26.950
EL +26.600

EL +20.500

2850 EL +15.500

B A
Figure 8.4– Section 01 (Member Property)

EL +26.600

EL +20.500

2850 EL +15.500

B A
Figure 8.5– Section 02 (Member Number)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 18 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

EL +26.600

EL +20.500

2850 EL +15.500

B A
Figure 8.6– Section 02 (Member Property)

EL +26.600

EL +20.500

2850 EL +15.500

B A
Figure 8.7– Section 03 (Member Number)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 19 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

EL +26.600

EL +20.500

2850 EL +15.500

B A
Figure 8.8– Section 03 (Member Property)

EL +26.950
EL +26.600

EL +20.500

EL +15.500

6000 6000

01 02 03

Figure 8.9– Section A (Member Number)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 20 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

EL +26.950
EL +26.600

EL +20.500

EL +15.500

6000 6000

01 02 03
Figure 8.10– Section A (Member Property)

EL +26.950
EL +26.600

EL +20.500

EL +15.500

6000 6000

01 02 03

Figure 8.11– Section B (Member Number)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 21 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

EL +26.950
EL +26.600

EL +20.500

EL +15.500

6000 6000

01 02 03
Figure 8.12– Section B (Member Property)

A
01 02 03
Figure 8.13– Plan at EL +20.500 (Member Number)

A
01 02 03

Figure 8.14– Plan at EL +20.500 (Member Property)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 22 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

A
01 02 03
Figure 8.15– Plan at EL +26.600 (Member Number)

A
01 02 03
Figure 8.16– Plan at EL +26.600 (Member Property)

A
01 02 03
Figure 8.17– Plan at EL +26.950 (Member Number)

A
01 02 03
Figure 8.18– Plan at EL +26.950 (Member Property)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 23 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

8.1.2 Natural of Frequency


The natural frequencies of pipe rack structure analyzed using eigen modal calculation method of
STAAD Pro is tabulated in following table.
Ninety (90) modes of vibrations were generated in the modal analysis based on the established mass
model to achieve mass participant more than 90%.
The first five (5) vibration mode shapes and natural frequency are tabulated below.
Table 8.2 - Natural frequency of Structure
Frequency, Period,
Mode Description of Mode Shape
Hz sec
1 1st Transversal Sway 1.621 0.617
2 2nd Transversal Sway 2.063 0.485
3 1st Longitudinal Sway 2.911 0.344

8.1.3 Mass Participation Factor


The mass participation factors and the cumulative participation factors in percent for each mode
and direction are listed in following table.

Table 8.3 - Mass Participation Factor of Pipe Rack


Mode X Y Z Summ-X Summ-Y Summ-Z
1 0 0 50.980 0.000 0 50.975
2 0 0 35.430 0.000 0 86.408
3 27.75 0 0.000 27.752 0 86.408
4 0 0 8.300 27.752 0 94.706
5 12.77 0 0.000 40.524 0 94.706
6 0 0 0.000 40.524 0 94.706
7 0 0 0.000 40.529 0 94.71
8 5.95 0 0.000 46.476 0 94.71
… … … … … … …
19 15.05 0 0.000 92.894 0 96.886

8.1.4. Stress Ratio


Table 8.4 - Maximum Steel Stress Ratio
Symbol Profile LC Clause Stress Ratio Check
R1 WH 250 1146 Eq. H1-1b 0.426 ≤ 1, OK
R2 SH 300 1111 Eq. H1-1b 0.933 ≤ 1, OK
R3 2L 75 1146 Eq. H2-1 0.658 ≤ 1, OK
R4 WH 125 1186 Sec. E1 0.197 ≤ 1, OK

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 24 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

8.1.5. Deflection
Table 8.5 - Maximum Sway Column

Member Allowable
Load Deflection
Location Joint Length Deflection L/200 Remarks
Comb (mm)
(mm) (mm)
Column 146 1112 21.76 11000 55 OK

Table 8.6 - Maximum Beam Deflection


Symbol Profile LC Clause Stress Ratio Check
R2 SH 300 2198 DEFLECTION 0.631 ≤ 1, OK

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 25 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Beam to Column Moment Connection (C1)


N
Bolt = 8 M20
M = 460 mm b = 40 mm
b N = 180 mm a1 = 40 mm
a1
a2 = 40 mm
a2
L1 = 140 mm
L2 = 90 mm
M L1 e = 45 mm
w = 9 mm

a2
a1
b

w
e L2 e

Table 8.7 - Beam to Column Moment Connection (C1)


Beam Details Column Details Connection Capacity Beam Force M T
No Section Section
Mall Vall Tall Critical Mu Vu Tu + ≤1 Remark
(kNm) (kN) (kN) Load Case (kNm) (kN) (kN) Mall Tall
58 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1143 5.98 2.83 18.25 0.12 PASS
59 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1143 4.85 2.33 10.94 0.09 PASS
60 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1147 1.43 1.19 18.44 0.05 PASS
62 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1148 1.20 1.00 2.07 0.02 PASS
65 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1153 9.08 36.67 12.13 0.16 PASS
311 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1152 14.53 57.69 8.88 0.23 PASS
329 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1111 19.23 64.53 46.31 0.37 PASS
343 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1144 2.16 1.87 1.42 0.03 PASS
344 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1143 2.07 1.67 2.30 0.03 PASS
348 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1143 1.55 0.96 2.21 0.03 PASS
444 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 17.86 11.99 82.47 0.41 PASS
446 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 18.20 11.95 92.29 0.44 PASS
448 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 22.17 14.09 95.84 0.50 PASS
468 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1141 2.62 2.67 8.91 0.05 PASS
469 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 3.05 2.67 7.58 0.06 PASS
470 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1141 3.53 2.97 0.97 0.05 PASS

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 26 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 8.7 - Beam to Column Moment Connection (C1) (Continued)


Beam Details Column Details Connection Capacity Beam Force M T
Mall Vall Tall Critical Mu Vu Tu + ≤1 Remark
No Section Section
(kNm) (kN) (kN) Load Case (kNm) (kN) (kN) Mall Tall
471 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1141 3.53 2.97 9.17 0.07 PASS
480 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1142 3.50 2.96 2.06 0.06 PASS
483 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1145 2.65 2.68 9.41 0.06 PASS
486 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1142 3.49 2.96 7.22 0.06 PASS
489 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 3.06 2.65 2.92 0.05 PASS
492 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1111 16.50 13.32 48.08 0.33 PASS
494 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 16.70 12.94 75.84 0.39 PASS
499 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1146 15.72 12.52 82.79 0.38 PASS
504 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1141 19.58 12.51 85.85 0.45 PASS
509 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1111 16.50 16.49 64.43 0.36 PASS
514 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1154 6.94 18.51 5.19 0.11 PASS
520 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1151 14.67 57.81 18.48 0.25 PASS
540 R2 SH 300 R1 WH 250 67.82 147.86 545.94 1111 12.64 30.44 52.70 0.28 PASS

3rd Check
Avaliable interaction shear and axial will be provided in graph (V vs P) to make easier engineer check the
connection of the structure. Below is explanation in develop the graph

Shear Strength and corresponding tension strength :


ØVn = 147.86 kN (from table above)
ØTn = 545.94 kN (from table above)

Maximum Actual Shea and Tension Load :

Vu = 64.53 kN (from table above)


Tu = 95.84 kN (from table above)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 27 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

𝐹𝑓𝑟 ≥ 0, full capacity , ØVn


< 0, with reduction, (1 - Ffr / ØTn) ØVn
*Ffr = Factored beam top flange force

Flange Forces
Shear Capacity
Ffr (kN) Renmark
200.00 Compress full capacity , ØVn 147.862
0.00 Netral full capacity , ØVn 147.862
-545.9363 Tension w/reduction, (1-Ffr/ØTn).ØVn 0.00

Ffr (kN)
240.00
200.00
160.00 64.53; 95.84
120.00
80.00
40.00
0.00
-40.00 0 Service
20 area40for required
60 80 100 120 140 Vr 160
-80.00
-120.00 shear from analysis (kN)
-160.00
-200.00
-240.00
-280.00
-320.00
-360.00
-400.00
-440.00
-480.00
-520.00
-560.00
-600.00

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 28 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Bracing to Beam Pinned Connection (C2)

2 Sides Bolt = 4 M20


s = 60 mm
lh = 45 mm
lh lv = 40 mm
Ls
s
Ø
lh

Ø lv
s
lv

Table 8.8 - Bracing to Beam Pinned Connection (C2)


Bracing Details Beam Details Connection Capacity Beam Force
V T
No Section Section
Vall Tall Critical Vu Tu + ≤1 Remark
(kN) (kN) Load Case (kN) (kN) Vall Tall
472 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.31 13.64 0.12 PASS
473 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.31 16.46 0.14 PASS
474 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.31 13.64 0.12 PASS
475 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.31 16.46 0.14 PASS
476 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.31 13.64 0.12 PASS
477 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.31 19.37 0.16 PASS
478 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.31 13.64 0.12 PASS
479 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.31 19.37 0.16 PASS
481 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.00 5.31 0.05 PASS
482 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.00 24.15 0.20 PASS
484 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.00 5.12 0.05 PASS
485 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.00 24.13 0.20 PASS
487 R3 2L 75 R2 SH 300 230.48 122.44 1143 1.00 5.31 0.05 PASS
488 R3 2L 75 R2 SH 300 230.48 122.44 1147 1.00 24.15 0.20 PASS
490 R3 2L 75 R3 2L 75 230.48 122.44 1143 1.00 5.12 0.05 PASS
491 R3 2L 75 R3 2L 75 230.48 122.44 1147 1.00 24.13 0.20 PASS
495 R3 2L 75 R3 2L 75 230.48 122.44 1111 0.20 19.91 0.16 PASS
497 R3 2L 75 R3 2L 75 230.48 122.44 1111 0.20 24.49 0.20 PASS

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 29 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 8.8 - Bracing to Beam Pinned Connection (C2) (Continued)


Bracing Details Beam Details Connection Capacity Beam Force
V T
No Section Section
Vall Tall Critical Vu Tu + ≤1 Remark
(kN) (kN) Load Case (kN) (kN) Vall Tall
500 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 19.91 0.16 PASS
502 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 24.49 0.20 PASS
505 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 19.91 0.16 PASS
507 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 24.49 0.20 PASS
510 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 19.91 0.16 PASS
512 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 24.49 0.20 PASS
515 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 19.91 0.16 PASS
517 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 24.49 0.20 PASS
521 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 19.91 0.16 PASS
523 R3 2L 75 R2 SH 300 230.48 122.44 1111 0.20 24.49 0.20 PASS

Bracing to Beam Pinned Connection (C3)


2 Sides

Bolt = 8 M20
s = 60 mm
Ls lv = 40 mm
s
Ø

Ø s lv
s
s
lv

Table 8.9 - Bracing to Beam Pinned Connection (C5)


Bracing Details Beam Details Connection Capacity Beam Force
Vall Tall Critical Vu Tu
V T Remark
No Section Section + ≤1
(kN) (kN) Load Case (kN) (kN) Vall Tall
532 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 11.20 0.06 PASS
533 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 8.85 0.05 PASS

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 30 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 8.9 - Bracing to Beam Pinned Connection (C5) (Continued)


Bracing Details Beam Details Connection Capacity Beam Force
Vall Tall Critical Vu Tu
V T Remark
No Section Section + ≤1
(kN) (kN) Load Case (kN) (kN) Vall Tall
535 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 8.76 0.05 PASS
536 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 0.02 0.00 PASS
537 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 3.91 0.02 PASS
538 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 8.76 0.05 PASS
539 R4 WH 125 R1 WH 250 353.40 181.86 1111 0.46 0.35 0.00 PASS
541 R4 WH 125 R1 WH 250 353.40 181.86 1187 0.00 0.00 0.00 PASS

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 31 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Base Plate Pinned Connection (C4)

Anchor Bolt = 4 M24


B = 300 mm a = 120 mm
N = 300 mm b = 120 mm
c = 90 mm
d = 90 mm
w = 9 mm

Table 8.10 - Base Plate Pinned Connection (C6)


Column Details Connection Capacity Beam Force V T
Pall Vall Tall Critical Pu Vu Tu + ≤1 Remark
No Section
(kN) (kN) (kN) Load Case (kN) (kN) (kN)
Vall Tall
1 R1 WH 250 1522.80 503.46 551.25 1146 262.81 28.29 86.16 0.21 PASS
2 R1 WH 250 1522.80 503.46 551.25 1141 247.40 28.73 133.15 0.30 PASS
131 R1 WH 250 1522.80 503.46 551.25 1146 241.67 32.55 110.49 0.27 PASS
132 R1 WH 250 1522.80 503.46 551.25 1141 188.41 33.53 131.93 0.31 PASS
140 R1 WH 250 1522.80 503.46 551.25 1146 247.43 30.49 106.99 0.25 PASS
141 R1 WH 250 1522.80 503.46 551.25 1141 196.76 32.36 139.65 0.32 PASS

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 32 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

8.2. Foundation

Figure 18 – Foundation Location Plan

Figure 19 – Foundation 3D View Type 1, Type 2 and Type 3

Figure 20 – Foundation Plan Type 1, Type 2 and Type 3

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 33 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Figure 21 – Footing Reinforcement Plan Type 1, Type 2 and Type 3

Figure 22– Section Type 1, Type 2 and Type 3

Figure 23 – Pedestal Type 1, Type 2 and Type 3

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 34 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 8.11 - Critical Load Below the Foundation Type 1


Stability Check
Dimension Sliding Overturning Bearing Capacity*
No
(m)
Lcomb > 1.5 Lcomb >2 Lcomb <1
F1 6.0 x 2.0 x 0.3 2133 3.95 2181 4.83 2146 0.97
F2 6.0 x 2.0 x 0.3 2131 3.46 2181 5.38 2146 0.92
F3 6.0 x 2.0 x 0.3 2133 3.98 2146 5.42 2146 0.88
Note: *, Increase bearing capacity by 33% when imposed by temporary load

9. CONCLUSION
Based on given condition in the structural analysis, the design of Pipe Rack 186-PRK-4006 is considered
adequate in meeting the design criteria.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 35 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10. CALCULATION
10.1. Load Case
10.1.1. Dead Load
All self weight of structural steel shall be calculated with STAAD.Pro 2007.

10.1.2. Piping Load


Based on piping info, the load on Pipe Rack 186-PRK-4006 are summarized on the following tables.
There are 3 conditions determine the value of piping load : Empty, Operating and Hydrotest condition.
a). Empty condition (PE) is taken where the pipe is in erection or shutdown condition.
The value is only consist of the selfweight of pipe.
b). Operating Condition (PO) is taken where the pipe is in daily operation.
The value is determined by empty load added with load of fluid and thermal during operation. .`
In this analysis, operating load is taken based on Pipe Stress Analysis (PSA) Report Doc. No.
TGH-090-CAL-PP-BEI-0001 and TGH-090-CAL-PP-BEI-0002.
The load is taken by shorted the maximum value for wet pipe, PO1 and dry pipe, PO2 during
operation condition (load case no. 2 and 3 respectively in PSA report)
c). Hydrotest Condition (PT) is taken where the pipe is in testing condition.
The value is determined by empty load added with load of full water.`
In this analysis, operating load is taken based on Pipe Stress Analysis (PSA) Report Doc. No.
TGH-090-CAL-PP-BEI-0001 and TGH-090-CAL-PP-BEI-0002. The load is taken in load case no. 1.

Table 10.1 - Piping Point Load


PO1 (kN)
Node Pipe line PE (kN)
FX FY FZ
590 090-VW-31001-30"-1CS6P63-NI 13.57 1.64 -17.03 4.84
600 090-VW-31001-30"-1CS6P63-NI 10.61 0.00 0.00 0.00
610 090-VW-31001-30"-1CS6P63-NI 11.94 -7.55 -34.83 16.82
70 090-VD-31001-34"-1SA0P53-NI 13.56 -19.07 -75.57 -12.26
75 090-VD-31001-34"-1SA0P53-NI 12.05 -1.19 -12.79 3.65
80 090-VD-31001-34"-1SA0P53-NI 15.41 0.47 -46.66 13.99

Table 10.2 - Piping Point Load


PO2 (kN)
Node Pipe line PT (kN)
FX FY FZ
590 090-VW-31001-30"-1CS6P63-NI -2.17 -24.60 -7.05 -74.56
600 090-VW-31001-30"-1CS6P63-NI -0.99 -13.29 -3.86 -20.31
610 090-VW-31001-30"-1CS6P63-NI 0.00 0.00 26.95 -36.42
70 090-VD-31001-34"-1SA0P53-NI -8.03 -50.17 -12.73 -66.41
75 090-VD-31001-34"-1SA0P53-NI -3.62 -28.33 -7.69 -44.93
80 090-VD-31001-34"-1SA0P53-NI -5.65 -47.56 -13.10 -66.84

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 36 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.1.3. Wind Load


RC = Risk category = IV
V = Basic wind speed = 43.40 m/s
E = Exposure category = C
Kd = Wind directionality factor = 0.85
Kzt = Topographic factor = 1.00
z = Height of pipe rack = 11.10 m
zg = = 274.32 m
α = = 9.50
Kz = Velocity pressure coef. = 1.02
= 2.01 * (z/zg)(2/α) for 4.5 m ≤ z ≤ zg
(2/α)
= 2.01 * (4.5/zg) for < 4.5 m
qz = Velocity pressure = 1.00 kN/m2
= 0.613 * Kd * Kzt * Kz * V2

Table 10.3 - Load Distribution at Various Height


Limit State Design: Risk Category III & IV Fws/Af
Elevation z (m) Kz v = 43.40 m/s ; Kd = 0.85 (kPa)
qz (kPa)
4.6 0.85 0.83 1.28
5 0.87 0.85 1.30
7 0.93 0.91 1.39
9 0.98 0.96 1.47
11 1.02 1.00 1.53
13 1.06 1.04 1.59
15 1.09 1.07 1.64
17 1.12 1.10 1.68
18.7 1.14 1.12 1.71

10.1.3.1. Wind Load due to Structure


G = Gust effect factor = 0.85
Cf = Force coefficient = 1.80
Fws = Wind load due to structure = 1.54 * Af kN
= qz * G * Cf * Af

The wind load will be applied on columns, main beam and vertical braces.

10.1.3.2. Wind Load due to Pipe


G = Gust effect factor = 0.85
CfT = Force coeff. For transversal = 0.70
CfL = Force coeff. For longitudinal = 0.50

At El. +26.600

qz at H = 11.5 m = 1.00
D max = Diameter of largest pipe (pipe 34") = 0.86 m
D ave = Diameter of average pipe = 0.81 m
B = Usable width for pipe = 6.50 m
L = Length for pipe = 10.50 m

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 37 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

AfT = Area for transversal = 15.86 m2


= (Dmax + 0.1 * B) * (L1/2 + L2/2)
AfL = Area for longitudinal = 12.09 m2
= (D ave + 0.1 * (L1/2 + L2/2)) *B
FwPT = Wind load due to pipe (transversal) = 9.47 kN (Ref. 2.1.9)
= qz * G * CfT * AfT
FwPL = Wind load due to pipe (longitudinal) = 5.16 kN (Ref. 2.1.9)
= qz * G * CfL * AfL

10.1.4. Earthquake Load


RC = Risk category = 3
SC = Seismic design category = D
R = Response modificarion coefficient = 3.25
(Steel Ordinary Concentrically Braced Frames)
TL = Long-period transition period = 10
Ie = Importance factor = 1.25
SDS = Design spectral response acceleration = 0.630
in the short period
SD1 = Design spectral response acceleration = 0.365
at a period of 1.0 s
T0 = 0.2 SD1/SDS = 0.116
Ts = SD1/SDS = 0.579
T = Time Period = 0.497 sec
= 0.0724 x H^0.8
SDS
Cs = = 0.155
(R / Ie)
SD1
Csmax = For T ≤ T L = 0.283
T * (R / Ie)
Csmin = 0.044 * SDS * Ie ≥ 0.01 = 0.035

Csused = 0.155
Vs = Seismic base shear = 0.155 * ƩWt
= Cs * ƩWt

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 38 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

The total of seismic base shear (Vs) shall be distributed prorate as point load at each of column in
accordance with the following formula :
Wi x hi Wi : Dead Load
Fi = Vs x
S (Wi x hi) hi : Story Height

Table 10.4 - Earthquake Load for Normal Operation (PO1)


(*)
Node W h W*h Vs Force Col. Force (kN)
(kN) (m) (kN.m) (kN) (kN) Qty each col.
Elevation +20.500
3 9.16 5.00 45.80 39.94 F1 0.76 1 0.76
4 10.23 5.00 51.17 39.94 F1 0.85 1 0.85
24 14.17 5.00 70.86 39.94 F1 1.18 1 1.18
26 14.12 5.00 70.61 39.94 F1 1.18 1 1.18
142 13.71 5.00 68.56 39.94 F1 1.14 1 1.14
143 14.27 5.00 71.36 39.94 F1 1.19 1 1.19
Elevation +26.600
7 14.12 11.10 156.74 39.94 F1 2.61 1 2.61
8 13.71 11.10 152.20 39.94 F1 2.54 1 2.54
32 14.27 11.10 158.42 39.94 F1 2.64 1 2.64
34 72.90 11.10 809.21 39.94 F1 13.48 1 13.48
146 51.49 11.10 571.52 39.94 F1 9.52 1 9.52
147 15.36 11.10 170.48 39.94 F1 2.84 1 2.84
Σ 257.52 2,396.93
(*) structure mass for each story that was taken from Staad Pro output

Table 10.5 - Earthquake Load for Normal Operation (PO2)


(*)
Node W h W*h Vs Force Col. Force (kN)
(kN) (m) (kN.m) (kN) (kN) Qty each col.
Elevation +20.500
3 10.03 5.00 50.13 41.62 F1 0.84 1 0.84
4 10.56 5.00 52.78 41.62 F1 0.89 1 0.89
24 16.70 5.00 83.52 41.62 F1 1.40 1 1.40
26 16.44 5.00 82.22 41.62 F1 1.38 1 1.38
142 14.29 5.00 71.46 41.62 F1 1.20 1 1.20
143 14.38 5.00 71.90 41.62 F1 1.21 1 1.21
Elevation +26.600
7 45.06 11.10 500.17 41.62 F1 8.41 1 8.41
8 17.46 11.10 193.78 41.62 F1 3.26 1 3.26
32 28.89 11.10 320.69 41.62 F1 5.39 1 5.39
34 20.47 11.10 227.17 41.62 F1 3.82 1 3.82
146 43.52 11.10 483.05 41.62 F1 8.12 1 8.12
147 30.58 11.10 339.43 41.62 F1 5.70 1 5.70
Σ 268.37 2,476.28
(*) structure mass for each story that was taken from Staad Pro output

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 39 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 10.6 - Earthquake Load for Installation Operation


(*)
Elevation W h W*h Vs Force Col. Force (kN)
(m) (kN) (m) (kN.m) (kN) (kN) Qty each col.
Elevation +20.500
3 10.62 5.00 53.09 28.14 F1 0.97 1 0.97
4 10.33 5.00 51.66 28.14 F1 0.94 1 0.94
24 16.01 5.00 80.03 28.14 F1 1.46 1 1.46
26 15.31 5.00 76.54 28.14 F1 1.39 1 1.39
142 12.23 5.00 61.17 28.14 F1 1.11 1 1.11
143 11.98 5.00 59.89 28.14 F1 1.09 1 1.09
Elevation +26.600
7 19.31 11.10 214.30 28.14 F1 3.90 1 3.90
8 17.83 11.10 197.96 28.14 F1 3.60 1 3.60
32 16.82 11.10 186.69 28.14 F1 3.39 1 3.39
34 15.45 11.10 171.50 28.14 F1 3.12 1 3.12
146 18.65 11.10 207.02 28.14 F1 3.76 1 3.76
147 16.95 11.10 188.15 28.14 F1 3.42 1 3.42
Σ 181.48 1,547.97
(*) structure mass for each story that was taken from Staad Pro output

10.1.5. Blast Load


10.1.5.1. Blast Load on Structure Member (SLB Case)
Structures subject to blast overpressure load shall be designed in accordance with (Ref. 2.1.5) and refer to
(Ref. 2.1.6) for application blast force on open structure.

Pso = Peak incident pressure = 0.58 psi = 4.00 kPa


(Ref. 2.1.5 Appendix 3)
Pdyn = Peak dynamic pressure = 0.01 psi = 0.05 kPa

Figure 24 - Peak Incident Pressure vs Peak Dynamic Pressure, Density of Air Behind the Shock Front, and
Particle Velocity

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 40 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

T = Duration = 0.15 s

Tn = Eff. Natural period of vibration = 0.34 s longitudinal direction


= 0.62 s transversal direction
T/Tn = = 0.44 longitudinal direction
= 0.24 transversal direction
Xm/Xe = µ (Ductility factor of steel) = 1.00 (elastic range)
DLF = Dynamic load factor DLFT = 1.60
DLFL = 1.00
Cd = Drag Coefficient = 2.00

Figure 25 - Maximum Deflection of Elasto-Plastic, One-Degree-of-Freedom System for Triangular Pulse Load

PBL = Blast pressure = Pdyn * DLF * Cd


PBL-Trans = 0.023 psi = 0.160 kPa
PBL-Long = 0.015 psi = 0.100 kPa

Blast load to structural member will be generated by StaadPro using application of wind load Type-2 for
transverse direction and wind Type-3 for longitudinal direction.

10.1.5.2. Blast Load due to Piping (SLB Case)


Effect of Blast Overpressure Load due to piping will be applied on structure design refer to Ref. 2.1.6.

Blast pressure load due to piping was evaluated by the following equation (refer to Ref. 2.1.6 Table 3).

Since piping is on pipe rack, the same DAF of pipe rack structure considering structure ductility will be
applied for blast load due to piping and equipment.

Dmax = Dia. of largest pipe = 0.864 m


PBL-TRANS = 0.09 kPa (with DAF = 1.5)
Davg = Average dia. of largest pipe = 0.864 m
PBL-LONG = 0.09 kPa (with DAF = 1)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 41 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

B = Usable width for pipe = 2.850 m


L = Length of pipe = 6.000 m
AfT = Area for transversal = 6.892 m2
= (Dmax + 0.1 * B) * (L1/2 + L2/2)
AfL = Area for longitudinal = 4.171 m2
= (Dmax + 0.1 * (L1/2 + L2/2)) *B
FBL-TRANS = Blast Load on pipe transversal = 0.413 x 1.60 = 0.662 kN
= (PBL-TRANS * AfT) / 1.5 * DLFT
FBL-LONG = Blast Load on pipe longitudinal = 0.250 x 1.00 = 0.250 kN
= (PBL-LONG * AfL) / 1.5 * DLFL

10.1.5.3. Blast Load on Structure Member (DLB Case)


Pso = Peak incident pressure = 2.32 psi = 16.00 kPa
Pdyn = Peak dynamic pressure = 0.12 psi = 0.82 kPa

Figure 26 - Peak Incident Pressure vs Peak Dynamic Pressure, Density of Air Behind the Shock Front, and
Particle Velocity

T = Duration = 0.15 s

Tn = Eff. Natural period of vibration = 0.34 s longitudinal direction


= 0.62 s transversal direction
T/Tn = = 0.44 longitudinal direction
= 0.24 transversal direction
Xm/Xe = µ (Ductility factor of steel) = 3.00 (elastic range)
DLF = Dynamic load factor DLFT = 0.70
DLFL = 0.50
Cd = Drag Coefficient = 2.00

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 42 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Figure 27 - Maximum Deflection of Elasto-Plastic, One-Degree-of-Freedom System for Triangular Pulse Load

PBL = Blast pressure = Pdyn * DLF * Cd


PBL-Trans = 0.167 psi = 1.149 kPa
PBL-Long = 0.119 psi = 0.820 kPa

Blast load to structural member will be generated by StaadPro using application of wind load Type-4 for
transeverse direction and wind Type-5 for longitudinal direction.

10.1.5.4. Blast Load due to Piping (DLB Case)


Effect of Blast Overpressure Load due to piping will be applied on structure design refer to Ref. 2.1.6.

Blast pressure load due to piping was evaluated by the following equation (refer to Ref. 2.1.6 Table 3).
Since piping is on pipe rack, the same DAF of pipe rack structure considering structure ductility will be
applied for blast load due to piping and equipment.

Dmax = Dia. of largest pipe = 0.864 m


PBL-TRANS = 1.48 kPa (with DAF = 1.5)
Davg = Average dia. of largest pipe = 0.864 m
PBL-LONG = 1.48 kPa (with DAF = 1)
B = Usable width for pipe = 2.850 m
L = Length of pipe = 6.000 m
AfT = Area for transversal = 6.892 m2
= (Dmax + 0.1 * B) * (L1/2 + L2/2)
AfL = Area for longitudinal = 4.171 m2
= (Dmax + 0.1 * (L1/2 + L2/2)) *B
FBL-TRANS = Blast Load on pipe transversal = 6.777 x 0.70 = 4.744 kN
= (PBL-TRANS * AfT) / 1.5 * DLFT
FBL-LONG = Blast Load on pipe longitudinal = 4.102 x 0.50 = 2.051 kN
= (PBL-LONG * AfL) / 1.5 * DLFL

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 43 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.2. Staad Pro Input


STAAD SPACE
START JOB INFORMATION
JOB NAME New Pipe Rack 3 (186-PRK-4006)
JOB CLIENT BP
JOB NO 4420002420A/4613
JOB REV C01
ENGINEER NAME NMA
CHECKER NAME HR
ENGINEER DATE 1-Sept-22
END JOB INFORMATION
INPUT WIDTH 79
UNIT METER KN
JOINT COORDINATES
1 0 0 0; 2 0 0 2.85001; 3 0 5 0; 4 0 5 2.85001; 7 0 11.1 0; 8 0 11.1 2.85001;
24 6.00001 5 0; 26 6.00001 5 2.85001; 31 3.00001 11.1 0; 32 6.00001 11.1 0;
33 3.00001 11.1 2.85001; 34 6.00001 11.1 2.85001; 131 6.00001 0 0;
132 6.00001 0 2.85001; 140 12 0 0; 141 12 0 2.85001; 142 12 5 0;
143 12 5 2.85001; 146 12 11.1 0; 147 12 11.1 2.85001; 155 0 11.45 0;
156 0 11.45 2.85001; 162 9.00002 11.1 0; 163 9.00002 11.1 2.85001;
164 3.00001 5 2.85001; 165 9 5 2.85001; 166 3.00001 5 0; 167 9 5 0;
168 0 3.00001 0; 169 0 5 1.425; 170 0 3.00001 2.85001; 171 6.00001 3.00001 0;
172 6.00001 5 1.425; 173 6.00001 3.00001 2.85001; 174 12 3.00001 0;
175 12 5 1.425; 176 12 3.00001 2.85001; 177 0 9.10002 0; 178 0 11.1 1.425;
179 0 9.10001 2.85001; 180 6.00001 9.10002 0; 181 6.00001 11.1 1.425;
182 6.00001 9.10002 2.85001; 183 12 9.10002 0; 184 12 11.1 1.425;
185 12 9.10002 2.85001; 186 0 11.45 1.425; 187 1.50001 8.05 2.85001;
188 1.50001 8.05 0; 189 7.50002 8.05 2.85001; 190 4.50001 8.05 2.85001;
191 4.50001 8.05 0; 192 7.50002 8.05 0; 193 10.5 8.05 2.85001; 194 10.5 8.05 0;
MEMBER INCIDENCES
1 1 168; 2 2 170; 4 3 177; 5 4 179; 58 7 31; 59 8 33; 60 31 32; 62 33 34;
65 32 181; 95 34 182; 124 32 180; 288 131 171; 289 132 173; 303 140 174;
304 141 176; 306 142 183; 307 143 185; 311 146 184; 326 8 156; 328 155 7;
329 155 186; 343 162 146; 344 163 147; 348 163 34; 366 162 32; 444 3 169;
446 24 172; 448 142 175; 468 4 164; 469 3 166; 470 24 167; 471 26 165;
472 4 187; 473 33 190; 474 3 188; 475 31 191; 476 26 189; 477 163 193;
478 24 192; 479 162 194; 480 164 26; 481 2 164; 482 164 132; 483 165 143;
484 132 165; 485 165 141; 486 166 24; 487 1 166; 488 166 131; 489 167 142;
490 131 167; 491 167 140; 492 7 178; 493 168 3; 494 169 4; 495 168 169;
496 170 4; 497 169 170; 498 171 24; 499 172 26; 500 171 172; 501 173 26;
502 172 173; 503 174 142; 504 175 143; 505 174 175; 506 176 143; 507 175 176;
508 177 7; 509 178 8; 510 177 178; 511 179 8; 512 178 179; 513 180 24;
514 181 34; 515 180 181; 516 182 26; 517 181 182; 518 183 146; 520 184 147;
521 183 184; 522 185 147; 523 184 185; 540 186 156; 541 178 186; 542 187 33;
543 8 187; 544 188 31; 545 7 188; 546 189 163; 547 34 189; 548 190 26;
549 34 190; 550 191 24; 551 32 191; 552 192 162; 553 32 192; 554 193 143;
555 147 193; 556 194 142; 557 146 194;
********************* MEMBER GROUP*******************
*****************************************************
START GROUP DEFINITION
MEMBER
_MAIN_COLUMN 1 2 4 5 95 124 288 289 303 304 306 307 493 496 498 501 503 506 -
508 511 513 516 518 522
_MAIN_BEAM(1) 58 TO 60 62 343 344 348 366
_SECONDARY_BEAM 65 514
_BRACE_V 95 124 513 516
_SECONDARY_BEAM2 65 311 514 520
_SECONDARY_BEAM1 65 311 514 520
JOINT

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 44 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

END GROUP DEFINITION


START USER TABLE
TABLE 1
UNIT MMS KN
PIPE
T4
114.3 102.26 2047.83 2047.83
T6
168.3 154.08 3600.46 3600.46
END
UNIT METER KN
DEFINE MATERIAL START
ISOTROPIC STEEL
E 1.99947e+008
POISSON 0.3
DENSITY 76.8191
ALPHA 6.5e-006
DAMP 0.03
TYPE STEEL
STRENGTH RY 1.5 RT 1.2
END DEFINE MATERIAL
********************* MEMBER PROPERTY*******************
*****************************************************
MEMBER PROPERTY JAPANESE
1 2 4 5 95 124 288 289 303 304 306 307 326 328 493 496 498 501 503 506 508 -
511 513 516 518 522 TABLE ST H250X250X9X14
58 TO 60 62 65 311 329 343 344 348 366 444 446 448 468 TO 471 480 483 486 -
489 492 494 499 504 509 514 520 540 TABLE ST H300X150X6.5X9
MEMBER PROPERTY JAPANESE
495 497 500 502 505 507 510 512 515 517 521 523 543 545 547 549 551 553 555 -
557 TABLE LD L75X75X6
472 TO 479 481 482 484 485 487 488 490 491 541 542 544 546 548 550 552 554 -
556 TABLE ST H125X125X6.5X9
CONSTANTS
BETA 90 MEMB 1 2 4 5 95 124 288 289 303 304 306 307 326 328 493 496 498 501 -
503 506 508 511 513 516 518 522
MATERIAL STEEL ALL
SUPPORTS
1 2 131 132 140 141 PINNED
MEMBER TRUSS
472 TO 479 481 482 484 485 487 488 490 491 495 497 500 502 505 507 510 512 -
515 517 521 523 541 TO 557
CUT OFF MODE SHAPE 50
CUT OFF FREQUENCY 500
DEFINE REFERENCE LOADS
* OBE = Operational Basis Earthquake
* MCER = Maximum Considered Earthquake
* Risk Category = III
* Seismic Design Category = D
* Response modification coeff. = OCBF/OMF
* Long-period transition, TL = 10 sec
* Importance factor: 2/3 MCER = 1.250
* OBE = 1.500
* Design spectral response accl. in short period = 0.745 for 2/3 MCER Case
* Design spectral response accl. in short 1.0 s = 0.522 for 2/3 MCER Case
* Design spectral response accl. in short period = 0.630 for OBE Case
* Design spectral response accl. in short 1.0 s = 0.365 for OBE Case
*
* For Reference Load R1 & R2 = All Dead Loads imposed in the structure
* Selfweight, Floor Loads, Cable trays,
* Pipe Empty, Equipment Empty, Crane load.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 45 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

* For Reference Load R1 & R2 = All loads imposed in Load R1 & R2


* All Operating Loads imposed in the structure
* Pipe Operating, Equipment Operating, Cabletrays
*
**===========================================================================**
LOAD R1 LOADTYPE Dead TITLE MASS X-DIRECTION EMPTY
**===========================================================================**
SELFWEIGHT X 1.1
**PIPE EMPTY**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX -15.41 0.762
**075**
65 CON GX -12.05 0.762
**070**
329 CON GX -13.56 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX -13.57 0.588995
**600**
514 CON GX -10.61 0.588995
**610**
540 CON GX -11.94 0.588995
**===========================================================================**
LOAD R2 LOADTYPE Dead TITLE MASS Z-DIRECTION EMPTY
**===========================================================================**
SELFWEIGHT Z 1.1
**PIPE EMPTY**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ -15.41 0.762
**075**
65 CON GZ -12.05 0.762
**070**
329 CON GZ -13.56 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ -13.57 0.588995
**600**
514 CON GZ -10.61 0.588995
**610**
540 CON GZ -11.94 0.588995
**===========================================================================**
LOAD R3 LOADTYPE Dead TITLE MASS X-DIRECTION OPERATING (1)
**===========================================================================**
SELFWEIGHT X 1.1
**PIPE EMPTY**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX 46.66 0.762
**075**
65 CON GX 12.79 0.762
**070**
329 CON GX 75.57 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX 17.03 0.588995
**600**

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 46 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

514 CON GX 0 0.588995


**610**
540 CON GX 34.83 0.588995
**===========================================================================**
LOAD R4 LOADTYPE Dead TITLE MASS Z-DIRECTION OPERATING (1)
**===========================================================================**
SELFWEIGHT Z 1.1
**PIPE EMPTY**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ 46.66 0.762
**075**
65 CON GZ 12.79 0.762
**070**
329 CON GZ 75.57 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ 17.03 0.588995
**600**
514 CON GZ 0 0.588995
**610**
540 CON GZ 34.83 0.588995
**===========================================================================**
LOAD R5 LOADTYPE Dead TITLE MASS X-DIRECTION OPERATING (2)
**===========================================================================**
SELFWEIGHT X 1.1
**PIPE EMPTY**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX 47.56 0.762
**075**
65 CON GX 28.33 0.762
**070**
329 CON GX 50.17 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX 24.6 0.588995
**600**
514 CON GX 13.29 0.588995
**610**
540 CON GX 0 0.588995
**===========================================================================**
LOAD R6 LOADTYPE Dead TITLE MASS Z-DIRECTION OPERATING (2)
**===========================================================================**
SELFWEIGHT Z 1.1
**PIPE EMPTY**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ 47.56 0.762
**075**
65 CON GZ 28.33 0.762
**070**
329 CON GZ 50.17 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ 24.6 0.588995
**600**
514 CON GZ 13.29 0.588995

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 47 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

**610**
540 CON GZ 0 0.588995
**===========================================================================**
LOAD R7 LOADTYPE Dead TITLE MASS X-DIRECTION OPERATING (EIGEN)
**===========================================================================**
SELFWEIGHT X 1.1
**PIPE EMPTY**
**OPERATING CONDITION 1**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX 46.66 0.762
**075**
65 CON GX 12.79 0.762
**070**
329 CON GX 75.57 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX 17.03 0.588995
**600**
514 CON GX 0 0.588995
**610**
540 CON GX 34.83 0.588995
**OPERATING CONDITION 2**
**090-VW-31001-30-1CS6P63-NI**
**080**
*311 CON GX 47.56 0.762
***075**
*65 CON GX 28.33 0.762
***070**
*329 CON GX 50.17 0.762
***090-VD-31001-34"-1SA0P53-NI**
***590**
*311 CON GX 24.6 2.014
***600**
*65 CON GX 13.29 2.014
***610**
*329 CON GX 0 2.014
**===========================================================================**
LOAD R8 LOADTYPE Dead TITLE MASS Z-DIRECTION OPERATING (EIGEN)
**===========================================================================**
SELFWEIGHT Z 1.1
**PIPE EMPTY**
**OPERATING CONDITION 1**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ 46.66 0.762
**075**
65 CON GZ 12.79 0.762
**070**
329 CON GZ 75.57 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ 17.03 0.588995
**600**
514 CON GZ 0 0.588995
**610**
540 CON GZ 34.83 0.588995
**OPERATING CONDITION 2**
**090-VW-31001-30-1CS6P63-NI**

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 48 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

**080**
311 CON GZ 47.56 0.762
**075**
65 CON GZ 28.33 0.762
**070**
329 CON GZ 50.17 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ 24.6 0.588995
**600**
514 CON GZ 13.29 0.588995
**610**
540 CON GZ 0 0.588995
**===========================================================================**
END DEFINE REFERENCE LOADS
DEFINE WIND LOAD
TYPE 1 WIND 1
INT 0 1.28 1.3 1.39 1.47 1.53 1.59 1.64 1.68 1.71 HEIG 0 4.6 5 7 9 11 13 -
15 17 18.7
*EXP 1 JOINT 1 TO 20 22 TO 105
**===========================================================================**
* APPLY BLAST LOAD AS CUSTOM WIND LOAD *
**===========================================================================**
* SLB = Strength Level Blast
* DLB = Ductility Level Blast
TYPE 2 SLB-Z DIRECTION
INT 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 0.16 HEIG 0 4.6 5 7 9 11 -
13 15 17 18.7
*EXP 1 JOINT 1 TO 105
TYPE 3 SLB-X DIRECTION
INT 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 0.1 HEIG 0 4.6 5 7 9 11 13 15 -
17 18.7
*EXP 1 JOINT 1 TO 105
TYPE 4 DLB-Z DIRECTION
INT 1.149 1.149 1.149 1.149 1.149 1.149 1.149 1.149 1.149 1.149 HEIG 0 4.6 5 -
7 9 11 13 15 17 18.7
*EXP 1 JOINT 1 TO 105
TYPE 5 DLB-X DIRECTION
INT 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 0.82 HEIG 0 4.6 5 7 9 11 -
13 15 17 18.7
*EXP 1 JOINT 1 TO 105
LOAD 1 DEAD LOAD (DL)
SELFWEIGHT Y -1.1
LOAD 2 EMPTY LOAD (PE)
**Pipe Load**
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GY -15.41 0.762
**075**
65 CON GY -12.05 0.762
**070**
329 CON GY -13.56 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GY -13.57 0.588995
**600**
514 CON GY -10.61 0.588995
**610**
540 CON GY -11.94 0.588995
LOAD 3 OPERATING LOAD (PO1)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 49 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX 0.47 0.762
311 CON GY -46.66 0.762
311 CON GZ 13.99 0.762
**075**
65 CON GX -1.19 0.762
65 CON GY -12.79 0.762
65 CON GZ 3.65 0.762
**070**
329 CON GX -19.07 0.762
329 CON GY -75.57 0.762
329 CON GZ -12.26 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX 1.64 0.588995
520 CON GY -17.03 0.588995
520 CON GZ 4.84 0.588995
**600**
514 CON GX 0 0.588995
514 CON GY 0 0.588995
514 CON GZ 0 0.588995
**610**
540 CON GX -7.55 0.588995
540 CON GY -34.83 0.588995
540 CON GZ 16.82 0.588995
LOAD 4 OPERATING LOAD (PO2)
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX -5.65 0.762
311 CON GY -47.56 0.762
311 CON GZ -13.1 0.762
**075**
65 CON GX -3.62 0.762
65 CON GY -28.33 0.762
65 CON GZ -7.69 0.762
**070**
329 CON GX -8.03 0.762
329 CON GY -50.17 0.762
329 CON GZ -12.73 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX -2.17 0.588995
520 CON GY -24.6 0.588995
520 CON GZ -7.05 0.588995
**600**
514 CON GX -0.99 0.588995
514 CON GY -13.29 0.588995
514 CON GZ -3.86 0.588995
**610**
540 CON GX 0 0.588995
540 CON GY 0 0.588995
540 CON GZ 0 0.588995
LOAD 5 TEST LOAD (PT)
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GY -66.82 0.762
**075**

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 50 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

65 CON GY -44.93 0.762


**070**
329 CON GY -66.41 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GY -74.56 0.588995
**600**
514 CON GY -20.31 0.588995
**610**
540 CON GY -36.42 0.588995
LOAD 6 WIND LOAD Z (WZ)
WIND LOAD Z 1.54 TYPE 1 XR 0 12 YR 0 11.5 ZR 0 1 OPEN
WIND LOAD Z 1.54 TYPE 1 XR 0 12 YR 0 11.5 ZR 2 3 OPEN
*DUE TO PIPE
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ 3.75 0.762
**075**
65 CON GZ 3.75 0.762
**070**
329 CON GZ 3.75 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
*520 CON GZ 4.12 0.588995
***600**
*514 CON GZ 4.12 0.588995
***610**
*540 CON GZ 4.12 0.588995
LOAD 7 WIND LOAD X (WX)
WIND LOAD X 1.54 TYPE 1 XR 0 12 YR 0 11.5 ZR 2 3 OPEN
WIND LOAD X 1.54 TYPE 1 XR 0 12 YR 0 11.5 ZR 0 1 OPEN
*DUE TO PIPE
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX -1.66 0.762
**075**
65 CON GX -1.66 0.762
**070**
329 CON GX -1.66 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX -1.78 0.588995
**600**
514 CON GX -1.78 0.588995
**610**
540 CON GX -1.78 0.588995
LOAD 8 SEISMIC OPERATING 1 (EZ01)
**===========================================================================**
JOINT LOAD
**EL +20.500**
3 FZ 0.76
4 FZ 0.85
24 FZ 1.18
26 FZ 1.18
142 FZ 1.14
143 FZ 1.19
**EL +26.600**
7 FZ 2.61
8 FZ 2.54

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 51 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

32 FZ 2.64
34 FZ 13.48
146 FZ 9.52
147 FZ 2.84
LOAD 9 SEISMIC OPERATING 1 (EX01)
**===========================================================================**
JOINT LOAD
**EL +20.500**
3 FX 0.76
4 FX 0.85
24 FX 1.18
26 FX 1.18
142 FX 1.14
143 FX 1.19
**EL +26.600**
7 FX 2.61
8 FX 2.54
32 FX 2.64
34 FX 13.48
146 FX 9.52
147 FX 2.84
LOAD 10 SEISMIC OPERATING 2 (EZO2)
**===========================================================================**
JOINT LOAD
**EL +20.500**
3 FZ 0.84
4 FZ 0.89
24 FZ 1.4
26 FZ 1.38
142 FZ 1.2
143 FZ 1.21
**EL +26.600**
7 FZ 8.41
8 FZ 3.26
32 FZ 5.39
34 FZ 3.82
146 FZ 8.12
147 FZ 5.7
LOAD 11 SEISMIC OPERATING 2 (EXO2)
**===========================================================================**
JOINT LOAD
**EL +20.500**
3 FX 0.84
4 FX 0.89
24 FX 1.4
26 FX 1.38
142 FX 1.2
143 FX 1.21
**EL +26.600**
7 FX 8.41
8 FX 3.26
32 FX 5.39
34 FX 3.82
146 FX 8.12
147 FX 5.7
*LOAD 9 THERMAL LOAD (TH)
***090-VW-31001-30-1CS6P63-NI**
***50**
***60**
***090-VD-31001-34"-1SA0P53-NI**
***70**

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 52 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

***80**
LOAD 12 SEISMIC EMPTY (EZE)
**===========================================================================**
JOINT LOAD
**EL +20.500**
3 FZ 0.97
4 FZ 0.94
24 FZ 1.46
26 FZ 1.39
142 FZ 1.11
143 FZ 1.09
**EL +26.600**
7 FZ 3.9
8 FZ 3.6
32 FZ 3.39
34 FZ 3.12
146 FZ 3.76
147 FZ 3.42
LOAD 13 SEISMIC EMPTY (EXE)
**===========================================================================**
JOINT LOAD
**EL +20.500**
3 FX 0.97
4 FX 0.94
24 FX 1.46
26 FX 1.39
142 FX 1.11
143 FX 1.09
**EL +26.600**
7 FX 3.9
8 FX 3.6
32 FX 3.39
34 FX 3.12
146 FX 3.76
147 FX 3.42
LOAD 14 BLAST LOAD SLB (BLZ)
**===========================================================================**
*DUE TO MEMBER PROPERTY
WIND LOAD Z 1 TYPE 2 XR 0 12 YR 0 11.5 ZR 0 1 OPEN
WIND LOAD Z 1 TYPE 2 XR 0 12 YR 0 12 ZR 2 3 OPEN
*DUE TO PIPE
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ 0.413 0.762
**075**
65 CON GZ 0.413 0.762
**070**
329 CON GZ 0.413 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ 0.413 0.588995
**600**
514 CON GZ 0.413 0.588995
**610**
540 CON GZ 0.413 0.588995
LOAD 15 BLAST LOAD SLB (BLX)
**===========================================================================**
*DUE TO MEMBER PROPERTY
WIND LOAD X 1 TYPE 3 XR 0 12 YR 0 12 ZR 0 1 OPEN
WIND LOAD X 1 TYPE 3 XR 0 12 YR 0 12 ZR 2 3 OPEN

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 53 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

*DUE TO PIPE
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX -0.263 0.762
**075**
65 CON GX -0.263 0.762
**070**
329 CON GX -0.263 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX -0.263 0.588995
**600**
514 CON GX -0.263 0.588995
**610**
540 CON GX -0.263 0.588995
LOAD 16 BLAST LOAD DLB (BLZ)
**===========================================================================**
*DUE TO MEMBER PROPERTY
WIND LOAD X 1 TYPE 4 XR 0 12 YR 0 11.5 ZR 0 1 OPEN
WIND LOAD X 1 TYPE 4 XR 0 12 YR 0 11.5 ZR 2 3 OPEN
*DUE TO PIPE
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GZ 3.727 0.762
**075**
65 CON GZ 3.727 0.762
**070**
329 CON GZ 3.727 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GZ 3.727 0.588995
**600**
514 CON GZ 3.727 0.588995
**610**
540 CON GZ 3.727 0.588995
LOAD 17 BLAST LOAD DLB (BLX)
**===========================================================================**
*DUE TO MEMBER PROPERTY
WIND LOAD X 1 TYPE 5 XR 0 12 YR 0 12 ZR 0 1 OPEN
WIND LOAD X 1 TYPE 5 XR 0 12 YR 0 12 ZR 2 3 OPEN
*DUE TO PIPE
MEMBER LOAD
**090-VW-31001-30-1CS6P63-NI**
**080**
311 CON GX -3.199 0.762
**075**
65 CON GX -3.199 0.762
**070**
329 CON GX -3.199 0.762
**090-VD-31001-34"-1SA0P53-NI**
**590**
520 CON GX -3.199 0.588995
**600**
514 CON GX -3.199 0.588995
**610**
540 CON GX -3.199 0.588995
*==========================================================================*
* Rayleigh Frequency **
**==========================================================================*

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 54 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

*LOAD 90 LOADTYPE None TITLE MASS X-DIRECTION EMPTY


*REFERENCE LOAD
*R1 1.0
*CALCULATE RAYLEIGH FREQUENCY
*LOAD 91 LOADTYPE None TITLE MASS Z-DIRECTION EMPTY
*REFERENCE LOAD
*R2 1.0
*CALCULATE RAYLEIGH FREQUENCY
*LOAD 92 LOADTYPE None TITLE MASS X-DIRECTION OPERATING
*REFERENCE LOAD
*R3 1.0
*CALCULATE RAYLEIGH FREQUENCY
*LOAD 93 LOADTYPE None TITLE MASS Z-DIRECTION OPERATING
*REFERENCE LOAD
*R4 1.0
*CALCULATE RAYLEIGH FREQUENCY
********************
* LOAD COMBINATION *
********************
***FACTORED***
*Normal Operation*
LOAD 1111 1.4 (DL+PO1)
REPEAT LOAD
1 1.4 3 1.4
LOAD 1112 1.4 (DL+PO2)
REPEAT LOAD
1 1.4 4 1.4
*Testing Operation*
LOAD 1121 1.2 (DL+PT)
REPEAT LOAD
1 1.2 5 1.2
*Instalation Operation + Wind*
LOAD 1131 0.9(DL+PE) + WZ(+)
REPEAT LOAD
1 0.9 2 0.9 6 1.0
LOAD 1132 0.9(DL+PE) + WX(+)
REPEAT LOAD
1 0.9 2 0.9 7 1.0
LOAD 1133 0.9(DL+PE) + WZ(-)
REPEAT LOAD
1 0.9 2 0.9 6 -1.0
LOAD 1134 0.9(DL+PE) + WX(-)
REPEAT LOAD
1 0.9 2 0.9 7 -1.0
*Normal Operation & Wind on positive Thermal*
LOAD 1141 1.2(DL+PO1) + WZ(+)
REPEAT LOAD
1 1.2 3 1.2 6 1.0
LOAD 1142 1.2(DL+PO2) + WZ(+)
REPEAT LOAD
1 1.2 4 1.2 6 1.0
LOAD 1143 1.2(DL+PO1) + WX(+)
REPEAT LOAD
1 1.2 3 1.2 7 1.0
LOAD 1144 1.2(DL+PO2) + WX(+)
REPEAT LOAD
1 1.2 4 1.2 7 1.0
LOAD 1145 1.2(DL+PO1) + WZ(-)
REPEAT LOAD
1 1.2 3 1.2 6 -1.0
LOAD 1146 1.2(DL+PO2) + WZ(-)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 55 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

REPEAT LOAD
1 1.2 4 1.2 6 -1.0
LOAD 1147 1.2(DL+PO1) + WX(-)
REPEAT LOAD
1 1.2 3 1.2 7 -1.0
LOAD 1148 1.2(DL+PO2) + WX(-)
REPEAT LOAD
1 1.2 4 1.2 7 -1.0
*Normal Operation & Wind on negative Thermal*
*LOAD 145 1.2(DL+PO-TH) + WZ(+)
*REPEAT LOAD
*1 1.2 3 1.2 9 -1.2 5 1.0
*LOAD 146 1.2(DL+PO-TH) + WX(+)
*REPEAT LOAD
*1 1.2 3 1.2 9 -1.2 6 1.0
*LOAD 147 1.2(DL+PO-TH) + WZ(-)
*REPEAT LOAD
*1 1.2 3 1.2 9 -1.2 5 -1.0
*LOAD 148 1.2(DL+PO-TH) + WX(-)
*REPEAT LOAD
*1 1.2 3 1.2 9 -1.2 6 -1.0
**Testing Operation & Wind*
LOAD 1151 1.2(DL+PT) + 0.6WZ(+)
REPEAT LOAD
1 1.2 5 1.2 6 0.6
LOAD 1152 1.2(DL+PT) + 0.6WX(+)
REPEAT LOAD
1 1.2 5 1.2 7 0.6
LOAD 1153 1.2(DL+PT) + 0.6WZ(-)
REPEAT LOAD
1 1.2 5 1.2 6 -0.6
LOAD 1154 1.2(DL+PT) + 0.6WX(-)
REPEAT LOAD
1 1.2 5 1.2 7 -0.6
*Instalation Operation + Seismic*
LOAD 1161 0.774(DL+PE) + EZE(+) + 0.3EXE(+)
REPEAT LOAD
1 0.774 2 0.774 12 1.0 13 0.3
LOAD 1162 0.774(DL+PE) + EZE(+) + 0.3EXE(-)
REPEAT LOAD
1 0.774 2 0.774 12 1.0 13 -0.3
LOAD 1163 0.774(DL+PE) + EZE(-) + 0.3EXE(+)
REPEAT LOAD
1 0.774 2 0.774 12 -1.0 13 0.3
LOAD 1164 0.774(DL+PE) + EZE(-) + 0.3EXE(-)
REPEAT LOAD
1 0.774 2 0.774 12 -1.0 13 -0.3
LOAD 1165 0.774(DL+PE) + 0.3EZE(+) + EXE(+)
REPEAT LOAD
1 0.774 2 0.774 12 0.3 13 1.0
LOAD 1166 0.774(DL+PE) + 0.3EZE(+) + EXE(-)
REPEAT LOAD
1 0.774 2 0.774 12 0.3 13 -1.0
LOAD 1167 0.774(DL+PE) + 0.3EZE(-) + EXE(+)
REPEAT LOAD
1 0.774 2 0.774 12 -0.3 13 1.0
LOAD 1168 0.774(DL+PE) + 0.3EZE(-) + EXE(-)
REPEAT LOAD
1 0.774 2 0.774 12 -0.3 13 -1.0
*Normal Operation & Earthquake on positive Thermal*
LOAD 1171 1.33(DL+PO1) + EZO1(+) + 0.3EXO1(+)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 56 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

REPEAT LOAD
1 1.33 3 1.33 8 1.0 9 0.3
LOAD 1172 1.33(DL+PO1) + EZO1(+) + 0.3EXO1(-)
REPEAT LOAD
1 1.33 3 1.33 8 1.0 9 -0.3
LOAD 1173 1.33(DL+PO1) + EZO1(-) + 0.3EXO1(+)
REPEAT LOAD
1 1.33 3 1.33 8 -1.0 9 0.3
LOAD 1174 1.33(DL+PO1) + EZO1(-) + 0.3EXO1(-)
REPEAT LOAD
1 1.33 3 1.33 8 -1.0 9 -0.3
LOAD 1175 1.33(DL+PO1) + 0.3EZO1(+) + EXO1(+)
REPEAT LOAD
1 1.33 3 1.33 8 0.3 9 1.0
LOAD 1176 1.33(DL+PO1) + 0.3EZO1(+) + EXO1(-)
REPEAT LOAD
1 1.33 3 1.33 8 0.3 9 -1.0
LOAD 1177 1.33(DL+PO1) + 0.3EZO1(-) + EXO1(+)
REPEAT LOAD
1 1.33 3 1.33 8 -0.3 9 1.0
LOAD 1178 1.33(DL+PO1) + 0.3EZO1(-) + EXO1(-)
REPEAT LOAD
1 1.33 3 1.33 8 -0.3 9 -1.0
LOAD 1179 1.33(DL+PO2) + EZO2(+) + 0.3EXO2(+)
REPEAT LOAD
1 1.33 4 1.33 10 1.0 11 0.3
LOAD 1180 1.33(DL+PO2) + EZO2(+) + 0.3EXO2(-)
REPEAT LOAD
1 1.33 4 1.33 10 1.0 11 -0.3
LOAD 1181 1.33(DL+PO2) + EZO2(-) + 0.3EXO2(+)
REPEAT LOAD
1 1.33 4 1.33 10 -1.0 11 0.3
LOAD 1182 1.33(DL+PO2) + EZO2(-) + 0.3EXO2(-)
REPEAT LOAD
1 1.33 4 1.33 10 -1.0 11 -0.3
LOAD 1183 1.33(DL+PO2) + 0.3EZO2(+) + EXO2(+)
REPEAT LOAD
1 1.33 4 1.33 10 0.3 11 1.0
LOAD 1184 1.33(DL+PO2) + 0.3EZO2(+) + EXO2(-)
REPEAT LOAD
1 1.33 4 1.33 10 0.3 11 -1.0
LOAD 1185 1.33(DL+PO2) + 0.3EZO2(-) + EXO2(+)
REPEAT LOAD
1 1.33 4 1.33 10 -0.3 11 1.0
LOAD 1186 1.33(DL+PO2) + 0.3EZO2(-) + EXO2(-)
REPEAT LOAD
1 1.33 4 1.33 10 -0.3 11 -1.0
**Normal Operation & Earthquake on negative Thermal*
*LOAD 181 1.33(DL+PO-TH) + EQZ(+) + 0.3EQX(+)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 1.0 8 0.3
*LOAD 182 1.33(DL+PO-TH) + EQZ(+) + 0.3EQX(-)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 1.0 8 -0.3
*LOAD 183 1.33(DL+PO-TH) + EQZ(-) + 0.3EQX(+)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 -1.0 8 0.3
*LOAD 184 1.33(DL+PO-TH) + EQZ(-) + 0.3EQX(-)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 -1.0 8 -0.3
*LOAD 185 1.33(DL+PO-TH) + 0.3EQZ(+) + EQX(+)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 57 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 0.3 8 1.0
*LOAD 186 1.33(DL+PO-TH) + 0.3EQZ(+) + EQX(-)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 0.3 8 -1.0
*LOAD 187 1.33(DL+PO-TH) + 0.3EQZ(-) + EQX(+)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 -0.3 8 1.0
*LOAD 188 1.33(DL+PO-TH) + 0.3EQZ(-) + EQX(-)
*REPEAT LOAD
*1 1.33 3 1.33 9 -1.33 7 -0.3 8 -1.0
*Normal Operation & Blast SLB on Positive Thermal*
LOAD 1191 0.76(DL+PO1) + BLZ
REPEAT LOAD
1 0.76 3 0.76 14 0.76
LOAD 1192 0.76(DL+PO2) + BLZ
REPEAT LOAD
1 0.76 4 0.76 14 0.76
LOAD 1193 0.76(DL+PO1) + BLX
REPEAT LOAD
1 0.76 3 0.76 15 0.76
LOAD 1194 0.76(DL+PO2) + BLX
REPEAT LOAD
1 0.76 4 0.76 15 0.76
**Normal Operation & Blast SLB on Negative Thermal*
*LOAD 193 0.76(DL+PO-TH) + BLZ
*REPEAT LOAD
*1 0.76 3 0.76 9 -0.76 12 0.76
*LOAD 194 0.76(DL+PO-TH) + BLX
*REPEAT LOAD
*1 0.76 3 0.76 9 -0.76 13 0.76
*Normal Operation & Blast DLB on Positive Thermal*
LOAD 1195 0.76(DL+PO1) + 0.76BLZ
REPEAT LOAD
1 0.76 3 0.76 16 0.76
LOAD 1196 0.76(DL+PO2) + 0.76BLZ
REPEAT LOAD
1 0.76 4 0.76 16 0.76
LOAD 1197 0.76(DL+PO1) + 0.76BLX
REPEAT LOAD
1 0.76 3 0.76 17 0.76
LOAD 1198 0.76(DL+PO2) + 0.76BLX
REPEAT LOAD
1 0.76 4 0.76 17 0.76
**Normal Operation & Blast DLB on Negative Thermal*
*LOAD 197 0.68(DL+PO-TH) + 0.68BLZ
*REPEAT LOAD
*1 0.68 3 0.68 9 -0.68 14 0.68
*LOAD 198 0.68(DL+PO-TH) + 0.68BLX
*REPEAT LOAD
*1 0.68 3 0.68 9 -0.68 15 0.68
***UNFACTORED***
*Normal Operation*
LOAD 2111 DL + PO1
REPEAT LOAD
1 1.0 3 1.0
LOAD 2112 DL + PO2
REPEAT LOAD
1 1.0 4 1.0
*Testing Operation*
LOAD 2121 DL + PT

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 58 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

REPEAT LOAD
1 1.0 5 1.0
*Installation Operation + Wind*
LOAD 2131 0.6(DL+PE) + 0.6WZ(+)
REPEAT LOAD
1 0.6 2 0.6 6 0.6
LOAD 2132 0.6(DL+PE) + 0.6WX(+)
REPEAT LOAD
1 0.6 2 0.6 7 0.6
LOAD 2133 0.6(DL+PE) + 0.6WZ(-)
REPEAT LOAD
1 0.6 2 0.6 6 -0.6
LOAD 2134 0.6(DL+PE) + 0.6WX(-)
REPEAT LOAD
1 0.6 2 0.6 7 -0.6
*Normal Operation + Wind on Positive Thermal*
LOAD 2141 DL + PO1 + 0.45WZ(+)
REPEAT LOAD
1 1.0 3 1.0 6 0.45
LOAD 2142 DL + PO2 + 0.45WZ(+)
REPEAT LOAD
1 1.0 4 1.0 6 0.45
LOAD 2143 DL + PO1 + 0.45WX(+)
REPEAT LOAD
1 1.0 3 1.0 7 0.45
LOAD 2144 DL + PO2 + 0.45WX(+)
REPEAT LOAD
1 1.0 4 1.0 7 0.45
LOAD 2145 DL + PO1 + 0.45WZ(-)
REPEAT LOAD
1 1.0 3 1.0 6 -0.45
LOAD 2146 DL + PO2 + 0.45WZ(-)
REPEAT LOAD
1 1.0 4 1.0 6 -0.45
LOAD 2147 DL + PO1 + 0.45WX(-)
REPEAT LOAD
1 1.0 3 1.0 7 -0.45
LOAD 2148 DL + PO2 + 0.45WX(-)
REPEAT LOAD
1 1.0 4 1.0 7 -0.45
**Normal Operation + Wind on Negative Thermal*
*LOAD 245 DL + PO - TH + 0.45WZ(+)
*REPEAT LOAD
*1 1.0 3 1.0 9 -1.0 5 0.45
*LOAD 246 DL + PO - TH + 0.45WX(+)
*REPEAT LOAD
*1 1.0 3 1.0 9 -1.0 6 0.45
*LOAD 247 DL + PO - TH + 0.45WZ(-)
*REPEAT LOAD
*1 1.0 3 1.0 9 -1.0 5 -0.45
*LOAD 248 DL + PO - TH + 0.45WX(-)
*REPEAT LOAD
*1 1.0 3 1.0 9 -1.0 6 -0.45
*Testing Operation + Wind*
LOAD 2151 DL + PT + 0.36WZ(+)
REPEAT LOAD
1 1.0 5 1.0 6 0.36
LOAD 2152 DL + PT + 0.36WX(+)
REPEAT LOAD
1 1.0 5 1.0 7 0.36
LOAD 2153 DL + PT + 0.36WZ(-)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 59 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

REPEAT LOAD
1 1.0 5 1.0 6 -0.36
LOAD 2154 DL + PT + 0.36WX(-)
REPEAT LOAD
1 1.0 5 1.0 7 -0.36
*Installation Operation + Earthquake*
LOAD 2161 0.9(DL + PE) + 0.7EZE(+) + 0.21EXE(+)
REPEAT LOAD
1 0.9 2 0.9 12 0.7 13 0.21
LOAD 2162 0.9(DL + PE) + 0.7EZE(+) + 0.21EXE(-)
REPEAT LOAD
1 0.9 2 0.9 12 0.7 13 -0.21
LOAD 2163 0.9(DL + PE) + 0.7EZE(-) + 0.21EXE(+)
REPEAT LOAD
1 0.9 2 0.9 12 -0.7 13 0.21
LOAD 2164 0.9(DL + PE) + 0.7EZE(-) + 0.21EXE(-)
REPEAT LOAD
1 0.9 2 0.9 12 -0.7 13 -0.21
LOAD 2165 0.9(DL + PE) + 0.21EZE(+) + 0.7EXE(+)
REPEAT LOAD
1 0.9 2 0.9 12 0.21 13 0.7
LOAD 2166 0.9(DL + PE) + 0.21EZE(+) + 0.7EXE(-)
REPEAT LOAD
1 0.9 2 0.9 12 0.21 13 -0.7
LOAD 2167 0.9(DL + PE) + 0.21EZE(-) + 0.7EXE(+)
REPEAT LOAD
1 0.9 2 0.9 12 -0.21 13 0.7
LOAD 2168 0.9(DL + PE) + 0.21EZE(-) + 0.7EXE(-)
REPEAT LOAD
1 0.9 2 0.9 12 -0.21 13 -0.7
*Normal Operation + Earthquake on positive Thermal*
LOAD 2171 0.9(DL+PO1) + 0.7EZO1(+) + 0.21EXO1(+)
REPEAT LOAD
1 0.9 3 0.9 8 0.7 9 0.21
LOAD 2172 0.9(DL+PO1) + 0.7EZO1(+) + 0.21EXO1(-)
REPEAT LOAD
1 0.9 3 0.9 8 0.7 9 -0.21
LOAD 2173 0.9(DL+PO1) + 0.7EZO1(-) + 0.21EXO1(+)
REPEAT LOAD
1 0.9 3 0.9 8 -0.7 9 0.21
LOAD 2174 0.9(DL+PO1) + 0.7EZO1(-) + 0.21EXO1(-)
REPEAT LOAD
1 0.9 3 0.9 8 -0.7 9 -0.21
LOAD 2175 0.9(DL+PO1) + 0.21EZO1(+) + 0.7EXO1(+)
REPEAT LOAD
1 0.9 3 0.9 8 0.21 9 0.7
LOAD 2176 0.9(DL+PO1) + 0.21EZO1(+) + 0.7EXO1(-)
REPEAT LOAD
1 0.9 3 0.9 8 0.21 9 -0.7
LOAD 2177 0.9(DL+PO1) + 0.21EZO1(-) + 0.7EXO1(+)
REPEAT LOAD
1 0.9 3 0.9 8 -0.21 9 0.7
LOAD 2178 0.9(DL+PO1) + 0.21EZO1(-) + 0.7EXO1(-)
REPEAT LOAD
1 0.9 3 0.9 8 -0.21 9 -0.7
LOAD 2179 0.9(DL+PO2) + 0.7EZO2(+) + 0.21EXO2(+)
REPEAT LOAD
1 0.9 4 0.9 10 0.7 11 0.21
LOAD 2180 0.9(DL+PO2) + 0.7EZO2(+) + 0.21EXO2(-)
REPEAT LOAD

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 60 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

1 0.9 4 0.9 10 0.7 11 -0.21


LOAD 2181 0.9(DL+PO2) + 0.7EZO2(-) + 0.21EXO2(+)
REPEAT LOAD
1 0.9 4 0.9 10 -0.7 11 0.21
LOAD 2182 0.9(DL+PO2) + 0.7EZO2(-) + 0.21EXO2(-)
REPEAT LOAD
1 0.9 4 0.9 10 -0.7 11 -0.21
LOAD 2183 0.9(DL+PO2) + 0.21EZO2(+) + 0.7EXO2(+)
REPEAT LOAD
1 0.9 4 0.9 10 0.21 11 0.7
LOAD 2184 0.9(DL+PO2) + 0.21EZO2(+) + 0.7EXO2(-)
REPEAT LOAD
1 0.9 4 0.9 10 0.21 11 -0.7
LOAD 2185 0.9(DL+PO2) + 0.21EZO2(-) + 0.7EXO2(+)
REPEAT LOAD
1 0.9 4 0.9 10 -0.21 11 0.7
LOAD 2186 0.9(DL+PO2) + 0.21EZO2(-) + 0.7EXO2(-)
REPEAT LOAD
1 0.9 4 0.9 10 -0.21 11 -0.7
**Normal Operation + Earthquake on negative Thermal*
*LOAD 281 0.9(DL+PO-TH) + 0.7EQX(+) + 0.21EQZ(+)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 0.7 8 0.21
*LOAD 282 0.9(DL+PO-TH) + 0.7EQX(+) + 0.21EQZ(-)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 0.7 8 -0.21
*LOAD 283 0.9(DL+PO-TH) + 0.7EQX(-) + 0.21EQZ(+)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 -0.7 8 0.21
*LOAD 284 0.9(DL+PO-TH) + 0.7EQX(-) + 0.21EQZ(-)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 -0.7 8 -0.21
*LOAD 285 0.9(DL+PO-TH) + 0.21EQX(+) + 0.7EQZ(+)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 0.21 8 0.7
*LOAD 286 0.9(DL+PO-TH) + 0.21EQX(+) + 0.7EQZ(-)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 0.21 8 -0.7
*LOAD 287 0.9(DL+PO-TH) + 0.21EQX(-) + 0.7EQZ(+)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 -0.21 8 0.7
*LOAD 288 0.9(DL+PO-TH) + 0.21EQX(-) + 0.7EQZ(-)
*REPEAT LOAD
*1 0.9 3 0.9 9 -0.9 7 -0.21 8 -0.7
*Normal Operation & Blast SLB on Positive Thermal*
LOAD 2191 DL + PO1 + 0.7BLZ
REPEAT LOAD
1 1.0 3 1.0 14 0.7
LOAD 2192 DL + PO2 + 0.7BLZ
REPEAT LOAD
1 1.0 4 1.0 14 0.7
LOAD 2193 DL + PO1 + 0.7BLX
REPEAT LOAD
1 1.0 3 1.0 15 0.7

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 61 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

LOAD 2194 DL + PO2 + 0.7BLX


REPEAT LOAD
1 1.0 4 1.0 15 0.7
**Normal Operation & Blast SLB on Negative Thermal*
*LOAD 293 DL + PO - TH + 0.7BLZ
*REPEAT LOAD
*1 1.0 3 1.0 9 -1.0 12 0.7
*LOAD 294 DL + PO - TH + 0.7BLX
*REPEAT LOAD
*1 1.0 3 1.0 9 -1.0 13 0.7
*Normal Operation & Blast DLB on Positive Thermal*
LOAD 2195 DL + PO1 + 0.7BLZ
REPEAT LOAD
1 1.0 3 1.0 16 0.7
LOAD 2196 DL + PO2 + 0.7BLZ
REPEAT LOAD
1 1.0 4 1.0 16 0.7
LOAD 2197 DL + PO1 + 0.7BLX
REPEAT LOAD
1 1.0 3 1.0 17 0.7
LOAD 2198 DL + PO2 + 0.7BLX
REPEAT LOAD
1 1.0 4 1.0 17 0.7
LOAD 18 LOADTYPE None TITLE LOAD CASE 18
REFERENCE LOAD
R3 1.0 R4 1.0
MODAL CALCULATION REQUESTED
PERFORM ANALYSIS
DEFINE ENVELOPE
1111 1112 1121 ENVELOPE 1 TYPE STRENGTH
**2.STRENGTH (TEMPORARY)
1131 TO 1134 1141 TO 1148 1151 TO 1154 1161 TO 1168 1171 TO 1186 1191 TO 1197 -
1198 ENVELOPE 2 TYPE STRENGTH
**====================================================================**
**3.SERVICEABILITY (PERMANENT)
2111 2112 2121 ENVELOPE 3 TYPE SERVICEABILITY
**4.SERVICEABILITY (TEMPORARY)
2131 TO 2134 2141 TO 2148 2151 TO 2154 2161 TO 2168 2171 TO 2186 2191 TO 2197 -
2198 ENVELOPE 4 TYPE SERVICEABILITY
END DEFINE ENVELOPE
*Steel Design
*LOAD LIST 211 212 221 231 TO 234 241 TO 248 251 TO 254 261 TO 268 271 TO 278 -
*281 TO 288 291 TO 298
*Permanent
*LOAD LIST 211 212 221
*Temporary
*LOAD LIST 231 TO 234 241 TO 248 251 TO 254 261 TO 268 271 TO 278 281 TO 288 -
*291 TO 298
*Factored
*LOAD LIST 1111 1112 1121 1131 TO 1134 1141 TO 1148 1151 TO 1154 1161 TO 1168 -
*1171 TO 1186 1191 TO 1198
LOAD LIST ENV 1 2
*****===========================================================================**

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 62 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

******========================== DESIGN PARAMETERS =============================**


*****===========================================================================**
*****==================== DESIGN CHECK (AISC 360-10*) ======================**
*****===========================================================================**
*****===========================================================================**
**** STRENGTH DESIGN *
*****===========================================================================**
****
*PARAMETER 1
*CODE AISC UNIFIED 2010
*METHOD LRFD
*MAIN 200 ALL
*RATIO 1 ALL
*TRACK 2 ALL
*FYLD 245000 ALL
*FU 400000 ALL
*TMAIN 300 ALL
**Parameter For Beam*
*LY 6 MEMB 58 TO 60 62 343 344 348 366 468 TO 471 480 483 486 489
***Parameter For Column**
*LZ 3 MEMB 1 2 288 289 303 304
**El. 5.05*
*KZ 0.95 MEMB 1 2 288 289 303 304 493 496 498 501 503 506
*KY 0.95 MEMB 1 2 288 289 303 304 493 496 498 501 503 506
**El. 11.5*
*LZ 4 MEMB 4 5 306 307 513 516
*CHECK CODE ALL
*STEEL MEMBER TAKE OFF ALL
**LOAD LIST 111 112 121 131 TO 134 141 TO 148 151 TO 154 161 TO 168 171 TO 178 -
**181 TO 188 191 TO 198
*LOAD LIST ENV 3 4
*PRINT SECTION MAX DISPL LIST 58 TO 60 62 65 311 329 343 344 348 366 444 446 -
*448 468 TO 471 480 483 486 489 492 494 499 504 509 514 520
*PRINT STORY DRIFT
PARAMETER 2
CODE AISC UNIFIED 2010
METHOD LRFD
FYLD 235000 ALL
FU 400000 ALL
MAIN 200 ALL
RATIO 1 ALL
TRACK 2 MEMB 58 TO 60 62 65 311 329 343 344 348 366 444 446 448 468 TO 471 -
480 483 486 489 492 494 499 504 509 514 520 540
DFF 360 MEMB 58 TO 60 62 65 311 329 343 344 348 366 444 446 448 468 TO 471 -
480 483 486 489 492 494 499 504 509 514 520 540
DJ1 8 MEMB 59
DJ2 33 MEMB 59
DJ1 33 MEMB 62
DJ2 34 MEMB 62
DJ1 163 MEMB 348
DJ2 34 MEMB 348
DJ1 163 MEMB 344
DJ2 147 MEMB 344

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 63 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

DJ1 7 MEMB 58
DJ2 31 MEMB 58
DJ1 31 MEMB 60
DJ2 32 MEMB 60
DJ1 162 MEMB 366
DJ2 32 MEMB 366
DJ1 162 MEMB 343
DJ2 146 MEMB 343
LOAD LIST ENV 3 4
CHECK CODE MEMB 58 TO 60 62 65 311 329 343 344 348 366 444 446 448 -
468 TO 471 480 483 486 489 492 494 499 504 509 514 520 540
FINISH

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 64 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.3. Steel Stress ratio

Table 10.7 - Steel Stress Ratio


Actual Allowable
Beam Analysis Property Clause L/C
Ratio Ratio
288 H250X250X9X14 0.426 1.000 Eq. H1-1b 1146
289 H250X250X9X14 0.411 1.000 Eq. H1-1b 1146
303 H250X250X9X14 0.404 1.000 Eq. H1-1b 1146
498 H250X250X9X14 0.398 1.000 Eq. H1-1b 1146
304 H250X250X9X14 0.397 1.000 Eq. H1-1b 1146
501 H250X250X9X14 0.384 1.000 Eq. H1-1b 1146
503 H250X250X9X14 0.377 1.000 Eq. H1-1b 1146
506 H250X250X9X14 0.371 1.000 Eq. H1-1b 1146
1 H250X250X9X14 0.352 1.000 Eq. H1-1b 1146
2 H250X250X9X14 0.329 1.000 Eq. H1-1b 1146
493 H250X250X9X14 0.329 1.000 Eq. H1-1b 1146
496 H250X250X9X14 0.308 1.000 Eq. H1-1b 1146
306 H250X250X9X14 0.296 1.000 Eq. H1-1b 1182
307 H250X250X9X14 0.265 1.000 Eq. H1-1b 1172
518 H250X250X9X14 0.248 1.000 Eq. H1-1b 1182
513 H250X250X9X14 0.242 1.000 Eq. H1-1b 1146
522 H250X250X9X14 0.222 1.000 Eq. H1-1b 1172
4 H250X250X9X14 0.213 1.000 Eq. H1-1b 1146
124 H250X250X9X14 0.186 1.000 Eq. H1-1b 1146
516 H250X250X9X14 0.183 1.000 Eq. H1-1b 1146
326 H250X250X9X14 0.173 1.000 Sec. G2.1(a) 1111
5 H250X250X9X14 0.172 1.000 Eq. H1-1b 1146
508 H250X250X9X14 0.158 1.000 Eq. H1-1b 1146
328 H250X250X9X14 0.154 1.000 Sec. G2.1(a) 1111
511 H250X250X9X14 0.142 1.000 Eq. H1-1b 1141
95 H250X250X9X14 0.118 1.000 Eq. H1-1b 1141
329 H300X150X6.5X9 0.933 1.000 Eq. H1-1b 1111
540 H300X150X6.5X9 0.627 1.000 Eq. H1-1b 1111
520 H300X150X6.5X9 0.382 1.000 Eq. H1-1b 1151
311 H300X150X6.5X9 0.37 1.000 Eq. H1-1b 1146
448 H300X150X6.5X9 0.328 1.000 Eq. H1-1b 1146
504 H300X150X6.5X9 0.298 1.000 Eq. H1-1b 1141
444 H300X150X6.5X9 0.281 1.000 Eq. H1-1b 1146
494 H300X150X6.5X9 0.27 1.000 Eq. H1-1b 1146
343 H300X150X6.5X9 0.257 1.000 Eq. H1-1b 1142
509 H300X150X6.5X9 0.225 1.000 Eq. H1-1b 1111
58 H300X150X6.5X9 0.222 1.000 Eq. H1-1b 1145
492 H300X150X6.5X9 0.218 1.000 Eq. H1-1b 1111
446 H300X150X6.5X9 0.202 1.000 Eq. H1-1b 1146
65 H300X150X6.5X9 0.197 1.000 Eq. H1-1b 1112
59 H300X150X6.5X9 0.195 1.000 Eq. H1-1b 1141
366 H300X150X6.5X9 0.19 1.000 Eq. H1-1b 1146

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 65 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

table 10.7 - Steel Stress Ratio (continued)


Actual Allowable
Beam Analysis Property Clause L/C
Ratio Ratio
344 H300X150X6.5X9 0.188 1.000 Eq. H1-1b 1145
483 H300X150X6.5X9 0.18 1.000 Eq. H1-1b 1145
471 H300X150X6.5X9 0.17 1.000 Eq. H1-1b 1141
470 H300X150X6.5X9 0.167 1.000 Eq. H1-1b 1141
489 H300X150X6.5X9 0.167 1.000 Eq. H1-1b 1145
348 H300X150X6.5X9 0.165 1.000 Eq. H1-1b 1141
499 H300X150X6.5X9 0.163 1.000 Eq. H1-1b 1141
486 H300X150X6.5X9 0.156 1.000 Eq. H1-1b 1146
480 H300X150X6.5X9 0.147 1.000 Eq. H1-1b 1141
60 H300X150X6.5X9 0.14 1.000 Eq. H1-1b 1141
469 H300X150X6.5X9 0.14 1.000 Eq. H1-1b 1145
514 H300X150X6.5X9 0.139 1.000 Eq. H1-1b 1144
62 H300X150X6.5X9 0.138 1.000 Eq. H1-1b 1146
468 H300X150X6.5X9 0.137 1.000 Eq. H1-1b 1141
500 L75X75X6 LDLD 0.658 1.000 Eq. H2-1 1146
505 L75X75X6 LDLD 0.636 1.000 Eq. H2-1 1146
507 L75X75X6 LDLD 0.606 1.000 Eq. H2-1 1141
502 L75X75X6 LDLD 0.537 1.000 Sec. E4 1141
495 L75X75X6 LDLD 0.534 1.000 Eq. H2-1 1146
497 L75X75X6 LDLD 0.405 1.000 Eq. H2-1 1141
521 L75X75X6 LDLD 0.393 1.000 Sec. E4 1182
523 L75X75X6 LDLD 0.376 1.000 Eq. H2-1 1172
515 L75X75X6 LDLD 0.301 1.000 Eq. H2-1 1146
510 L75X75X6 LDLD 0.262 1.000 Eq. H2-1 1181
512 L75X75X6 LDLD 0.228 1.000 Eq. H2-1 1141
517 L75X75X6 LDLD 0.208 1.000 Sec. E4 1141
543 L75X75X6 LDLD 0.007 1.000 Eq. H2-1 1134
545 L75X75X6 LDLD 0.007 1.000 Sec. E4 1134
547 L75X75X6 LDLD 0.007 1.000 Sec. E4 1134
549 L75X75X6 LDLD 0.007 1.000 Eq. H2-1 1132
551 L75X75X6 LDLD 0.007 1.000 Eq. H2-1 1132
553 L75X75X6 LDLD 0.007 1.000 Sec. E4 1134
555 L75X75X6 LDLD 0.007 1.000 Eq. H2-1 1132
557 L75X75X6 LDLD 0.007 1.000 Eq. H2-1 1132
490 H125X125X6.5X9 0.197 1.000 Sec. E1 1186
487 H125X125X6.5X9 0.196 1.000 Sec. E1 1186
484 H125X125X6.5X9 0.169 1.000 Sec. E1 1176
481 H125X125X6.5X9 0.166 1.000 Sec. E1 1176
482 H125X125X6.5X9 0.097 1.000 Sec. E1 1132
485 H125X125X6.5X9 0.097 1.000 Sec. E1 1132
491 H125X125X6.5X9 0.097 1.000 Sec. E1 1132
488 H125X125X6.5X9 0.096 1.000 Sec. E1 1132
541 H125X125X6.5X9 0.09 1.000 Sec. E4 1111
478 H125X125X6.5X9 0.083 1.000 Sec. E1 1186

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 66 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

table 10.7 - Steel Stress Ratio (continued)


Actual Allowable
Beam Analysis Property Clause L/C
Ratio Ratio
552 H125X125X6.5X9 0.08 1.000 Sec. E1 1186
476 H125X125X6.5X9 0.074 1.000 Sec. E1 1178
546 H125X125X6.5X9 0.072 1.000 Sec. E1 1178
474 H125X125X6.5X9 0.066 1.000 Sec. E1 1184
544 H125X125X6.5X9 0.064 1.000 Sec. E1 1184
472 H125X125X6.5X9 0.049 1.000 Sec. E1 1176
542 H125X125X6.5X9 0.046 1.000 Sec. E1 1176
479 H125X125X6.5X9 0.036 1.000 Eq. Sec. D2 1186
556 H125X125X6.5X9 0.035 1.000 Eq. Sec. D2 1186
477 H125X125X6.5X9 0.033 1.000 Eq. Sec. D2 1178
554 H125X125X6.5X9 0.032 1.000 Eq. Sec. D2 1178
475 H125X125X6.5X9 0.03 1.000 Eq. Sec. D2 1184
550 H125X125X6.5X9 0.028 1.000 Eq. Sec. D2 1184
548 H125X125X6.5X9 0.026 1.000 Sec. E1 1177
473 H125X125X6.5X9 0.023 1.000 Sec. E1 1177

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 67 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.4. Deflection Check


10.4.1. Sway Check
Sway check shall not be over H/200 (refer to Ref 2.1.4)

Table 10.8 - Column Displacement Summary Output


Resultant
Node L/C X (mm) Y (mm) Z (mm) rX (rad) rY (rad) rZ (rad)
(mm)
Max X 147 1121 0.0490 -0.5360 -0.0070 0.5390 -0.002 0 0
Min X 7 1111 -0.7740 -0.5770 4.4870 4.5900 0.001 -0.001 0.001
Max Y 8 1112 -0.2230 0.0130 -14.3710 14.3730 -0.001 0 0
Min Y 146 1112 -0.4980 -0.6790 -21.7460 21.7630 0.001 -0.002 0
Max Z 147 1111 -0.3380 -0.5070 19.4760 19.4850 -0.001 -0.001 0
Min Z 146 1112 -0.4980 -0.6790 -21.7460 21.7630 0.001 -0.002 0
Max rX 146 1121 0.0240 -0.5390 -0.0280 0.5400 0.002 0 0
Min rX 147 1121 0.0490 -0.5360 -0.0070 0.5390 -0.002 0 0
Max rY 147 1112 -0.2370 0.0090 -21.7290 21.7300 -0.001 0.002 0
Min rY 146 1112 -0.4980 -0.6790 -21.7460 21.7630 0.001 -0.002 0
Max rZ 7 1111 -0.7740 -0.5770 4.4870 4.5900 0.001 -0.001 0.001
Min rZ 147 1121 0.0490 -0.5360 -0.0070 0.5390 -0.002 0 0
Max Rst 146 1112 -0.4980 -0.6790 -21.7460 21.7630 0.001 -0.002 0

10.4.2. Beam Deflection


Beam displacement ratio shall be less than L/360.

Table 10.9 - Beam Deflection


Actual Allowable
Beam Analysis Property Clause L/C
Ratio Ratio
329 H300X150X6.5X9 0.631 1.000 DEFLECTION 2198
540 H300X150X6.5X9 0.466 1.000 DEFLECTION 2198
343 H300X150X6.5X9 0.192 1.000 DEFLECTION 2198
311 H300X150X6.5X9 0.147 1.000 DEFLECTION 2198
520 H300X150X6.5X9 0.134 1.000 DEFLECTION 2198
366 H300X150X6.5X9 0.13 1.000 DEFLECTION 2198
348 H300X150X6.5X9 0.122 1.000 DEFLECTION 2198
344 H300X150X6.5X9 0.106 1.000 DEFLECTION 2198
59 H300X150X6.5X9 0.081 1.000 DEFLECTION 2198
65 H300X150X6.5X9 0.08 1.000 DEFLECTION 2198
60 H300X150X6.5X9 0.079 1.000 DEFLECTION 2198
492 H300X150X6.5X9 0.078 1.000 DEFLECTION 2198
58 H300X150X6.5X9 0.076 1.000 DEFLECTION 2198
470 H300X150X6.5X9 0.075 1.000 DEFLECTION 2198
471 H300X150X6.5X9 0.075 1.000 DEFLECTION 2198
509 H300X150X6.5X9 0.074 1.000 DEFLECTION 2198
62 H300X150X6.5X9 0.073 1.000 DEFLECTION 2198
504 H300X150X6.5X9 0.068 1.000 DEFLECTION 2198
483 H300X150X6.5X9 0.065 1.000 DEFLECTION 2198
489 H300X150X6.5X9 0.065 1.000 DEFLECTION 2198

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 68 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Table 10.9 - Beam Deflection (Continued)


Actual Allowable
Beam Analysis Property Clause L/C
Ratio Ratio
448 H300X150X6.5X9 0.064 1.000 DEFLECTION 2198
514 H300X150X6.5X9 0.061 1.000 DEFLECTION 2198
444 H300X150X6.5X9 0.057 1.000 DEFLECTION 2198
494 H300X150X6.5X9 0.057 1.000 DEFLECTION 2198
480 H300X150X6.5X9 0.048 1.000 DEFLECTION 2198
486 H300X150X6.5X9 0.048 1.000 DEFLECTION 2198
468 H300X150X6.5X9 0.041 1.000 DEFLECTION 2198
469 H300X150X6.5X9 0.041 1.000 DEFLECTION 2198
446 H300X150X6.5X9 0.03 1.000 DEFLECTION 2198
499 H300X150X6.5X9 0.03 1.000 DEFLECTION 2198

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 69 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5. Connection Design


10.5.1. Beam to Column Moment Connection Bolted Type (C1)

R1 Column (R1) WH 250


R2 Beam (R2) SH 300

10.5.1.1. Member Capacity Calculation


Used member : SH 300 ; member properties as follows :
d = 300 mm
tf = 9 mm
tw = 6.5 mm
bf = 150 mm
4
Ix = 72,100,000 mm
3
Sx = 481,000 mm

Allowable tensile for steel structure (Fbx) :


Fbx = 0.6 * Fy
= 141 MPa

Moment Capacity of the member (Mcap):


M1 = Fbx * Sx
= 67821000 N.mm
= 691345.5657 kg.cm = 67.82 kN.m

Allowable shear for steel structure (Fv) :


Fv = 0.4 * Fy
= 94 MPa

Shear capacity of the member (Vcap)


V1 = Aw * Fv
= (d - 2 tf - 2 r)* tw * Fv where : r = scallop, assumed 20 mm
= 147862 N
= 15072.58 kg = 147.862 kN

Tension of Beam Member


T1 = A * 0.6 * Fy
where : A = Cross section area of the member
= 46.78 cm2
T1 = 67237 kg

SUMMARY : For member SH 300


Moment Capacity M1 = 67.82 kN.m
Shear Capacity V1 = 147.86 kN
Tension Capacity T1 = 659.59 kN

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 70 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.1.2. Connection Design


10.5.1.2.1. Bolt Arrangement Check

Used bolt diameter (db):


db = 20 mm
n = 8 nos

minimum spacing (s) :


The distance between centers of standard, oversized or slotted fastener holes shall not
be less than 2,67 times the nominal diameter of the fastener* (a distance of 3db is preferred)
if applicable. Along a line of transmitted force, the distance between centers of holes
shall be not less than 3db when Fp = 1,2 Fu or Fp = Fu. Otherwise, the distance between
centers of holes shall not be less than s ≤ 2 P/Fu.t + d/2 for standard hole.

s = 3 * db
= 60 mm

minimum edge distance :


Along a line of transmitted force, in the direction of the force, the distance from the center of
a standard hole to the edge of connected part Le shall be less than 1,5 db.when
Fp = 1.2 Fu or Fp = Fu. Otherwise the edge distance shall be not less than Le ≤ 2P/Fu.t

Le = 1.5 * db
= 30 mm

For designing bolt arrangement is given dimension below :


1. Bolt to bolt distances :
a1 = 40 mm
a2 = 80 mm
a1 + a2 = 120 mm > s= 60 mm → OK > s
c = 0 mm < s= 60 mm → designed with 4
line of bolt only

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 71 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

L1 = 140 mm > s= 60 mm → OK > s


L2 = 90 mm > s= 60 mm → OK > s

2. Bolt to edge distances :


b = 40 mm Le = 30 mm → OK > Le
e = 45 mm Le = 30 mm → OK > Le

10.5.1.2.2. Bolt Capacity Check


Allowable shear of bolt (V2) :
V2 = n . ɸ x Fv . A bolt
where : n = number of bolts
Fv = allowable shear per one bolt
Abolt = section area of bolt = 1/4 * π * d^2

For designing connection is given anchor specification below :


n = 8 nos ɸ = 0.75
Fv = 372.00 MPa
2
Abolt = 314.2 mm
Then, allowable shear of bolt / bolt shear capacity is follows :
V2 = 8 * 0.75 * 372 * 314.2
= 701294 N
= 71487.71 kg
= 701.29 kN

Allowable moment due to bolt tension (M2)


M2 = Ft . Sb
where : Ft = allowable tension stress = (442 - 4.39fv2)1/2
fv = Vmin / (n . Abolt)
Sb = section modulus = Iyb / y1
Iyb = moment inertia of bolt = Σab*y2 + bf *d13/3
d1 = distance from bottom plate to neutral axist
y1 = M - b - d1

with taken configuration as follows :

b
a1
a2

M y1
L1 y2

a2 y3
a1
d1
b
bf
N

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 72 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

1 2
Force equilibrium : bf x d1 =  Ab x Y
2

d1 = 74.214 mm (trial and error)

Check :
150x 0.5 x74.3^2 =
2 x 314.2 x 345.79 + 2 x 314.2 x 225.79 + 2 x 314.2 x 85.79

413083.053 = 413083.053 … Ok d1 trial can be used


M = 460 mm
b = 40 mm
y1 = 345.7856 mm
bf = 150 mm

Iyb = π / 4 * db2 [2y12 + 2 (y2)2+2 (y3)2] + bf*d13/3


4
= 132219447.6 mm
Sb = Iyb / y1
= 132219447.56 / 345.79
3
= 382374.0477 mm

For designing connection is given anchor specification below :


fv = V1 / (n * Abolt)
= 147862 / 8 / 314.2
= 58.82479 MPa = 8.531815 ksi
Ft = (442 - 4.39 fv2)1/2 (for A325)
= 40.20502 ksi = 277.2039 MPa

Then, allowable moment due to bolt tension is as follows :


M2 = Ft . Sb
= 105995562.3 N.mm
= 105.9955623 kN.m

Tension of Bolt
T2 = ((M3/(d-tf))/4)*n
= 55651 kg
= 545.94 kN
COG
TT

10.5.1.2.3. Plat Capacity Check


Allowable hole bearing on end plate :
V3 = Fp . db . tp . n
where : Fp = allowable bearing stress
Fp = 1.2 Fu; if Lv ≥ 1.5db and s ≥ 3db
Fp = 0.5 Fu (s/d-0.5); if s < 3 db
Fp = (Lv . Fu) / 2 db ≤ 1.2 Fu; Lv < 1.5db
Lc = distance center of hole to edge of end plate
tp = end plat thickness

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 73 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

For designing connection is given anchor specification below :


Fu = 400.00 Mpa ɸ = 0.75
db = 20 mm
tp = 22 mm
n = 8 bolt
Lc = 22 mm =
Fp =

= 1.2 x 22 x 22.00 x 400.00 ≤ 2.4 x 20 x 22.00 x 400.00


= 232.32 ≤ 422
= 232 kN

Then, allowable bolt bearing is follows :


V3 = 0.75 * 232.32 * 8
= 1393.92 N
= 142.0917 kg
= 1393.92 kN

Allowable moment on end plate (M3) :


Me = 1/6bp . tp2 . Fb

Maximum tension at flange due to Me


Ff = (4.Me) / (αm. Pe)

M3 = Ff . (d - tf)
 1 2 
=  ( 6 .bp.tp .0.75Fy) 
 4.  .(d − tf)
 (  m.Pe) 
 
where : αm = CaCb . (Af/Aw)1/3 . (Pe/db)1/4
Ca = constant = 1.13
Cb = (bfb / bp)1/2
bp = bfb + 2.5 cm (maximum effective width)
Fb = 0.75Fy
tp = end plate thickness
bp = end plate width
Ff = flange force
Me = extreme fibre bending moment in end plate
Pe = effective bolt distance from top of beam flange
= a1 - db/4 - 0.707*g
Pf = bolt distance from top of beam flange (a1)
bfb = beam flange width in end plate
g = fillet weld size or reinforcement of groove weld

For designing connection is given anchor specification below :


tp = 22 mm
bfb = 150 mm

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 74 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

bp = 180 mm
Ca = 1.13
Cb = 0.912870929
Fb = 176.25 MPa

Me = 2559150 N.mm
Pf = 40 mm
Pe = 35 mm
Af = 1350 mm2
Aw = 1833 mm2
bp = 180 mm
tp = 22 mm
Me = 2559150 Nmm
= 26087.15596 kgcm
αm = 1.071448005
Ff = 272971.0489 N
M3 = 79434575.23 Nmm
= 809730.6343 kg.cm
= 79.35 kN.m

10.5.1.2.4. Weld Capacity Check


Allowable shear of welding (V4) :
V4 = 2 * 0.707 g * (d - 2tf - 2Sc) * E70
where : g = leg of fillet weld on web of beam requirement due to shear stress
E70 = 0.3 * 60 * 70.31 = 1300 kg/cm2
g = 9 mm
d = 300 mm
tf = 9 mm
Sc = 20 mm
E70 = 70 ksi
Then, the allowable shear of welding:
V4 = 45471.96 kg
= 446.0799 kN

Weld on Web and Beam Flange Tension


T3 = V4 + (bf * tf * 2 * 0.6 * Fy)
= 84279 kg
= 826.777 kN
Tmin = 55651 kg
= 545.94 kN

10.5.1.2.5. Combination of Tension and Moment


Tension and moment of the member shall conform the below formula:

M T
+ ≤ 1
Mall Tall

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 75 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Where :
M = Moment
T = Tension force
Mall = Allowable moment capacity
Tall = Allowable tension capacity

Mall = 67.82 kN.m


Tall = 545.94 kN

So, the inner forces of the member shall conform the below formula
M T
+ ≤ 1
67.82 545.94

10.5.1.3. Checking
Member Moment Capacity Governed Allowable
Designation Member Bolts End Plate Moment Capacity
(kN.m) (kN.m) (kN.m) (kN.m)
SH 300 67.82 106.00 79.35 67.82

Member Shear Capacity Governed Allowable


Designation Member Bolts Plate Bearing Welding Shear Capacity
(kN) (kN) (kN) (kN) (kN)
SH 300 147.86 701.29 1393.92 446.08 147.86

Member Tension Capacity Governed Allowable


Designation Member Bolts Welding Tension Capacity
(kN) (kN) (kN) (kN)
SH 300 659.59 545.94 826.78 545.94

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 76 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.2. Bracing Connection (C2)


10.5.2.1. Allowable Axial Forces Based on Bolt Shear Capacity C1, T1

C1a = T1a = Fvbolt * (n * m) * Ab m1


m2

where
Fvbolt = allowable shear per one bolt
= 372.00 MPa
n = number row of bolt n3
m = number column of bolt n2
n*m = number of bolt
n1
Ab = single area of bolt

Brace member: 2L 75
Fvbolt = 372.00 Mpa n = 2 ea db = 20 mm
2 2
= 3720 kg/cm m = 2 ea Ab = 314 mm

C1a = T1a = 46746.90 kg


= 458.59 kN

For Tee Brace Type

C1b = T1b = Fvbolt * (n * m) * Ab

Brace member: 2L 75

Fvbolt = 372.00 MPa n = 2 ea db = 20 mm


2 2
= 26154.2 kg/cm m = 2 ea Ab = 314 mm

C1b = T1b = 328663 kg


= 3224.19 kN

10.5.2.2. Allowable Axial Forces Based on Bolt Bearing of Brace and Gusset Plate C2, T2

C2a = T2a = Fp * (n * m) * db * tg (Gusset Plate)


T2b = Fp * (n * m) * db * tf (Tee Brace Type-2)
C2c= T2c = Fp * (n * m) * db * t (Angle Brace Type)

where;
Fp = 1.2 Fu; if lv ≥ 1.5 db and s ≥ 3 db
Fp = lv*Fu/2 db ≤ 1.2 Fu; if lv < 1.5 db
Fp = 0.5*Fu (s/db-0.5); if s < 3 db

Brace member: 2L 75
2
Fp = 4895 kg/cm n = 2 ea db = 20 mm
= 480.17 MPa m = 2 ea tg = 12 mm
tw = 6 mm

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 77 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

C2a = T2a = 46989 kg


= 460.96 kN

C2c = T2c = 23494 kg


= 230.48 kN
Brace member: 2L 75

2
Fp = 4895 kg/cm n = 2 ea db = 20 mm
= 480.17 MPa m = 2 ea tf = 9 mm

T2b = 35242 kg
345.72 kN

10.5.2.3. Allowable Tension Forces of Brace and Gusset Plate Tear Out (Block Shear) T3
The tear out check will be applied only on gusset plate.
For Tee Brace

T3a = Av * Fv + At * Ft
= Av * (0.3 * Fu) + At * (0.5 * Fu)

where;

Av = (lv + (n - 1) * (s - dh) - 0.5 dh) * 2 * tg


At = (L1 - dh) * tg

Brace member: 2L 75

lv = 40 mm s = 60 mm tg = 12 mm
n = 2 ea dh = 22 mm L1 = 150 mm

2 2
Av = 16.08 cm Fu = 4079 kg/cm
2
At = 15.36 cm = 400 MPa

T3a = 51002 kg
= 500.33 kN

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 78 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

For Angle Brace Type

Tear Out on Member

T3b = Av * Fv + At * Ft
= Av * (0.3 * Fu) + At * (0.5 * Fu)

For d < 150;


Av = ( Lv + (n-1) * (s-dh) - 0.5 * dh) * tg
At = ( Lh + 10 - 0.5dh) * tg

Brace member: 2L 75

lv = 40 mm s = 60 mm tg = 12 mm
n = 2 ea dh = 22 mm Lh = 45 mm
2 2
Av = 8.04 cm Fu = 4079 kg/cm
2
At = 5.28 cm

T3b = 20607 kg
= 202.15 kN

For d ≥ 150;
Av = ( Lv + (n-1) * ( s-dh) - 0.5 * dh) * tg
At = ( Lh + 10 - 1.5 * dh) * tg

10.5.2.4. Allowable Axial Tension Forces of Gusset Plate T5 (For Tension Brace Only)

T5a = Ag * 0.60 Fy tg

T5b = Ae * 0.50 Fu
Ls
Where;
Ag = Ls. tg
Ae = An
An = (Ls - m.dh).tg ≤ 0.85 Ag
GUSSET
Ls = bf + 20 PLATE
Ls = d + 20

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 79 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

The value of T5 is the smallest between T5a and T5b.


Brace member: 2L 75

Ls = 95 mm m = 2 ea bf = 75 mm
tg = 12 mm dh = 22 mm d = 75 mm
2
Ag = 1140 mm Fy = 2396 kg/cm2
2 2
Ae = An = 612 mm < 969 mm Fu = 4079 kg/cm2

T5a = 16391 kg
= 160.80 kN
T5b = 12481 kg
= 122.44 kN

10.5.2.5. Allowable Axial Tension Forces of Brace T6 (For Tension Brace Only)
For Tee Brace

T6a’ = Ag * 0.60 Fy
T6a” = Ae * 0.50 Fu (Ref 3 Sect D.1)

where;
Ag = Member Gross Area
Ae = U. An
An = Ag - m.dh.tf
U = 0.9 when bf ≥ 2/3 dp and n ≥ 3
= 0.85 when bf < 2/3 dp and n ≥ 3
= 0.75 when n < 3
dp = depth of shape of the Tee brace cut from AISC 9th edition Sec B. 3

Brace member: 2L 75

2 2
m = 2 ea Ag = 1140.00 cm Ae = 1022.436 mm
dh = 22 mm U = 0.9
2
tf = 9 mm An = 1136.04 mm
2
Fy = 2396 kg/cm
2
Fu = 4079 kg/cm

T6a’ = 1639098 kg
= 16079.55 kN
T6a” = 2085197 kg
= 20455.78 kN

The value of T6a is the smallest between T6a’ and T6a”.


For Angle Brace Type

T6b’ = Ag * 0.60 Fy
T6b” = Ae * 0.50 Fu
where ;
Ae = U. An

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 80 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

An = Ag - m.dh.t
U = 0.75

Brace member: 2L 75
2
m = 2 ea Ag = 17.46 cm
2
dh = 22 mm An = 13.5 mm
2
tf = 9 mm Ae = 10.125 mm
T6b’ = 25104 kg
= 246.27 kN
T6b” = 20649 kg
= 202.57 kN

The value of T6b is the smallest between T6b’ and T6b”.

10.5.2.6. Allowable Axial Forces due to welding shear of Gusset Plate C7, T7
2 Sides
tg
a
lh
Ls
s
Ø
Lg lh

Ø lv
s
lv

Lg = Ls/sinØ + ((n-1)*s+2lv)* cosØ


Fillet weld
C7a = T7a = (2 * 0.707 * a * Lg * 0.3Fu)

Brace member: 2L 75

2
Ls = 95 mm n = 2 ea Fu = 4079 kg/cm
lv = 40 mm Ø = 60 o
s = 60 mm a = 10 mm

Lg = 180 mm

C7a = T7a = 31092 kg


= 305.01 kN

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 81 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.2.7. Checking

Allowable Shear Allowable


Member (kN) Shear Capacity
C1 C2a C2c C7 (kN) *
2L 75 458.6 461.0 230.5 305.0 230.48

Allowable Tension Allowable


Member (kN) Tension Capacity
T1 T2a T2c T3 T5a T5b T6 T7 (kN) *
2L 75 458.6 461.0 230.5 202.1 160.8 122.4 202.6 305.0 122.4

10.5.3. Bracing Connection (C3)


10.5.3.1. Allowable Axial Forces Based on Bolt Shear Capacity C1, T1

C1a = T1a = Fvbolt * (n * m) * Ab m1


m2

where
Fvbolt = allowable shear per one bolt
= 372.00 MPa
n = number row of bolt n3
m = number column of bolt n2
n*m = number of bolt
n1
Ab = single area of bolt

Brace member: WH 125

Fvbolt = 372.00 Mpa n = 4 ea db = 20 mm


2 2
= 3720 kg/cm m = 2 ea Ab = 314 mm

C1a = T1a = 93,493.8 kg


= 917.17 kN

For Tee Brace Type

C1b = T1b = Fvbolt * (n * m) * Ab

Brace member: WH 125

Fvbolt = 372.00 MPa n = 4 ea db = 20 mm


2 2
= 26154.2 kg/cm m = 2 ea Ab = 2513 mm

C1b = T1b = 5258614 kg


= 51587.00 kN

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 82 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.3.2. Allowable Axial Forces Based on Bolt Bearing of Brace and Gusset Plate C2, T2

C2a = T2a = Fp * (n * m) * db * tg (Gusset Plate)


T2b = Fp * (n * m) * db * tf (Tee Brace Type-2)
C2c= T2c = Fp * (n * m) * db * t

where;
Fp = 1.2 Fu; if lv ≥ 1.5 db and s ≥ 3 db
Fp = lv*Fu/2 db ≤ 1.2 Fu; if lv < 1.5 db
Fp = 0.5*Fu (s/db-0.5); if s < 3 db

Brace member: WH 125

2
Fp = 4895 kg/cm n = 4 ea db = 20 mm
= 480.17 MPa m = 2 ea tg = 9 mm
tw = 6.5 mm

C2a = T2a = 70483 kg


= 691.44 kN

C2c = T2c = 50904 kg


= 499.37 kN

Brace member: WH 125

2
Fp = 4895 kg/cm n = 4 ea db = 20 mm
= 480.17 MPa m = 2 ea tf = 9 mm

T2b = 70483 kg
691.44 kN

10.5.3.3. Allowable Tension Forces of Brace and Gusset Plate Tear Out (Block Shear) T3
The tear out check will be applied only on gusset plate.
For Tee Brace

T3a = Av * Fv + At * Ft
= Av * (0.3 * Fu) + At * (0.5 * Fu)
where;

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 83 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Av = (lv + (n - 1) * (s - dh) - 0.5 dh) * 2 * tg


At = (L1 - dh) * tg

Brace member: WH 125

lv = 40 mm s = 60 mm tg = 12 mm
n = 4 ea dh = 22 mm L1 = 80 mm

2 2
Av = 34.32 cm Fu = 150 kg/cm
2
At = 6.96 cm = 400 MPa

T3a = 2066 kg
= 20.27 kN

10.5.3.4. Allowable Axial Tension Forces of Gusset Plate T5 (For Tension Brace Only)

T5a = Ag * 0.60 Fy tg

T5b = Ae * 0.50 Fu
Ls
Where;
Ag = Ls. tg
Ae = An
An = (Ls - m.dh).tg ≤ 0.85 Ag
GUSSET
Ls = bf + 20 PLATE
Ls = d + 20
The value of T5 is the smallest between T5a and T5b.
Brace member: WH 125

Ls = 145 mm m = 2 ea bf = 125 mm
tg = 9 mm dh = 22 mm d = 125 mm
2
Ag = 1305 mm Fy = 2396 kg/cm2
2 2
Ae = An = 909 mm < 1109 mm Fu = 4079 kg/cm2

T5a = 18763 kg
= 184.07 kN
T5b = 18539 kg
= 181.86 kN

10.5.3.5. Allowable Axial Tension Forces of Brace T6 (For Tension Brace Only)
For Tee Brace

T6a’ = Ag * 0.60 Fy
T6a” = Ae * 0.50 Fu (Ref 3 Sect D.1)

where;

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 84 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Ag = Member Gross Area


Ae = U. An
An = Ag - m.dh.tf
U = 0.9 when bf ≥ 2/3 dp and n ≥ 3
= 0.85 when bf < 2/3 dp and n ≥ 3
= 0.75 when n < 3
dp = depth of shape of the Tee brace cut from AISC 9th edition Sec B. 3

Brace member: WH 125

2 2
m = 2 ea Ag = 23.39 cm Ae = 17.487 mm
dh = 22 mm U = 0.9
2
tf = 9 mm An = 19.43 mm

2
Fy = 2396 kg/cm
2
Fu = 4079 kg/cm

T6a’ = 33630 kg
= 329.91 kN
T6a” = 35664 kg
= 349.86 kN

The value of T6a is the smallest between T6a’ and T6a”.

For Angle Brace Type

T6b’ = Ag * 0.60 Fy
T6b” = Ae * 0.50 Fu
where ;
Ae = U. An
An = Ag - m.dh.t
U = 0.75

Brace member: WH 125


2
m = 2 ea Ag = 30.31 cm
2
dh = 22 mm An = 26.35 mm
2
tf = 9 mm Ae = 19.7625 mm
T6b’ = 43580 kg
= 427.52 kN
T6b” = 40304 kg
= 395.39 kN

The value of T6b is the smallest between T6b’ and T6b”.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 85 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.3.6. Allowable Axial Forces due to welding shear of Gusset Plate C7, T7
2 Sides
tg
a
lh
Ls
s
Ø
Lg lh

Ø lv
s
lv

Lg = Ls/sinØ + ((n-1)*s+2lv)* cosØ


Fillet weld
C7a = T7a = (2 * 0.707 * a * Lg * 0.3Fu)

Brace member: WH 125


2
Ls = 145 mm n = 4 ea Fu = 4079 kg/cm
lv = 40 mm Ø = 60 o
s = 60 mm a = 7 mm
Lg = 297 mm

C7a = T7a = 36024 kg


= 353.40 kN

10.5.3.7. Checking

Allowable Shear Allowable


Member (kN) Shear Capacity
C1 C2a C2c C7 (kN) *
WH 125 917.2 691.4 499.4 353.4 353.40

Allowable Tension Allowable


Member (kN) Tension Capacity
T1 T2a T2c T3 T5a T5b T6 T7 (kN) *
WH 125 917.2 691.4 499.4 233.7 184.1 181.9 395.4 353.4 181.9

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 86 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.4. Base Plate Pinned Connection (C4)


10.5.4.1. Material Mechanical Characteristics

Profile = Column member = WH 250


f'c = 28.00 MPa
Fu = 400.00 MPa
Fy = 235.00 MPa
Fys = 245.00 MPa
FE70xx = 483.00 MPa
dc = Overall column depth = 250.00 mm
bf = Column flange width = 250.00 mm
tw = Column web thickness = 9.00 mm
tf = Column flange thickness = 14.00 mm
R = Corner radius of member = 25.00 mm
PB = Pedestal width = 450.00 mm
PN = Pedestal length = 450.00 mm
B = Base plate width = 300.00 mm
N = Base plate length = 300.00 mm
tp = Base plate thickness = 25.00 mm
a = See sketch = 120.00 mm
b = See sketch = 120.00 mm
c = See sketch = 90.00 mm
d = See sketch = 90.00 mm
ts = Stiffener plate thickness = 10.00 mm
Hs = Stiffener plate height = 250.00 mm
r = Scallop for stiffener = 25.00 mm

10.5.4.2. Compressive Axial Capacity


10.5.4.2.1. Concrete Bearing Limit Check
2
A1 = Area of the base plate = 90000 mm
= BxN
2
A2 = Max. area of the supporting = 202500 mm
concrete
= PB x PN
Ø = Resistance factor = 0.60

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 87 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

P1 = Nominal bearing strength = 1927.80 kN ≤ Ø x 1.7 x f'c x A1 = 2570.4


= Ø x 0.85 x f'c x A1 x √(A2/A1) kN….OK

10.5.4.2.2. Base Plate Yielding Limit


Refer to "AISC Design Guide 1 Section 3.1.2", bearing pressure causes bending in the base plate at
the assumed critical sections shown in figure below :

m = (N - 0.95dc) / 2 = 31.25 mm
n = (B - 0.8bf) / 2 = 50.00 mm
λ = 1.00 for conservative
λn' = Yield-line theory cantilever = 62.50 mm
distance from column web
or flange
= λ √(dc x bf) / 4
l = The critical base plate = 62.50 mm
cantilever dimension
= max (m, n, λn')
Ø = Resistance factor for flexure = 0.90
tp = l x √((2 x P2) / (ØFy x B x N))
tp2 2
= l x (2 x P2) / (ØFy x B x N)
From above equation, formula can be arranged as follow to get variable P :
P2 = The required axial = 1522.80 kN
compressive load
= (Ø tp2 x Fy x B x N) / (2 x l 2)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 88 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.4.2.3. Axial Capacity due to Shear Rupture on Stiffener Plate

a1 = (a - tw) / 2 = 55.50 mm
2
Ast = Area of tributary stiffener = 14130.00 mm
= (1/2 x b x a1) + ((B - a) / 2) x b
2
Ae-st = (Hs - r) x ts = 2250.00 mm
Ø = Resistance factor = 0.75
Vr = Ø 0.6 Fu x Ae-st = 405.00 kN

P3 = The required axial due to = 2579.62 kN


rupture
= Vr x A1 / Ast

10.5.4.2.4. Axial Capacity due to Shear Yielding on Stiffener Plate

a1 = (a - tw) / 2 = 55.50 mm
2
Ast = Area of tributary stiffener = 14130.00 mm
= (1/2 x b x a1) + ((B - a) / 2) x b
2
Ag-st = Hs x ts = 2500.00 mm
Ø = Resistance factor = 0.75
Vr = Ø 0.6 Fys x Ag-st = 275.63 kN

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 89 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

P4 = The required axial due to = 1755.57 kN


rupture
= Vr x A1 / Ast
10.5.4.2.5. Axial Capacity due to Flexural Rupture on Stiffener Plate

2
A1 = Area of the base plate = 90000 mm
2
Ast = Area of tributary stiffener = 14130 mm
3
Znet = Net plastic sec. modulus = 126563 mm
= 1/4 x (Hs - r)2 x ts
y = 2/3 x ((bf - tw)/2) = 80.33 mm
Ø = Resistance factor = 0.75

P5 = The required axial due to = 3010.45 kN


flexural rupture
= (Ø Fu x Znet x A1) / (Ast x y)

10.5.4.2.6. Axial Capacity due to Flexural Yielding on Stiffener Plate

2
A1 = Area of the base plate = 90000 mm
2
Ast = Area of tributary stiffener = 14130 mm
3
Zgross = Gross plastic sec. modulus = 156250 mm
= 1/4 x Hs2 x ts
y = 2/3 x ((bf - tw)/2) = 80.33 mm
Ø = Resistance factor = 0.75

P6 = The required axial due to = 2276.42 kN


flexural yielding
= (Ø Fu x Zgross x A1) / (Ast x y)

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 90 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.4.2.7. Axial Capacity due to Weld on Stiffener Plate

2
A1 = Area of the base plate = 90000 mm
2
Ast = Area of tributary stiffener = 14130 mm
θ = Angle = 0o
Lw = Length of weld = 225.00 mm
= Hs - r
W1 = Min. size of fillet weld = 9.00 mm
Aw = Effective area of weld = 2863.35 mm
= 2 x 0.707 x W 1 x Lw
Fnw = Nominal stress of weld = 289.80 MPa
= 0.6 x Fe70 x (1 + 0.5 sin1.5 θ)
Ø = Resistance factor = 0.75
V = Ø Fnw x Aw = 622.35 kN

P7 = The required axial due to = 3964.01 kN


weld on stiffener
= V x A1 / Ast

10.5.4.2.8. Axial Capacity due to Combine Strength

A1 = Area of the base plate = 90000 mm2


Ast = Are of tributary stiffener = 14130 mm2
Øv = Resistance factor shear = 1.00
Øb = Resistance factor moment = 0.90
y = 2/3 x ((bf - tw)/2) = 80.33 mm
Ag-st = Gross cross sectional area = 2500.00 mm2
of stiffener
= Hs x ts

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 91 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

3
Zpl-st = Plastic section modulus of = 156250 mm
stiffener
= 1/4 x Hs2 x ts
Vr = = 279.06 kN
= Fys / ((1/(Øv 0.6 x Ag-st))^2 + (y/(Øb Zpl-st))^2)^0.5

P8 = The required axial due to = 1777.46 kN


combine strength
= Vr x A1 / Ast

10.5.4.3. Tensile Axial Capacity


10.5.4.3.1. Anchor Capacity
db = Diameter of anchor bolt = 25.40 mm
n = Number of bolt = 4 ea
Tavl-bolt = Available tension per one = 210 kN
anchor bolt

T1 = Tension of anchor bolt = 839.11 kN


= n x Tavl-bolt

10.5.4.3.2. Base Plate Yielding Limit

n = Number of bolt = 4 ea
b1 = (b - ts) / 2 = 55.00 mm
a1 = (a - tw) / 2 = 55.50 mm
beff = 1 = 1.00 mm ..moment will calculate based
on per mm width of section
Ø = Resistance factor = 0.90
Mu = Z x ØFy
= 1/4 x beff x t2 x ØFy = 33046.88 N.mm/mm

From above equation, formula can be arranged as follow to get available T :


T = 199.12 kN
T2 = Tension of base plate = 796.48 kN
= nxT

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 92 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.4.6.3. Weld Tension Check


θ = Angle = 90 o
w = Size of fillet weld leg = 9.00 mm
FE70 = Filler metal classification = 483.00 MPa
strength
Fnw = Nominal stress of the weld = 434.70 MPa
metal
= 0.6 x Fe70 x (1 + 0.5 sin1.5 θ)
Lw = Length of weld = 1226.00 mm
= (2 x (dc - (2 x tf) - (2 x R))) + (2 x (bf - tw - (2 x R)))
2
Aw = Effective area of weld = 15602.08 mm
= 2 x 0.707 x w x Lw

T3 = Tension of base plate = 5086.67 kN


= Ø Fnw x Aw

10.5.4.3.4. Tension Capacity due to Shear Rupture on Stiffener Plate

2
Ae-st = (Hs - r) x ts = 2250.00 mm
Ø = Resistance factor = 0.75
Vr = Ø 0.6 Fu x Ae-st = 405.00 kN

T4 = Tension due to shear = 810.00 kN


rupture
= 2 x Vr

10.5.4.3.5. Tension Capacity due to Shear Yielding on Stiffener Plate

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 93 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

2
Ag-st = Hs x ts = 2500.00 mm
Ø = Resistance factor = 0.75
Vr = Ø 0.6 Fys x Ag-st = 275.63 kN

T5 = Tension due to shear = 551.25 kN


yielding
= 2 x Vr

10.5.4.3.6. Tension Capacity due to Flexural Rupture on Stiffener Plate

3
Znet = Net plastic sec. modulus = 126563 mm
= 1/4 x (Hs - r)2 x ts
y1 = a1 = 55.50 mm
Ø = Resistance factor = 0.75

T6 = Tension capacity due to = 1368.24 kN


flexural rupture
= 2 x ((Ø Fu x Znet) / y1

10.5.4.3.7. Tension Capacity due to Flexural Yielding on Stiffener Plate

3
Zgross = Gross plastic sec. modulus = 156250 mm
= 1/4 x Hs2 x ts
y1 = a1 = 55.50 mm
Ø = Resistance factor = 0.75

T7 = Tension capacity due to = 1034.63 kN


flexural yielding
= 2 x ((Ø Fys x Zgross) / y1

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 94 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.4.3.8. Tension Capacity due to Weld on Stiffener Plate

θ = Angle = 0o
Lw = Length of weld = 225.00 mm
= Hs - r
W1 = Min. size of fillet weld = 9.00 mm
Aw = Effective area of weld = 2863.35 mm
= 2 x 0.707 x W 1 x Lw
Fnw = Nominal stress of weld = 289.80 MPa
= 0.6 x Fe70 x (1 + 0.5 sin1.5 θ)
Ø = Resistance factor = 0.75
V = Ø Fnw x Aw = 622.35 kN

T8 = The required tension due to = 1244.70 kN


weld on stiffener
= 2xV

10.5.4.3.9. Tension Capacity due to Combine Strength

A1 = Area of the base plate = 90000 mm2


Ast = Are of tributary stiffener = 14130 mm2
Øv = Resistance factor shear = 1.00
Øb = Resistance factor moment = 0.90
y1 = (a - tw) / 2 = 55.50 mm
Ag-st = Gross cross sectional area = 2500.00 mm2
of stiffener
= Hs x ts
3
Zpl-st = Plastic section modulus of = 156250 mm
stiffener
= 1/4 x Hs2 x ts

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 95 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

Vr = = 316.24 kN
= Fys / ((1/(Øv 0.6 x Ag-st))^2 + (y/(Øb Zpl-st))^2)^0.5

T9 = The required tension due to = 632.48 kN


combine strength
= 2 x Vr

10.5.4.4. Shear Capacity


10.5.4.4.1. Anchor Capacity
db = Diameter of anchor bolt = 25.40 mm
n = Number of anchor = 4.00 ea
Vavl-nolt = Available shear per one = 125.87 kN
anchor bolt
V1 = Shear of anchor bolt = 503.46 kN
= n x Vavl-bolt

10.5.4.6.2. Hole Bearing on Base Plate


db = Diameter of anchor bolt = 25.40 mm
dh = Hole of anchor bolt = 32.00 mm
n = Total number of bolts = 4.00 ea
nv = Number of bolts shear = 2.00 ea
Ø = Resistance factor = 0.75
Ic = Clear distance = 39.50 mm
d - (dh / 2)
c - (dh / 2)
= min
(a - tw) / 2 - (dh / 2)
b - dh for nbolt ≥ 2 ea
Ø Rnv = Design shear strength = 355.50 kN
Ø x 1.2 x Ic x tp x Fu
= min
Ø x 2.4 x db x tp x Fu
V2 = Plate bearing strength = 711.00 kN
= Ø Rnv x nv

10.5.4.6.3. Weld Shear Check


θ = Angle = 90 o
w = Size of fillet weld leg = 9.00 mm
FE70 = Filler metal classification = 483.00 MPa
strength
Fnw = Nominal stress of the weld = 434.70 MPa
metal
= 0.6 x Fe70 x (1 + 0.5 sin1.5 θ)
Lw = Length of weld = 344.00 mm
= (2 x (dc - (2 x tf) - (2 x R)))
Aw = Effective area of weld = 4377.74 mm
= 2 x 0.707 x w x Lw
V3 = Avaiable shear of weld = 1427.25 kN
= Ø Fnw x Aw

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 96 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

10.5.4.5. Checking
Allowable Axial Allowable
Member (kN) Axial Capacity
P1 P2 P3 P4 P5 P6 P7 P8 (kN)
WH 250 1927.8 1522.8 2579.6 1755.6 3010.4 2276.4 3964.0 1777.5 1522.8

Allowable Tension Allowable


Member (kN) Tension Capacity
T1 T2 T3 T4 T5 T6 T7 T8 T9 (kN)
WH 250 839.1 796.5 5086.7 810.0 551.3 1368.2 1034.6 1244.7 632.5 551.3

Allowable Shear Allowable


Member (kN) Shear Capacity
V1 V2 V3 (kN)
WH 250 503.5 711.0 1427.3 503.46

10.5.5. Anchor Bolt Capacity

- Bolt capacity and budaries are refer to Standard Drawing for Anchor Bolt (TEP-900-CAL-CV-BP4-0006),
Type 1.
- All material shall be in accordance with project specification
Bolt = A36 or ASTM A307
Concrete with fc' = 28 Mpa

Type-1 bolt capacity and boundaries


db (in) db (mm) Le (mm) Tall (kN) Vall (kN)
1/2 13 265 28.40 14.71
5/8 16 295 45.24 21.52
3/4 18 330 66.95 34.81
7/8 22 368 92.43 48.06
1 26 429 121.25 63.05

db = diameter
Bolt
Le Minimum
= bolt embedment
Tall = allowable tension capacity
Bolt
Vall = allowable shear capacity
Bolt

Anchor Design
Vu = Vmax / 0.8
= 100.81/0.8
= 8.06 kN (Support Reaction)
Tu = Tmax
= 282.56 kN (Support Reaction)
n = 4 ea
n/side = 2

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 97 of 98


Tangguh Wet Flare And Dry Flare Tip Replacement Project -
Pipe Rack 186-PRK-4006 - Structure and Foundation Calculation

db = 1 in
= 25.4 mm
Tall = 121.25 kN
Vall = 63.05 kN
Tall total = Tall * n
485 kN Tall total > Tu, OK
Vall total = Vall * n
252.2 kN Vall total > Vu, OK

Use 4 ea 1 in dia. anchor bolt.

TGH-070-CAL-CV-BEI-0006 Rev C02 Page 98 of 98


ATTACHMENT A
FOUNDATION CALCULATION
FOUNDATION CALCULATION SHEET

One-Stop Solution for Foundation

TITLE DESCRIPTION
PROJECT/JOB NO. 186-PRK-4006
PROJECT/JOB NAME New Pipe Rack
CLIENT NAME BP
SITE NAME Marauke
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Pipe Rack
LOAD COMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 1

FOUNDATION LISTS
Group Name No. Description No. Description
F1 1 F1
F2 2 F2
F3 3 F3

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 2

CONTENTS

1. GENERAL
1.1 CODE & STANDARD
1.2 MATERIALS & UNIT WEIGHT
1.3 LOAD COMBINATION

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

3. FOUNDATION DATA
3.1 FOOTING DATA
3.2 PIER DATA
3.3 SECTION DATA
3.4 LOAD COMBINATION

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
4.2 CHECK OF OVERTURNING MOMENT
4.3 CHECK OF CONTACT PRESSURE

5. DESIGN OF FOOTING
5.1 REQUIRED REINFORCEMENT
5.2 ONE WAY SHEAR FORCE

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 3

1. GENERAL
1.1 CODE & STANDARD
Items Description
Design Code American Concrete Institute (ACI 318)
Horizontal Force for Wind UNIFORM BUILDING CODE (UBC-1997)
Horizontal Force for Seismic UNIFORM BUILDING CODE [UBC-1997]
Unit System Input : SI, Output : SI, Calculation Unit : IMPERIAL

1.2 SUBSOIL CONDITION & SAFETY FACTORS


Items Description
Allowable Increase of Soil (Wind) 33.33 %
Allowable Increase of Soil (Seismic) 33.33 %
Allowable Increase of Soil (Test) 20 %
Safety factor against overturning for OVM1(FO1) 1.5
Safety factor against overturning for OVM2(FO2) 1.5
Safety factor against overturning for OVM3(FO3) 1.5
Safety factor against overturning for OVM4(FO4) 1.5
Safety factor against sliding for the SL1(FS1) 1.5
Safety factor against sliding for the SL2(FS2) 1.5
Safety factor against sliding for the SL3(FS3) 1.5
Safety factor against sliding for the SL4(FS4) 1.5
Friction factor (m) 0.35

1.3 LOAD COMBINATION


1.3.1 Group - F1
Footing List = F1
Comb . ID Load Combination for stability
2111 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1
2112 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2
2121 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT
2131 .6 SW + .6 Dead Load (dl) + .6 PE + .6 WZ
2132 .6 SW + .6 Dead Load (dl) + .6 PE + .6 WX
2133 .6 SW + .6 Dead Load (dl) + .6 PE + -.6 WZ
2134 .6 SW + .6 Dead Load (dl) + .6 PE + -.6 WX
2141 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .45 WZ
2142 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .45 WZ
2143 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .45 WX
2144 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .45 WX
2145 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + -.45 WZ
2146 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + -.45 WZ

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 4

2147 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + -.45 WX


2148 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + -.45 WX
2151 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + .36 WZ
2152 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + .36 WX
2153 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + -.36 WZ
2154 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + -.36 WX
2161 .9 SW + .9 Dead Load (dl) + .9 PE + .7 EZE + .21 EXE
2162 .9 SW + .9 Dead Load (dl) + .9 PE + .7 EZE + -.21 EXE
2163 .9 SW + .9 Dead Load (dl) + .9 PE + -.7 EZE + .21 EXE
2164 .9 SW + .9 Dead Load (dl) + .9 PE + -.7 EZE + -.21 EXE
2165 .9 SW + .9 Dead Load (dl) + .9 PE + .21 EZE + .7 EXE
2166 .9 SW + .9 Dead Load (dl) + .9 PE + .21 EZE + -.7 EXE
2167 .9 SW + .9 Dead Load (dl) + .9 PE + -.21 EZE + .7 EXE
2168 .9 SW + .9 Dead Load (dl) + .9 PE + -.21 EZE + -.7 EXE
2171 .9 SW + .9 Dead Load (dl) + .9 PO1 + .21 EXO1 + .7 EZO1
2172 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.21 EXO1 + .7 EZO1
2173 .9 SW + .9 Dead Load (dl) + .9 PO1 + .21 EXO1 + -.7 EZO1
2174 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.21 EXO1 + -.7 EZO1
2175 .9 SW + .9 Dead Load (dl) + .9 PO1 + .7 EXO1 + .21 EZO1
2176 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.7 EXO1 + .21 EZO1
2177 .9 SW + .9 Dead Load (dl) + .9 PO1 + .7 EXO1 + -.21 EZO1
2178 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.7 EXO1 + -.21 EZO1
2179 .9 SW + .9 Dead Load (dl) + .9 PO2 + .7 EZO2 + .21 EXO2
2180 .9 SW + .9 Dead Load (dl) + .9 PO2 + .7 EZO2 + -.21 EXO2
2181 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.7 EZO2 + .21 EXO2
2182 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.7 EZO2 + -.21 EXO2
2183 .9 SW + .9 Dead Load (dl) + .9 PO2 + .21 EZO2 + .7 EXO2
2184 .9 SW + .9 Dead Load (dl) + .9 PO2 + .21 EZO2 + -.7 EXO2
2185 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.21 EZO2 + .7 EXO2
2186 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.21 EZO2 + -.7 EXO2
2191 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLSZ
2192 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLSZ
2193 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLSX
2194 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLSX
2195 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLDZ
2196 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLDX
2197 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLDZ
2198 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLDX
Comb . ID Load Combination for Reinforcement
1111 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO1
1112 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO2

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 5

1121 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT


1131 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WZ
1132 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WX
1133 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WZ
1134 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WX
1141 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WZ
1142 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WZ
1143 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WX
1144 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WX
1145 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WZ
1146 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WZ
1147 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WX
1148 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WX
1151 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WZ
1152 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WX
1153 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WZ
1154 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WX
1161 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + .3 EXE
1162 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + -.3 EXE
1163 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + .3 EXE
1164 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + -.3 EXE
1165 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + 1.0 EXE
1166 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + -1.0 EXE
1167 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + 1.0 EXE
1168 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + -1.0 EXE
1171 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + 1.0 EZO1
1172 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + 1.0 EZO1
1173 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + -1.0 EZO1
1174 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + -1.0 EZO1
1175 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + .3 EZO1
1176 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + .3 EZO1
1177 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + -.3 EZO1
1178 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + -.3 EZO1
1179 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + .3 EXO2
1180 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + -.3 EXO2
1181 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + .3 EXO2
1182 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + -.3 EXO2
1183 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + 1.0 EXO2
1184 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + -1.0 EXO2
1185 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + 1.0 EXO2
1186 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + -1.0 EXO2

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 6

1191 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSZ
1192 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSZ
1193 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSX
1194 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSX
1195 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDZ
1196 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDZ
1197 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDX
1198 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDX

1.3.2 Group - F2
Footing List = F2
Comb . ID Load Combination for stability
2111 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1
2112 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2
2121 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT
2131 .6 SW + .6 Dead Load (dl) + .6 PE + .6 WZ
2132 .6 SW + .6 Dead Load (dl) + .6 PE + .6 WX
2133 .6 SW + .6 Dead Load (dl) + .6 PE + -.6 WZ
2134 .6 SW + .6 Dead Load (dl) + .6 PE + -.6 WX
2141 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .45 WZ
2142 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .45 WZ
2143 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .45 WX
2144 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .45 WX
2145 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + -.45 WZ
2146 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + -.45 WZ
2147 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + -.45 WX
2148 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + -.45 WX
2151 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + .36 WZ
2152 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + .36 WX
2153 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + -.36 WZ
2154 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + -.36 WX
2161 .9 SW + .9 Dead Load (dl) + .9 PE + .7 EZE + .21 EXE
2162 .9 SW + .9 Dead Load (dl) + .9 PE + .7 EZE + -.21 EXE
2163 .9 SW + .9 Dead Load (dl) + .9 PE + -.7 EZE + .21 EXE
2164 .9 SW + .9 Dead Load (dl) + .9 PE + -.7 EZE + -.21 EXE
2165 .9 SW + .9 Dead Load (dl) + .9 PE + .21 EZE + .7 EXE
2166 .9 SW + .9 Dead Load (dl) + .9 PE + .21 EZE + -.7 EXE
2167 .9 SW + .9 Dead Load (dl) + .9 PE + -.21 EZE + .7 EXE
2168 .9 SW + .9 Dead Load (dl) + .9 PE + -.21 EZE + -.7 EXE
2171 .9 SW + .9 Dead Load (dl) + .9 PO1 + .21 EXO1 + .7 EZO1
2172 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.21 EXO1 + .7 EZO1
2173 .9 SW + .9 Dead Load (dl) + .9 PO1 + .21 EXO1 + -.7 EZO1

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 7

2174 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.21 EXO1 + -.7 EZO1


2175 .9 SW + .9 Dead Load (dl) + .9 PO1 + .7 EXO1 + .21 EZO1
2176 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.7 EXO1 + .21 EZO1
2177 .9 SW + .9 Dead Load (dl) + .9 PO1 + .7 EXO1 + -.21 EZO1
2178 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.7 EXO1 + -.21 EZO1
2179 .9 SW + .9 Dead Load (dl) + .9 PO2 + .7 EZO2 + .21 EXO2
2180 .9 SW + .9 Dead Load (dl) + .9 PO2 + .7 EZO2 + -.21 EXO2
2181 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.7 EZO2 + .21 EXO2
2182 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.7 EZO2 + -.21 EXO2
2183 .9 SW + .9 Dead Load (dl) + .9 PO2 + .21 EZO2 + .7 EXO2
2184 .9 SW + .9 Dead Load (dl) + .9 PO2 + .21 EZO2 + -.7 EXO2
2185 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.21 EZO2 + .7 EXO2
2186 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.21 EZO2 + -.7 EXO2
2191 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLSZ
2192 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLSZ
2193 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLSX
2194 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLSX
2195 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLDZ
2196 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLDX
2197 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLDZ
2198 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLDX
Comb . ID Load Combination for Reinforcement
1111 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO1
1112 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO2
1121 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT
1131 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WZ
1132 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WX
1133 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WZ
1134 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WX
1141 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WZ
1142 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WZ
1143 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WX
1144 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WX
1145 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WZ
1146 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WZ
1147 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WX
1148 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WX
1151 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WZ
1152 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WX
1153 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WZ
1154 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WX

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 8

1161 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + .3 EXE
1162 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + -.3 EXE
1163 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + .3 EXE
1164 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + -.3 EXE
1165 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + 1.0 EXE
1166 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + -1.0 EXE
1167 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + 1.0 EXE
1168 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + -1.0 EXE
1171 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + 1.0 EZO1
1172 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + 1.0 EZO1
1173 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + -1.0 EZO1
1174 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + -1.0 EZO1
1175 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + .3 EZO1
1176 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + .3 EZO1
1177 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + -.3 EZO1
1178 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + -.3 EZO1
1179 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + .3 EXO2
1180 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + -.3 EXO2
1181 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + .3 EXO2
1182 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + -.3 EXO2
1183 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + 1.0 EXO2
1184 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + -1.0 EXO2
1185 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + 1.0 EXO2
1186 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + -1.0 EXO2
1191 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSZ
1192 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSZ
1193 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSX
1194 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSX
1195 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDZ
1196 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDZ
1197 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDX
1198 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDX

1.3.3 Group - F3
Footing List = F3
Comb . ID Load Combination for stability
2111 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1
2112 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2
2121 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT
2131 .6 SW + .6 Dead Load (dl) + .6 PE + .6 WZ
2132 .6 SW + .6 Dead Load (dl) + .6 PE + .6 WX
2133 .6 SW + .6 Dead Load (dl) + .6 PE + -.6 WZ

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 9

2134 .6 SW + .6 Dead Load (dl) + .6 PE + -.6 WX


2141 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .45 WZ
2142 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .45 WZ
2143 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .45 WX
2144 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .45 WX
2145 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + -.45 WZ
2146 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + -.45 WZ
2147 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + -.45 WX
2148 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + -.45 WX
2151 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + .36 WZ
2152 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + .36 WX
2153 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + -.36 WZ
2154 1.0 SW + 1.0 Dead Load (dl) + 1.0 PT + -.36 WX
2161 .9 SW + .9 Dead Load (dl) + .9 PE + .7 EZE + .21 EXE
2162 .9 SW + .9 Dead Load (dl) + .9 PE + .7 EZE + -.21 EXE
2163 .9 SW + .9 Dead Load (dl) + .9 PE + -.7 EZE + .21 EXE
2164 .9 SW + .9 Dead Load (dl) + .9 PE + -.7 EZE + -.21 EXE
2165 .9 SW + .9 Dead Load (dl) + .9 PE + .21 EZE + .7 EXE
2166 .9 SW + .9 Dead Load (dl) + .9 PE + .21 EZE + -.7 EXE
2167 .9 SW + .9 Dead Load (dl) + .9 PE + -.21 EZE + .7 EXE
2168 .9 SW + .9 Dead Load (dl) + .9 PE + -.21 EZE + -.7 EXE
2171 .9 SW + .9 Dead Load (dl) + .9 PO1 + .21 EXO1 + .7 EZO1
2172 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.21 EXO1 + .7 EZO1
2173 .9 SW + .9 Dead Load (dl) + .9 PO1 + .21 EXO1 + -.7 EZO1
2174 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.21 EXO1 + -.7 EZO1
2175 .9 SW + .9 Dead Load (dl) + .9 PO1 + .7 EXO1 + .21 EZO1
2176 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.7 EXO1 + .21 EZO1
2177 .9 SW + .9 Dead Load (dl) + .9 PO1 + .7 EXO1 + -.21 EZO1
2178 .9 SW + .9 Dead Load (dl) + .9 PO1 + -.7 EXO1 + -.21 EZO1
2179 .9 SW + .9 Dead Load (dl) + .9 PO2 + .7 EZO2 + .21 EXO2
2180 .9 SW + .9 Dead Load (dl) + .9 PO2 + .7 EZO2 + -.21 EXO2
2181 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.7 EZO2 + .21 EXO2
2182 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.7 EZO2 + -.21 EXO2
2183 .9 SW + .9 Dead Load (dl) + .9 PO2 + .21 EZO2 + .7 EXO2
2184 .9 SW + .9 Dead Load (dl) + .9 PO2 + .21 EZO2 + -.7 EXO2
2185 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.21 EZO2 + .7 EXO2
2186 .9 SW + .9 Dead Load (dl) + .9 PO2 + -.21 EZO2 + -.7 EXO2
2191 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLSZ
2192 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLSZ
2193 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLSX
2194 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLSX

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 10

2195 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLDZ


2196 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLDX
2197 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO1 + .7 BLDZ
2198 1.0 SW + 1.0 Dead Load (dl) + 1.0 PO2 + .7 BLDX
Comb . ID Load Combination for Reinforcement
1111 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO1
1112 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO2
1121 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT
1131 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WZ
1132 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WX
1133 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WZ
1134 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WX
1141 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WZ
1142 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WZ
1143 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WX
1144 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WX
1145 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WZ
1146 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WZ
1147 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WX
1148 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WX
1151 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WZ
1152 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WX
1153 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WZ
1154 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WX
1161 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + .3 EXE
1162 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + -.3 EXE
1163 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + .3 EXE
1164 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + -.3 EXE
1165 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + 1.0 EXE
1166 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + -1.0 EXE
1167 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + 1.0 EXE
1168 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + -1.0 EXE
1171 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + 1.0 EZO1
1172 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + 1.0 EZO1
1173 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + -1.0 EZO1
1174 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + -1.0 EZO1
1175 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + .3 EZO1
1176 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + .3 EZO1
1177 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + -.3 EZO1
1178 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + -.3 EZO1
1179 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + .3 EXO2

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 11

1180 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + -.3 EXO2
1181 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + .3 EXO2
1182 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + -.3 EXO2
1183 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + 1.0 EXO2
1184 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + -1.0 EXO2
1185 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + 1.0 EXO2
1186 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + -1.0 EXO2
1191 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSZ
1192 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSZ
1193 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSX
1194 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSX
1195 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDZ
1196 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDZ
1197 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDX
1198 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDX

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 12

2. DRAWING
2.1 LOCATION PLAN
2.2 DETAIL SKETCH

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 13

REFERENCE DWGS
NO. DWG NO. DWG TITLE

A01 A02 A03

NOTES
6000
* OUTPUT UNIT : mm
6000

2 4 6

01

New Pipe Rack PROJECT

1 3 5

F1 F2 F3
FOUNDATION LOCATION PLAN
Pipe Rack

SQUAD CHECK
Y PROCESS PIPING VESSELS STRUCT. ELEC. INST.

Z X SCALE JOB NO. MICROFILM NO.

AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 14

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 15

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

2000
1000x2

1575
NOTES
* OUTPUT UNIT : mm
2
CL FOOTING

6000

2850

New Pipe Rack PROJECT

1
1575

FOUNDATION DETAIL FOR


F1

SQUAD CHECK
FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 16

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

TYP.
3
NOTES
* OUTPUT UNIT : mm

D19@200

D19@200
New Pipe Rack PROJECT

FOUNDATION DETAIL FOR


D19@200
F1
D19@200

SQUAD CHECK
REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 17

1200
300
1
LEAN CONC. 50 THK
CRUSHED STONE 100 THK
ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022F1 Item No. Page 18

1 2
450 450
50 50
165 165 165 165
TYP. TYP.
120 120

165

165
450

120

450

120
D10 D10

165

165
12-D19 12-D19
150 PR.

150 PR.
30 GR.

30 GR.
3

3
2

2
1500

1500
@150

@150
D10

D10
D19 D19
75

75

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 19

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 20

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

2000
1000x2

1575
NOTES
* OUTPUT UNIT : mm
4
CL FOOTING

6000

2850

New Pipe Rack PROJECT

3
1575

FOUNDATION DETAIL FOR


F2

SQUAD CHECK
FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 21

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

TYP.
3
NOTES
* OUTPUT UNIT : mm

D19@200

D19@200
New Pipe Rack PROJECT

FOUNDATION DETAIL FOR


D19@200
F2
D19@200

SQUAD CHECK
REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 22

1200
300
3
LEAN CONC. 50 THK
CRUSHED STONE 100 THK
ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022F2 Item No. Page 23

3 4
450 450
50 50
165 165 165 165
TYP. TYP.
120 120

165

165
450

120

450

120
D10 D10

165

165
12-D19 12-D19
150 PR.

150 PR.
30 GR.

30 GR.
3

3
2

2
1500

1500
@150

@150
D10

D10
D19 D19
75

75

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 24

2.2 DETAIL SKETCH

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 25

REFERENCE DWGS
NO. DWG NO. DWG TITLE
CL FOOTING

2000
1000x2

1575
NOTES
* OUTPUT UNIT : mm
6
CL FOOTING

6000

2850

New Pipe Rack PROJECT

5
1575

FOUNDATION DETAIL FOR


F3

SQUAD CHECK
FOUNDATION PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 26

REFERENCE DWGS
NO. DWG NO. DWG TITLE

CL FOOTING

TOP BOTTOM

TYP.
3
NOTES
* OUTPUT UNIT : mm

D19@200

D19@200
New Pipe Rack PROJECT

FOUNDATION DETAIL FOR


D19@200
F3
D19@200

SQUAD CHECK
REINFORCEMENT PLAN

PROCESS PIPING VESSELS STRUCT. ELEC. INST.

SCALE JOB NO. MICROFILM NO.

REV. DATE DESCRIPTION DRWNCHKDAPPDAPPDAPPD


AS SHOWN 186-PRK-4006

Copyright (c) GS E&C. All Rights Reserved


12/09/2022 Page 27

1200
300
5
LEAN CONC. 50 THK
CRUSHED STONE 100 THK
ELEVATION S1 - X

OUTPUT UNIT : mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022F3 Item No. Page 28

5 6
450 450
50 50
165 165 165 165
TYP. TYP.
120 120

165

165
450

120

450

120
D10 D10

165

165
12-D19 12-D19
150 PR.

150 PR.
30 GR.

30 GR.
3

3
2

2
1500

1500
@150

@150
D10

D10
D19 D19
75

75

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 29

3. FOUNDATION DATA
3.1 FOOTING DATA
Unit : mmFt. Name F1
Ft. Type MAT
2
2000 Area 12.000 m
Ft. Thickness 300.00 mm
3
Ft. Volume 3.600 m
Ft. Weight 84.600 kN
Soil Height 1200.00 mm
2 3
Soil Volume 13.914 m
Soil Weight 245.721 kN
6000

Buoyancy Not Consider


Self Weight (except Pr.SW) 330.321 kN

1500
1200

The Origin coordinate


300

The Center of gravity (0,0) mm

Unit : mmFt. Name F2


Ft. Type MAT
2
2000 Area 12.000 m
Ft. Thickness 300.00 mm
3
Ft. Volume 3.600 m
Ft. Weight 84.600 kN
Soil Height 1200.00 mm
4 3
Soil Volume 13.914 m
Soil Weight 245.721 kN
6000

Buoyancy Not Consider


Self Weight (except Pr.SW) 330.321 kN

3
1500
1200

The Origin coordinate


300

The Center of gravity (0,0) mm

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 30

Unit : mmFt. Name F3


Ft. Type MAT
2
2000 Area 12.000 m
Ft. Thickness 300.00 mm
3
Ft. Volume 3.600 m
Ft. Weight 84.600 kN
Soil Height 1200.00 mm
6 3
Soil Volume 13.914 m
Soil Weight 245.721 kN
6000

Buoyancy Not Consider


Self Weight (except Pr.SW) 330.321 kN

1500
1200
The Origin coordinate
The Center of gravity (0,0) mm 300

3.2 PIER DATA


Off X , Off Y is offset position from the Center of the footing
If Pier Shape is Circle or Circle wall, Pl is a Diameter. and Pw is a Inner Diameter
Area is pier concrete area
Weight is pier and inner soil weight in case circle wall except Tank1 Type(Circle Ring Footing Shape)
2
Unit( Length : mm , Weight : kN , Area : m )
Ft.Name Pr.Name Shape Pl Pw Ph Area Weight Off X Off Y
1 Rectangle 450.000 450.000 1500.000 0.203 7.138 0.000 -1425.000
F1
2 Rectangle 450.000 450.000 1500.000 0.203 7.138 0.000 1425.000
3 Rectangle 450.000 450.000 1500.000 0.203 7.138 0.000 -1425.000
F2
4 Rectangle 450.000 450.000 1500.000 0.203 7.138 0.000 1425.000
5 Rectangle 450.000 450.000 1500.000 0.203 7.138 0.000 -1425.000
F3
6 Rectangle 450.000 450.000 1500.000 0.203 7.138 0.000 1425.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 31

3.3 SECTION DATA


Ft.Name / Sec.Name F1 / S1 Ft.Name / Sec.Name F2 / S1

2000 Unit : mm 2000 Unit : mm


6000

6000
2 2
Direction All Direct Section Area 12.000 m Direction All Direct Section Area 12.000 m
3 3
F.Volume 3.600 m F.Weight 84.600 kN F.Volume 3.600 m F.Weight 84.600 kN
3 3
S.Volume 13.914 m S.Weight 245.721 kN S.Volume 13.914 m S.Weight 245.721 kN
Pier Wt 14.276 kN Total Weight 344.597 kN Pier Wt 14.276 kN Total Weight 344.597 kN

Ft.Name / Sec.Name F3 / S1

2000 Unit : mm
6000

2
Direction All Direct Section Area 12.000 m
3
F.Volume 3.600 m F.Weight 84.600 kN
3
S.Volume 13.914 m S.Weight 245.721 kN
Pier Wt 14.276 kN Total Weight 344.597 kN

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 32

3.4 LOAD COMBINATION


In Pier Top In Footing Bottom In Footing Bottom Center
without Self Weight with Pier Self Weight, with Pier & Footing Self Weight & Soil Weight,
But without Footing Self Weight, Case PileType
(Frame Analysis) in centroid of Pile Group
Case NonPileType
in centroid of Footing

3.4.1 Load Combination in Pier Top (Without SW)


Group 1 - F1 Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F1 2111 7.975 2.912 -111.338 0.000 0.000
2112 0.688 -6.413 20.358 0.000 0.000
2121 1.092 -0.215 -59.632 0.000 0.000
2131 0.785 10.757 -74.353 0.000 0.000
2132 -3.667 -0.004 -11.007 0.000 0.000
2133 0.287 -10.761 39.311 0.000 0.000
2134 4.739 0.000 -24.035 0.000 0.000
2141 8.162 10.981 -153.962 0.000 0.000
2142 0.875 1.656 -22.266 0.000 0.000
2143 4.823 2.911 -106.452 0.000 0.000
2144 -2.464 -6.414 25.244 0.000 0.000
2145 7.788 -5.157 -68.714 0.000 0.000
2146 0.501 -14.482 62.982 0.000 0.000
2147 11.127 2.913 -116.224 0.000 0.000
2148 3.840 -6.412 15.472 0.000 0.000
2151 1.241 6.241 -93.731 0.000 0.000
1
2152 -1.430 -0.216 -55.723 0.000 0.000
2153 0.943 -6.671 -25.533 0.000 0.000
2154 3.614 -0.214 -63.541 0.000 0.000
2161 0.146 3.228 -46.146 0.000 0.000
2162 1.589 3.243 -50.842 0.000 0.000
2163 0.020 -3.249 -1.721 0.000 0.000
2164 1.463 -3.233 -6.418 0.000 0.000
2165 -1.582 0.942 -25.118 0.000 0.000
2166 3.229 0.995 -40.773 0.000 0.000
2167 -1.620 -1.001 -11.791 0.000 0.000
2168 3.192 -0.948 -27.445 0.000 0.000
2171 7.762 6.602 -131.030 0.000 0.000
2172 9.985 6.566 -138.216 0.000 0.000
2173 4.370 -1.325 -62.192 0.000 0.000
2174 6.593 -1.361 -69.378 0.000 0.000
2175 3.981 3.870 -98.554 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 33

2176 11.391 3.750 -122.506 0.000 0.000


2177 2.964 1.492 -77.902 0.000 0.000
2178 10.374 1.372 -101.855 0.000 0.000
2179 0.328 -1.241 -13.037 0.000 0.000
2180 2.234 -1.135 -20.083 0.000 0.000
2181 -0.995 -10.409 56.727 0.000 0.000
2182 0.911 -10.302 49.682 0.000 0.000
2183 -2.360 -4.574 19.600 0.000 0.000
2184 3.995 -4.219 -3.885 0.000 0.000
2185 -2.757 -7.325 40.529 0.000 0.000
2186 3.598 -6.969 17.044 0.000 0.000
2191 8.049 5.510 -129.909 0.000 0.000
2192 0.761 -3.815 1.787 0.000 0.000
2193 8.476 2.921 -113.985 0.000 0.000
2194 1.188 -6.404 17.711 0.000 0.000
2195 6.116 7.458 -144.224 0.000 0.000
2196 0.757 -6.379 13.328 0.000 0.000
2197 6.116 7.458 -144.224 0.000 0.000
2198 0.757 -6.379 13.328 0.000 0.000
1111 11.165 4.077 -155.873 0.000 0.000
1112 0.963 -8.978 28.501 0.000 0.000
1121 1.310 -0.258 -71.558 0.000 0.000
1131 1.220 17.929 -121.002 0.000 0.000
1132 -6.200 -0.006 -15.425 0.000 0.000
1133 0.390 -17.935 68.438 0.000 0.000
1134 7.810 0.000 -37.139 0.000 0.000
1141 9.985 21.426 -228.326 0.000 0.000
1142 1.241 10.236 -70.290 0.000 0.000
1143 2.565 3.491 -122.749 0.000 0.000
1144 -6.179 -7.699 35.287 0.000 0.000
1145 9.155 -14.438 -38.886 0.000 0.000
1146 0.411 -25.628 119.150 0.000 0.000
1147 16.575 3.497 -144.463 0.000 0.000
1148 7.831 -7.693 13.573 0.000 0.000
1151 1.559 10.501 -128.390 0.000 0.000
1152 -2.893 -0.260 -65.044 0.000 0.000
1153 1.061 -11.017 -14.726 0.000 0.000
1154 5.513 -0.256 -78.073 0.000 0.000
1161 -0.249 4.612 -50.980 0.000 0.000
1162 1.813 4.635 -57.689 0.000 0.000
1163 -0.429 -4.640 12.484 0.000 0.000
1164 1.633 -4.617 5.775 0.000 0.000
1165 -2.718 1.347 -20.940 0.000 0.000
1166 4.156 1.423 -43.304 0.000 0.000
1167 -2.772 -1.428 -1.901 0.000 0.000
1168 4.102 -1.352 -24.265 0.000 0.000
1171 11.442 9.561 -192.117 0.000 0.000
1172 14.618 9.509 -202.382 0.000 0.000
1173 6.596 -1.763 -93.777 0.000 0.000
1174 9.772 -1.815 -104.042 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 34

1175 6.041 5.658 -145.722 0.000 0.000


1176 16.627 5.486 -179.940 0.000 0.000
1177 4.587 2.260 -116.220 0.000 0.000
1178 15.173 2.088 -150.438 0.000 0.000
1179 0.498 -2.057 -17.723 0.000 0.000
1180 3.222 -1.905 -27.788 0.000 0.000
1181 -1.392 -15.153 81.941 0.000 0.000
1182 1.332 -15.001 71.876 0.000 0.000
1183 -3.340 -6.819 28.902 0.000 0.000
1184 5.738 -6.311 -4.648 0.000 0.000
1185 -3.907 -10.748 58.801 0.000 0.000
1186 5.171 -10.240 25.251 0.000 0.000
1191 6.141 5.033 -104.780 0.000 0.000
1192 0.603 -2.054 -4.691 0.000 0.000
1193 6.604 2.223 -87.491 0.000 0.000
1194 1.066 -4.864 12.598 0.000 0.000
1195 3.617 6.396 -107.656 0.000 0.000
1196 -1.338 0.055 -18.103 0.000 0.000
1197 5.490 2.013 -82.539 0.000 0.000
1198 0.535 -4.328 7.014 0.000 0.000
2111 0.406 3.412 -55.161 0.000 0.000
2112 6.359 -6.297 -123.083 0.000 0.000
2121 0.981 0.288 -74.460 0.000 0.000
2131 0.294 10.762 38.485 0.000 0.000
2132 -3.650 0.007 -11.842 0.000 0.000
2133 0.792 -10.758 -75.178 0.000 0.000
2134 4.736 -0.004 -24.851 0.000 0.000
2141 0.219 11.482 -12.537 0.000 0.000
2142 6.172 1.773 -80.459 0.000 0.000
2143 -2.739 3.416 -50.283 0.000 0.000
2144 3.214 -6.293 -118.205 0.000 0.000
2145 0.593 -4.658 -97.785 0.000 0.000
2146 6.546 -14.367 -165.707 0.000 0.000
2147 3.551 3.408 -60.039 0.000 0.000
2148 9.504 -6.301 -127.961 0.000 0.000
2
2151 0.832 6.744 -40.361 0.000 0.000
2152 -1.535 0.291 -70.557 0.000 0.000
2153 1.130 -6.168 -108.559 0.000 0.000
2154 3.497 0.285 -78.363 0.000 0.000
2161 -0.003 3.239 -2.930 0.000 0.000
2162 1.506 3.243 -7.686 0.000 0.000
2163 0.123 -3.237 -47.354 0.000 0.000
2164 1.632 -3.234 -52.111 0.000 0.000
2165 -1.719 0.968 -12.929 0.000 0.000
2166 3.311 0.980 -28.784 0.000 0.000
2167 -1.682 -0.975 -26.256 0.000 0.000
2168 3.348 -0.962 -42.111 0.000 0.000
2171 -2.311 7.062 -11.789 0.000 0.000
2172 -0.350 7.006 -18.663 0.000 0.000
2173 1.081 -0.865 -80.627 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 35

2174 3.042 -0.920 -87.501 0.000 0.000


2175 -3.411 4.352 -27.863 0.000 0.000
2176 3.124 4.167 -50.775 0.000 0.000
2177 -2.393 1.974 -48.514 0.000 0.000
2178 4.142 1.789 -71.427 0.000 0.000
2179 3.834 -1.130 -72.087 0.000 0.000
2180 6.289 -1.043 -79.698 0.000 0.000
2181 5.157 -10.292 -141.852 0.000 0.000
2182 7.612 -10.205 -149.462 0.000 0.000
2183 1.432 -4.438 -87.625 0.000 0.000
2184 9.617 -4.148 -112.995 0.000 0.000
2185 1.829 -7.186 -108.555 0.000 0.000
2186 10.014 -6.897 -133.924 0.000 0.000
2191 0.332 6.010 -36.590 0.000 0.000
2192 6.285 -3.699 -104.512 0.000 0.000
2193 0.934 3.412 -57.837 0.000 0.000
2194 6.887 -6.297 -125.759 0.000 0.000
2195 -1.743 7.963 -15.025 0.000 0.000
2196 6.536 -6.293 -130.228 0.000 0.000
2197 -1.743 7.963 -15.025 0.000 0.000
2198 6.536 -6.293 -130.228 0.000 0.000
1111 0.568 4.777 -77.225 0.000 0.000
1112 8.903 -8.816 -172.316 0.000 0.000
1121 1.177 0.346 -89.352 0.000 0.000
1131 0.399 17.936 67.199 0.000 0.000
1132 -6.174 0.012 -16.679 0.000 0.000
1133 1.229 -17.930 -122.239 0.000 0.000
1134 7.803 -0.006 -38.361 0.000 0.000
1141 0.072 22.027 28.526 0.000 0.000
1142 7.216 10.377 -52.981 0.000 0.000
1143 -6.502 4.103 -55.352 0.000 0.000
1144 0.642 -7.547 -136.859 0.000 0.000
1145 0.902 -13.839 -160.912 0.000 0.000
1146 8.046 -25.489 -242.419 0.000 0.000
1147 7.476 4.085 -77.034 0.000 0.000
1148 14.620 -7.565 -158.541 0.000 0.000
1151 0.928 11.105 -32.521 0.000 0.000
1152 -3.016 0.351 -82.847 0.000 0.000
1153 1.426 -10.414 -146.183 0.000 0.000
1154 5.371 0.340 -95.857 0.000 0.000
1161 -0.467 4.626 11.462 0.000 0.000
1162 1.688 4.631 4.667 0.000 0.000
1163 -0.287 -4.626 -52.002 0.000 0.000
1164 1.868 -4.621 -58.797 0.000 0.000
1165 -2.920 1.381 -2.823 0.000 0.000
1166 4.266 1.399 -25.473 0.000 0.000
1167 -2.866 -1.394 -21.862 0.000 0.000
1168 4.320 -1.376 -44.512 0.000 0.000
1171 -3.283 10.240 -19.284 0.000 0.000
1172 -0.483 10.160 -29.104 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 36

1173 1.563 -1.084 -117.624 0.000 0.000


1174 4.363 -1.164 -127.444 0.000 0.000
1175 -4.855 6.369 -42.247 0.000 0.000
1176 4.481 6.105 -74.979 0.000 0.000
1177 -3.401 2.971 -71.749 0.000 0.000
1178 5.935 2.707 -104.481 0.000 0.000
1179 5.759 -1.893 -108.432 0.000 0.000
1180 9.266 -1.769 -119.305 0.000 0.000
1181 7.649 -14.981 -208.096 0.000 0.000
1182 11.156 -14.857 -218.969 0.000 0.000
1183 2.328 -6.619 -130.630 0.000 0.000
1184 14.020 -6.205 -166.872 0.000 0.000
1185 2.895 -10.545 -160.529 0.000 0.000
1186 14.587 -10.131 -196.771 0.000 0.000
1191 0.229 5.413 -21.760 0.000 0.000
1192 4.753 -1.965 -73.380 0.000 0.000
1193 0.882 2.593 -44.828 0.000 0.000
1194 5.406 -4.786 -96.449 0.000 0.000
1195 -1.812 6.742 1.480 0.000 0.000
1196 2.237 0.139 -44.707 0.000 0.000
1197 0.448 2.324 -44.450 0.000 0.000
1198 4.496 -4.278 -90.637 0.000 0.000

Group 2 - F2 Unit( kN , kN-m )


Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F2 2111 13.747 4.352 -62.126 0.000 0.000
2112 0.013 -7.672 19.219 0.000 0.000
2121 0.248 -0.412 -51.418 0.000 0.000
2131 -0.167 12.385 -73.582 0.000 0.000
2132 -7.915 -0.065 -19.390 0.000 0.000
2133 0.164 -12.516 34.852 0.000 0.000
2134 7.913 -0.065 -19.340 0.000 0.000
2141 13.623 13.690 -102.788 0.000 0.000
2142 -0.111 1.666 -21.443 0.000 0.000
2143 7.812 4.352 -62.145 0.000 0.000
2144 -5.922 -7.672 19.200 0.000 0.000
2145 13.871 -4.986 -21.464 0.000 0.000
3 2146 0.137 -17.010 59.881 0.000 0.000
2147 19.682 4.352 -62.107 0.000 0.000
2148 5.948 -7.672 19.238 0.000 0.000
2151 0.149 7.058 -83.948 0.000 0.000
2152 -4.500 -0.412 -51.433 0.000 0.000
2153 0.347 -7.882 -18.888 0.000 0.000
2154 4.996 -0.412 -51.403 0.000 0.000
2161 -1.509 3.260 -50.995 0.000 0.000
2162 1.381 3.260 -50.992 0.000 0.000
2163 -1.384 -3.456 -7.103 0.000 0.000
2164 1.505 -3.456 -7.100 0.000 0.000
2165 -4.836 0.909 -35.636 0.000 0.000
2166 4.796 0.909 -35.626 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 37

2167 -4.799 -1.105 -22.469 0.000 0.000


2168 4.833 -1.105 -22.459 0.000 0.000
2171 13.263 8.663 -88.783 0.000 0.000
2172 17.715 8.668 -88.829 0.000 0.000
2173 7.030 -0.834 -22.997 0.000 0.000
2174 11.482 -0.830 -23.043 0.000 0.000
2175 5.887 5.334 -65.704 0.000 0.000
2176 20.727 5.349 -65.858 0.000 0.000
2177 4.017 2.484 -45.968 0.000 0.000
2178 18.857 2.500 -46.122 0.000 0.000
2179 -0.857 -2.000 -16.919 0.000 0.000
2180 2.959 -2.001 -16.979 0.000 0.000
2181 -2.936 -11.808 51.573 0.000 0.000
2182 0.880 -11.810 51.513 0.000 0.000
2183 -6.037 -5.431 7.124 0.000 0.000
2184 6.684 -5.436 6.922 0.000 0.000
2185 -6.660 -8.373 27.672 0.000 0.000
2186 6.060 -8.379 27.470 0.000 0.000
2191 13.725 7.088 -80.119 0.000 0.000
2192 -0.009 -4.936 1.226 0.000 0.000
2193 14.781 4.352 -62.144 0.000 0.000
2194 1.047 -7.672 19.201 0.000 0.000
2195 9.940 8.920 -97.683 0.000 0.000
2196 0.502 -7.672 19.144 0.000 0.000
2197 9.940 8.920 -97.683 0.000 0.000
2198 0.502 -7.672 19.144 0.000 0.000
1111 19.246 6.093 -86.976 0.000 0.000
1112 0.018 -10.741 26.907 0.000 0.000
1121 0.298 -0.494 -61.702 0.000 0.000
1131 -0.278 20.653 -119.409 0.000 0.000
1132 -13.192 -0.098 -29.089 0.000 0.000
1133 0.274 -20.849 61.313 0.000 0.000
1134 13.188 -0.098 -29.005 0.000 0.000
1141 16.220 25.973 -164.912 0.000 0.000
1142 -0.260 11.545 -67.298 0.000 0.000
1143 3.306 5.222 -74.593 0.000 0.000
1144 -13.174 -9.206 23.021 0.000 0.000
1145 16.772 -15.529 15.810 0.000 0.000
1146 0.292 -29.957 113.424 0.000 0.000
1147 29.686 5.222 -74.509 0.000 0.000
1148 13.206 -9.206 23.105 0.000 0.000
1151 0.132 11.956 -115.918 0.000 0.000
1152 -7.616 -0.494 -61.727 0.000 0.000
1153 0.463 -12.945 -7.485 0.000 0.000
1154 8.212 -0.494 -61.676 0.000 0.000
1161 -2.155 4.713 -56.334 0.000 0.000
1162 1.973 4.713 -56.330 0.000 0.000
1163 -1.977 -4.881 6.368 0.000 0.000
1164 2.151 -4.881 6.372 0.000 0.000
1165 -6.908 1.355 -34.393 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 38

1166 6.852 1.355 -34.379 0.000 0.000


1167 -6.855 -1.523 -15.583 0.000 0.000
1168 6.905 -1.523 -15.569 0.000 0.000
1171 19.556 12.569 -129.585 0.000 0.000
1172 25.916 12.575 -129.651 0.000 0.000
1173 10.652 -0.999 -35.605 0.000 0.000
1174 17.012 -0.993 -35.671 0.000 0.000
1175 9.019 7.812 -96.615 0.000 0.000
1176 30.219 7.834 -96.835 0.000 0.000
1177 6.348 3.742 -68.421 0.000 0.000
1178 27.548 3.764 -68.641 0.000 0.000
1179 -1.224 -3.197 -23.319 0.000 0.000
1180 4.228 -3.199 -23.405 0.000 0.000
1181 -4.194 -17.209 74.527 0.000 0.000
1182 1.258 -17.211 74.441 0.000 0.000
1183 -8.623 -8.098 11.028 0.000 0.000
1184 9.549 -8.106 10.740 0.000 0.000
1185 -9.514 -12.302 40.382 0.000 0.000
1186 8.658 -12.310 40.094 0.000 0.000
1191 10.424 6.278 -66.752 0.000 0.000
1192 -0.014 -2.861 -4.929 0.000 0.000
1193 11.570 3.308 -47.236 0.000 0.000
1194 1.132 -5.831 14.587 0.000 0.000
1195 5.649 7.396 -76.787 0.000 0.000
1196 -3.690 -0.780 -21.472 0.000 0.000
1197 9.823 2.959 -42.318 0.000 0.000
1198 0.483 -5.217 12.996 0.000 0.000
2111 -1.112 4.391 0.726 0.000 0.000
2112 10.222 -7.166 -105.757 0.000 0.000
2121 -0.175 0.454 -63.005 0.000 0.000
2131 0.168 12.515 34.096 0.000 0.000
2132 -7.893 0.064 -20.145 0.000 0.000
2133 -0.163 -12.386 -74.337 0.000 0.000
2134 7.898 0.064 -20.096 0.000 0.000
2141 -0.988 13.729 41.388 0.000 0.000
2142 10.346 2.172 -65.095 0.000 0.000
2143 -7.034 4.391 0.708 0.000 0.000
2144 4.300 -7.166 -105.775 0.000 0.000
4 2145 -1.236 -4.947 -39.936 0.000 0.000
2146 10.098 -16.504 -146.419 0.000 0.000
2147 4.810 4.391 0.744 0.000 0.000
2148 16.144 -7.166 -105.739 0.000 0.000
2151 -0.076 7.924 -30.475 0.000 0.000
2152 -4.912 0.454 -63.020 0.000 0.000
2153 -0.274 -7.016 -95.535 0.000 0.000
2154 4.562 0.454 -62.990 0.000 0.000
2161 -1.445 3.454 -8.236 0.000 0.000
2162 1.577 3.454 -8.234 0.000 0.000
2163 -1.569 -3.262 -52.127 0.000 0.000
2164 1.452 -3.262 -52.125 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 39

2165 -5.014 1.104 -23.600 0.000 0.000


2166 5.058 1.104 -23.593 0.000 0.000
2167 -5.051 -0.911 -36.768 0.000 0.000
2168 5.021 -0.911 -36.761 0.000 0.000
2171 -6.083 8.698 33.631 0.000 0.000
2172 -2.152 8.702 33.461 0.000 0.000
2173 0.150 -0.798 -32.154 0.000 0.000
2174 4.081 -0.794 -32.324 0.000 0.000
2175 -8.488 5.369 10.804 0.000 0.000
2176 4.616 5.383 10.238 0.000 0.000
2177 -6.618 2.520 -8.931 0.000 0.000
2178 6.486 2.534 -9.497 0.000 0.000
2179 5.698 -1.544 -60.929 0.000 0.000
2180 10.622 -1.546 -60.940 0.000 0.000
2181 7.777 -11.353 -129.423 0.000 0.000
2182 12.701 -11.355 -129.433 0.000 0.000
2183 0.682 -4.975 -84.890 0.000 0.000
2184 17.094 -4.982 -84.925 0.000 0.000
2185 1.306 -7.917 -105.438 0.000 0.000
2186 17.718 -7.924 -105.473 0.000 0.000
2191 -1.090 7.127 18.719 0.000 0.000
2192 10.244 -4.430 -87.764 0.000 0.000
2193 -0.024 4.391 0.710 0.000 0.000
2194 11.311 -7.166 -105.773 0.000 0.000
2195 -4.861 8.958 36.275 0.000 0.000
2196 10.925 -7.166 -105.826 0.000 0.000
2197 -4.861 8.958 36.275 0.000 0.000
2198 10.925 -7.166 -105.826 0.000 0.000
1111 -1.557 6.147 1.016 0.000 0.000
1112 14.311 -10.032 -148.060 0.000 0.000
1121 -0.210 0.545 -75.606 0.000 0.000
1131 0.280 20.847 60.180 0.000 0.000
1132 -13.155 0.096 -30.222 0.000 0.000
1133 -0.272 -20.655 -120.542 0.000 0.000
1134 13.163 0.096 -30.140 0.000 0.000
1141 -1.058 26.020 91.232 0.000 0.000
1142 12.542 12.152 -36.547 0.000 0.000
1143 -14.493 5.269 0.830 0.000 0.000
1144 -0.893 -8.599 -126.949 0.000 0.000
1145 -1.610 -15.482 -89.490 0.000 0.000
1146 11.990 -29.350 -217.269 0.000 0.000
1147 11.825 5.269 0.912 0.000 0.000
1148 25.425 -8.599 -126.867 0.000 0.000
1151 -0.044 12.995 -21.389 0.000 0.000
1152 -8.105 0.545 -75.631 0.000 0.000
1153 -0.376 -11.906 -129.823 0.000 0.000
1154 7.685 0.545 -75.581 0.000 0.000
1161 -2.066 4.880 5.394 0.000 0.000
1162 2.250 4.880 5.397 0.000 0.000
1163 -2.244 -4.714 -57.308 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 40

1164 2.072 -4.714 -57.305 0.000 0.000


1165 -7.164 1.522 -16.555 0.000 0.000
1166 7.224 1.522 -16.545 0.000 0.000
1167 -7.218 -1.356 -35.366 0.000 0.000
1168 7.170 -1.356 -35.356 0.000 0.000
1171 -8.739 12.620 48.076 0.000 0.000
1172 -3.123 12.626 47.833 0.000 0.000
1173 0.165 -0.946 -45.902 0.000 0.000
1174 5.781 -0.940 -46.145 0.000 0.000
1175 -12.175 7.865 15.466 0.000 0.000
1176 6.545 7.885 14.658 0.000 0.000
1177 -9.503 3.795 -12.727 0.000 0.000
1178 9.217 3.815 -13.535 0.000 0.000
1179 8.593 -2.523 -91.725 0.000 0.000
1180 15.627 -2.526 -91.740 0.000 0.000
1181 11.563 -16.535 -189.573 0.000 0.000
1182 18.597 -16.538 -189.588 0.000 0.000
1183 1.427 -7.424 -125.955 0.000 0.000
1184 24.873 -7.434 -126.005 0.000 0.000
1185 2.318 -11.628 -155.309 0.000 0.000
1186 25.764 -11.638 -155.359 0.000 0.000
1191 -0.822 6.307 20.088 0.000 0.000
1192 7.792 -2.476 -60.840 0.000 0.000
1193 0.337 3.337 0.534 0.000 0.000
1194 8.951 -5.446 -80.393 0.000 0.000
1195 -4.398 7.423 35.027 0.000 0.000
1196 3.309 -0.436 -37.381 0.000 0.000
1197 -0.073 2.986 0.427 0.000 0.000
1198 7.634 -4.873 -71.981 0.000 0.000

Group 3 - F3 Unit( kN , kN-m )


Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F3 2111 5.895 5.539 -60.143 0.000 0.000
2112 -0.683 -8.951 19.564 0.000 0.000
2121 -0.948 -1.119 -84.347 0.000 0.000
2131 -0.950 10.610 -74.687 0.000 0.000
2132 -4.743 -0.093 -24.489 0.000 0.000
2133 -0.128 -10.799 38.687 0.000 0.000
2134 3.664 -0.097 -11.511 0.000 0.000
2141 5.587 13.567 -102.658 0.000 0.000
2142 -0.991 -0.923 -22.951 0.000 0.000
5
2143 2.742 5.540 -65.010 0.000 0.000
2144 -3.836 -8.950 14.697 0.000 0.000
2145 6.203 -2.489 -17.628 0.000 0.000
2146 -0.375 -16.979 62.079 0.000 0.000
2147 9.048 5.538 -55.276 0.000 0.000
2148 2.470 -8.952 24.431 0.000 0.000
2151 -1.195 5.304 -118.359 0.000 0.000
2152 -3.470 -1.118 -88.240 0.000 0.000
2153 -0.701 -7.542 -50.335 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 41

2154 1.574 -1.120 -80.454 0.000 0.000


2161 -1.656 3.123 -51.507 0.000 0.000
2162 -0.210 3.107 -46.813 0.000 0.000
2163 -1.409 -3.391 -7.187 0.000 0.000
2164 0.038 -3.407 -2.493 0.000 0.000
2165 -3.258 0.862 -41.470 0.000 0.000
2166 1.565 0.808 -25.825 0.000 0.000
2167 -3.183 -1.093 -28.175 0.000 0.000
2168 1.640 -1.146 -12.530 0.000 0.000
2171 5.587 10.233 -89.856 0.000 0.000
2172 7.818 10.265 -82.624 0.000 0.000
2173 2.793 -0.295 -25.634 0.000 0.000
2174 5.024 -0.263 -18.402 0.000 0.000
2175 2.006 6.512 -75.815 0.000 0.000
2176 9.444 6.617 -51.709 0.000 0.000
2177 1.167 3.353 -56.549 0.000 0.000
2178 8.605 3.458 -32.442 0.000 0.000
2179 -1.201 -2.923 -19.917 0.000 0.000
2180 0.714 -3.028 -12.811 0.000 0.000
2181 -1.943 -13.084 48.026 0.000 0.000
2182 -0.028 -13.189 55.132 0.000 0.000
2183 -3.695 -6.357 -4.428 0.000 0.000
2184 2.689 -6.707 19.260 0.000 0.000
2185 -3.918 -9.405 15.955 0.000 0.000
2186 2.466 -9.755 39.643 0.000 0.000
2191 5.802 8.138 -78.337 0.000 0.000
2192 -0.776 -6.352 1.370 0.000 0.000
2193 6.395 5.530 -57.478 0.000 0.000
2194 -0.183 -8.960 22.229 0.000 0.000
2195 3.721 10.103 -99.358 0.000 0.000
2196 -0.618 -8.985 26.669 0.000 0.000
2197 3.721 10.103 -99.358 0.000 0.000
2198 -0.618 -8.985 26.669 0.000 0.000
1111 8.253 7.755 -84.200 0.000 0.000
1112 -0.956 -12.531 27.390 0.000 0.000
1121 -1.138 -1.343 -101.216 0.000 0.000
1131 -1.494 17.699 -121.478 0.000 0.000
1132 -7.815 -0.139 -37.815 0.000 0.000
1133 -0.124 -17.983 67.478 0.000 0.000
1134 6.197 -0.145 -16.185 0.000 0.000
1141 6.389 24.488 -166.650 0.000 0.000
1142 -1.505 7.100 -71.001 0.000 0.000
1143 0.068 6.650 -82.987 0.000 0.000
1144 -7.826 -10.738 12.662 0.000 0.000
1145 7.759 -11.194 22.306 0.000 0.000
1146 -0.135 -28.582 117.955 0.000 0.000
1147 14.080 6.644 -61.357 0.000 0.000
1148 6.186 -10.744 34.292 0.000 0.000
1151 -1.549 9.362 -157.903 0.000 0.000
1152 -5.341 -1.341 -107.705 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 42

1153 -0.727 -12.047 -44.530 0.000 0.000


1154 3.066 -1.345 -94.727 0.000 0.000
1161 -1.906 4.542 -58.229 0.000 0.000
1162 0.161 4.519 -51.524 0.000 0.000
1163 -1.552 -4.764 5.084 0.000 0.000
1164 0.515 -4.787 11.789 0.000 0.000
1165 -4.194 1.312 -43.892 0.000 0.000
1166 2.696 1.236 -21.542 0.000 0.000
1167 -4.088 -1.480 -24.898 0.000 0.000
1168 2.802 -1.556 -2.548 0.000 0.000
1171 8.242 14.864 -131.029 0.000 0.000
1172 11.430 14.909 -120.697 0.000 0.000
1173 4.250 -0.176 -39.283 0.000 0.000
1174 7.438 -0.131 -28.951 0.000 0.000
1175 3.126 9.548 -110.971 0.000 0.000
1176 13.752 9.698 -76.533 0.000 0.000
1177 1.929 5.036 -83.447 0.000 0.000
1178 12.555 5.186 -49.009 0.000 0.000
1179 -1.746 -4.572 -27.587 0.000 0.000
1180 0.990 -4.722 -17.435 0.000 0.000
1181 -2.806 -19.088 69.475 0.000 0.000
1182 -0.070 -19.238 79.627 0.000 0.000
1183 -5.309 -9.477 -5.459 0.000 0.000
1184 3.811 -9.977 28.381 0.000 0.000
1185 -5.627 -13.832 23.659 0.000 0.000
1186 3.493 -14.332 57.499 0.000 0.000
1191 4.379 7.032 -65.463 0.000 0.000
1192 -0.620 -3.981 -4.885 0.000 0.000
1193 5.023 4.200 -42.815 0.000 0.000
1194 0.024 -6.813 17.762 0.000 0.000
1195 1.897 8.200 -78.992 0.000 0.000
1196 -2.577 -1.653 -24.791 0.000 0.000
1197 4.072 3.734 -33.995 0.000 0.000
1198 -0.401 -6.119 20.206 0.000 0.000
2111 -1.212 6.434 -8.810 0.000 0.000
2112 3.859 -7.930 -104.222 0.000 0.000
2121 -1.201 1.005 -86.558 0.000 0.000
2131 -0.132 10.801 37.774 0.000 0.000
2132 -4.737 0.091 -25.393 0.000 0.000
2133 -0.954 -10.609 -75.599 0.000 0.000
2134 3.651 0.101 -12.433 0.000 0.000
2141 -0.904 14.462 33.705 0.000 0.000
6
2142 4.167 0.098 -61.707 0.000 0.000
2143 -4.357 6.430 -13.670 0.000 0.000
2144 0.714 -7.934 -109.082 0.000 0.000
2145 -1.520 -1.594 -51.325 0.000 0.000
2146 3.551 -15.958 -146.737 0.000 0.000
2147 1.933 6.438 -3.950 0.000 0.000
2148 7.004 -7.926 -99.362 0.000 0.000
2151 -0.954 7.428 -52.546 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 43

2152 -3.717 1.002 -90.446 0.000 0.000


2153 -1.448 -5.418 -120.570 0.000 0.000
2154 1.315 1.008 -82.670 0.000 0.000
2161 -1.447 3.403 -8.586 0.000 0.000
2162 0.066 3.399 -3.832 0.000 0.000
2163 -1.695 -3.111 -52.906 0.000 0.000
2164 -0.182 -3.115 -48.152 0.000 0.000
2165 -3.298 1.127 -29.645 0.000 0.000
2166 1.743 1.115 -13.797 0.000 0.000
2167 -3.372 -0.827 -42.941 0.000 0.000
2168 1.669 -0.839 -27.093 0.000 0.000
2171 -3.474 11.029 20.660 0.000 0.000
2172 -1.502 11.080 27.704 0.000 0.000
2173 -0.680 0.501 -43.562 0.000 0.000
2174 1.293 0.552 -36.518 0.000 0.000
2175 -4.797 7.284 -10.035 0.000 0.000
2176 1.777 7.455 13.444 0.000 0.000
2177 -3.959 4.126 -29.302 0.000 0.000
2178 2.616 4.297 -5.823 0.000 0.000
2179 1.870 -2.014 -63.639 0.000 0.000
2180 4.334 -2.099 -56.017 0.000 0.000
2181 2.612 -12.175 -131.582 0.000 0.000
2182 5.076 -12.260 -123.961 0.000 0.000
2183 -0.745 -5.471 -96.310 0.000 0.000
2184 7.469 -5.755 -70.906 0.000 0.000
2185 -0.522 -8.519 -116.694 0.000 0.000
2186 7.691 -8.803 -91.289 0.000 0.000
2191 -1.119 9.033 9.384 0.000 0.000
2192 3.952 -5.331 -86.028 0.000 0.000
2193 -0.686 6.434 -6.117 0.000 0.000
2194 4.385 -7.930 -101.529 0.000 0.000
2195 -3.046 10.992 23.163 0.000 0.000
2196 4.032 -7.933 -97.008 0.000 0.000
2197 -3.046 10.992 23.163 0.000 0.000
2198 4.032 -7.933 -97.008 0.000 0.000
1111 -1.697 9.008 -12.334 0.000 0.000
1112 5.403 -11.102 -145.911 0.000 0.000
1121 -1.441 1.206 -103.870 0.000 0.000
1131 -0.129 17.985 66.108 0.000 0.000
1132 -7.804 0.136 -39.169 0.000 0.000
1133 -1.500 -17.697 -122.846 0.000 0.000
1134 6.175 0.152 -17.569 0.000 0.000
1141 -0.769 25.562 83.905 0.000 0.000
1142 5.316 8.325 -30.589 0.000 0.000
1143 -8.444 7.713 -21.372 0.000 0.000
1144 -2.359 -9.524 -135.866 0.000 0.000
1145 -2.139 -10.120 -105.049 0.000 0.000
1146 3.946 -27.357 -219.543 0.000 0.000
1147 5.536 7.729 0.228 0.000 0.000
1148 11.621 -9.508 -114.266 0.000 0.000

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 44

1151 -1.030 11.911 -47.183 0.000 0.000


1152 -5.635 1.201 -110.350 0.000 0.000
1153 -1.852 -9.499 -160.556 0.000 0.000
1154 2.753 1.211 -97.390 0.000 0.000
1161 -1.604 4.780 3.864 0.000 0.000
1162 0.557 4.774 10.656 0.000 0.000
1163 -1.958 -4.526 -59.450 0.000 0.000
1164 0.203 -4.532 -52.658 0.000 0.000
1165 -4.248 1.529 -26.220 0.000 0.000
1166 2.954 1.511 -3.580 0.000 0.000
1167 -4.355 -1.263 -45.214 0.000 0.000
1168 2.847 -1.281 -22.574 0.000 0.000
1171 -5.017 16.041 29.124 0.000 0.000
1172 -2.199 16.114 39.187 0.000 0.000
1173 -1.025 1.001 -62.622 0.000 0.000
1174 1.793 1.074 -52.559 0.000 0.000
1175 -6.907 10.691 -14.726 0.000 0.000
1176 2.485 10.935 18.816 0.000 0.000
1177 -5.709 6.179 -42.250 0.000 0.000
1178 3.683 6.423 -8.708 0.000 0.000
1179 2.842 -3.228 -95.528 0.000 0.000
1180 6.363 -3.350 -84.640 0.000 0.000
1181 3.902 -17.744 -192.590 0.000 0.000
1182 7.423 -17.866 -181.702 0.000 0.000
1183 -0.894 -8.167 -142.202 0.000 0.000
1184 10.840 -8.573 -105.910 0.000 0.000
1185 -0.576 -12.521 -171.321 0.000 0.000
1186 11.158 -12.927 -135.029 0.000 0.000
1191 -0.820 7.712 13.058 0.000 0.000
1192 3.034 -3.205 -59.455 0.000 0.000
1193 -0.350 4.890 -3.772 0.000 0.000
1194 3.504 -6.027 -76.285 0.000 0.000
1195 -2.606 8.803 25.069 0.000 0.000
1196 0.843 -0.964 -39.811 0.000 0.000
1197 -0.656 4.372 1.017 0.000 0.000
1198 2.792 -5.396 -63.864 0.000 0.000

3.4.2 Load Combination in Footing Bottom (With Pier SW)


Group 1 - F1 Unit( kN , kN-m )
Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F1 2111 7.975 2.912 -118.476 -5.242 14.355
2112 0.688 -6.413 13.220 11.543 1.238
2121 1.092 -0.215 -66.770 0.387 1.966
2131 0.785 10.757 -78.636 -19.363 1.414
1
2132 -3.667 -0.004 -15.290 0.006 -6.600
2133 0.287 -10.761 35.028 19.370 0.517
2134 4.739 0.000 -28.318 0.000 8.531
2141 8.162 10.981 -161.100 -19.767 14.691

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 45

2142 0.875 1.656 -29.404 -2.982 1.575


2143 4.823 2.911 -113.590 -5.239 8.681
2144 -2.464 -6.414 18.106 11.546 -4.436
2145 7.788 -5.157 -75.852 9.283 14.019
2146 0.501 -14.482 55.844 26.068 0.902
2147 11.127 2.913 -123.362 -5.244 20.029
2148 3.840 -6.412 8.334 11.541 6.912
2151 1.241 6.241 -100.869 -11.233 2.235
2152 -1.430 -0.216 -62.862 0.389 -2.574
2153 0.943 -6.671 -32.671 12.007 1.697
2154 3.614 -0.214 -70.679 0.385 6.505
2161 0.146 3.228 -52.570 -5.810 0.262
2162 1.589 3.243 -57.267 -5.838 2.861
2163 0.020 -3.249 -8.145 5.848 0.036
2164 1.463 -3.233 -12.842 5.819 2.634
2165 -1.582 0.942 -31.542 -1.696 -2.848
2166 3.229 0.995 -47.197 -1.792 5.813
2167 -1.620 -1.001 -18.215 1.801 -2.916
2168 3.192 -0.948 -33.870 1.706 5.745
2171 7.762 6.602 -137.455 -11.884 13.972
2172 9.985 6.566 -144.640 -11.819 17.973
2173 4.370 -1.325 -68.617 2.384 7.866
2174 6.593 -1.361 -75.802 2.449 11.867
2175 3.981 3.870 -104.978 -6.966 7.166
2176 11.391 3.750 -128.931 -6.749 20.505
2177 2.964 1.492 -84.327 -2.686 5.334
2178 10.374 1.372 -108.279 -2.469 18.673
2179 0.328 -1.241 -19.462 2.235 0.590
2180 2.234 -1.135 -26.507 2.043 4.021
2181 -0.995 -10.409 50.303 18.736 -1.792
2182 0.911 -10.302 43.258 18.544 1.640
2183 -2.360 -4.574 13.176 8.234 -4.247
2184 3.995 -4.219 -10.309 7.594 7.191
2185 -2.757 -7.325 34.105 13.184 -4.962
2186 3.598 -6.969 10.620 12.544 6.476
2191 8.049 5.510 -137.047 -9.917 14.487
2192 0.761 -3.815 -5.351 6.868 1.371
2193 8.476 2.921 -121.124 -5.258 15.256
2194 1.188 -6.404 10.572 11.527 2.139
2195 6.116 7.458 -151.362 -13.424 11.008
2196 0.757 -6.379 6.190 11.483 1.363
2197 6.116 7.458 -151.362 -13.424 11.008
2198 0.757 -6.379 6.190 11.483 1.363
1111 11.165 4.077 -165.867 -7.338 20.097
1112 0.963 -8.978 18.508 16.161 1.734
1121 1.310 -0.258 -80.124 0.464 2.359
1131 1.220 17.929 -127.426 -32.273 2.195
1132 -6.200 -0.006 -21.849 0.010 -11.161
1133 0.390 -17.935 62.014 32.282 0.701
1134 7.810 0.000 -43.563 -0.001 14.057

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 46

1141 9.985 21.426 -236.891 -38.568 17.973


1142 1.241 10.236 -78.856 -18.426 2.233
1143 2.565 3.491 -131.314 -6.285 4.617
1144 -6.179 -7.699 26.721 13.857 -11.123
1145 9.155 -14.438 -47.451 25.988 16.479
1146 0.411 -25.628 110.584 46.130 0.739
1147 16.575 3.497 -153.028 -6.295 29.835
1148 7.831 -7.693 5.007 13.847 14.095
1151 1.559 10.501 -136.956 -18.902 2.807
1152 -2.893 -0.260 -73.610 0.468 -5.207
1153 1.061 -11.017 -23.292 19.831 1.911
1154 5.513 -0.256 -86.638 0.461 9.924
1161 -0.249 4.612 -56.505 -8.302 -0.448
1162 1.813 4.635 -63.214 -8.343 3.264
1163 -0.429 -4.640 6.959 8.352 -0.772
1164 1.633 -4.617 0.250 8.310 2.940
1165 -2.718 1.347 -26.465 -2.425 -4.892
1166 4.156 1.423 -48.829 -2.562 7.481
1167 -2.772 -1.428 -7.426 2.571 -4.990
1168 4.102 -1.352 -29.790 2.434 7.384
1171 11.442 9.561 -201.611 -17.209 20.595
1172 14.618 9.509 -211.876 -17.116 26.312
1173 6.596 -1.763 -103.271 3.174 11.873
1174 9.772 -1.815 -113.536 3.267 17.589
1175 6.041 5.658 -155.215 -10.184 10.873
1176 16.627 5.486 -189.433 -9.874 29.928
1177 4.587 2.260 -125.713 -4.069 8.256
1178 15.173 2.088 -159.931 -3.759 27.311
1179 0.498 -2.057 -27.217 3.703 0.897
1180 3.222 -1.905 -37.282 3.429 5.799
1181 -1.392 -15.153 72.447 27.276 -2.505
1182 1.332 -15.001 62.382 27.002 2.397
1183 -3.340 -6.819 19.408 12.274 -6.013
1184 5.738 -6.311 -14.142 11.360 10.328
1185 -3.907 -10.748 49.307 19.346 -7.033
1186 5.171 -10.240 15.757 18.431 9.307
1191 6.141 5.033 -110.205 -9.060 11.053
1192 0.603 -2.054 -10.116 3.696 1.085
1193 6.604 2.223 -92.916 -4.001 11.888
1194 1.066 -4.864 7.173 8.755 1.919
1195 3.617 6.396 -112.510 -11.513 6.510
1196 -1.338 0.055 -22.957 -0.099 -2.409
1197 5.490 2.013 -87.393 -3.623 9.883
1198 0.535 -4.328 2.160 7.791 0.963
2111 0.406 3.412 -62.299 -6.142 0.731
2112 6.359 -6.297 -130.221 11.335 11.446
2121 0.981 0.288 -81.598 -0.518 1.766
2
2131 0.294 10.762 34.202 -19.371 0.529
2132 -3.650 0.007 -16.125 -0.013 -6.571
2133 0.792 -10.758 -79.461 19.364 1.426

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 47

2134 4.736 -0.004 -29.134 0.006 8.526


2141 0.219 11.482 -19.676 -20.667 0.395
2142 6.172 1.773 -87.598 -3.191 11.110
2143 -2.739 3.416 -57.421 -6.149 -4.930
2144 3.214 -6.293 -125.343 11.327 5.785
2145 0.593 -4.658 -104.923 8.384 1.067
2146 6.546 -14.367 -172.845 25.860 11.782
2147 3.551 3.408 -67.178 -6.134 6.392
2148 9.504 -6.301 -135.100 11.342 17.107
2151 0.832 6.744 -47.499 -12.139 1.497
2152 -1.535 0.291 -77.695 -0.524 -2.763
2153 1.130 -6.168 -115.697 11.102 2.035
2154 3.497 0.285 -85.501 -0.513 6.295
2161 -0.003 3.239 -9.354 -5.830 -0.005
2162 1.506 3.243 -14.110 -5.837 2.711
2163 0.123 -3.237 -53.779 5.827 0.221
2164 1.632 -3.234 -58.535 5.820 2.938
2165 -1.719 0.968 -19.353 -1.742 -3.095
2166 3.311 0.980 -35.208 -1.765 5.959
2167 -1.682 -0.975 -32.681 1.755 -3.027
2168 3.348 -0.962 -48.536 1.732 6.027
2171 -2.311 7.062 -18.213 -12.711 -4.160
2172 -0.350 7.006 -25.087 -12.612 -0.631
2173 1.081 -0.865 -87.051 1.557 1.946
2174 3.042 -0.920 -93.925 1.657 5.475
2175 -3.411 4.352 -34.287 -7.834 -6.140
2176 3.124 4.167 -57.200 -7.501 5.624
2177 -2.393 1.974 -54.939 -3.554 -4.308
2178 4.142 1.789 -77.851 -3.221 7.455
2179 3.834 -1.130 -78.511 2.034 6.901
2180 6.289 -1.043 -86.122 1.877 11.321
2181 5.157 -10.292 -148.276 18.525 9.282
2182 7.612 -10.205 -155.887 18.368 13.702
2183 1.432 -4.438 -94.050 7.988 2.578
2184 9.617 -4.148 -119.419 7.467 17.310
2185 1.829 -7.186 -114.979 12.936 3.293
2186 10.014 -6.897 -140.348 12.414 18.025
2191 0.332 6.010 -43.728 -10.817 0.599
2192 6.285 -3.699 -111.650 6.659 11.314
2193 0.934 3.412 -64.975 -6.142 1.681
2194 6.887 -6.297 -132.897 11.335 12.396
2195 -1.743 7.963 -22.163 -14.334 -3.137
2196 6.536 -6.293 -137.366 11.327 11.765
2197 -1.743 7.963 -22.163 -14.334 -3.137
2198 6.536 -6.293 -137.366 11.327 11.765
1111 0.568 4.777 -87.219 -8.598 1.023
1112 8.903 -8.816 -182.310 15.868 16.025
1121 1.177 0.346 -97.918 -0.622 2.119
1131 0.399 17.936 60.774 -32.284 0.719
1132 -6.174 0.012 -23.104 -0.021 -11.114

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 48

1133 1.229 -17.930 -128.664 32.275 2.213


1134 7.803 -0.006 -44.786 0.011 14.046
1141 0.072 22.027 19.960 -39.649 0.130
1142 7.216 10.377 -61.546 -18.678 12.988
1143 -6.502 4.103 -63.918 -7.386 -11.703
1144 0.642 -7.547 -145.424 13.585 1.155
1145 0.902 -13.839 -169.478 24.909 1.624
1146 8.046 -25.489 -250.984 45.881 14.482
1147 7.476 4.085 -85.600 -7.354 13.457
1148 14.620 -7.565 -167.106 13.618 26.316
1151 0.928 11.105 -41.086 -19.990 1.671
1152 -3.016 0.351 -91.413 -0.632 -5.429
1153 1.426 -10.414 -154.749 18.746 2.567
1154 5.371 0.340 -104.422 -0.612 9.667
1161 -0.467 4.626 5.937 -8.326 -0.841
1162 1.688 4.631 -0.858 -8.336 3.039
1163 -0.287 -4.626 -57.527 8.327 -0.517
1164 1.868 -4.621 -64.322 8.318 3.363
1165 -2.920 1.381 -8.348 -2.486 -5.255
1166 4.266 1.399 -30.998 -2.518 7.680
1167 -2.866 -1.394 -27.387 2.510 -5.158
1168 4.320 -1.376 -50.037 2.478 7.777
1171 -3.283 10.240 -28.778 -18.431 -5.910
1172 -0.483 10.160 -38.598 -18.289 -0.869
1173 1.563 -1.084 -127.118 1.952 2.813
1174 4.363 -1.164 -136.938 2.095 7.854
1175 -4.855 6.369 -51.741 -11.463 -8.739
1176 4.481 6.105 -84.473 -10.988 8.066
1177 -3.401 2.971 -81.243 -5.348 -6.122
1178 5.935 2.707 -113.975 -4.873 10.683
1179 5.759 -1.893 -117.926 3.408 10.366
1180 9.266 -1.769 -128.798 3.184 16.679
1181 7.649 -14.981 -217.590 26.966 13.768
1182 11.156 -14.857 -228.462 26.742 20.081
1183 2.328 -6.619 -140.123 11.914 4.190
1184 14.020 -6.205 -176.365 11.169 25.236
1185 2.895 -10.545 -170.023 18.981 5.211
1186 14.587 -10.131 -206.265 18.236 26.257
1191 0.229 5.413 -27.185 -9.744 0.412
1192 4.753 -1.965 -78.805 3.538 8.555
1193 0.882 2.593 -50.253 -4.668 1.587
1194 5.406 -4.786 -101.874 8.614 9.731
1195 -1.812 6.742 -3.374 -12.135 -3.261
1196 2.237 0.139 -49.561 -0.251 4.026
1197 0.448 2.324 -49.304 -4.184 0.807
1198 4.496 -4.278 -95.491 7.700 8.093

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 49

Group 2 - F2 Unit( kN , kN-m )


Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F2 2111 13.747 4.352 -69.264 -7.834 24.745
2112 0.013 -7.672 12.081 13.810 0.023
2121 0.248 -0.412 -58.556 0.742 0.446
2131 -0.167 12.385 -77.864 -22.293 -0.300
2132 -7.915 -0.065 -23.673 0.118 -14.247
2133 0.164 -12.516 30.569 22.529 0.296
2134 7.913 -0.065 -23.623 0.118 14.243
2141 13.623 13.690 -109.927 -24.642 24.521
2142 -0.111 1.666 -28.582 -2.999 -0.200
2143 7.812 4.352 -69.283 -7.834 14.061
2144 -5.922 -7.672 12.062 13.810 -10.660
2145 13.871 -4.986 -28.602 8.975 24.968
2146 0.137 -17.010 52.743 30.618 0.247
2147 19.682 4.352 -69.245 -7.834 35.429
2148 5.948 -7.672 12.100 13.810 10.707
2151 0.149 7.058 -91.086 -12.705 0.268
2152 -4.500 -0.412 -58.571 0.742 -8.101
2153 0.347 -7.882 -26.026 14.188 0.625
2154 4.996 -0.412 -58.541 0.742 8.994
2161 -1.509 3.260 -57.419 -5.868 -2.716
2162 1.381 3.260 -57.416 -5.868 2.485
2163 -1.384 -3.456 -13.528 6.221 -2.492
2164 1.505 -3.456 -13.525 6.221 2.710
2165 -4.836 0.909 -42.060 -1.637 -8.706
3
2166 4.796 0.909 -42.051 -1.637 8.632
2167 -4.799 -1.105 -28.893 1.990 -8.638
2168 4.833 -1.105 -28.883 1.990 8.699
2171 13.263 8.663 -95.208 -15.594 23.873
2172 17.715 8.668 -95.254 -15.602 31.886
2173 7.030 -0.834 -29.422 1.502 12.654
2174 11.482 -0.830 -29.468 1.493 20.667
2175 5.887 5.334 -72.129 -9.601 10.597
2176 20.727 5.349 -72.283 -9.628 37.309
2177 4.017 2.484 -52.393 -4.472 7.231
2178 18.857 2.500 -52.547 -4.500 33.943
2179 -0.857 -2.000 -23.343 3.600 -1.542
2180 2.959 -2.001 -23.404 3.603 5.327
2181 -2.936 -11.808 45.149 21.255 -5.285
2182 0.880 -11.810 45.089 21.258 1.584
2183 -6.037 -5.431 0.700 9.775 -10.866
2184 6.684 -5.436 0.498 9.785 12.031
2185 -6.660 -8.373 21.247 15.072 -11.989
2186 6.060 -8.379 21.046 15.082 10.908
2191 13.725 7.088 -87.258 -12.758 24.706
2192 -0.009 -4.936 -5.913 8.886 -0.016
2193 14.781 4.352 -69.282 -7.834 26.606
2194 1.047 -7.672 12.063 13.810 1.884
2195 9.940 8.920 -104.821 -16.055 17.891

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 50

2196 0.502 -7.672 12.006 13.810 0.903


2197 9.940 8.920 -104.821 -16.055 17.891
2198 0.502 -7.672 12.006 13.810 0.903
1111 19.246 6.093 -96.970 -10.967 34.642
1112 0.018 -10.741 16.913 19.333 0.033
1121 0.298 -0.494 -70.267 0.890 0.536
1131 -0.278 20.653 -125.833 -37.175 -0.500
1132 -13.192 -0.098 -35.514 0.177 -23.745
1133 0.274 -20.849 54.889 37.528 0.494
1134 13.188 -0.098 -35.430 0.177 23.739
1141 16.220 25.973 -173.478 -46.752 29.197
1142 -0.260 11.545 -75.864 -20.780 -0.469
1143 3.306 5.222 -83.159 -9.400 5.952
1144 -13.174 -9.206 14.455 16.572 -23.714
1145 16.772 -15.529 7.244 27.951 30.190
1146 0.292 -29.957 104.858 53.923 0.525
1147 29.686 5.222 -83.075 -9.400 53.436
1148 13.206 -9.206 14.539 16.572 23.770
1151 0.132 11.956 -124.484 -21.521 0.238
1152 -7.616 -0.494 -70.293 0.890 -13.710
1153 0.463 -12.945 -16.051 23.301 0.834
1154 8.212 -0.494 -70.242 0.890 14.781
1161 -2.155 4.713 -61.859 -8.483 -3.878
1162 1.973 4.713 -61.855 -8.483 3.552
1163 -1.977 -4.881 0.843 8.786 -3.558
1164 2.151 -4.881 0.847 8.786 3.873
1165 -6.908 1.355 -39.918 -2.439 -12.435
1166 6.852 1.355 -39.904 -2.439 12.333
1167 -6.855 -1.523 -21.107 2.742 -12.339
1168 6.905 -1.523 -21.093 2.742 12.429
1171 19.556 12.569 -139.078 -22.624 35.200
1172 25.916 12.575 -139.144 -22.636 46.648
1173 10.652 -0.999 -45.098 1.798 19.173
1174 17.012 -0.993 -45.164 1.787 30.621
1175 9.019 7.812 -106.108 -14.062 16.234
1176 30.219 7.834 -106.328 -14.102 54.394
1177 6.348 3.742 -77.914 -6.736 11.426
1178 27.548 3.764 -78.134 -6.775 49.586
1179 -1.224 -3.197 -32.812 5.754 -2.202
1180 4.228 -3.199 -32.899 5.758 7.611
1181 -4.194 -17.209 65.034 30.975 -7.548
1182 1.258 -17.211 64.947 30.980 2.265
1183 -8.623 -8.098 1.535 14.576 -15.522
1184 9.549 -8.106 1.247 14.591 17.188
1185 -9.514 -12.302 30.888 22.143 -17.126
1186 8.658 -12.310 30.600 22.157 15.584
1191 10.424 6.278 -72.177 -11.300 18.763
1192 -0.014 -2.861 -10.354 5.149 -0.025
1193 11.570 3.308 -52.660 -5.954 20.826
1194 1.132 -5.831 9.162 10.495 2.038

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 51

1195 5.649 7.396 -81.641 -13.313 10.169


1196 -3.690 -0.780 -26.326 1.404 -6.641
1197 9.823 2.959 -47.172 -5.327 17.681
1198 0.483 -5.217 8.142 9.391 0.870
2111 -1.112 4.391 -6.412 -7.904 -2.002
2112 10.222 -7.166 -112.895 12.899 18.400
2121 -0.175 0.454 -70.143 -0.817 -0.315
2131 0.168 12.515 29.813 -22.527 0.302
2132 -7.893 0.064 -24.428 -0.116 -14.207
2133 -0.163 -12.386 -78.620 22.296 -0.294
2134 7.898 0.064 -24.379 -0.116 14.216
2141 -0.988 13.729 34.250 -24.712 -1.778
2142 10.346 2.172 -72.233 -3.910 18.623
2143 -7.034 4.391 -6.431 -7.904 -12.660
2144 4.300 -7.166 -112.914 12.899 7.741
2145 -1.236 -4.947 -47.075 8.905 -2.225
2146 10.098 -16.504 -153.558 29.707 18.176
2147 4.810 4.391 -6.394 -7.904 8.657
2148 16.144 -7.166 -112.877 12.899 29.058
2151 -0.076 7.924 -37.613 -14.264 -0.136
2152 -4.912 0.454 -70.158 -0.817 -8.842
2153 -0.274 -7.016 -102.673 12.629 -0.494
2154 4.562 0.454 -70.128 -0.817 8.212
2161 -1.445 3.454 -14.660 -6.218 -2.601
2162 1.577 3.454 -14.658 -6.218 2.838
2163 -1.569 -3.262 -58.552 5.871 -2.825
2164 1.452 -3.262 -58.550 5.871 2.614
4
2165 -5.014 1.104 -30.025 -1.987 -9.024
2166 5.058 1.104 -30.018 -1.987 9.105
2167 -5.051 -0.911 -43.192 1.640 -9.092
2168 5.021 -0.911 -43.185 1.640 9.037
2171 -6.083 8.698 27.206 -15.656 -10.949
2172 -2.152 8.702 27.037 -15.664 -3.873
2173 0.150 -0.798 -38.578 1.437 0.270
2174 4.081 -0.794 -38.748 1.429 7.346
2175 -8.488 5.369 4.380 -9.665 -15.278
2176 4.616 5.383 3.814 -9.690 8.309
2177 -6.618 2.520 -15.356 -4.537 -11.912
2178 6.486 2.534 -15.921 -4.562 11.675
2179 5.698 -1.544 -67.354 2.779 10.257
2180 10.622 -1.546 -67.364 2.783 19.120
2181 7.777 -11.353 -135.847 20.435 13.999
2182 12.701 -11.355 -135.858 20.438 22.862
2183 0.682 -4.975 -91.314 8.954 1.227
2184 17.094 -4.982 -91.349 8.967 30.769
2185 1.306 -7.917 -111.862 14.251 2.350
2186 17.718 -7.924 -111.897 14.263 31.892
2191 -1.090 7.127 11.581 -12.828 -1.963
2192 10.244 -4.430 -94.902 7.975 18.439
2193 -0.024 4.391 -6.428 -7.904 -0.042

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 52

2194 11.311 -7.166 -112.911 12.899 20.359


2195 -4.861 8.958 29.137 -16.125 -8.750
2196 10.925 -7.166 -112.964 12.899 19.666
2197 -4.861 8.958 29.137 -16.125 -8.750
2198 10.925 -7.166 -112.964 12.899 19.666
1111 -1.557 6.147 -8.977 -11.065 -2.802
1112 14.311 -10.032 -158.053 18.058 25.759
1121 -0.210 0.545 -84.172 -0.981 -0.378
1131 0.280 20.847 53.756 -37.525 0.503
1132 -13.155 0.096 -36.646 -0.173 -23.680
1133 -0.272 -20.655 -126.966 37.178 -0.490
1134 13.163 0.096 -36.564 -0.173 23.693
1141 -1.058 26.020 82.666 -46.836 -1.905
1142 12.542 12.152 -45.113 -21.873 22.576
1143 -14.493 5.269 -7.736 -9.485 -26.088
1144 -0.893 -8.599 -135.515 15.479 -1.607
1145 -1.610 -15.482 -98.056 27.867 -2.899
1146 11.990 -29.350 -225.835 52.830 21.583
1147 11.825 5.269 -7.654 -9.485 21.284
1148 25.425 -8.599 -135.433 15.479 45.766
1151 -0.044 12.995 -29.955 -23.392 -0.080
1152 -8.105 0.545 -84.196 -0.981 -14.590
1153 -0.376 -11.906 -138.388 21.430 -0.676
1154 7.685 0.545 -84.147 -0.981 13.834
1161 -2.066 4.880 -0.131 -8.784 -3.719
1162 2.250 4.880 -0.128 -8.784 4.051
1163 -2.244 -4.714 -62.833 8.486 -4.039
1164 2.072 -4.714 -62.830 8.486 3.730
1165 -7.164 1.522 -22.080 -2.739 -12.896
1166 7.224 1.522 -22.070 -2.739 13.003
1167 -7.218 -1.356 -40.891 2.441 -12.992
1168 7.170 -1.356 -40.881 2.441 12.907
1171 -8.739 12.620 38.582 -22.716 -15.730
1172 -3.123 12.626 38.340 -22.727 -5.621
1173 0.165 -0.946 -55.396 1.703 0.297
1174 5.781 -0.940 -55.638 1.692 10.406
1175 -12.175 7.865 5.973 -14.157 -21.914
1176 6.545 7.885 5.165 -14.193 11.782
1177 -9.503 3.795 -22.221 -6.831 -17.106
1178 9.217 3.815 -23.029 -6.867 16.590
1179 8.593 -2.523 -101.219 4.542 15.468
1180 15.627 -2.526 -101.234 4.547 28.129
1181 11.563 -16.535 -199.067 29.764 20.814
1182 18.597 -16.538 -199.082 29.769 33.475
1183 1.427 -7.424 -135.448 13.363 2.568
1184 24.873 -7.434 -135.498 13.381 44.771
1185 2.318 -11.628 -164.803 20.930 4.172
1186 25.764 -11.638 -164.853 20.948 46.375
1191 -0.822 6.307 14.663 -11.353 -1.479
1192 7.792 -2.476 -66.264 4.457 14.026

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 53

1193 0.337 3.337 -4.891 -6.007 0.606


1194 8.951 -5.446 -85.818 9.803 16.111
1195 -4.398 7.423 30.174 -13.361 -7.917
1196 3.309 -0.436 -42.235 0.785 5.956
1197 -0.073 2.986 -4.427 -5.375 -0.131
1198 7.634 -4.873 -76.835 8.771 13.742

Group 3 - F3 Unit( kN , kN-m )


Ft.Name Pr.Name L.Comb. SFx SFy SFz SMx SMy
F3 2111 5.895 5.539 -67.281 -9.970 10.611
2112 -0.683 -8.951 12.426 16.112 -1.229
2121 -0.948 -1.119 -91.485 2.014 -1.706
2131 -0.950 10.610 -78.970 -19.098 -1.711
2132 -4.743 -0.093 -28.772 0.167 -8.537
2133 -0.128 -10.799 34.404 19.439 -0.231
2134 3.664 -0.097 -15.794 0.174 6.596
2141 5.587 13.567 -109.796 -24.421 10.056
2142 -0.991 -0.923 -30.089 1.661 -1.784
2143 2.742 5.540 -72.148 -9.973 4.936
2144 -3.836 -8.950 7.559 16.109 -6.904
2145 6.203 -2.489 -24.766 4.481 11.166
2146 -0.375 -16.979 54.941 30.563 -0.675
2147 9.048 5.538 -62.414 -9.968 16.286
2148 2.470 -8.952 17.293 16.114 4.445
2151 -1.195 5.304 -125.497 -9.547 -2.150
2152 -3.470 -1.118 -95.379 2.012 -6.246
2153 -0.701 -7.542 -57.473 13.575 -1.263
2154 1.574 -1.120 -87.592 2.016 2.833
2161 -1.656 3.123 -57.931 -5.621 -2.982
5 2162 -0.210 3.107 -53.237 -5.592 -0.377
2163 -1.409 -3.391 -13.611 6.104 -2.536
2164 0.038 -3.407 -8.918 6.133 0.069
2165 -3.258 0.862 -47.895 -1.551 -5.864
2166 1.565 0.808 -32.250 -1.455 2.817
2167 -3.183 -1.093 -34.599 1.967 -5.730
2168 1.640 -1.146 -18.954 2.063 2.951
2171 5.587 10.233 -96.280 -18.420 10.057
2172 7.818 10.265 -89.048 -18.477 14.073
2173 2.793 -0.295 -32.058 0.530 5.027
2174 5.024 -0.263 -24.826 0.474 9.043
2175 2.006 6.512 -82.240 -11.721 3.610
2176 9.444 6.617 -58.133 -11.910 16.999
2177 1.167 3.353 -62.973 -6.036 2.101
2178 8.605 3.458 -38.866 -6.225 15.490
2179 -1.201 -2.923 -26.342 5.261 -2.162
2180 0.714 -3.028 -19.235 5.450 1.285
2181 -1.943 -13.084 41.602 23.551 -3.498
2182 -0.028 -13.189 48.708 23.740 -0.051
2183 -3.695 -6.357 -10.852 11.442 -6.652
2184 2.689 -6.707 12.836 12.072 4.839

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 54

2185 -3.918 -9.405 9.531 16.929 -7.052


2186 2.466 -9.755 33.219 17.559 4.439
2191 5.802 8.138 -85.476 -14.649 10.443
2192 -0.776 -6.352 -5.769 11.433 -1.397
2193 6.395 5.530 -64.616 -9.954 11.511
2194 -0.183 -8.960 15.091 16.128 -0.330
2195 3.721 10.103 -106.497 -18.185 6.697
2196 -0.618 -8.985 19.531 16.172 -1.112
2197 3.721 10.103 -106.497 -18.185 6.697
2198 -0.618 -8.985 19.531 16.172 -1.112
1111 8.253 7.755 -94.194 -13.958 14.855
1112 -0.956 -12.531 17.396 22.557 -1.721
1121 -1.138 -1.343 -109.782 2.417 -2.048
1131 -1.494 17.699 -127.902 -31.858 -2.689
1132 -7.815 -0.139 -44.239 0.251 -14.067
1133 -0.124 -17.983 61.054 32.370 -0.223
1134 6.197 -0.145 -22.609 0.261 11.154
1141 6.389 24.488 -175.215 -44.078 11.500
1142 -1.505 7.100 -79.567 -12.780 -2.708
1143 0.068 6.650 -91.552 -11.970 0.122
1144 -7.826 -10.738 4.096 19.329 -14.086
1145 7.759 -11.194 13.741 20.150 13.966
1146 -0.135 -28.582 109.389 51.448 -0.242
1147 14.080 6.644 -69.922 -11.959 25.344
1148 6.186 -10.744 25.726 19.340 11.136
1151 -1.549 9.362 -166.469 -16.851 -2.787
1152 -5.341 -1.341 -116.271 2.414 -9.614
1153 -0.727 -12.047 -53.095 21.685 -1.308
1154 3.066 -1.345 -103.293 2.420 5.519
1161 -1.906 4.542 -63.754 -8.176 -3.431
1162 0.161 4.519 -57.049 -8.135 0.289
1163 -1.552 -4.764 -0.440 8.575 -2.794
1164 0.515 -4.787 6.265 8.616 0.926
1165 -4.194 1.312 -49.417 -2.361 -7.549
1166 2.696 1.236 -27.067 -2.224 4.853
1167 -4.088 -1.480 -30.423 2.664 -7.358
1168 2.802 -1.556 -8.073 2.801 5.044
1171 8.242 14.864 -140.523 -26.756 14.836
1172 11.430 14.909 -130.191 -26.837 20.574
1173 4.250 -0.176 -48.777 0.316 7.651
1174 7.438 -0.131 -38.445 0.235 13.389
1175 3.126 9.548 -120.465 -17.186 5.627
1176 13.752 9.698 -86.027 -17.456 24.754
1177 1.929 5.036 -92.941 -9.065 3.471
1178 12.555 5.186 -58.503 -9.335 22.598
1179 -1.746 -4.572 -37.081 8.229 -3.144
1180 0.990 -4.722 -26.929 8.499 1.781
1181 -2.806 -19.088 59.981 34.358 -5.052
1182 -0.070 -19.238 70.133 34.628 -0.127
1183 -5.309 -9.477 -14.953 17.059 -9.557

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 55

1184 3.811 -9.977 18.887 17.959 6.859


1185 -5.627 -13.832 14.166 24.898 -10.129
1186 3.493 -14.332 48.006 25.798 6.287
1191 4.379 7.032 -70.888 -12.657 7.882
1192 -0.620 -3.981 -10.310 7.166 -1.116
1193 5.023 4.200 -48.240 -7.560 9.041
1194 0.024 -6.813 12.337 12.263 0.042
1195 1.897 8.200 -83.846 -14.760 3.414
1196 -2.577 -1.653 -29.645 2.976 -4.638
1197 4.072 3.734 -38.849 -6.721 7.329
1198 -0.401 -6.119 15.352 11.015 -0.722
2111 -1.212 6.434 -15.948 -11.581 -2.182
2112 3.859 -7.930 -111.360 14.274 6.946
2121 -1.201 1.005 -93.696 -1.809 -2.162
2131 -0.132 10.801 33.491 -19.441 -0.238
2132 -4.737 0.091 -29.675 -0.164 -8.527
2133 -0.954 -10.609 -79.882 19.095 -1.717
2134 3.651 0.101 -16.715 -0.181 6.572
2141 -0.904 14.462 26.567 -26.032 -1.627
2142 4.167 0.098 -68.845 -0.177 7.501
2143 -4.357 6.430 -20.808 -11.575 -7.844
2144 0.714 -7.934 -116.220 14.280 1.284
2145 -1.520 -1.594 -58.463 2.870 -2.736
2146 3.551 -15.958 -153.875 28.725 6.391
2147 1.933 6.438 -11.088 -11.588 3.480
2148 7.004 -7.926 -106.500 14.268 12.608
2151 -0.954 7.428 -59.684 -13.370 -1.718
2152 -3.717 1.002 -97.584 -1.804 -6.691
2153 -1.448 -5.418 -127.708 9.752 -2.606
2154 1.315 1.008 -89.808 -1.814 2.368
6 2161 -1.447 3.403 -15.011 -6.125 -2.604
2162 0.066 3.399 -10.256 -6.119 0.118
2163 -1.695 -3.111 -59.330 5.600 -3.050
2164 -0.182 -3.115 -54.576 5.607 -0.328
2165 -3.298 1.127 -36.069 -2.029 -5.936
2166 1.743 1.115 -20.221 -2.007 3.138
2167 -3.372 -0.827 -49.365 1.488 -6.070
2168 1.669 -0.839 -33.517 1.511 3.004
2171 -3.474 11.029 14.236 -19.852 -6.253
2172 -1.502 11.080 21.280 -19.944 -2.703
2173 -0.680 0.501 -49.986 -0.902 -1.224
2174 1.293 0.552 -42.943 -0.994 2.327
2175 -4.797 7.284 -16.460 -13.112 -8.635
2176 1.777 7.455 7.020 -13.419 3.199
2177 -3.959 4.126 -35.726 -7.427 -7.126
2178 2.616 4.297 -12.247 -7.734 4.708
2179 1.870 -2.014 -70.063 3.625 3.366
2180 4.334 -2.099 -62.442 3.778 7.802
2181 2.612 -12.175 -138.006 21.915 4.702
2182 5.076 -12.260 -130.385 22.068 9.137

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 56

2183 -0.745 -5.471 -102.735 9.847 -1.341


2184 7.469 -5.755 -77.330 10.359 13.444
2185 -0.522 -8.519 -123.118 15.334 -0.940
2186 7.691 -8.803 -97.713 15.846 13.844
2191 -1.119 9.033 2.246 -16.260 -2.014
2192 3.952 -5.331 -93.166 9.596 7.114
2193 -0.686 6.434 -13.255 -11.581 -1.234
2194 4.385 -7.930 -108.667 14.274 7.894
2195 -3.046 10.992 16.025 -19.786 -5.483
2196 4.032 -7.933 -104.147 14.280 7.257
2197 -3.046 10.992 16.025 -19.786 -5.483
2198 4.032 -7.933 -104.147 14.280 7.257
1111 -1.697 9.008 -22.327 -16.214 -3.054
1112 5.403 -11.102 -155.904 19.984 9.725
1121 -1.441 1.206 -112.435 -2.171 -2.594
1131 -0.129 17.985 59.684 -32.373 -0.233
1132 -7.804 0.136 -45.593 -0.245 -14.048
1133 -1.500 -17.697 -129.270 31.855 -2.699
1134 6.175 0.152 -23.993 -0.274 11.116
1141 -0.769 25.562 75.339 -46.011 -1.385
1142 5.316 8.325 -39.155 -14.985 9.568
1143 -8.444 7.713 -29.938 -13.883 -15.200
1144 -2.359 -9.524 -144.432 17.143 -4.247
1145 -2.139 -10.120 -113.615 18.216 -3.851
1146 3.946 -27.357 -228.109 49.243 7.102
1147 5.536 7.729 -8.338 -13.912 9.964
1148 11.621 -9.508 -122.832 17.114 20.917
1151 -1.030 11.911 -55.749 -21.439 -1.854
1152 -5.635 1.201 -118.915 -2.162 -10.143
1153 -1.852 -9.499 -169.122 17.097 -3.334
1154 2.753 1.211 -105.955 -2.179 4.955
1161 -1.604 4.780 -1.661 -8.603 -2.887
1162 0.557 4.774 5.131 -8.593 1.002
1163 -1.958 -4.526 -64.975 8.148 -3.524
1164 0.203 -4.532 -58.183 8.157 0.365
1165 -4.248 1.529 -31.745 -2.752 -7.647
1166 2.954 1.511 -9.105 -2.719 5.317
1167 -4.355 -1.263 -50.739 2.274 -7.838
1168 2.847 -1.281 -28.099 2.306 5.125
1171 -5.017 16.041 19.631 -28.873 -9.030
1172 -2.199 16.114 29.693 -29.005 -3.958
1173 -1.025 1.001 -72.115 -1.801 -1.845
1174 1.793 1.074 -62.053 -1.933 3.227
1175 -6.907 10.691 -24.220 -19.244 -12.432
1176 2.485 10.935 9.322 -19.683 4.473
1177 -5.709 6.179 -51.744 -11.123 -10.276
1178 3.683 6.423 -18.202 -11.562 6.629
1179 2.842 -3.228 -105.022 5.810 5.116
1180 6.363 -3.350 -94.134 6.030 11.453
1181 3.902 -17.744 -202.084 31.939 7.024

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 57

1182 7.423 -17.866 -191.196 32.158 13.361


1183 -0.894 -8.167 -151.696 14.700 -1.608
1184 10.840 -8.573 -115.404 15.431 19.513
1185 -0.576 -12.521 -180.814 22.538 -1.036
1186 11.158 -12.927 -144.522 23.269 20.085
1191 -0.820 7.712 7.633 -13.881 -1.476
1192 3.034 -3.205 -64.880 5.769 5.461
1193 -0.350 4.890 -9.197 -8.802 -0.629
1194 3.504 -6.027 -81.710 10.848 6.308
1195 -2.606 8.803 20.215 -15.846 -4.690
1196 0.843 -0.964 -44.665 1.736 1.517
1197 -0.656 4.372 -3.837 -7.869 -1.181
1198 2.792 -5.396 -68.717 9.712 5.026

3.4.3 Load Combination in Footing Bottom Center (With Pier & Footing SW)
Load Combination of Elastic Condition
Group 1 - F1
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F1 2111 8.381 6.324 -511.096 68.669 15.086 1000.0 , 2843.4
2112 7.047 -12.710 -447.322 -181.525 12.685 1000.0 , 3456.9
2121 2.073 0.073 -478.689 -21.261 3.731 1000.0 , 3044.1
2131 1.079 21.519 -242.627 122.060 1.943 1000.0 , 2570.9
2132 -7.317 0.004 -229.608 -1.197 -13.171 1000.0 , 3003.3
2133 1.079 -21.519 -242.626 -124.413 1.943 1000.0 , 3435.3
2134 9.476 -0.004 -255.645 -1.156 17.056 1000.0 , 3003.0
2141 8.381 22.463 -511.097 161.096 15.086 1000.0 , 2605.7
2142 7.047 3.429 -447.323 -89.098 12.685 1000.0 , 3185.4
2143 2.084 6.327 -501.332 68.654 3.751 1000.0 , 2840.3
2144 0.750 -12.707 -437.558 -181.541 1.349 1000.0 , 3467.2
2145 8.381 -9.815 -511.096 -23.758 15.086 1000.0 , 3081.1
2146 7.047 -28.849 -447.322 -273.953 12.685 1000.0 , 3728.5
2147 14.678 6.321 -520.861 68.684 26.421 1000.0 , 2846.3
2148 13.344 -12.713 -457.087 -181.510 24.020 1000.0 , 3447.2
2151 2.073 12.984 -478.690 52.680 3.731 1000.0 , 2841.1
2152 -2.965 0.075 -470.878 -21.273 -5.337 1000.0 , 3044.9
2153 2.073 -12.838 -478.689 -95.203 3.731 1000.0 , 3247.2
2154 7.111 0.071 -486.501 -21.249 12.800 1000.0 , 3043.4
2161 0.143 6.467 -359.213 49.944 0.257 1000.0 , 2843.0
2162 3.095 6.486 -368.666 49.823 5.572 1000.0 , 2846.9
2163 0.143 -6.486 -359.213 -53.352 0.257 1000.0 , 3165.8
2164 3.095 -6.467 -368.666 -53.473 5.572 1000.0 , 3162.1
2165 -3.302 1.910 -348.185 13.931 -5.943 1000.0 , 2954.4

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 58

2166 6.540 1.976 -379.695 13.528 11.772 1000.0 , 2958.6


2167 -3.302 -1.976 -348.185 -17.057 -5.943 1000.0 , 3054.1
2168 6.540 -1.910 -379.695 -17.461 11.772 1000.0 , 3050.6
2171 5.451 13.664 -452.957 145.323 9.812 1000.0 , 2650.4
2172 9.635 13.573 -467.017 145.933 17.342 1000.0 , 2659.3
2173 5.451 -2.189 -452.957 -22.329 9.812 1000.0 , 3054.1
2174 9.635 -2.281 -467.017 -21.719 17.342 1000.0 , 3051.6
2175 0.570 8.222 -436.554 85.934 1.026 1000.0 , 2785.5
2176 14.516 7.917 -483.419 87.966 26.128 1000.0 , 2802.1
2177 0.570 3.466 -436.554 35.639 1.026 1000.0 , 2910.8
2178 14.516 3.161 -483.419 37.670 26.128 1000.0 , 2916.0
2179 4.161 -2.371 -395.262 -79.877 7.491 1000.0 , 3196.5
2180 8.523 -2.178 -409.918 -81.031 15.342 1000.0 , 3191.8
2181 4.161 -20.700 -395.262 -245.715 7.491 1000.0 , 3660.7
2182 8.523 -20.507 -409.918 -246.869 15.342 1000.0 , 3640.7
2183 -0.927 -9.012 -378.163 -136.574 -1.669 1000.0 , 3371.6
2184 13.612 -8.367 -427.017 -140.421 24.501 1000.0 , 3338.0
2185 -0.927 -14.511 -378.163 -186.325 -1.669 1000.0 , 3516.7
2186 13.612 -13.866 -427.017 -190.172 24.501 1000.0 , 3467.6
2191 8.381 11.519 -511.096 112.245 15.086 1000.0 , 2739.8
2192 7.047 -7.515 -447.322 -137.950 12.685 1000.0 , 3338.6
2193 9.409 6.333 -516.420 68.612 16.937 1000.0 , 2845.1
2194 8.075 -12.701 -452.646 -181.583 14.536 1000.0 , 3451.7
2195 4.373 15.421 -503.847 156.350 7.871 1000.0 , 2634.6
2196 7.293 -12.672 -461.497 -181.757 13.128 1000.0 , 3443.3
2197 4.373 15.421 -503.847 156.350 7.871 1000.0 , 2634.6
2198 7.293 -12.672 -461.497 -181.757 13.128 1000.0 , 3443.3

Group 2 - F2
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F2 2111 12.635 8.743 -405.997 73.827 22.743 1000.0 , 2779.4
2112 10.235 -14.838 -431.135 -151.382 18.423 1000.0 , 3413.1
2121 0.073 0.042 -459.020 -16.587 0.131 1000.0 , 3036.0
2131 0.001 24.900 -246.244 108.621 0.002 1000.0 , 2594.5
2132 -15.808 -0.001 -246.294 -1.073 -28.455 1000.0 , 3002.8
2133 0.001 -24.902 -246.244 -110.769 0.002 1000.0 , 3411.2
2134 15.811 -0.001 -246.194 -1.075 28.459 1000.0 , 3002.8
2141 12.635 27.419 -405.997 156.098 22.743 1000.0 , 2494.0
2142 10.235 3.838 -431.135 -69.111 18.423 1000.0 , 3144.3
2143 0.778 8.743 -406.035 73.827 1.400 1000.0 , 2779.4
2144 -1.622 -14.838 -431.173 -151.382 -2.920 1000.0 , 3413.0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 59

2145 12.635 -9.933 -405.997 -8.445 22.743 1000.0 , 3064.8


2146 10.235 -33.514 -431.135 -233.654 18.423 1000.0 , 3681.9
2147 24.492 8.743 -405.960 73.826 44.086 1000.0 , 2779.4
2148 22.092 -14.838 -431.098 -151.383 39.766 1000.0 , 3413.1
2151 0.073 14.983 -459.020 49.230 0.131 1000.0 , 2834.0
2152 -9.413 0.042 -459.050 -16.587 -16.943 1000.0 , 3036.0
2153 0.073 -14.899 -459.020 -82.404 0.131 1000.0 , 3237.9
2154 9.559 0.042 -458.991 -16.588 17.206 1000.0 , 3036.0
2161 -2.954 6.714 -369.368 48.846 -5.317 1000.0 , 2848.6
2162 2.957 6.714 -369.363 48.845 5.323 1000.0 , 2848.6
2163 -2.954 -6.718 -369.368 -52.068 -5.317 1000.0 , 3159.4
2164 2.957 -6.718 -369.363 -52.069 5.323 1000.0 , 3159.4
2165 -9.850 2.013 -369.374 13.528 -17.730 1000.0 , 2957.4
2166 9.854 2.013 -369.357 13.524 17.736 1000.0 , 2957.4
2167 -9.850 -2.017 -369.374 -16.746 -17.730 1000.0 , 3050.6
2168 9.854 -2.017 -369.357 -16.750 17.736 1000.0 , 3050.6
2171 7.180 17.361 -365.290 143.190 12.924 1000.0 , 2562.1
2172 15.563 17.370 -365.506 142.998 28.014 1000.0 , 2562.7
2173 7.180 -1.633 -365.289 -10.110 12.924 1000.0 , 3032.8
2174 15.563 -1.624 -365.505 -10.302 28.014 1000.0 , 3033.2
2175 -2.601 10.703 -365.038 89.759 -4.681 1000.0 , 2726.1
2176 25.343 10.732 -365.758 89.119 45.618 1000.0 , 2728.1
2177 -2.601 5.005 -365.038 43.769 -4.681 1000.0 , 2867.4
2178 25.343 5.034 -365.757 43.129 45.618 1000.0 , 2869.1
2179 4.842 -3.544 -387.986 -56.336 8.715 1000.0 , 3149.0
2180 13.581 -3.548 -388.057 -56.258 24.447 1000.0 , 3148.8
2181 4.842 -23.161 -387.987 -216.230 8.715 1000.0 , 3612.6
2182 13.581 -23.164 -388.058 -216.152 24.447 1000.0 , 3612.3
2183 -5.355 -10.405 -387.903 -112.390 -9.639 1000.0 , 3311.5
2184 23.778 -10.418 -388.140 -112.130 42.800 1000.0 , 3310.8
2185 -5.355 -16.290 -387.904 -160.358 -9.639 1000.0 , 3450.6
2186 23.778 -16.303 -388.140 -160.098 42.800 1000.0 , 3449.8
2191 12.635 14.214 -405.997 115.260 22.743 1000.0 , 2653.1
2192 10.235 -9.367 -431.135 -109.949 18.423 1000.0 , 3294.1
2193 14.757 8.743 -406.032 73.830 26.563 1000.0 , 2779.4
2194 12.357 -14.838 -431.170 -151.379 22.243 1000.0 , 3413.0
2195 5.079 17.878 -406.005 158.711 9.141 1000.0 , 2529.8
2196 11.427 -14.838 -431.279 -151.373 20.569 1000.0 , 3412.9
2197 5.079 17.878 -406.005 158.711 9.141 1000.0 , 2529.8
2198 11.427 -14.838 -431.279 -151.373 20.569 1000.0 , 3412.9

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 60

Group 3 - F3
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F3 2111 4.683 11.973 -413.550 51.598 8.429 1000.0 , 2823.1
2112 3.176 -16.881 -429.255 -146.009 5.717 1000.0 , 3410.9
2121 -2.149 -0.114 -515.502 -2.945 -3.868 1000.0 , 3006.1
2131 -1.082 21.410 -243.672 121.717 -1.948 1000.0 , 2573.6
2132 -9.480 -0.002 -256.640 -1.284 -17.064 1000.0 , 3003.3
2133 -1.082 -21.408 -243.671 -124.323 -1.948 1000.0 , 3433.4
2134 7.315 0.004 -230.702 -1.321 13.167 1000.0 , 3003.6
2141 4.683 28.030 -413.551 143.863 8.429 1000.0 , 2530.1
2142 3.176 -0.824 -429.256 -53.744 5.717 1000.0 , 3128.7
2143 -1.615 11.971 -423.277 51.612 -2.907 1000.0 , 2827.2
2144 -3.122 -16.883 -438.982 -145.996 -5.620 1000.0 , 3401.8
2145 4.683 -4.084 -413.550 -40.667 8.429 1000.0 , 3116.1
2146 3.176 -32.938 -429.255 -238.274 5.717 1000.0 , 3693.2
2147 10.981 11.975 -403.824 51.584 19.766 1000.0 , 2818.9
2148 9.474 -16.879 -419.529 -146.023 17.054 1000.0 , 3420.5
2151 -2.149 12.732 -515.503 70.867 -3.868 1000.0 , 2818.1
2152 -7.188 -0.116 -523.284 -2.935 -12.938 1000.0 , 3006.0
2153 -2.149 -12.960 -515.502 -76.757 -3.868 1000.0 , 3194.2
2154 2.890 -0.112 -507.721 -2.956 5.201 1000.0 , 3006.2
2161 -3.103 6.526 -370.231 49.415 -5.586 1000.0 , 2848.3
2162 -0.144 6.506 -360.783 49.537 -0.259 1000.0 , 2844.5
2163 -3.103 -6.503 -370.231 -53.445 -5.586 1000.0 , 3161.6
2164 -0.144 -6.522 -360.783 -53.323 -0.259 1000.0 , 3165.2
2165 -6.556 1.989 -381.253 13.271 -11.800 1000.0 , 2959.3
2166 3.309 1.923 -349.760 13.679 5.955 1000.0 , 2955.2
2167 -6.556 -1.920 -381.253 -17.587 -11.800 1000.0 , 3050.8
2168 3.309 -1.985 -349.760 -17.179 5.955 1000.0 , 3054.2
2171 2.113 21.262 -379.333 119.213 3.803 1000.0 , 2618.1
2172 6.317 21.345 -365.058 118.796 11.370 1000.0 , 2605.1
2173 2.113 0.206 -379.333 -25.919 3.803 1000.0 , 3062.0
2174 6.317 0.289 -365.058 -26.336 11.370 1000.0 , 3064.9
2175 -2.792 13.796 -395.988 68.903 -5.025 1000.0 , 2781.5
2176 11.221 14.072 -348.402 67.513 20.198 1000.0 , 2756.6
2177 -2.792 7.479 -395.988 25.364 -5.025 1000.0 , 2909.5
2178 11.221 7.755 -348.402 23.973 20.198 1000.0 , 2900.6
2179 0.669 -4.937 -393.694 -53.417 1.204 1000.0 , 3146.0
2180 5.048 -5.127 -378.966 -52.341 9.087 1000.0 , 3149.4
2181 0.669 -25.259 -393.694 -210.476 1.204 1000.0 , 3599.8

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 61

2182 5.048 -25.449 -378.966 -209.399 9.087 1000.0 , 3619.4


2183 -4.440 -11.827 -410.876 -109.643 -7.993 1000.0 , 3295.0
2184 10.157 -12.462 -361.784 -106.056 18.283 1000.0 , 3325.4
2185 -4.440 -17.924 -410.876 -156.761 -7.993 1000.0 , 3425.8
2186 10.157 -18.558 -361.784 -153.173 18.283 1000.0 , 3472.6
2191 4.683 17.171 -413.550 94.095 8.429 1000.0 , 2697.7
2192 3.176 -11.683 -429.255 -103.512 5.717 1000.0 , 3290.1
2193 5.709 11.964 -408.193 51.654 10.277 1000.0 , 2820.7
2194 4.202 -16.890 -423.898 -145.953 7.564 1000.0 , 3416.0
2195 0.675 21.095 -420.793 136.622 1.215 1000.0 , 2585.1
2196 3.414 -16.918 -414.937 -145.788 6.145 1000.0 , 3424.7
2197 0.675 21.095 -420.793 136.622 1.215 1000.0 , 2585.1
2198 3.414 -16.918 -414.937 -145.788 6.145 1000.0 , 3424.7

Load Combination of Ultimate Condition


Group 1 - F1
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Nam L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F1 1111 11.733 8.854 -715.535 96.137 21.120 1000.0 , 2807.9
1112 9.866 -17.794 -626.251 -254.136 17.758 1000.0 , 3579.1
1121 2.488 0.088 -574.427 -25.514 4.478 1000.0 , 3049.9
1131 1.619 35.865 -363.941 203.629 2.914 1000.0 , 2324.4
1132 -12.375 0.006 -342.242 -1.798 -22.275 1000.0 , 3004.8
1133 1.619 -35.865 -363.939 -207.158 2.914 1000.0 , 3684.5
1134 15.613 -0.006 -385.638 -1.731 28.104 1000.0 , 3004.2
1141 10.057 43.454 -613.317 287.796 18.103 1000.0 , 2331.2
1142 8.456 20.613 -536.788 -12.437 15.222 1000.0 , 2947.6
1143 -3.937 7.595 -591.618 82.369 -7.086 1000.0 , 2817.3
1144 -5.538 -15.246 -515.089 -217.864 -9.968 1000.0 , 3546.3
1145 10.057 -28.276 -613.315 -122.991 18.103 1000.0 , 3317.7
S1
1146 8.456 -51.117 -536.786 -423.224 15.222 1000.0 , 4094.6
1147 24.051 7.583 -635.014 82.436 43.292 1000.0 , 2831.1
1148 22.450 -15.258 -558.485 -217.797 40.411 1000.0 , 3498.1
1151 2.488 21.607 -574.428 97.723 4.478 1000.0 , 2731.3
1152 -5.909 0.091 -561.409 -25.534 -10.636 1000.0 , 3051.2
1153 2.488 -21.431 -574.427 -148.750 4.478 1000.0 , 3368.5
1154 10.884 0.084 -587.446 -25.493 19.591 1000.0 , 3048.6
1161 -0.717 9.238 -306.236 72.351 -1.290 1000.0 , 2766.4
1162 3.501 9.266 -319.740 72.178 6.303 1000.0 , 2774.7
1163 -0.717 -9.266 -306.236 -75.214 -1.290 1000.0 , 3241.3
1164 3.501 -9.238 -319.740 -75.387 6.303 1000.0 , 3233.3
1165 -5.638 2.729 -290.481 20.905 -10.148 1000.0 , 2929.3

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 62

1166 8.422 2.823 -335.495 20.329 15.160 1000.0 , 2938.0


1167 -5.638 -2.823 -290.481 -23.364 -10.148 1000.0 , 3077.9
1168 8.422 -2.729 -335.495 -23.941 15.160 1000.0 , 3070.3
1171 8.158 19.800 -669.716 210.646 14.685 1000.0 , 2560.8
1172 14.135 19.670 -689.801 211.516 25.443 1000.0 , 2574.9
1173 8.158 -2.848 -669.716 -28.857 14.685 1000.0 , 3060.6
1174 14.135 -2.978 -689.801 -27.986 25.443 1000.0 , 3057.4
1175 1.186 12.026 -646.283 125.804 2.134 1000.0 , 2725.6
1176 21.108 11.590 -713.233 128.706 37.994 1000.0 , 2752.5
1177 1.186 5.232 -646.283 53.953 2.134 1000.0 , 2882.1
1178 21.108 4.796 -713.233 56.856 37.994 1000.0 , 2891.6
1179 6.257 -3.951 -584.470 -122.149 11.263 1000.0 , 3271.9
1180 12.488 -3.674 -605.408 -123.798 22.478 1000.0 , 3262.7
1181 6.257 -30.135 -584.470 -359.060 11.263 1000.0 , 3869.3
1182 12.488 -29.858 -605.408 -360.709 22.478 1000.0 , 3834.9
1183 -1.012 -13.438 -560.043 -203.144 -1.822 1000.0 , 3504.0
1184 19.758 -12.516 -629.835 -208.640 35.564 1000.0 , 3443.8
1185 -1.012 -21.293 -560.043 -274.218 -1.822 1000.0 , 3692.9
1186 19.758 -20.371 -629.835 -279.713 35.564 1000.0 , 3607.5
1191 6.370 10.447 -388.433 99.499 11.465 1000.0 , 2747.1
1192 5.356 -4.019 -339.965 -90.649 9.640 1000.0 , 3233.5
1193 7.486 4.816 -394.213 52.126 13.475 1000.0 , 2871.6
1194 6.472 -9.650 -345.745 -138.021 11.650 1000.0 , 3365.6
1195 1.805 13.138 -340.503 131.871 3.250 1000.0 , 2651.5
1196 0.898 0.194 -297.137 -38.261 1.617 1000.0 , 3094.1
1197 5.938 4.337 -361.316 46.470 10.689 1000.0 , 2883.8
1198 5.031 -8.606 -317.949 -123.662 9.056 1000.0 , 3328.5

Group 2 - F2
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Nam L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F2 1111 17.689 12.240 -568.396 103.357 31.840 1000.0 , 2712.6
1112 14.329 -20.773 -603.590 -211.935 25.792 1000.0 , 3528.8
1121 0.088 0.050 -550.825 -19.904 0.158 1000.0 , 3040.9
1131 0.002 41.500 -369.366 181.214 0.003 1000.0 , 2364.0
1132 -26.347 -0.002 -369.449 -1.610 -47.425 1000.0 , 3004.0
S1 1133 0.002 -41.504 -369.366 -184.437 0.003 1000.0 , 3644.0
1134 26.351 -0.002 -369.283 -1.613 47.431 1000.0 , 3004.0
1141 15.162 51.994 -487.197 271.417 27.292 1000.0 , 2133.3
1142 12.282 23.696 -517.363 1.166 22.108 1000.0 , 2902.9
1143 -11.187 10.492 -487.280 88.593 -20.137 1000.0 , 2744.8
1144 -14.067 -17.806 -517.446 -181.657 -25.321 1000.0 , 3473.5

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 63

1145 15.162 -31.010 -487.197 -94.233 27.292 1000.0 , 3356.3


1146 12.282 -59.308 -517.363 -364.484 22.108 1000.0 , 4044.2
1147 41.511 10.492 -487.114 88.591 74.720 1000.0 , 2744.7
1148 38.631 -17.806 -517.280 -181.660 69.536 1000.0 , 3473.6
1151 0.088 24.952 -550.825 89.791 0.158 1000.0 , 2722.1
1152 -15.722 0.050 -550.874 -19.904 -28.299 1000.0 , 3040.9
1153 0.088 -24.851 -550.825 -129.600 0.158 1000.0 , 3359.6
1154 15.897 0.050 -550.775 -19.905 28.615 1000.0 , 3040.9
1161 -4.221 9.592 -317.658 70.696 -7.597 1000.0 , 2775.8
1162 4.224 9.592 -317.651 70.694 7.603 1000.0 , 2775.8
1163 -4.221 -9.596 -317.658 -73.466 -7.597 1000.0 , 3231.3
1164 4.224 -9.596 -317.651 -73.468 7.603 1000.0 , 3231.3
1165 -14.072 2.877 -317.667 20.241 -25.330 1000.0 , 2935.2
1166 14.076 2.877 -317.643 20.236 25.336 1000.0 , 2935.2
1167 -14.072 -2.880 -317.667 -23.007 -25.330 1000.0 , 3071.9
1168 14.076 -2.880 -317.643 -23.013 25.336 1000.0 , 3071.9
1171 10.817 25.189 -539.823 207.826 19.470 1000.0 , 2412.4
1172 22.793 25.201 -540.132 207.552 41.027 1000.0 , 2413.4
1173 10.817 -1.945 -539.821 -11.173 19.470 1000.0 , 3034.1
1174 22.793 -1.933 -540.130 -11.447 41.027 1000.0 , 3034.6
1175 -3.155 15.677 -539.463 131.496 -5.680 1000.0 , 2629.0
1176 36.765 15.719 -540.491 130.583 66.176 1000.0 , 2631.8
1177 -3.155 7.537 -539.462 65.796 -5.680 1000.0 , 2815.6
1178 36.765 7.579 -540.490 64.883 66.176 1000.0 , 2818.0
1179 7.370 -5.720 -573.359 -87.184 13.266 1000.0 , 3209.9
1180 19.855 -5.725 -573.460 -87.073 35.739 1000.0 , 3209.7
1181 7.370 -33.744 -573.360 -315.605 13.266 1000.0 , 3810.5
1182 19.855 -33.749 -573.462 -315.493 35.739 1000.0 , 3810.1
1183 -7.196 -15.522 -573.241 -167.261 -12.954 1000.0 , 3420.5
1184 34.422 -15.540 -573.579 -166.890 61.959 1000.0 , 3419.4
1185 -7.196 -23.929 -573.242 -235.788 -12.954 1000.0 , 3600.7
1186 34.422 -23.947 -573.579 -235.416 61.959 1000.0 , 3599.5
1191 9.603 12.585 -308.558 101.093 17.285 1000.0 , 2680.9
1192 7.779 -5.337 -327.663 -70.066 14.001 1000.0 , 3195.8
1193 11.907 6.645 -308.595 56.112 21.432 1000.0 , 2824.5
1194 10.083 -11.277 -327.700 -115.047 18.149 1000.0 , 3332.6
1195 1.251 14.819 -276.086 132.661 2.252 1000.0 , 2582.7
1196 -0.381 -1.216 -293.180 -20.481 -0.685 1000.0 , 3056.8
1197 9.750 5.945 -276.218 50.211 17.550 1000.0 , 2840.5
1198 8.118 -10.090 -293.312 -102.931 14.612 1000.0 , 3303.5

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 64

Group 3 - F3
- C.G. of Load is coordinate from left bottom. Unit : mm Unit( kN , kN-m )
Ft.Name Sec.Nam L.Comb. SFx SFy SFz SMx SMy C.G. of Loads
F3 1111 6.556 16.762 -578.971 72.237 11.801 1000.0 , 2770.8
1112 4.446 -23.633 -600.958 -204.413 8.004 1000.0 , 3526.7
1121 -2.579 -0.137 -618.603 -3.535 -4.642 1000.0 , 3006.8
1131 -1.624 35.684 -365.508 203.079 -2.922 1000.0 , 2329.3
1132 -15.620 -0.003 -387.122 -1.924 -28.115 1000.0 , 3004.6
1133 -1.624 -35.680 -365.506 -206.987 -2.922 1000.0 , 3680.5
1134 12.372 0.007 -343.892 -1.984 22.270 1000.0 , 3005.2
1141 5.620 50.050 -496.262 266.951 10.115 1000.0 , 2170.1
1142 3.811 15.425 -515.108 29.822 6.860 1000.0 , 2871.8
1143 -8.376 14.363 -517.876 61.948 -15.078 1000.0 , 2805.7
1144 -10.185 -20.262 -536.722 -175.181 -18.333 1000.0 , 3449.7
1145 5.620 -21.314 -496.260 -143.115 10.115 1000.0 , 3421.9
1146 3.811 -55.939 -515.106 -380.244 6.860 1000.0 , 4071.0
1147 19.616 14.373 -474.646 61.887 35.308 1000.0 , 2785.2
1148 17.807 -20.252 -493.492 -175.241 32.053 1000.0 , 3495.3
1151 -2.579 21.272 -618.604 119.485 -4.642 1000.0 , 2714.5
1152 -10.976 -0.140 -631.572 -3.516 -19.758 1000.0 , 3006.7
1153 -2.579 -21.546 -618.602 -126.555 -4.642 1000.0 , 3299.2
1154 5.819 -0.134 -605.634 -3.553 10.474 1000.0 , 3007.0
S1
1161 -3.510 9.322 -321.084 71.704 -6.318 1000.0 , 2776.4
1162 0.718 9.293 -307.587 71.879 1.292 1000.0 , 2768.2
1163 -3.510 -9.290 -321.084 -75.239 -6.318 1000.0 , 3232.4
1164 0.718 -9.319 -307.587 -75.065 1.292 1000.0 , 3240.3
1165 -8.442 2.840 -336.831 20.070 -15.196 1000.0 , 2938.8
1166 5.650 2.746 -291.841 20.652 10.169 1000.0 , 2930.2
1167 -8.442 -2.743 -336.831 -24.013 -15.196 1000.0 , 3070.4
1168 5.650 -2.837 -291.841 -23.431 10.169 1000.0 , 3077.9
1171 3.226 30.905 -560.219 172.589 5.806 1000.0 , 2494.2
1172 9.231 31.023 -539.825 171.994 16.616 1000.0 , 2471.2
1173 3.226 0.825 -560.219 -34.743 5.806 1000.0 , 3073.7
1174 9.231 0.943 -539.825 -35.338 16.616 1000.0 , 3078.1
1175 -3.781 20.239 -584.012 100.718 -6.805 1000.0 , 2711.3
1176 16.237 20.633 -516.032 98.732 29.227 1000.0 , 2666.2
1177 -3.781 11.215 -584.012 38.519 -6.805 1000.0 , 2876.4
1178 16.237 11.609 -516.032 36.533 29.227 1000.0 , 2858.9
1179 1.096 -7.800 -581.430 -82.777 1.973 1000.0 , 3204.9
1180 7.352 -8.072 -560.390 -81.239 13.234 1000.0 , 3212.2
1181 1.096 -36.832 -581.430 -307.146 1.973 1000.0 , 3790.5

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 65

1182 7.352 -37.104 -560.390 -305.608 13.234 1000.0 , 3825.0


1183 -6.203 -17.644 -605.976 -163.099 -11.165 1000.0 , 3392.1
1184 14.651 -18.550 -535.844 -157.975 26.372 1000.0 , 3448.3
1185 -6.203 -26.354 -605.976 -230.410 -11.165 1000.0 , 3559.1
1186 14.651 -27.260 -535.844 -225.285 26.372 1000.0 , 3642.8
1191 3.559 14.743 -314.298 85.354 6.406 1000.0 , 2715.7
1192 2.414 -7.186 -326.234 -64.827 4.345 1000.0 , 3191.8
1193 4.673 9.090 -308.481 39.276 8.412 1000.0 , 2856.5
1194 3.528 -12.839 -320.417 -110.906 6.350 1000.0 , 3335.3
1195 -0.709 17.003 -288.250 117.681 -1.277 1000.0 , 2623.6
1196 -1.734 -2.617 -298.929 -16.692 -3.121 1000.0 , 3052.9
1197 3.416 8.106 -267.305 35.302 6.148 1000.0 , 2866.2
1198 2.391 -11.515 -277.984 -99.071 4.304 1000.0 , 3312.2

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 66

4. CHECK OF STABILITY
4.1 CHECK OF SLIDING
mSFz + P.F mSFz + P.F
Formula : ( or ) > Fs => OK (Uni-Axial)
SFx SFy
P.F = Passive Force (apply only in case checked passive force, mark by P )
Group 1 - F1 Unit ( kN )
Ft.Name Dir. L.Comb. ( mSFz + P.F) / SFx or ( mSFz + H.P.F) / SFy Fs(i) Result
X 2133 0.35 242.63 / 1.08 = 78.67 1.5 OK
F1
Y 2133 0.35 242.63 / 21.52 = 3.95 1.5 OK

Group 2 - F2 Unit ( kN )
Ft.Name Dir. L.Comb. ( mSFz + P.F) / SFx or ( mSFz + H.P.F) / SFy Fs(i) Result
X 2133 SFx = 0 , Then N/A 1.5 OK
F2
Y 2133 0.35 246.24 / 24.9 = 3.46 1.5 OK

Group 3 - F3 Unit ( kN )
Ft.Name Dir. L.Comb. ( mSFz + P.F) / SFx or ( mSFz + H.P.F) / SFy Fs(i) Result
X 2131 0.35 243.67 / 1.08 = 78.79 1.5 OK
F3
Y 2131 0.35 243.67 / 21.41 = 3.98 1.5 OK

4.2 CHECK OF OVERTURNING MOMENT


Formula : (SMry / SMoy or SMrx / SMox) > OVM(i) => OK
Group 1 - F1 Unit ( kN-m )
Ft.Name Dir. L.Comb. SMry / SMoy = OVM or SMrx / SMox = OVM OVM(i) Result
X 2181 395.26 / 7.49 = 52.77 1.5 OK
F1
Y 2181 1185.79 / 245.71 = 4.83 1.5 OK

Group 2 - F2 Unit ( kN-m )


Ft.Name Dir. L.Comb. SMry / SMoy = OVM or SMrx / SMox = OVM OVM(i) Result
X 2181 387.99 / 8.71 = 44.52 1.5 OK
F2
Y 2181 1163.96 / 216.23 = 5.38 1.5 OK

Group 3 - F3 Unit ( kN-m )


Ft.Name Dir. L.Comb. SMry / SMoy = OVM or SMrx / SMox = OVM OVM(i) Result
X 2146 429.26 / 5.72 = 75.09 1.5 OK
F3
Y 2146 1287.76 / 238.27 = 5.4 1.5 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 67

4.3 CHECK OF CONTACT PRESSURE


4.3.1 Contact Pressure Formula
'Handbook CONCRETE ENGINEERING' Second Edition edited by Mark Fintel

SFz SMy X(i) SMx Y(i)


q1,q2 =
Af Iy Ix
if q1 or q2 < 0 , than q1 and q2 will be recalculated
by following formula
L
q(x) width(x) X dx
Px = 0 L
0
q(x) width(x) dx
P = L0 q(x) width(x) dx

4.3.2 Input Data


2 4 4
Ft.Name Af (m ) Fl (m ) Fw (m ) Ix (m ) Iy (m )
F1 12.000 2.000 6.000 36.0000 4.0000
F2 12.000 2.000 6.000 36.0000 4.0000
F3 12.000 2.000 6.000 36.0000 4.0000

4.3.3 Pressure Check


- Qa = Soil bearing capacity
- Uc = Uplift Allowable capacity
Group 1 - F1
- XY-Direction (Bi-Axial) Unit( kN , kN-m , kN/m )
2

Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result


F1 2146 11.276 63.277 0.000 6.086 63.3 65.0 100 % OK

Group 2 - F2
- XY-Direction (Bi-Axial) Unit( kN , kN-m , kN/m )
2

Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result


F2 2146 11.851 60.005 0.000 6.139 60.0 65.0 100 % OK

Group 3 - F3
- XY-Direction (Bi-Axial) Unit( kN , kN-m , kN/m )
2

Ft.Nam L.Comb q1 q2 ci cj Qmax Qa Cont.A.R Result


F3 2146 14.486 57.057 0.000 6.046 57.1 65.0 100 % OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 68

5. DESIGN OF FOOTING

5.1 REQUIRED REINFORCEMENT


5.1.1 Reinforcement Formula
- Shrinkage And Temperature Reinforcement ---- ACI CODE 7.12.2
As As1 = fac b h , fac = following
Area of shrinkage and temperature reinforcement shall provide at least the following ratio
of reinforcement area to gross concrete area, but not less than 0.0014
(a) Slabs where Grade 40 or 50 deformed bars are used ........................................................................0.0020
(b) Slabs where Grade 60 deformed bars or welded wire reinforcement are used....................................0.0018
(c) Slabs where reinforcement with yield stress exceeding 60,000 psi measured at a yield
0.0018 60,000
strain of 0.35 percent is used .......................................................................................................
fy
- Required Reinforcement by Analysis
As As2 = r.req b d
- At every section of flexural members where tensile reinforcement is required
3 fck 200
As (As5 = bw d) (As4 = b d) ---- ACI Eq (10-3)
fy fy
- The requirements of Eq (10-3) need not be applied, if every section As provided is
at least one -third greater then that required by analysis ---- ACI CODE 10.5.3
As3 = 1.333 r.req b d
Asmax = 0.75 rb b d
fck 0.003 Es
rb = 0.85 b 1
fy 0.003 Es + fy
Selected As = Max ( As1 , As2 , Min ( As3 , Max ( As4 , As5 ) ) )
If Selected As < Using As < Asmax , then OK!!

Note : The reinforcement is calculated bases on the maximum moment under the foundation in each direction.
But, the 'ISO' , 'OCT' , 'HEX' , 'COMB' , 'TANK1' foundations are calaulated as face pier
Where,
Mu 0.85 fck 2Rn
Rn =
fbd2
, f = 0.9 , r.req =
fy
1- 1- (
0.85fck )
5.1.2 Check of Footing Reinforcement
Group 1 - F1
Footing Name : F1 GroupType : Mat_Foundation
- X direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
1198 top 31 - D19 @ 200 1.000 6.000 287.450 8882.155
S1
1178 botom 31 - D19 @ 200 1.225 6.000 287.450 8882.155

Sec.Name L.Comb. Mu (kN-m) Rn r.Req


1198 top - - -
S1
1178 bottom 119.790 0.268 0.0007
2 2 2 2 2 2
Sec.Name L.Comb. As1(mm ) As2(mm ) As3(mm ) As4(mm ) As5(mm ) Asmax(mm )
1198 top 1620.000 - - 6098.149 5829.198 67093.110
S1
1178 bottom 1620.000 1194.047 1591.665 6098.149 5829.198 67093.110

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 69


2 2
Sec.Name L.Comb. Using As(mm ) Select As(mm ) Result
1198 top 8882.155 1620.000 OK
S1
1178 bottom 8882.155 1620.000 OK

- Y direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
1198 top 11 - D19 @ 200 3.000 2.000 268.350 3151.732
S1
1182 botom 11 - D19 @ 200 4.200 2.000 268.350 3151.732

Sec.Name L.Comb. Mu (kN-m) Rn r.Req


1198 top - - -
S1
1182 bottom 144.908 1.118 0.0029
2 2 2 2 2 2
Sec.Name L.Comb. As1(mm ) As2(mm ) As3(mm ) As4(mm ) As5(mm ) Asmax(mm )
1198 top 540.000 - - 1897.650 1813.956 20878.340
S1
1182 bottom 540.000 1576.387 2101.323 1897.650 1813.956 20878.340
2 2
Sec.Name L.Comb. Using As(mm ) Select As(mm ) Result
1198 top 3151.732 540.000 OK
S1
1182 bottom 3151.732 1897.650 OK

Group 2 - F2
Footing Name : F2 GroupType : Mat_Foundation
- X direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
1198 top 31 - D19 @ 200 1.000 6.000 287.450 8882.155
S1
1186 botom 31 - D19 @ 200 1.225 6.000 287.450 8882.155

Sec.Name L.Comb. Mu (kN-m) Rn r.Req


1198 top - - -
S1
1186 bottom 106.827 0.239 0.0006
2 2 2 2 2 2
Sec.Name L.Comb. As1(mm ) As2(mm ) As3(mm ) As4(mm ) As5(mm ) Asmax(mm )
1198 top 1620.000 - - 6098.149 5829.198 67093.110
S1
1186 bottom 1620.000 1064.174 1418.544 6098.149 5829.198 67093.110
2 2
Sec.Name L.Comb. Using As(mm ) Select As(mm ) Result
1198 top 8882.155 1620.000 OK
S1
1186 bottom 8882.155 1620.000 OK

- Y direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
1198 top 11 - D19 @ 200 3.000 2.000 268.350 3151.732
S1
1182 botom 11 - D19 @ 200 4.200 2.000 268.350 3151.732

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 70

Sec.Name L.Comb. Mu (kN-m) Rn r.Req


1198 top - - -
S1
1182 bottom 133.672 1.031 0.0027
2 2 2 2 2 2
Sec.Name L.Comb. As1(mm ) As2(mm ) As3(mm ) As4(mm ) As5(mm ) Asmax(mm )
1198 top 540.000 - - 1897.650 1813.956 20878.340
S1
1182 bottom 540.000 1451.317 1934.605 1897.650 1813.956 20878.340
2 2
Sec.Name L.Comb. Using As(mm ) Select As(mm ) Result
1198 top 3151.732 540.000 OK
S1
1182 bottom 3151.732 1897.650 OK

Group 3 - F3
Footing Name : F3 GroupType : Mat_Foundation
- X direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
1198 top 31 - D19 @ 200 1.000 6.000 287.450 8882.155
S1
1152 botom 31 - D19 @ 200 0.775 6.000 287.450 8882.155

Sec.Name L.Comb. Mu (kN-m) Rn r.Req


1198 top - - -
S1
1152 bottom 101.435 0.227 0.0006
2 2 2 2 2 2
Sec.Name L.Comb. As1(mm ) As2(mm ) As3(mm ) As4(mm ) As5(mm ) Asmax(mm )
1198 top 1620.000 - - 6098.149 5829.198 67093.110
S1
1152 bottom 1620.000 1010.202 1346.599 6098.149 5829.198 67093.110
2 2
Sec.Name L.Comb. Using As(mm ) Select As(mm ) Result
1198 top 8882.155 1620.000 OK
S1
1152 bottom 8882.155 1620.000 OK

- Y direction (All Width)

2
Sec.Name L.Comb. Using Bar (mm) Loc. (m) Width b (m) d (mm) As (mm )
1198 top 11 - D19 @ 200 3.000 2.000 268.350 3151.732
S1
1181 botom 11 - D19 @ 200 4.200 2.000 268.350 3151.732

Sec.Name L.Comb. Mu (kN-m) Rn r.Req


1198 top - - -
S1
1181 bottom 133.783 1.032 0.0027
2 2 2 2 2 2
Sec.Name L.Comb. As1(mm ) As2(mm ) As3(mm ) As4(mm ) As5(mm ) Asmax(mm )
1198 top 540.000 - - 1897.650 1813.956 20878.340
S1
1181 bottom 540.000 1452.550 1936.249 1897.650 1813.956 20878.340
2 2
Sec.Name L.Comb. Using As(mm ) Select As(mm ) Result
1198 top 3151.732 540.000 OK
S1
1181 bottom 3151.732 1897.650 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 71

5.2 ONE WAY SHEAR FORCE


5.2.1 One-Way Shear Formula
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- f Vc = 0.75 2 fck B'w d (eq 11-3)
- Vu <= f Vc , then OK!!

5.2.2 Check of One-Way Shear


Group 1 - F1

Footing Name : F1 GroupType : Mat_Foundation PileType : False

Unit : mm
2000

2
6000

4937

1512

- X direction One-Way Shear (All Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 1176 1512 287.5 6000 1136.694 194.95 OK
- Y direction One-Way Shear (All Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 1182 4937 268.4 2000 353.721 159.826 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 72

Group 2 - F2

Footing Name : F2 GroupType : Mat_Foundation PileType : False

Unit : mm
2000

4
6000

4937

1512

- X direction One-Way Shear (All Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 1186 1512 287.5 6000 1136.694 174.149 OK
- Y direction One-Way Shear (All Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 1182 4937 268.4 2000 353.721 147.577 OK

Group 3 - F3

Footing Name : F3 GroupType : Mat_Foundation PileType : False

Unit : mm
2000

6
6000

4937

488

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Foundation Client : BP Page 73

- X direction One-Way Shear (All Width)


Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 1152 488 287.5 6000 1136.694 165.119 OK
- Y direction One-Way Shear (All Width)
Sec.Name L.Comb. Loc. (mm) d (mm) Bw (mm) fVc (kN) Vu (kN) Result
S1 1181 4937 268.4 2000 353.721 147.772 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

COLUMN CALCULATION SHEET

One-Stop Solution for Column

TITLE DESCRIPTION
PROJECT/JOB NO. 186-PRK-4006
PROJECT/JOB NAME New Pipe Rack
CLIENT NAME BP
SITE NAME Marauke
DOCUMENT NO.
REFERENCE NO.
STRUCTURE NAME Pipe Rack
GROUP NAME
LOADCOMBINATION GROUP NAME
REV DATE DESCRIPTION PREP'D CHK'D APPR'D APPR'D

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 1

CONTENTS

1. INPUT DATA
1.1 GENERAL
1.2 PIER DATA
1.3 LOADING DATA
2. PM DIAGRAM
2.1 FORMULA
2.2 PM DIAGRAM & ANALYSIS
2.3 ANALYSIS & RESULT
2.4 DETAIL PM DIAGRAM
3. ONE-WAY SHEAR
3.1 FORMULA
3.2 ONE-WAY SHEAR

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 2

1. INPUT DATA
1.1 General
Design Code American Concrete Institute (ACI 318)

Input Unit SI Output Unit SI

f Bending f Axial f Sprial reinf. f Tied reinf. f Shear


0.9 0.9 0.7 0.65 0.75

fck fy (D10 ~ D16) fy (D19 ~) Ec Es Steel Db Cover


2 2 2 2 2
28 N/mm 390 N/mm 390 N/mm 234530 kN/mm 2000000 kN/mm JIS G3112 (D) 50 mm

1.2 Pier Data


450 Pier Name 1 Ver Bar D19, 4 4 EA
50
Pier Shape Rectangle Tie Bar D10 @ 150 mm
2
Width 450 mm Fck 28 N/mm
450

2
Length 450 mm fy 390 N/mm
2
Height 1500 mm Using As 3438.25 mm

dx 380.92 mm dy 380.92 mm
2 2 2
Main Bar 4-4-12 , Area = 3438.253mm , Amin (1%) = 2025mm , Amax (8%) = 16200mm

Bar Check Reinforcrment Area is OK

450 Pier Name 2 Ver Bar D19, 4 4 EA


50
Pier Shape Rectangle Tie Bar D10 @ 150 mm
2
Width 450 mm Fck 28 N/mm
450

2
Length 450 mm fy 390 N/mm
2
Height 1500 mm Using As 3438.25 mm

dx 380.92 mm dy 380.92 mm
2 2 2
Main Bar 4-4-12 , Area = 3438.253mm , Amin (1%) = 2025mm , Amax (8%) = 16200mm

Bar Check Reinforcrment Area is OK

450 Pier Name 3 Ver Bar D19, 4 4 EA


50
Pier Shape Rectangle Tie Bar D10 @ 150 mm
2
Width 450 mm Fck 28 N/mm
450

2
Length 450 mm fy 390 N/mm
2
Height 1500 mm Using As 3438.25 mm

dx 380.92 mm dy 380.92 mm
2 2 2
Main Bar 4-4-12 , Area = 3438.253mm , Amin (1%) = 2025mm , Amax (8%) = 16200mm

Bar Check Reinforcrment Area is OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 3

450 Pier Name 4 Ver Bar D19, 4 4 EA


50
Pier Shape Rectangle Tie Bar D10 @ 150 mm
2
Width 450 mm Fck 28 N/mm
450

2
Length 450 mm fy 390 N/mm
2
Height 1500 mm Using As 3438.25 mm

dx 380.92 mm dy 380.92 mm
2 2 2
Main Bar 4-4-12 , Area = 3438.253mm , Amin (1%) = 2025mm , Amax (8%) = 16200mm

Bar Check Reinforcrment Area is OK

450 Pier Name 5 Ver Bar D19, 4 4 EA


50
Pier Shape Rectangle Tie Bar D10 @ 150 mm
2
Width 450 mm Fck 28 N/mm
450

2
Length 450 mm fy 390 N/mm
2
Height 1500 mm Using As 3438.25 mm

dx 380.92 mm dy 380.92 mm
2 2 2
Main Bar 4-4-12 , Area = 3438.253mm , Amin (1%) = 2025mm , Amax (8%) = 16200mm

Bar Check Reinforcrment Area is OK

450 Pier Name 6 Ver Bar D19, 4 4 EA


50
Pier Shape Rectangle Tie Bar D10 @ 150 mm
2
Width 450 mm Fck 28 N/mm
450

2
Length 450 mm fy 390 N/mm
2
Height 1500 mm Using As 3438.25 mm

dx 380.92 mm dy 380.92 mm
2 2 2
Main Bar 4-4-12 , Area = 3438.253mm , Amin (1%) = 2025mm , Amax (8%) = 16200mm

Bar Check Reinforcrment Area is OK

1.3 Loading Data


1.3.1 Load Case Unit( kN , kN-m )
Pier Name Name Fx Fy Fz Mx My
SW 0 0 -7.138 0 0
EZE 0.09 4.626 -31.732 0 0
EXE -3.437 -0.038 11.182 0 0
BLSZ 0.105 3.711 -26.53 0 0
BLSX 0.715 0.013 -3.782 0 0
1 BLDZ -2.656 6.494 -46.98 0 0
BLDX 0.099 0.048 -10.043 0 0
Dead Load (dl) 0.83 0.079 -17.243 0 0
PO1 7.145 2.833 -94.095 0 0
EXO1 -5.293 0.086 17.109 0 0
PO2 -0.142 -6.492 37.601 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 4

PE 0.064 -0.082 -11.959 0 0


PT 0.262 -0.294 -42.389 0 0
WZ 0.415 17.932 -94.72 0 0
EZO2 0.945 6.548 -49.832 0 0
EXO2 -4.539 -0.254 16.775 0 0
WX -7.005 -0.003 10.857 0 0
EZO1 2.423 5.662 -49.17 0 0
SW 0 0 -7.138 0 0
EZE -0.09 4.626 31.732 0 0
EXE -3.593 -0.009 11.325 0 0
BLSZ -0.105 3.711 26.53 0 0
BLSX 0.754 0 -3.823 0 0
BLDZ -3.07 6.502 57.337 0 0
BLDX 0.253 0.006 -10.207 0 0
Dead Load (dl) 0.83 -0.079 -17.243 0 0
PO1 -0.424 3.491 -37.918 0 0
2
EXO1 -4.668 0.132 16.366 0 0
PO2 5.529 -6.218 -105.84 0 0
PE 0.075 0.082 -13.335 0 0
PT 0.151 0.367 -57.217 0 0
WZ -0.415 17.933 94.719 0 0
EZO2 -0.945 6.544 49.832 0 0
EXO2 -5.846 -0.207 18.121 0 0
WX -6.989 0.009 10.841 0 0
EZO1 -2.423 5.662 49.17 0 0
SW 0 0 -7.138 0 0
EZE -0.089 4.797 -31.351 0 0
EXE -6.88 0 -0.007 0 0
BLSZ -0.031 3.908 -25.705 0 0
BLSX 1.477 0 -0.026 0 0
BLDZ -5.439 6.525 -50.796 0 0
BLDX 0.698 0 -0.107 0 0
Dead Load (dl) -0.002 0.072 -21.368 0 0
PO1 13.749 4.28 -40.758 0 0
3
EXO1 -10.6 -0.011 0.11 0 0
PO2 0.015 -7.744 40.587 0 0
PE 0 -0.181 -10.907 0 0
PT 0.25 -0.484 -30.05 0 0
WZ -0.276 20.751 -90.361 0 0
EZO2 1.485 7.006 -48.923 0 0
EXO2 -9.086 0.004 0.144 0 0
WX -13.19 0 -0.042 0 0
EZO1 4.452 6.784 -46.99 0 0
SW 0 0 -7.138 0 0
EZE 0.089 4.797 31.351 0 0
EXE -7.194 0 -0.005 0 0
4 BLSZ 0.031 3.908 25.705 0 0
BLSX 1.555 0 -0.023 0 0
BLDZ -5.356 6.525 50.785 0 0
BLDX 1.005 0 -0.098 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 5

Dead Load (dl) -0.002 -0.072 -21.368 0 0


PO1 -1.11 4.463 22.094 0 0
EXO1 -9.36 -0.01 0.404 0 0
PO2 10.224 -7.094 -84.389 0 0
PE 0.006 0.179 -12.166 0 0
PT -0.173 0.526 -41.637 0 0
WZ 0.276 20.751 90.361 0 0
EZO2 -1.485 7.006 48.924 0 0
EXO2 -11.723 0.005 0.025 0 0
WX -13.159 0 -0.041 0 0
EZO1 -4.452 6.783 46.989 0 0
SW 0 0 -7.138 0 0
EZE -0.177 4.653 -31.657 0 0
EXE -3.445 0.038 -11.175 0 0
BLSZ -0.133 3.713 -25.992 0 0
BLSX 0.714 -0.013 3.807 0 0
BLDZ -3.106 6.52 -56.022 0 0
BLDX 0.093 -0.048 10.15 0 0
Dead Load (dl) -0.829 0.072 -16.374 0 0
PO1 6.724 5.467 -43.769 0 0
5
EXO1 -5.313 -0.075 -17.219 0 0
PO2 0.146 -9.023 35.938 0 0
PE -0.07 -0.23 -13.626 0 0
PT -0.119 -1.191 -67.973 0 0
WZ -0.685 17.841 -94.478 0 0
EZO2 0.53 7.258 -48.531 0 0
EXO2 -4.56 0.25 -16.92 0 0
WX -7.006 0.003 -10.815 0 0
EZO1 1.996 7.52 -45.873 0 0
SW 0 0 -7.138 0 0
EZE 0.177 4.653 31.657 0 0
EXE -3.601 0.009 -11.32 0 0
BLSZ 0.133 3.713 25.992 0 0
BLSX 0.752 0 3.847 0 0
BLDZ -2.62 6.512 45.676 0 0
BLDX 0.247 -0.005 10.305 0 0
Dead Load (dl) -0.829 -0.072 -16.374 0 0
PO1 -0.383 6.506 7.564 0 0
6
EXO1 -4.696 -0.122 -16.771 0 0
PO2 4.688 -7.858 -87.848 0 0
PE -0.076 0.232 -15.147 0 0
PT -0.372 1.077 -70.184 0 0
WZ 0.685 17.841 94.477 0 0
EZO2 -0.53 7.258 48.531 0 0
EXO2 -5.867 0.203 -18.146 0 0
WX -6.99 -0.008 -10.8 0 0
EZO1 -1.996 7.52 45.873 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 6

1.3.2 Load Combination List


Group 1 - F1
Comb . ID Load Combination for Reinforcement
1111 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO1
1112 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO2
1121 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT
1131 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WZ
1132 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WX
1133 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WZ
1134 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WX
1141 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WZ
1142 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WZ
1143 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WX
1144 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WX
1145 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WZ
1146 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WZ
1147 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WX
1148 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WX
1151 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WZ
1152 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WX
1153 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WZ
1154 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WX
1161 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + .3 EXE
1162 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + -.3 EXE
1163 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + .3 EXE
1164 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + -.3 EXE
1165 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + 1.0 EXE
1166 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + -1.0 EXE
1167 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + 1.0 EXE
1168 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + -1.0 EXE
1171 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + 1.0 EZO1
1172 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + 1.0 EZO1
1173 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + -1.0 EZO1
1174 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + -1.0 EZO1
1175 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + .3 EZO1
1176 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + .3 EZO1
1177 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + -.3 EZO1
1178 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + -.3 EZO1
1179 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + .3 EXO2
1180 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + -.3 EXO2
1181 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + .3 EXO2

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 7

1182 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + -.3 EXO2
1183 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + 1.0 EXO2
1184 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + -1.0 EXO2
1185 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + 1.0 EXO2
1186 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + -1.0 EXO2
1191 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSZ
1192 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSZ
1193 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSX
1194 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSX
1195 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDZ
1196 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDZ
1197 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDX
1198 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDX

Group 2 - F2
Comb . ID Load Combination for Reinforcement
1111 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO1
1112 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO2
1121 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT
1131 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WZ
1132 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WX
1133 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WZ
1134 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WX
1141 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WZ
1142 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WZ
1143 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WX
1144 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WX
1145 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WZ
1146 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WZ
1147 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WX
1148 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WX
1151 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WZ
1152 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WX
1153 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WZ
1154 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WX
1161 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + .3 EXE
1162 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + -.3 EXE
1163 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + .3 EXE
1164 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + -.3 EXE
1165 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + 1.0 EXE
1166 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + -1.0 EXE
1167 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + 1.0 EXE

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 8

1168 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + -1.0 EXE
1171 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + 1.0 EZO1
1172 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + 1.0 EZO1
1173 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + -1.0 EZO1
1174 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + -1.0 EZO1
1175 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + .3 EZO1
1176 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + .3 EZO1
1177 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + -.3 EZO1
1178 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + -.3 EZO1
1179 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + .3 EXO2
1180 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + -.3 EXO2
1181 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + .3 EXO2
1182 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + -.3 EXO2
1183 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + 1.0 EXO2
1184 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + -1.0 EXO2
1185 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + 1.0 EXO2
1186 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + -1.0 EXO2
1191 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSZ
1192 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSZ
1193 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSX
1194 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSX
1195 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDZ
1196 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDZ
1197 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDX
1198 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDX

Group 3 - F3
Comb . ID Load Combination for Reinforcement
1111 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO1
1112 1.4 SW + 1.4 Dead Load (dl) + 1.4 PO2
1121 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT
1131 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WZ
1132 .9 SW + .9 Dead Load (dl) + .9 PE + 1.0 WX
1133 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WZ
1134 .9 SW + .9 Dead Load (dl) + .9 PE + -1.0 WX
1141 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WZ
1142 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WZ
1143 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + 1.0 WX
1144 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + 1.0 WX
1145 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WZ
1146 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WZ
1147 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO1 + -1.0 WX

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 9

1148 1.2 SW + 1.2 Dead Load (dl) + 1.2 PO2 + -1.0 WX


1151 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WZ
1152 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + .6 WX
1153 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WZ
1154 1.2 SW + 1.2 Dead Load (dl) + 1.2 PT + -.6 WX
1161 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + .3 EXE
1162 .774 SW + .774 Dead Load (dl) + .774 PE + 1.0 EZE + -.3 EXE
1163 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + .3 EXE
1164 .774 SW + .774 Dead Load (dl) + .774 PE + -1.0 EZE + -.3 EXE
1165 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + 1.0 EXE
1166 .774 SW + .774 Dead Load (dl) + .774 PE + .3 EZE + -1.0 EXE
1167 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + 1.0 EXE
1168 .774 SW + .774 Dead Load (dl) + .774 PE + -.3 EZE + -1.0 EXE
1171 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + 1.0 EZO1
1172 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + 1.0 EZO1
1173 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + .3 EXO1 + -1.0 EZO1
1174 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -.3 EXO1 + -1.0 EZO1
1175 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + .3 EZO1
1176 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + .3 EZO1
1177 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + 1.0 EXO1 + -.3 EZO1
1178 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO1 + -1.0 EXO1 + -.3 EZO1
1179 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + .3 EXO2
1180 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + 1.0 EZO2 + -.3 EXO2
1181 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + .3 EXO2
1182 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -1.0 EZO2 + -.3 EXO2
1183 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + 1.0 EXO2
1184 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + .3 EZO2 + -1.0 EXO2
1185 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + 1.0 EXO2
1186 1.33 SW + 1.33 Dead Load (dl) + 1.33 PO2 + -.3 EZO2 + -1.0 EXO2
1191 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSZ
1192 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSZ
1193 .76 SW + .76 Dead Load (dl) + .76 PO1 + .76 BLSX
1194 .76 SW + .76 Dead Load (dl) + .76 PO2 + .76 BLSX
1195 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDZ
1196 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDZ
1197 .68 SW + .68 Dead Load (dl) + .68 PO1 + .68 BLDX
1198 .68 SW + .68 Dead Load (dl) + .68 PO2 + .68 BLDX

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 10

1.3.3 In Pier Top


Group 1 - F1 Unit( kN , kN-m )
P. Name LC# SFx SFy SFz SMx SMy
1111 11.165 4.077 -155.873 0 0
1112 0.963 -8.978 28.501 0 0
1121 1.31 -0.258 -71.558 0 0
1131 1.22 17.929 -121.002 0 0
1132 -6.2 -0.006 -15.425 0 0
1133 0.39 -17.935 68.438 0 0
1134 7.81 0 -37.139 0 0
1141 9.985 21.426 -228.326 0 0
1142 1.241 10.236 -70.29 0 0
1143 2.565 3.491 -122.749 0 0
1144 -6.179 -7.699 35.287 0 0
1145 9.155 -14.438 -38.886 0 0
1146 0.411 -25.628 119.15 0 0
1147 16.575 3.497 -144.463 0 0
1148 7.831 -7.693 13.573 0 0
1151 1.559 10.501 -128.39 0 0
1152 -2.893 -0.26 -65.044 0 0
1153 1.061 -11.017 -14.726 0 0
1154 5.513 -0.256 -78.073 0 0
1
1161 -0.249 4.612 -50.98 0 0
1162 1.813 4.635 -57.689 0 0
1163 -0.429 -4.64 12.484 0 0
1164 1.633 -4.617 5.775 0 0
1165 -2.718 1.347 -20.94 0 0
1166 4.156 1.423 -43.304 0 0
1167 -2.772 -1.428 -1.901 0 0
1168 4.102 -1.352 -24.265 0 0
1171 11.442 9.561 -192.117 0 0
1172 14.618 9.509 -202.382 0 0
1173 6.596 -1.763 -93.777 0 0
1174 9.772 -1.815 -104.042 0 0
1175 6.041 5.658 -145.722 0 0
1176 16.627 5.486 -179.94 0 0
1177 4.587 2.26 -116.22 0 0
1178 15.173 2.088 -150.438 0 0
1179 0.498 -2.057 -17.723 0 0
1180 3.222 -1.905 -27.788 0 0
1181 -1.392 -15.153 81.941 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 11

1182 1.332 -15.001 71.876 0 0


1183 -3.34 -6.819 28.902 0 0
1184 5.738 -6.311 -4.648 0 0
1185 -3.907 -10.748 58.801 0 0
1186 5.171 -10.24 25.251 0 0
1191 6.141 5.033 -104.78 0 0
1192 0.603 -2.054 -4.691 0 0
1193 6.604 2.223 -87.491 0 0
1194 1.066 -4.864 12.598 0 0
1195 3.617 6.396 -107.656 0 0
1196 -1.338 0.055 -18.103 0 0
1197 5.49 2.013 -82.539 0 0
1198 0.535 -4.328 7.014 0 0
1111 0.568 4.777 -77.225 0 0
1112 8.903 -8.816 -172.316 0 0
1121 1.177 0.346 -89.352 0 0
1131 0.399 17.936 67.199 0 0
1132 -6.174 0.012 -16.679 0 0
1133 1.229 -17.93 -122.239 0 0
1134 7.803 -0.006 -38.361 0 0
1141 0.072 22.027 28.526 0 0
1142 7.216 10.377 -52.981 0 0
1143 -6.502 4.103 -55.352 0 0
1144 0.642 -7.547 -136.859 0 0
1145 0.902 -13.839 -160.912 0 0
1146 8.046 -25.489 -242.419 0 0
1147 7.476 4.085 -77.034 0 0
2
1148 14.62 -7.565 -158.541 0 0
1151 0.928 11.105 -32.521 0 0
1152 -3.016 0.351 -82.847 0 0
1153 1.426 -10.414 -146.183 0 0
1154 5.371 0.34 -95.857 0 0
1161 -0.467 4.626 11.462 0 0
1162 1.688 4.631 4.667 0 0
1163 -0.287 -4.626 -52.002 0 0
1164 1.868 -4.621 -58.797 0 0
1165 -2.92 1.381 -2.823 0 0
1166 4.266 1.399 -25.473 0 0
1167 -2.866 -1.394 -21.862 0 0
1168 4.32 -1.376 -44.512 0 0
1171 -3.283 10.24 -19.284 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 12

1172 -0.483 10.16 -29.104 0 0


1173 1.563 -1.084 -117.624 0 0
1174 4.363 -1.164 -127.444 0 0
1175 -4.855 6.369 -42.247 0 0
1176 4.481 6.105 -74.979 0 0
1177 -3.401 2.971 -71.749 0 0
1178 5.935 2.707 -104.481 0 0
1179 5.759 -1.893 -108.432 0 0
1180 9.266 -1.769 -119.305 0 0
1181 7.649 -14.981 -208.096 0 0
1182 11.156 -14.857 -218.969 0 0
1183 2.328 -6.619 -130.63 0 0
1184 14.02 -6.205 -166.872 0 0
1185 2.895 -10.545 -160.529 0 0
1186 14.587 -10.131 -196.771 0 0
1191 0.229 5.413 -21.76 0 0
1192 4.753 -1.965 -73.38 0 0
1193 0.882 2.593 -44.828 0 0
1194 5.406 -4.786 -96.449 0 0
1195 -1.812 6.742 1.48 0 0
1196 2.237 0.139 -44.707 0 0
1197 0.448 2.324 -44.45 0 0
1198 4.496 -4.278 -90.637 0 0

Group 2 - F2 Unit( kN , kN-m )


P. Name LC# SFx SFy SFz SMx SMy
1111 19.246 6.093 -86.976 0 0
1112 0.018 -10.741 26.907 0 0
1121 0.298 -0.494 -61.702 0 0
1131 -0.278 20.653 -119.409 0 0
1132 -13.192 -0.098 -29.089 0 0
1133 0.274 -20.849 61.313 0 0
1134 13.188 -0.098 -29.005 0 0
1141 16.22 25.973 -164.912 0 0
3
1142 -0.26 11.545 -67.298 0 0
1143 3.306 5.222 -74.593 0 0
1144 -13.174 -9.206 23.021 0 0
1145 16.772 -15.529 15.81 0 0
1146 0.292 -29.957 113.424 0 0
1147 29.686 5.222 -74.509 0 0
1148 13.206 -9.206 23.105 0 0
1151 0.132 11.956 -115.918 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 13

1152 -7.616 -0.494 -61.727 0 0


1153 0.463 -12.945 -7.485 0 0
1154 8.212 -0.494 -61.676 0 0
1161 -2.155 4.713 -56.334 0 0
1162 1.973 4.713 -56.33 0 0
1163 -1.977 -4.881 6.368 0 0
1164 2.151 -4.881 6.372 0 0
1165 -6.908 1.355 -34.393 0 0
1166 6.852 1.355 -34.379 0 0
1167 -6.855 -1.523 -15.583 0 0
1168 6.905 -1.523 -15.569 0 0
1171 19.556 12.569 -129.585 0 0
1172 25.916 12.575 -129.651 0 0
1173 10.652 -0.999 -35.605 0 0
1174 17.012 -0.993 -35.671 0 0
1175 9.019 7.812 -96.615 0 0
1176 30.219 7.834 -96.835 0 0
1177 6.348 3.742 -68.421 0 0
1178 27.548 3.764 -68.641 0 0
1179 -1.224 -3.197 -23.319 0 0
1180 4.228 -3.199 -23.405 0 0
1181 -4.194 -17.209 74.527 0 0
1182 1.258 -17.211 74.441 0 0
1183 -8.623 -8.098 11.028 0 0
1184 9.549 -8.106 10.74 0 0
1185 -9.514 -12.302 40.382 0 0
1186 8.658 -12.31 40.094 0 0
1191 10.424 6.278 -66.752 0 0
1192 -0.014 -2.861 -4.929 0 0
1193 11.57 3.308 -47.236 0 0
1194 1.132 -5.831 14.587 0 0
1195 5.649 7.396 -76.787 0 0
1196 -3.69 -0.78 -21.472 0 0
1197 9.823 2.959 -42.318 0 0
1198 0.483 -5.217 12.996 0 0
1111 -1.557 6.147 1.016 0 0
1112 14.311 -10.032 -148.06 0 0
1121 -0.21 0.545 -75.606 0 0
4
1131 0.28 20.847 60.18 0 0
1132 -13.155 0.096 -30.222 0 0
1133 -0.272 -20.655 -120.542 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 14

1134 13.163 0.096 -30.14 0 0


1141 -1.058 26.02 91.232 0 0
1142 12.542 12.152 -36.547 0 0
1143 -14.493 5.269 0.83 0 0
1144 -0.893 -8.599 -126.949 0 0
1145 -1.61 -15.482 -89.49 0 0
1146 11.99 -29.35 -217.269 0 0
1147 11.825 5.269 0.912 0 0
1148 25.425 -8.599 -126.867 0 0
1151 -0.044 12.995 -21.389 0 0
1152 -8.105 0.545 -75.631 0 0
1153 -0.376 -11.906 -129.823 0 0
1154 7.685 0.545 -75.581 0 0
1161 -2.066 4.88 5.394 0 0
1162 2.25 4.88 5.397 0 0
1163 -2.244 -4.714 -57.308 0 0
1164 2.072 -4.714 -57.305 0 0
1165 -7.164 1.522 -16.555 0 0
1166 7.224 1.522 -16.545 0 0
1167 -7.218 -1.356 -35.366 0 0
1168 7.17 -1.356 -35.356 0 0
1171 -8.739 12.62 48.076 0 0
1172 -3.123 12.626 47.833 0 0
1173 0.165 -0.946 -45.902 0 0
1174 5.781 -0.94 -46.145 0 0
1175 -12.175 7.865 15.466 0 0
1176 6.545 7.885 14.658 0 0
1177 -9.503 3.795 -12.727 0 0
1178 9.217 3.815 -13.535 0 0
1179 8.593 -2.523 -91.725 0 0
1180 15.627 -2.526 -91.74 0 0
1181 11.563 -16.535 -189.573 0 0
1182 18.597 -16.538 -189.588 0 0
1183 1.427 -7.424 -125.955 0 0
1184 24.873 -7.434 -126.005 0 0
1185 2.318 -11.628 -155.309 0 0
1186 25.764 -11.638 -155.359 0 0
1191 -0.822 6.307 20.088 0 0
1192 7.792 -2.476 -60.84 0 0
1193 0.337 3.337 0.534 0 0
1194 8.951 -5.446 -80.393 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 15

1195 -4.398 7.423 35.027 0 0


1196 3.309 -0.436 -37.381 0 0
1197 -0.073 2.986 0.427 0 0
1198 7.634 -4.873 -71.981 0 0

Group 3 - F3 Unit( kN , kN-m )


P. Name LC# SFx SFy SFz SMx SMy
1111 8.253 7.755 -84.2 0 0
1112 -0.956 -12.531 27.39 0 0
1121 -1.138 -1.343 -101.216 0 0
1131 -1.494 17.699 -121.478 0 0
1132 -7.815 -0.139 -37.815 0 0
1133 -0.124 -17.983 67.478 0 0
1134 6.197 -0.145 -16.185 0 0
1141 6.389 24.488 -166.65 0 0
1142 -1.505 7.1 -71.001 0 0
1143 0.068 6.65 -82.987 0 0
1144 -7.826 -10.738 12.662 0 0
1145 7.759 -11.194 22.306 0 0
1146 -0.135 -28.582 117.955 0 0
1147 14.08 6.644 -61.357 0 0
1148 6.186 -10.744 34.292 0 0
1151 -1.549 9.362 -157.903 0 0
1152 -5.341 -1.341 -107.705 0 0
5 1153 -0.727 -12.047 -44.53 0 0
1154 3.066 -1.345 -94.727 0 0
1161 -1.906 4.542 -58.229 0 0
1162 0.161 4.519 -51.524 0 0
1163 -1.552 -4.764 5.084 0 0
1164 0.515 -4.787 11.789 0 0
1165 -4.194 1.312 -43.892 0 0
1166 2.696 1.236 -21.542 0 0
1167 -4.088 -1.48 -24.898 0 0
1168 2.802 -1.556 -2.548 0 0
1171 8.242 14.864 -131.029 0 0
1172 11.43 14.909 -120.697 0 0
1173 4.25 -0.176 -39.283 0 0
1174 7.438 -0.131 -28.951 0 0
1175 3.126 9.548 -110.971 0 0
1176 13.752 9.698 -76.533 0 0
1177 1.929 5.036 -83.447 0 0
1178 12.555 5.186 -49.009 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 16

1179 -1.746 -4.572 -27.587 0 0


1180 0.99 -4.722 -17.435 0 0
1181 -2.806 -19.088 69.475 0 0
1182 -0.07 -19.238 79.627 0 0
1183 -5.309 -9.477 -5.459 0 0
1184 3.811 -9.977 28.381 0 0
1185 -5.627 -13.832 23.659 0 0
1186 3.493 -14.332 57.499 0 0
1191 4.379 7.032 -65.463 0 0
1192 -0.62 -3.981 -4.885 0 0
1193 5.023 4.2 -42.815 0 0
1194 0.024 -6.813 17.762 0 0
1195 1.897 8.2 -78.992 0 0
1196 -2.577 -1.653 -24.791 0 0
1197 4.072 3.734 -33.995 0 0
1198 -0.401 -6.119 20.206 0 0
1111 -1.697 9.008 -12.334 0 0
1112 5.403 -11.102 -145.911 0 0
1121 -1.441 1.206 -103.87 0 0
1131 -0.129 17.985 66.108 0 0
1132 -7.804 0.136 -39.169 0 0
1133 -1.5 -17.697 -122.846 0 0
1134 6.175 0.152 -17.569 0 0
1141 -0.769 25.562 83.905 0 0
1142 5.316 8.325 -30.589 0 0
1143 -8.444 7.713 -21.372 0 0
1144 -2.359 -9.524 -135.866 0 0
1145 -2.139 -10.12 -105.049 0 0
6 1146 3.946 -27.357 -219.543 0 0
1147 5.536 7.729 0.228 0 0
1148 11.621 -9.508 -114.266 0 0
1151 -1.03 11.911 -47.183 0 0
1152 -5.635 1.201 -110.35 0 0
1153 -1.852 -9.499 -160.556 0 0
1154 2.753 1.211 -97.39 0 0
1161 -1.604 4.78 3.864 0 0
1162 0.557 4.774 10.656 0 0
1163 -1.958 -4.526 -59.45 0 0
1164 0.203 -4.532 -52.658 0 0
1165 -4.248 1.529 -26.22 0 0
1166 2.954 1.511 -3.58 0 0

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 17

1167 -4.355 -1.263 -45.214 0 0


1168 2.847 -1.281 -22.574 0 0
1171 -5.017 16.041 29.124 0 0
1172 -2.199 16.114 39.187 0 0
1173 -1.025 1.001 -62.622 0 0
1174 1.793 1.074 -52.559 0 0
1175 -6.907 10.691 -14.726 0 0
1176 2.485 10.935 18.816 0 0
1177 -5.709 6.179 -42.25 0 0
1178 3.683 6.423 -8.708 0 0
1179 2.842 -3.228 -95.528 0 0
1180 6.363 -3.35 -84.64 0 0
1181 3.902 -17.744 -192.59 0 0
1182 7.423 -17.866 -181.702 0 0
1183 -0.894 -8.167 -142.202 0 0
1184 10.84 -8.573 -105.91 0 0
1185 -0.576 -12.521 -171.321 0 0
1186 11.158 -12.927 -135.029 0 0
1191 -0.82 7.712 13.058 0 0
1192 3.034 -3.205 -59.455 0 0
1193 -0.35 4.89 -3.772 0 0
1194 3.504 -6.027 -76.285 0 0
1195 -2.606 8.803 25.069 0 0
1196 0.843 -0.964 -39.811 0 0
1197 -0.656 4.372 1.017 0 0
1198 2.792 -5.396 -63.864 0 0

1.3.4 In Pier Bottom


Group 1 - F1 Unit( kN , kN-m )
P. Name LC# SFx SFy SFz SMx SMy
1111 11.165 4.077 165.867 -4.892 13.398
1112 0.963 -8.978 -18.508 10.774 1.156
1121 1.31 -0.258 80.124 0.31 1.572
1131 1.22 17.929 127.426 -21.515 1.464
1132 -6.2 -0.006 21.849 0.007 -7.44
1 1133 0.39 -17.935 -62.014 21.522 0.468
1134 7.81 0 43.563 0 9.372
1141 9.985 21.426 236.891 -25.712 11.982
1142 1.241 10.236 78.856 -12.284 1.489
1143 2.565 3.491 131.314 -4.19 3.078
1144 -6.179 -7.699 -26.721 9.238 -7.415

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 18

1145 9.155 -14.438 47.451 17.325 10.986


1146 0.411 -25.628 -110.584 30.753 0.493
1147 16.575 3.497 153.028 -4.197 19.89
1148 7.831 -7.693 -5.007 9.231 9.397
1151 1.559 10.501 136.956 -12.601 1.871
1152 -2.893 -0.26 73.61 0.312 -3.471
1153 1.061 -11.017 23.292 13.221 1.274
1154 5.513 -0.256 86.638 0.307 6.616
1161 -0.249 4.612 56.505 -5.535 -0.299
1162 1.813 4.635 63.214 -5.562 2.176
1163 -0.429 -4.64 -6.959 5.568 -0.515
1164 1.633 -4.617 -0.25 5.54 1.96
1165 -2.718 1.347 26.465 -1.617 -3.262
1166 4.156 1.423 48.829 -1.708 4.987
1167 -2.772 -1.428 7.426 1.714 -3.326
1168 4.102 -1.352 29.79 1.623 4.922
1171 11.442 9.561 201.611 -11.473 13.73
1172 14.618 9.509 211.876 -11.411 17.541
1173 6.596 -1.763 103.271 2.116 7.915
1174 9.772 -1.815 113.536 2.178 11.726
1175 6.041 5.658 155.215 -6.789 7.249
1176 16.627 5.486 189.433 -6.583 19.952
1177 4.587 2.26 125.713 -2.712 5.504
1178 15.173 2.088 159.931 -2.506 18.207
1179 0.498 -2.057 27.217 2.469 0.598
1180 3.222 -1.905 37.282 2.286 3.866
1181 -1.392 -15.153 -72.447 18.184 -1.67
1182 1.332 -15.001 -62.382 18.001 1.598
1183 -3.34 -6.819 -19.408 8.183 -4.009
1184 5.738 -6.311 14.142 7.573 6.885
1185 -3.907 -10.748 -49.307 12.897 -4.689
1186 5.171 -10.24 -15.757 12.288 6.205
1191 6.141 5.033 110.205 -6.04 7.369
1192 0.603 -2.054 10.116 2.464 0.723
1193 6.604 2.223 92.916 -2.668 7.925
1194 1.066 -4.864 -7.173 5.837 1.28
1195 3.617 6.396 112.51 -7.675 4.34
1196 -1.338 0.055 22.957 -0.066 -1.606
1197 5.49 2.013 87.393 -2.415 6.588
1198 0.535 -4.328 -2.16 5.194 0.642
2 1111 0.568 4.777 87.219 -5.732 0.682

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 19

1112 8.903 -8.816 182.31 10.579 10.683


1121 1.177 0.346 97.918 -0.415 1.413
1131 0.399 17.936 -60.774 -21.523 0.479
1132 -6.174 0.012 23.104 -0.014 -7.409
1133 1.229 -17.93 128.664 21.516 1.475
1134 7.803 -0.006 44.786 0.008 9.364
1141 0.072 22.027 -19.96 -26.433 0.087
1142 7.216 10.377 61.546 -12.452 8.659
1143 -6.502 4.103 63.918 -4.924 -7.802
1144 0.642 -7.547 145.424 9.057 0.77
1145 0.902 -13.839 169.478 16.606 1.083
1146 8.046 -25.489 250.984 30.587 9.655
1147 7.476 4.085 85.6 -4.902 8.971
1148 14.62 -7.565 167.106 9.078 17.544
1151 0.928 11.105 41.086 -13.326 1.114
1152 -3.016 0.351 91.413 -0.421 -3.619
1153 1.426 -10.414 154.749 12.497 1.711
1154 5.371 0.34 104.422 -0.408 6.445
1161 -0.467 4.626 -5.937 -5.551 -0.561
1162 1.688 4.631 0.858 -5.557 2.026
1163 -0.287 -4.626 57.527 5.552 -0.345
1164 1.868 -4.621 64.322 5.545 2.242
1165 -2.92 1.381 8.348 -1.657 -3.503
1166 4.266 1.399 30.998 -1.679 5.12
1167 -2.866 -1.394 27.387 1.673 -3.439
1168 4.32 -1.376 50.037 1.652 5.185
1171 -3.283 10.24 28.778 -12.287 -3.94
1172 -0.483 10.16 38.598 -12.192 -0.579
1173 1.563 -1.084 127.118 1.301 1.875
1174 4.363 -1.164 136.938 1.396 5.236
1175 -4.855 6.369 51.741 -7.642 -5.826
1176 4.481 6.105 84.473 -7.325 5.377
1177 -3.401 2.971 81.243 -3.566 -4.081
1178 5.935 2.707 113.975 -3.249 7.122
1179 5.759 -1.893 117.926 2.272 6.91
1180 9.266 -1.769 128.798 2.123 11.12
1181 7.649 -14.981 217.59 17.977 9.178
1182 11.156 -14.857 228.462 17.828 13.388
1183 2.328 -6.619 140.123 7.943 2.794
1184 14.02 -6.205 176.365 7.446 16.824
1185 2.895 -10.545 170.023 12.654 3.474

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 20

1186 14.587 -10.131 206.265 12.157 17.504


1191 0.229 5.413 27.185 -6.496 0.275
1192 4.753 -1.965 78.805 2.358 5.704
1193 0.882 2.593 50.253 -3.112 1.058
1194 5.406 -4.786 101.874 5.743 6.487
1195 -1.812 6.742 3.374 -8.09 -2.174
1196 2.237 0.139 49.561 -0.167 2.684
1197 0.448 2.324 49.304 -2.789 0.538
1198 4.496 -4.278 95.491 5.133 5.395

Group 2 - F2 Unit( kN , kN-m )


P. Name LC# SFx SFy SFz SMx SMy
1111 19.246 6.093 96.97 -7.311 23.095
1112 0.018 -10.741 -16.913 12.889 0.022
1121 0.298 -0.494 70.267 0.593 0.357
1131 -0.278 20.653 125.833 -24.783 -0.333
1132 -13.192 -0.098 35.514 0.118 -15.83
1133 0.274 -20.849 -54.889 25.019 0.329
1134 13.188 -0.098 35.43 0.118 15.826
1141 16.22 25.973 173.478 -31.168 19.464
1142 -0.26 11.545 75.864 -13.854 -0.312
1143 3.306 5.222 83.159 -6.267 3.968
1144 -13.174 -9.206 -14.455 11.048 -15.809
1145 16.772 -15.529 -7.244 18.634 20.127
1146 0.292 -29.957 -104.858 35.949 0.35
1147 29.686 5.222 83.075 -6.267 35.624
1148 13.206 -9.206 -14.539 11.048 15.847
3
1151 0.132 11.956 124.484 -14.347 0.158
1152 -7.616 -0.494 70.293 0.593 -9.14
1153 0.463 -12.945 16.051 15.534 0.556
1154 8.212 -0.494 70.242 0.593 9.854
1161 -2.155 4.713 61.859 -5.655 -2.585
1162 1.973 4.713 61.855 -5.655 2.368
1163 -1.977 -4.881 -0.843 5.858 -2.372
1164 2.151 -4.881 -0.847 5.858 2.582
1165 -6.908 1.355 39.918 -1.626 -8.29
1166 6.852 1.355 39.904 -1.626 8.222
1167 -6.855 -1.523 21.107 1.828 -8.226
1168 6.905 -1.523 21.093 1.828 8.286
1171 19.556 12.569 139.078 -15.083 23.467
1172 25.916 12.575 139.144 -15.091 31.099
1173 10.652 -0.999 45.098 1.199 12.782

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 21

1174 17.012 -0.993 45.164 1.191 20.414


1175 9.019 7.812 106.108 -9.375 10.823
1176 30.219 7.834 106.328 -9.401 36.263
1177 6.348 3.742 77.914 -4.49 7.617
1178 27.548 3.764 78.134 -4.517 33.057
1179 -1.224 -3.197 32.812 3.836 -1.468
1180 4.228 -3.199 32.899 3.839 5.074
1181 -4.194 -17.209 -65.034 20.65 -5.032
1182 1.258 -17.211 -64.947 20.653 1.51
1183 -8.623 -8.098 -1.535 9.718 -10.348
1184 9.549 -8.106 -1.247 9.727 11.459
1185 -9.514 -12.302 -30.888 14.762 -11.417
1186 8.658 -12.31 -30.6 14.771 10.389
1191 10.424 6.278 72.177 -7.533 12.509
1192 -0.014 -2.861 10.354 3.433 -0.016
1193 11.57 3.308 52.66 -3.969 13.884
1194 1.132 -5.831 -9.162 6.997 1.359
1195 5.649 7.396 81.641 -8.876 6.779
1196 -3.69 -0.78 26.326 0.936 -4.428
1197 9.823 2.959 47.172 -3.551 11.787
1198 0.483 -5.217 -8.142 6.26 0.58
1111 -1.557 6.147 8.977 -7.377 -1.868
1112 14.311 -10.032 158.053 12.039 17.173
1121 -0.21 0.545 84.172 -0.654 -0.252
1131 0.28 20.847 -53.756 -25.017 0.336
1132 -13.155 0.096 36.646 -0.116 -15.786
1133 -0.272 -20.655 126.966 24.786 -0.327
1134 13.163 0.096 36.564 -0.116 15.795
1141 -1.058 26.02 -82.666 -31.224 -1.27
1142 12.542 12.152 45.113 -14.582 15.051
1143 -14.493 5.269 7.736 -6.323 -17.392
4
1144 -0.893 -8.599 135.515 10.319 -1.071
1145 -1.61 -15.482 98.056 18.578 -1.932
1146 11.99 -29.35 225.835 35.22 14.388
1147 11.825 5.269 7.654 -6.323 14.19
1148 25.425 -8.599 135.433 10.319 30.51
1151 -0.044 12.995 29.955 -15.594 -0.053
1152 -8.105 0.545 84.196 -0.654 -9.726
1153 -0.376 -11.906 138.388 14.287 -0.451
1154 7.685 0.545 84.147 -0.654 9.222
1161 -2.066 4.88 0.131 -5.856 -2.479

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 22

1162 2.25 4.88 0.128 -5.856 2.7


1163 -2.244 -4.714 62.833 5.657 -2.693
1164 2.072 -4.714 62.83 5.657 2.487
1165 -7.164 1.522 22.08 -1.826 -8.597
1166 7.224 1.522 22.07 -1.826 8.669
1167 -7.218 -1.356 40.891 1.628 -8.661
1168 7.17 -1.356 40.881 1.628 8.604
1171 -8.739 12.62 -38.582 -15.144 -10.487
1172 -3.123 12.626 -38.34 -15.151 -3.748
1173 0.165 -0.946 55.396 1.135 0.198
1174 5.781 -0.94 55.638 1.128 6.937
1175 -12.175 7.865 -5.973 -9.438 -14.609
1176 6.545 7.885 -5.165 -9.462 7.855
1177 -9.503 3.795 22.221 -4.554 -11.404
1178 9.217 3.815 23.029 -4.578 11.06
1179 8.593 -2.523 101.219 3.028 10.312
1180 15.627 -2.526 101.234 3.032 18.753
1181 11.563 -16.535 199.067 19.842 13.876
1182 18.597 -16.538 199.082 19.846 22.317
1183 1.427 -7.424 135.448 8.909 1.712
1184 24.873 -7.434 135.498 8.921 29.847
1185 2.318 -11.628 164.803 13.953 2.781
1186 25.764 -11.638 164.853 13.965 30.917
1191 -0.822 6.307 -14.663 -7.569 -0.986
1192 7.792 -2.476 66.264 2.971 9.351
1193 0.337 3.337 4.891 -4.005 0.404
1194 8.951 -5.446 85.818 6.535 10.741
1195 -4.398 7.423 -30.174 -8.907 -5.278
1196 3.309 -0.436 42.235 0.523 3.971
1197 -0.073 2.986 4.427 -3.583 -0.087
1198 7.634 -4.873 76.835 5.847 9.161

Group 3 - F3 Unit( kN , kN-m )


P. Name LC# SFx SFy SFz SMx SMy
1111 8.253 7.755 94.194 -9.306 9.904
1112 -0.956 -12.531 -17.396 15.038 -1.147
1121 -1.138 -1.343 109.782 1.611 -1.365
1131 -1.494 17.699 127.902 -21.239 -1.793
5
1132 -7.815 -0.139 44.239 0.167 -9.378
1133 -0.124 -17.983 -61.054 21.58 -0.149
1134 6.197 -0.145 22.609 0.174 7.436
1141 6.389 24.488 175.215 -29.385 7.667

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 23

1142 -1.505 7.1 79.567 -8.52 -1.806


1143 0.068 6.65 91.552 -7.98 0.082
1144 -7.826 -10.738 -4.096 12.886 -9.391
1145 7.759 -11.194 -13.741 13.433 9.311
1146 -0.135 -28.582 -109.389 34.299 -0.162
1147 14.08 6.644 69.922 -7.973 16.896
1148 6.186 -10.744 -25.726 12.893 7.424
1151 -1.549 9.362 166.469 -11.234 -1.858
1152 -5.341 -1.341 116.271 1.609 -6.409
1153 -0.727 -12.047 53.095 14.457 -0.872
1154 3.066 -1.345 103.293 1.614 3.679
1161 -1.906 4.542 63.754 -5.451 -2.288
1162 0.161 4.519 57.049 -5.423 0.193
1163 -1.552 -4.764 0.44 5.717 -1.863
1164 0.515 -4.787 -6.265 5.744 0.618
1165 -4.194 1.312 49.417 -1.574 -5.033
1166 2.696 1.236 27.067 -1.483 3.235
1167 -4.088 -1.48 30.423 1.776 -4.905
1168 2.802 -1.556 8.073 1.867 3.363
1171 8.242 14.864 140.523 -17.837 9.891
1172 11.43 14.909 130.191 -17.891 13.716
1173 4.25 -0.176 48.777 0.211 5.101
1174 7.438 -0.131 38.445 0.157 8.926
1175 3.126 9.548 120.465 -11.457 3.751
1176 13.752 9.698 86.027 -11.637 16.503
1177 1.929 5.036 92.941 -6.043 2.314
1178 12.555 5.186 58.503 -6.223 15.065
1179 -1.746 -4.572 37.081 5.486 -2.096
1180 0.99 -4.722 26.929 5.666 1.188
1181 -2.806 -19.088 -59.981 22.905 -3.368
1182 -0.07 -19.238 -70.133 23.085 -0.084
1183 -5.309 -9.477 14.953 11.373 -6.371
1184 3.811 -9.977 -18.887 11.973 4.573
1185 -5.627 -13.832 -14.166 16.599 -6.753
1186 3.493 -14.332 -48.006 17.199 4.191
1191 4.379 7.032 70.888 -8.438 5.255
1192 -0.62 -3.981 10.31 4.777 -0.744
1193 5.023 4.2 48.24 -5.04 6.027
1194 0.024 -6.813 -12.337 8.175 0.028
1195 1.897 8.2 83.846 -9.84 2.276
1196 -2.577 -1.653 29.645 1.984 -3.092

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 24

1197 4.072 3.734 38.849 -4.481 4.886


1198 -0.401 -6.119 -15.352 7.343 -0.481
1111 -1.697 9.008 22.327 -10.809 -2.036
1112 5.403 -11.102 155.904 13.322 6.483
1121 -1.441 1.206 112.435 -1.447 -1.729
1131 -0.129 17.985 -59.684 -21.582 -0.155
1132 -7.804 0.136 45.593 -0.163 -9.365
1133 -1.5 -17.697 129.27 21.236 -1.799
1134 6.175 0.152 23.993 -0.182 7.411
1141 -0.769 25.562 -75.339 -30.674 -0.923
1142 5.316 8.325 39.155 -9.99 6.379
1143 -8.444 7.713 29.938 -9.255 -10.133
1144 -2.359 -9.524 144.432 11.429 -2.831
1145 -2.139 -10.12 113.615 12.144 -2.567
1146 3.946 -27.357 228.109 32.828 4.735
1147 5.536 7.729 8.338 -9.275 6.643
1148 11.621 -9.508 122.832 11.41 13.945
1151 -1.03 11.911 55.749 -14.293 -1.236
1152 -5.635 1.201 118.915 -1.441 -6.762
1153 -1.852 -9.499 169.122 11.398 -2.223
1154 2.753 1.211 105.955 -1.453 3.303
6 1161 -1.604 4.78 1.661 -5.735 -1.925
1162 0.557 4.774 -5.131 -5.729 0.668
1163 -1.958 -4.526 64.975 5.432 -2.349
1164 0.203 -4.532 58.183 5.438 0.243
1165 -4.248 1.529 31.745 -1.834 -5.098
1166 2.954 1.511 9.105 -1.813 3.544
1167 -4.355 -1.263 50.739 1.516 -5.225
1168 2.847 -1.281 28.099 1.537 3.417
1171 -5.017 16.041 -19.631 -19.249 -6.02
1172 -2.199 16.114 -29.693 -19.337 -2.639
1173 -1.025 1.001 72.115 -1.201 -1.23
1174 1.793 1.074 62.053 -1.289 2.151
1175 -6.907 10.691 24.22 -12.829 -8.288
1176 2.485 10.935 -9.322 -13.122 2.982
1177 -5.709 6.179 51.744 -7.415 -6.851
1178 3.683 6.423 18.202 -7.708 4.419
1179 2.842 -3.228 105.022 3.874 3.411
1180 6.363 -3.35 94.134 4.02 7.635
1181 3.902 -17.744 202.084 21.293 4.683
1182 7.423 -17.866 191.196 21.439 8.907

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 25

1183 -0.894 -8.167 151.696 9.8 -1.072


1184 10.84 -8.573 115.404 10.287 13.009
1185 -0.576 -12.521 180.814 15.026 -0.691
1186 11.158 -12.927 144.522 15.513 13.39
1191 -0.82 7.712 -7.633 -9.254 -0.984
1192 3.034 -3.205 64.88 3.846 3.641
1193 -0.35 4.89 9.197 -5.868 -0.42
1194 3.504 -6.027 81.71 7.232 4.205
1195 -2.606 8.803 -20.215 -10.564 -3.127
1196 0.843 -0.964 44.665 1.157 1.011
1197 -0.656 4.372 3.837 -5.246 -0.787
1198 2.792 -5.396 68.717 6.475 3.35

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 26

2. ONE-WAY SHEAR
2.1 FORMULA
1) Maximum Axial Load Strength
- Po = 0.85 fck (Ag-Ast) + S fy Ast
- Pnmax = f1 Po ( f1 = Axial Strenth Resuction Factiors)
- Mnmax = The Value of diagram, When P is Pn.
- Pumax = f2 Pnmax
f2 = Sprial or Tied Reinforcement Reduction Factor

2) Balanced Strain Condition


A balanced Strain condition exists at a cross-setion
when the maximum strain at the extreme
compression fiber just reaches eu = 0.003 simultaneously
with the first yield strain of es = fy/Es in the tension reinforcement.
The ratio of neutral axis depth cb is shown below
Cb eu
=
d eu + ey
eu = 0.003
fc = 0.85 fck

3) Strength for Combined Flexure and Axial Load


Maximum usable strain at extreme
concrete compression fiber shall
be assumed equal to eu = 0.003
if c that is neutral axis is supposed,
Pn and Mn can be calculated as below
fPn = f0.85 fck ( Acomp - S(1 to 11) Ast ) + S(1 to 28) fs Ast
fMn = f0.85 fck ( Acomp - S(1 to 11) Ast ) ( h/2 - c + yc )
+ S(1 to 28) fs Ast ( h/2 - c + ys )
fs(i) = e(i) Es , - fy fs(i) fy
Pn
Sprial or Tied Reinforcement Reduction Factor f = 0.9 - 0.2 0.9
Pa
Pa = 0.1 fck Ag
Acomp is Area from top to a (b 1c)
b 1c = 0.85 - 0.05 ( fck - 4000 ) / 1000 0.65 (psi)

4) Slenderness Effects
Cm p EI
2
0.2EcIg + EsIse
dns = 1 Pc = 2 EI =
1-Pu/0.75Pc (klu) 1+b d

5) Shear
f fy Av d
fVc = f 2 fck bw d , fVs = (psi)
s
fVsmax = f 8 fck bw d (psi)
fVn = fVc + fVs

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 27

2.2 PM DIAGRAM & ANALYSIS


2.2.1 Pier Name : 1

P (kN , kN-m ) Axis X - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 Mx
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

P (kN , kN-m ) Axis Y - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 My
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 28

2.2.2 Pier Name : 2

P (kN , kN-m ) Axis X - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 Mx
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

P (kN , kN-m ) Axis Y - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 My
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 29

2.2.3 Pier Name : 3

P (kN , kN-m ) Axis X - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 Mx
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

P (kN , kN-m ) Axis Y - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 My
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 30

2.2.4 Pier Name : 4

P (kN , kN-m ) Axis X - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 Mx
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

P (kN , kN-m ) Axis Y - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 My
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 31

2.2.5 Pier Name : 5

P (kN , kN-m ) Axis X - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 Mx
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

P (kN , kN-m ) Axis Y - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 My
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 32

2.2.6 Pier Name : 6

P (kN , kN-m ) Axis X - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 Mx
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

P (kN , kN-m ) Axis Y - Axis (All comb.)

6000 Po 6078.587 kN
Pnmax
5000 Pn / fPn 5470.729 kN / 3829.510 kN

fPnmax
4000 Balanced Mn / fMn 133.17 kN-m / 93.22 kN-m
3000
Pb / fPb 3915.618 kN / 2740.933 kN
2000
Mb / fM 358.39 kN-m / 250.87 kN-m
1000
c(Balanced) 380.9 mm
0 My
emin 28.74 mm
-1000
klu / rx 22.22
-2000
100 200 300 400 500
Slender Consider

2.3 ANALYSIS & RESULT


2.3.1 Moment Check unit (kN-m )
Pier L/C# dx dy SdMux SdMuy fMnx fMny Result
1111 1 1 4.89 13.4 79.56 214.38 OK
1112 1 1 10.77 1.16 207.84 21.09 OK
1121 1 1 2.3 2.3 164.37 164.37 OK
1131 1 1 21.52 3.66 219.56 37.18 OK
1 1132 1 1 0.63 7.44 18.12 212.26 OK
1133 1 1 21.52 0.47 200.99 3.51 OK
1134 1 1 1.25 9.37 29.7 214.06 OK
1141 1 1 25.71 11.98 208.17 99.07 OK
1142 1 1 12.28 2.27 216.16 42.08 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 33

1143 1 1 4.19 3.77 174.55 156.04 OK


1144 1 1 9.24 7.42 172.48 140.31 OK
1145 1 1 17.33 10.99 189.21 120.74 OK
1146 1 1 30.75 0.49 193.47 3.51 OK
1147 1 1 4.4 19.89 50.76 219.77 OK
1148 1 1 9.23 9.4 160.69 160.69 OK
1151 1 1 12.6 3.94 216.08 68.28 OK
1152 1 1 2.12 3.47 115.81 192.52 OK
1153 1 1 13.22 1.27 212.32 21.99 OK
1154 1 1 2.49 6.62 77.99 210.28 OK
1161 1 1 5.53 1.62 212.21 62.34 OK
1162 1 1 5.56 2.18 207.18 82.8 OK
1163 1 1 5.57 0.51 209.55 20.52 OK
1164 1 1 5.54 1.96 205.86 72.16 OK
1165 1 1 1.62 3.26 100.57 198.44 OK
1166 1 1 1.71 4.99 70.77 209.77 OK
1167 1 1 1.71 3.33 102.33 196.94 OK
1168 1 1 1.62 4.92 67.06 208.93 OK
1171 1 1 11.47 13.73 152.59 179.17 OK
1172 1 1 11.41 17.54 125.27 192.57 OK
1173 1 1 2.97 7.92 77.47 211.49 OK
1174 1 1 3.26 11.73 60.91 216.28 OK
1175 1 1 6.79 7.25 160.04 172.79 OK
1176 1 1 6.58 19.95 70.69 218.25 OK
1177 1 1 3.61 5.5 125.24 189.53 OK
1178 1 1 4.6 18.21 57.09 219.5 OK
1179 1 1 2.47 0.78 208.99 67.12 OK
1180 1 1 2.29 3.87 115.58 191.47 OK
1181 1 1 18.18 1.67 199.43 19.78 OK
1182 1 1 18 1.6 200.91 16.27 OK
1183 1 1 8.18 4.01 195.84 96.32 OK
1184 1 1 7.57 6.89 168.6 153.87 OK
1185 1 1 12.9 4.69 198.15 74.11 OK
1186 1 1 12.29 6.2 195.2 100.06 OK
1191 1 1 6.04 7.37 147.39 178.9 OK
1192 1 1 2.46 0.72 209.28 59.33 OK
1193 1 1 2.67 7.93 69.53 213.04 OK
1194 1 1 5.84 1.28 208.99 47.36 OK
1195 1 1 7.68 4.34 196.17 111.1 OK
1196 1 1 0.66 1.61 83.68 204.16 OK
1197 1 1 2.51 6.59 77.97 210.34 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 34

1198 1 1 5.19 0.64 210.33 27.62 OK


1111 1 1 5.73 2.51 206.3 89.5 OK
1112 1 1 10.58 10.68 167.43 167.43 OK
1121 1 1 2.81 2.81 164.98 164.98 OK
1131 1 1 21.52 0.48 201.16 3.51 OK
1132 1 1 0.66 7.41 20.26 212.41 OK
1133 1 1 21.52 3.7 219.62 36.98 OK
1134 1 1 1.29 9.36 29.48 214.16 OK
1141 1 1 26.43 0.09 207.46 0 OK
1142 1 1 12.45 8.66 185.42 129.27 OK
1143 1 1 4.92 7.8 120.83 189.73 OK
1144 1 1 9.06 4.18 206.6 95.69 OK
1145 1 1 16.61 4.87 219.07 62.44 OK
1146 1 1 30.59 9.65 221.16 69.12 OK
1147 1 1 4.9 8.97 105.82 197.91 OK
1148 1 1 9.08 17.54 105.3 201.88 OK
1151 1 1 13.33 1.18 213.67 20.44 OK
1152 1 1 2.63 3.62 134.34 183.87 OK
1153 1 1 12.5 4.45 215 75.84 OK
1154 1 1 3 6.44 95.61 204.87 OK
1161 1 1 5.55 0.56 209.81 20.44 OK
2
1162 1 1 5.56 2.03 204.78 76.35 OK
1163 1 1 5.55 1.65 212.27 62.31 OK
1164 1 1 5.55 2.24 207.26 82.78 OK
1165 1 1 1.66 3.5 94.57 199.51 OK
1166 1 1 1.68 5.12 67.02 209.25 OK
1167 1 1 1.67 3.44 96.75 199.8 OK
1168 1 1 1.65 5.18 66.52 210.74 OK
1171 1 1 12.29 3.94 209.09 67.08 OK
1172 1 1 12.19 1.11 213.48 20.87 OK
1173 1 1 3.65 3.65 165.91 165.91 OK
1174 1 1 3.94 5.24 137.09 184.54 OK
1175 1 1 7.64 5.83 180 139.47 OK
1176 1 1 7.33 5.38 183.61 134.33 OK
1177 1 1 3.57 4.08 151.84 174.68 OK
1178 1 1 3.28 7.12 95.54 205.45 OK
1179 1 1 3.39 6.91 99.29 203.31 OK
1180 1 1 3.7 11.12 72.51 214.38 OK
1181 1 1 17.98 9.18 204.37 104.71 OK
1182 1 1 17.83 13.39 185.93 141.49 OK
1183 1 1 7.94 4.03 202.66 101.99 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 35

1184 1 1 7.45 16.82 91.27 210.14 OK


1185 1 1 12.65 4.89 213.16 83.54 OK
1186 1 1 12.16 17.5 132.73 189.1 OK
1191 1 1 6.5 0.78 212.81 24.88 OK
1192 1 1 2.36 5.7 86.15 207 OK
1193 1 1 3.11 1.44 202.53 92.91 OK
1194 1 1 5.74 6.49 155.65 173.17 OK
1195 1 1 8.09 2.17 209.41 55.4 OK
1196 1 1 1.42 2.68 105.44 196.95 OK
1197 1 1 2.79 1.42 199.51 100.36 OK
1198 1 1 5.13 5.4 158.91 170.33 OK
1111 1 1 7.31 23.09 69.41 213.36 OK
1112 1 1 12.89 0.02 208.05 0 OK
1121 1 1 2.02 2.02 164.02 164.02 OK
1131 1 1 24.78 3.62 219.58 33.76 OK
1132 1 1 1.02 15.83 13.44 213.26 OK
1133 1 1 25.02 0.33 202.09 3.51 OK
1134 1 1 1.02 15.83 13.44 213.27 OK
1141 1 1 31.17 19.46 193.06 121.35 OK
1142 1 1 13.85 2.18 216.27 35.23 OK
1143 1 1 6.27 3.97 190.31 120.92 OK
1144 1 1 11.05 15.81 128.45 181.96 OK
1145 1 1 18.63 20.13 155.6 164.87 OK
1146 1 1 35.95 0.35 194.36 0 OK
1147 1 1 6.27 35.62 37.86 216.72 OK
1148 1 1 11.05 15.85 128.45 181.96 OK
3
1151 1 1 14.35 3.58 217.69 56.06 OK
1152 1 1 2.02 9.14 47.45 215.33 OK
1153 1 1 15.53 0.56 211.91 6.93 OK
1154 1 1 2.02 9.85 43.65 215.5 OK
1161 1 1 5.66 2.59 203.31 92.85 OK
1162 1 1 5.66 2.37 205.79 86.48 OK
1163 1 1 5.86 2.37 203.47 80.47 OK
1164 1 1 5.86 2.58 201.1 87.96 OK
1165 1 1 1.63 8.29 41.51 213.64 OK
1166 1 1 1.63 8.22 41.51 213.64 OK
1167 1 1 1.83 8.23 46.97 211.83 OK
1168 1 1 1.83 8.29 46.97 211.82 OK
1171 1 1 15.08 23.47 121.19 192.02 OK
1172 1 1 15.09 31.1 98.48 204.84 OK
1173 1 1 1.3 12.78 21.9 214.1 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 36

1174 1 1 1.3 20.41 15.52 213.96 OK


1175 1 1 9.37 10.82 152.08 176.01 OK
1176 1 1 9.4 36.26 57.08 216.43 OK
1177 1 1 4.49 7.62 115.83 192.62 OK
1178 1 1 4.52 33.06 31.03 216.45 OK
1179 1 1 3.84 1.47 206.19 79.66 OK
1180 1 1 3.84 5.07 138.83 179.83 OK
1181 1 1 20.65 5.03 199.8 49.31 OK
1182 1 1 20.65 1.51 200.49 16.27 OK
1183 1 1 9.72 10.35 156.14 165.54 OK
1184 1 1 9.73 11.46 147.15 171.79 OK
1185 1 1 14.76 11.42 175.47 135.52 OK
1186 1 1 14.77 10.39 180.28 127.61 OK
1191 1 1 7.53 12.51 115.79 192.45 OK
1192 1 1 3.43 0.3 211.42 19.41 OK
1193 1 1 3.97 13.88 62.43 211.91 OK
1194 1 1 7 1.36 209.24 39.35 OK
1195 1 1 8.88 6.78 181.14 139.61 OK
1196 1 1 0.94 4.43 46.87 212.23 OK
1197 1 1 3.55 11.79 62.57 211.5 OK
1198 1 1 6.26 0.58 209.43 20.57 OK
1111 1 1 7.38 1.87 209.82 55.28 OK
1112 1 1 12.04 17.17 131.2 187.85 OK
1121 1 1 2.42 2.42 164.51 164.51 OK
1131 1 1 25.02 0.34 202.35 3.51 OK
1132 1 1 1.05 15.79 13.35 213.42 OK
1133 1 1 24.79 3.65 219.69 33.54 OK
1134 1 1 1.05 15.8 13.35 213.42 OK
1141 1 1 31.22 1.27 197.87 6.97 OK
1142 1 1 14.58 15.05 160.37 165.54 OK
1143 1 1 6.32 17.39 76.14 205.34 OK
4
1144 1 1 10.32 3.89 212.34 80.57 OK
1145 1 1 18.58 2.82 217.88 31.37 OK
1146 1 1 35.22 14.39 213.58 87.82 OK
1147 1 1 6.32 14.19 91.04 200.7 OK
1148 1 1 10.32 30.51 72.31 214.83 OK
1151 1 1 15.59 0.86 212.86 13.76 OK
1152 1 1 2.42 9.73 53.64 215.52 OK
1153 1 1 14.29 3.98 217.95 60.29 OK
1154 1 1 2.42 9.22 57.6 214.87 OK
1161 1 1 5.86 2.48 202.44 84.06 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 37

1162 1 1 5.86 2.7 200.11 91.7 OK


1163 1 1 5.66 2.69 202.25 95.74 OK
1164 1 1 5.66 2.49 204.64 89.83 OK
1165 1 1 1.83 8.6 46.95 211.89 OK
1166 1 1 1.83 8.67 43 212.27 OK
1167 1 1 1.63 8.66 41.35 213.7 OK
1168 1 1 1.63 8.6 41.35 213.7 OK
1171 1 1 15.14 10.49 180.32 125.47 OK
1172 1 1 15.15 3.75 203.61 52.19 OK
1173 1 1 1.59 1.59 163.47 163.47 OK
1174 1 1 1.6 6.94 50.33 214.09 OK
1175 1 1 9.44 14.61 120.22 187.16 OK
1176 1 1 9.46 7.85 173.61 143.72 OK
1177 1 1 4.55 11.4 79.94 205.36 OK
1178 1 1 4.58 11.06 83.68 204.17 OK
1179 1 1 3.03 10.31 61.22 215.43 OK
1180 1 1 3.03 18.75 34.63 218.08 OK
1181 1 1 19.84 13.88 190.01 130.16 OK
1182 1 1 19.85 22.32 157.04 176.53 OK
1183 1 1 8.91 3.89 208.03 92.02 OK
1184 1 1 8.92 29.85 64.25 216.82 OK
1185 1 1 13.95 4.74 215.65 75.52 OK
1186 1 1 13.97 30.92 94.2 208.09 OK
1191 1 1 7.57 0.99 208.4 28.86 OK
1192 1 1 2.97 9.35 66.09 211.96 OK
1193 1 1 4 0.4 211.07 22.32 OK
1194 1 1 6.54 10.74 115.91 192.91 OK
1195 1 1 8.91 5.28 188.08 112 OK
1196 1 1 1.21 3.97 62.69 211.11 OK
1197 1 1 3.58 0.13 211.03 6.96 OK
1198 1 1 5.85 9.16 120.86 190.07 OK
1111 1 1 9.31 9.9 158.88 170.28 OK
1112 1 1 15.04 1.15 208.01 16.27 OK
1121 1 1 3.16 3.16 165.37 165.37 OK
1131 1 1 21.24 3.68 219.57 37.12 OK
1132 1 1 1.27 9.38 29.57 214.12 OK
5
1133 1 1 21.58 0.15 201.12 0 OK
1134 1 1 0.65 7.44 20.32 212.37 OK
1141 1 1 29.39 7.67 220.08 57.72 OK
1142 1 1 8.52 2.29 214.54 57.71 OK
1143 1 1 7.98 2.63 212.94 69.56 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 38

1144 1 1 12.89 9.39 180.55 134.31 OK


1145 1 1 13.43 9.31 182.02 128.48 OK
1146 1 1 34.3 0.16 193.68 0 OK
1147 1 1 7.97 16.9 95.74 202.71 OK
1148 1 1 12.89 7.42 190.98 107.5 OK
1151 1 1 11.23 4.78 211.44 87.75 OK
1152 1 1 3.34 6.41 104.89 199.93 OK
1153 1 1 14.46 1.53 214.68 24.18 OK
1154 1 1 2.97 3.68 144.36 179.95 OK
1161 1 1 5.45 2.29 205.93 86.45 OK
1162 1 1 5.42 1.64 212.23 62.32 OK
1163 1 1 5.72 1.86 206.85 67.84 OK
1164 1 1 5.74 0.62 209.7 23.55 OK
1165 1 1 1.57 5.03 66.53 210.7 OK
1166 1 1 1.48 3.24 92.95 200.96 OK
1167 1 1 1.78 4.91 75.46 207.16 OK
1168 1 1 1.87 3.36 108.45 194.07 OK
1171 1 1 17.84 9.89 198.22 109.14 OK
1172 1 1 17.89 13.72 182.37 141.31 OK
1173 1 1 1.4 5.1 58.43 212.28 OK
1174 1 1 1.1 8.93 26.66 213.6 OK
1175 1 1 11.46 3.75 214.97 68.75 OK
1176 1 1 11.64 16.5 129.3 186.2 OK
1177 1 1 6.04 2.67 205.35 92.61 OK
1178 1 1 6.22 15.07 86.54 205.56 OK
1179 1 1 5.49 2.1 206.52 79.53 OK
1180 1 1 5.67 1.19 212.65 42.92 OK
1181 1 1 22.91 3.37 201.33 29.13 OK
1182 1 1 23.09 0.08 199.6 0 OK
1183 1 1 11.37 6.37 193.4 110.24 OK
1184 1 1 11.97 4.57 201.7 76.82 OK
1185 1 1 16.6 6.75 201.35 80.93 OK
1186 1 1 17.2 4.19 202.45 48.42 OK
1191 1 1 8.44 5.25 189.91 120.85 OK
1192 1 1 4.78 0.74 211.57 31.38 OK
1193 1 1 5.04 6.03 147.76 175.04 OK
1194 1 1 8.18 0.03 208.81 0 OK
1195 1 1 9.84 2.41 215.48 53.65 OK
1196 1 1 1.98 3.09 120.68 188.71 OK
1197 1 1 4.48 4.89 154.46 169.96 OK
1198 1 1 7.34 0.48 208.31 13.98 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 39

1111 1 1 10.81 2.04 212.36 40.7 OK


1112 1 1 13.32 6.48 204.34 100.55 OK
1121 1 1 3.23 3.23 165.45 165.45 OK
1131 1 1 21.58 0.16 201.54 0 OK
1132 1 1 1.31 9.37 29.35 214.22 OK
1133 1 1 21.24 3.72 219.52 40.64 OK
1134 1 1 0.69 7.41 21.9 212.34 OK
1141 1 1 30.67 0.92 198.88 6.97 OK
1142 1 1 9.99 6.38 188.97 120.71 OK
1143 1 1 9.26 10.13 154.25 169.47 OK
1144 1 1 11.43 4.15 214.32 76.17 OK
1145 1 1 12.14 3.27 216.93 56.91 OK
1146 1 1 32.83 6.56 224.58 44.14 OK
1147 1 1 9.27 6.64 183.73 129.21 OK
1148 1 1 11.41 13.94 145.94 180.03 OK
1151 1 1 14.29 1.6 214.91 23.7 OK
1152 1 1 3.42 6.76 102.4 201.62 OK
1153 1 1 11.4 4.86 210.38 90.33 OK
1154 1 1 3.05 3.3 159.14 170.79 OK
1161 1 1 5.74 1.92 206.95 67.8 OK
6 1162 1 1 5.73 0.67 209.78 26.31 OK
1163 1 1 5.43 2.35 204.79 89.81 OK
1164 1 1 5.44 1.67 211.36 66.3 OK
1165 1 1 1.83 5.1 75.42 207.26 OK
1166 1 1 1.81 3.54 102.18 197.05 OK
1167 1 1 1.52 5.23 62.48 211.76 OK
1168 1 1 1.54 3.42 90.14 202.21 OK
1171 1 1 19.25 6.02 204.59 63.9 OK
1172 1 1 19.34 2.64 205.98 30.11 OK
1173 1 1 2.07 2.07 164.08 164.08 OK
1174 1 1 1.78 2.15 147.86 175.89 OK
1175 1 1 12.83 8.29 188.49 120.62 OK
1176 1 1 13.12 2.98 208.64 47.36 OK
1177 1 1 7.42 6.85 168.32 157.83 OK
1178 1 1 7.71 4.42 193.47 110.26 OK
1179 1 1 3.87 3.41 175.96 152.07 OK
1180 1 1 4.02 7.64 103.6 199.48 OK
1181 1 1 21.29 5.81 220.98 60.14 OK
1182 1 1 21.44 8.91 212.12 88.44 OK
1183 1 1 9.8 4.36 208.5 92.54 OK
1184 1 1 10.29 13.01 142.99 181.04 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 40

1185 1 1 15.03 5.2 216.65 75.02 OK


1186 1 1 15.51 13.39 178.29 151.38 OK
1191 1 1 9.25 0.98 209.49 23.69 OK
1192 1 1 3.85 3.64 168.94 158.18 OK
1193 1 1 5.87 0.42 211.39 14.95 OK
1194 1 1 7.23 4.21 193.59 114.17 OK
1195 1 1 10.56 3.13 205.16 59.57 OK
1196 1 1 1.28 1.28 163.06 163.06 OK
1197 1 1 5.25 0.79 211.08 32.48 OK
1198 1 1 6.47 3.35 199.74 101.21 OK

2.3.2 Force Check unit (kN )


Pier L/C# SFz fPs fPnmax Result
1111 -1128.37 3829.51 165.87 OK
1112 -1206.83 3829.51 -18.51 OK
1121 -1168.93 3829.51 80.12 OK
1131 -1146.56 3829.51 127.43 OK
1132 -1196.49 3829.51 21.85 OK
1133 -1206.83 3829.51 -62.01 OK
1134 -1186.22 3829.51 43.56 OK
1141 -1094.78 3829.51 236.89 OK
1142 -1169.53 3829.51 78.86 OK
1143 -1144.72 3829.51 131.31 OK
1144 -1206.83 3829.51 -26.72 OK
1145 -1184.38 3829.51 47.45 OK
1146 -1206.83 3829.51 -110.58 OK
1147 -1134.45 3829.51 153.03 OK
1
1148 -1206.83 3829.51 -5.01 OK
1151 -1142.05 3829.51 136.96 OK
1152 -1172.01 3829.51 73.61 OK
1153 -1195.81 3829.51 23.29 OK
1154 -1165.85 3829.51 86.64 OK
1161 -1180.1 3829.51 56.5 OK
1162 -1176.93 3829.51 63.21 OK
1163 -1206.83 3829.51 -6.96 OK
1164 -1206.83 3829.51 -0.25 OK
1165 -1194.31 3829.51 26.46 OK
1166 -1183.73 3829.51 48.83 OK
1167 -1203.31 3829.51 7.43 OK
1168 -1192.74 3829.51 29.79 OK
1171 -1111.47 3829.51 201.61 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 41

1172 -1106.61 3829.51 211.88 OK


1173 -1157.98 3829.51 103.27 OK
1174 -1153.13 3829.51 113.54 OK
1175 -1133.41 3829.51 155.22 OK
1176 -1117.23 3829.51 189.43 OK
1177 -1147.37 3829.51 125.71 OK
1178 -1131.18 3829.51 159.93 OK
1179 -1193.95 3829.51 27.22 OK
1180 -1189.19 3829.51 37.28 OK
1181 -1206.83 3829.51 -72.45 OK
1182 -1206.83 3829.51 -62.38 OK
1183 -1206.83 3829.51 -19.41 OK
1184 -1200.14 3829.51 14.14 OK
1185 -1206.83 3829.51 -49.31 OK
1186 -1206.83 3829.51 -15.76 OK
1191 -1154.7 3829.51 110.2 OK
1192 -1202.04 3829.51 10.12 OK
1193 -1162.88 3829.51 92.92 OK
1194 -1206.83 3829.51 -7.17 OK
1195 -1153.61 3829.51 112.51 OK
1196 -1195.97 3829.51 22.96 OK
1197 -1165.49 3829.51 87.39 OK
1198 -1206.83 3829.51 -2.16 OK
1111 -1165.57 3829.51 87.22 OK
1112 -1120.6 3829.51 182.31 OK
1121 -1160.51 3829.51 97.92 OK
1131 -1206.83 3829.51 -60.77 OK
1132 -1195.9 3829.51 23.1 OK
1133 -1145.97 3829.51 128.66 OK
1134 -1185.64 3829.51 44.79 OK
1141 -1206.83 3829.51 -19.96 OK
1142 -1177.72 3829.51 61.55 OK
2
1143 -1176.59 3829.51 63.92 OK
1144 -1138.04 3829.51 145.42 OK
1145 -1126.67 3829.51 169.48 OK
1146 -1088.11 3829.51 250.98 OK
1147 -1166.34 3829.51 85.6 OK
1148 -1127.79 3829.51 167.11 OK
1151 -1187.39 3829.51 41.09 OK
1152 -1163.59 3829.51 91.41 OK
1153 -1133.63 3829.51 154.75 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 42

1154 -1157.44 3829.51 104.42 OK


1161 -1206.83 3829.51 -5.94 OK
1162 -1206.42 3829.51 0.86 OK
1163 -1179.62 3829.51 57.53 OK
1164 -1176.4 3829.51 64.32 OK
1165 -1202.88 3829.51 8.35 OK
1166 -1192.16 3829.51 31 OK
1167 -1193.87 3829.51 27.39 OK
1168 -1183.16 3829.51 50.04 OK
1171 -1193.21 3829.51 28.78 OK
1172 -1188.57 3829.51 38.6 OK
1173 -1146.7 3829.51 127.12 OK
1174 -1142.06 3829.51 136.94 OK
1175 -1182.35 3829.51 51.74 OK
1176 -1166.87 3829.51 84.47 OK
1177 -1168.4 3829.51 81.24 OK
1178 -1152.92 3829.51 113.97 OK
1179 -1151.05 3829.51 117.93 OK
1180 -1145.91 3829.51 128.8 OK
1181 -1103.91 3829.51 217.59 OK
1182 -1098.77 3829.51 228.46 OK
1183 -1140.55 3829.51 140.12 OK
1184 -1123.41 3829.51 176.37 OK
1185 -1126.41 3829.51 170.02 OK
1186 -1109.27 3829.51 206.26 OK
1191 -1193.97 3829.51 27.18 OK
1192 -1169.55 3829.51 78.81 OK
1193 -1183.06 3829.51 50.25 OK
1194 -1158.64 3829.51 101.87 OK
1195 -1205.23 3829.51 3.37 OK
1196 -1183.38 3829.51 49.56 OK
1197 -1183.51 3829.51 49.3 OK
1198 -1161.66 3829.51 95.49 OK
1111 -1160.96 3829.51 96.97 OK
1112 -1206.83 3829.51 -16.91 OK
1121 -1173.59 3829.51 70.27 OK
1131 -1147.31 3829.51 125.83 OK
3
1132 -1190.03 3829.51 35.51 OK
1133 -1206.83 3829.51 -54.89 OK
1134 -1190.07 3829.51 35.43 OK
1141 -1124.77 3829.51 173.48 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 43

1142 -1170.94 3829.51 75.86 OK


1143 -1167.49 3829.51 83.16 OK
1144 -1206.83 3829.51 -14.46 OK
1145 -1206.83 3829.51 -7.24 OK
1146 -1206.83 3829.51 -104.86 OK
1147 -1167.53 3829.51 83.07 OK
1148 -1206.83 3829.51 -14.54 OK
1151 -1147.95 3829.51 124.48 OK
1152 -1173.58 3829.51 70.29 OK
1153 -1199.23 3829.51 16.05 OK
1154 -1173.6 3829.51 70.24 OK
1161 -1177.57 3829.51 61.86 OK
1162 -1177.57 3829.51 61.85 OK
1163 -1206.83 3829.51 -0.84 OK
1164 -1206.83 3829.51 -0.85 OK
1165 -1187.95 3829.51 39.92 OK
1166 -1187.95 3829.51 39.9 OK
1167 -1196.84 3829.51 21.11 OK
1168 -1196.85 3829.51 21.09 OK
1171 -1141.04 3829.51 139.08 OK
1172 -1141.01 3829.51 139.14 OK
1173 -1185.5 3829.51 45.1 OK
1174 -1185.46 3829.51 45.16 OK
1175 -1156.64 3829.51 106.11 OK
1176 -1156.53 3829.51 106.33 OK
1177 -1169.97 3829.51 77.91 OK
1178 -1169.87 3829.51 78.13 OK
1179 -1191.31 3829.51 32.81 OK
1180 -1191.27 3829.51 32.9 OK
1181 -1206.83 3829.51 -65.03 OK
1182 -1206.83 3829.51 -64.95 OK
1183 -1206.83 3829.51 -1.53 OK
1184 -1206.83 3829.51 -1.25 OK
1185 -1206.83 3829.51 -30.89 OK
1186 -1206.83 3829.51 -30.6 OK
1191 -1172.69 3829.51 72.18 OK
1192 -1201.93 3829.51 10.35 OK
1193 -1181.92 3829.51 52.66 OK
1194 -1206.83 3829.51 -9.16 OK
1195 -1168.21 3829.51 81.64 OK
1196 -1194.37 3829.51 26.33 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 44

1197 -1184.51 3829.51 47.17 OK


1198 -1206.83 3829.51 -8.14 OK
1111 -1202.58 3829.51 8.98 OK
1112 -1132.07 3829.51 158.05 OK
1121 -1167.01 3829.51 84.17 OK
1131 -1206.83 3829.51 -53.76 OK
1132 -1189.49 3829.51 36.65 OK
1133 -1146.77 3829.51 126.97 OK
1134 -1189.53 3829.51 36.56 OK
1141 -1206.83 3829.51 -82.67 OK
1142 -1185.49 3829.51 45.11 OK
1143 -1203.17 3829.51 7.74 OK
1144 -1142.73 3829.51 135.52 OK
1145 -1160.45 3829.51 98.06 OK
1146 -1100.01 3829.51 225.84 OK
1147 -1203.21 3829.51 7.65 OK
1148 -1142.77 3829.51 135.43 OK
1151 -1192.66 3829.51 29.96 OK
1152 -1167 3829.51 84.2 OK
1153 -1141.37 3829.51 138.39 OK
1154 -1167.03 3829.51 84.15 OK
4 1161 -1206.76 3829.51 0.13 OK
1162 -1206.77 3829.51 0.13 OK
1163 -1177.11 3829.51 62.83 OK
1164 -1177.11 3829.51 62.83 OK
1165 -1196.38 3829.51 22.08 OK
1166 -1196.39 3829.51 22.07 OK
1167 -1187.49 3829.51 40.89 OK
1168 -1187.49 3829.51 40.88 OK
1171 -1206.83 3829.51 -38.58 OK
1172 -1206.83 3829.51 -38.34 OK
1173 -1180.62 3829.51 55.4 OK
1174 -1180.51 3829.51 55.64 OK
1175 -1206.83 3829.51 -5.97 OK
1176 -1206.83 3829.51 -5.16 OK
1177 -1196.32 3829.51 22.22 OK
1178 -1195.93 3829.51 23.03 OK
1179 -1158.95 3829.51 101.22 OK
1180 -1158.94 3829.51 101.23 OK
1181 -1112.67 3829.51 199.07 OK
1182 -1112.66 3829.51 199.08 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 45

1183 -1142.76 3829.51 135.45 OK


1184 -1142.74 3829.51 135.5 OK
1185 -1128.88 3829.51 164.8 OK
1186 -1128.85 3829.51 164.85 OK
1191 -1206.83 3829.51 -14.66 OK
1192 -1175.48 3829.51 66.26 OK
1193 -1204.51 3829.51 4.89 OK
1194 -1166.24 3829.51 85.82 OK
1195 -1206.83 3829.51 -30.17 OK
1196 -1186.85 3829.51 42.23 OK
1197 -1204.73 3829.51 4.43 OK
1198 -1170.48 3829.51 76.84 OK
1111 -1162.27 3829.51 94.19 OK
1112 -1206.83 3829.51 -17.4 OK
1121 -1154.9 3829.51 109.78 OK
1131 -1146.33 3829.51 127.9 OK
1132 -1185.9 3829.51 44.24 OK
1133 -1206.83 3829.51 -61.05 OK
1134 -1196.13 3829.51 22.61 OK
1141 -1123.95 3829.51 175.22 OK
1142 -1169.19 3829.51 79.57 OK
1143 -1163.52 3829.51 91.55 OK
1144 -1206.83 3829.51 -4.1 OK
1145 -1206.83 3829.51 -13.74 OK
1146 -1206.83 3829.51 -109.39 OK
1147 -1173.75 3829.51 69.92 OK
5 1148 -1206.83 3829.51 -25.73 OK
1151 -1128.09 3829.51 166.47 OK
1152 -1151.83 3829.51 116.27 OK
1153 -1181.71 3829.51 53.1 OK
1154 -1157.97 3829.51 103.29 OK
1161 -1176.67 3829.51 63.75 OK
1162 -1179.84 3829.51 57.05 OK
1163 -1206.62 3829.51 0.44 OK
1164 -1206.83 3829.51 -6.26 OK
1165 -1183.45 3829.51 49.42 OK
1166 -1194.02 3829.51 27.07 OK
1167 -1192.44 3829.51 30.42 OK
1168 -1203.01 3829.51 8.07 OK
1171 -1140.36 3829.51 140.52 OK
1172 -1145.25 3829.51 130.19 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 46

1173 -1183.76 3829.51 48.78 OK


1174 -1188.64 3829.51 38.45 OK
1175 -1149.85 3829.51 120.46 OK
1176 -1166.14 3829.51 86.03 OK
1177 -1162.87 3829.51 92.94 OK
1178 -1179.16 3829.51 58.5 OK
1179 -1189.29 3829.51 37.08 OK
1180 -1194.09 3829.51 26.93 OK
1181 -1206.83 3829.51 -59.98 OK
1182 -1206.83 3829.51 -70.13 OK
1183 -1199.75 3829.51 14.95 OK
1184 -1206.83 3829.51 -18.89 OK
1185 -1206.83 3829.51 -14.17 OK
1186 -1206.83 3829.51 -48.01 OK
1191 -1173.3 3829.51 70.89 OK
1192 -1201.95 3829.51 10.31 OK
1193 -1184.01 3829.51 48.24 OK
1194 -1206.83 3829.51 -12.34 OK
1195 -1167.17 3829.51 83.85 OK
1196 -1192.8 3829.51 29.65 OK
1197 -1188.45 3829.51 38.85 OK
1198 -1206.83 3829.51 -15.35 OK
1111 -1196.27 3829.51 22.33 OK
1112 -1133.09 3829.51 155.9 OK
1121 -1153.65 3829.51 112.44 OK
1131 -1206.83 3829.51 -59.68 OK
1132 -1185.26 3829.51 45.59 OK
1133 -1145.68 3829.51 129.27 OK
1134 -1195.48 3829.51 23.99 OK
1141 -1206.83 3829.51 -75.34 OK
1142 -1188.31 3829.51 39.16 OK
6 1143 -1192.67 3829.51 29.94 OK
1144 -1138.51 3829.51 144.43 OK
1145 -1153.09 3829.51 113.61 OK
1146 -1098.93 3829.51 228.11 OK
1147 -1202.88 3829.51 8.34 OK
1148 -1148.73 3829.51 122.83 OK
1151 -1180.46 3829.51 55.75 OK
1152 -1150.58 3829.51 118.92 OK
1153 -1126.83 3829.51 169.12 OK
1154 -1156.71 3829.51 105.96 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 47

1161 -1206.04 3829.51 1.66 OK


1162 -1206.83 3829.51 -5.13 OK
1163 -1176.09 3829.51 64.98 OK
1164 -1179.31 3829.51 58.18 OK
1165 -1191.81 3829.51 31.75 OK
1166 -1202.52 3829.51 9.11 OK
1167 -1182.83 3829.51 50.74 OK
1168 -1193.54 3829.51 28.1 OK
1171 -1206.83 3829.51 -19.63 OK
1172 -1206.83 3829.51 -29.69 OK
1173 -1172.72 3829.51 72.12 OK
1174 -1177.48 3829.51 62.05 OK
1175 -1195.37 3829.51 24.22 OK
1176 -1206.83 3829.51 -9.32 OK
1177 -1182.35 3829.51 51.74 OK
1178 -1198.22 3829.51 18.2 OK
1179 -1157.15 3829.51 105.02 OK
1180 -1162.3 3829.51 94.13 OK
1181 -1111.24 3829.51 202.08 OK
1182 -1116.39 3829.51 191.2 OK
1183 -1135.08 3829.51 151.7 OK
1184 -1152.24 3829.51 115.4 OK
1185 -1121.3 3829.51 180.81 OK
1186 -1138.47 3829.51 144.52 OK
1191 -1206.83 3829.51 -7.63 OK
1192 -1176.14 3829.51 64.88 OK
1193 -1202.48 3829.51 9.2 OK
1194 -1168.18 3829.51 81.71 OK
1195 -1206.83 3829.51 -20.21 OK
1196 -1185.7 3829.51 44.67 OK
1197 -1205.01 3829.51 3.84 OK
1198 -1174.32 3829.51 68.72 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 48

3. ONE-WAY SHEAR
3.1 FORMULA
ACI 318-05 CODE 11.3.1.1
- For members subject to shear and flexure only.
- Vc = 2 fck Bw d (eq 11-3)
Av fy d
- Vs = (eq 11-15)
s
- Vu <= f Vc + f Vs , f = 0.75 (eq 11-1)
- When, Value of f Vs shall not exceed f 8 fck Bw d (Vs max)

3.2 ONE-WAY SHEAR Unit(kN)


P. Name Dir. LC# fVc fVs fVs max Vu Result
1111 112.973 158.952 451.893 11.165 OK
1112 112.973 158.952 451.893 0.963 OK
1121 112.973 158.952 451.893 1.31 OK
1131 112.973 158.952 451.893 1.22 OK
1132 112.973 158.952 451.893 6.2 OK
1133 112.973 158.952 451.893 0.39 OK
1134 112.973 158.952 451.893 7.81 OK
1141 112.973 158.952 451.893 9.985 OK
1142 112.973 158.952 451.893 1.241 OK
1143 112.973 158.952 451.893 2.565 OK
1144 112.973 158.952 451.893 6.179 OK
1145 112.973 158.952 451.893 9.155 OK
1146 112.973 158.952 451.893 0.411 OK
1147 112.973 158.952 451.893 16.575 OK
1 X
1148 112.973 158.952 451.893 7.831 OK
1151 112.973 158.952 451.893 1.559 OK
1152 112.973 158.952 451.893 2.893 OK
1153 112.973 158.952 451.893 1.061 OK
1154 112.973 158.952 451.893 5.513 OK
1161 112.973 158.952 451.893 0.249 OK
1162 112.973 158.952 451.893 1.813 OK
1163 112.973 158.952 451.893 0.429 OK
1164 112.973 158.952 451.893 1.633 OK
1165 112.973 158.952 451.893 2.718 OK
1166 112.973 158.952 451.893 4.156 OK
1167 112.973 158.952 451.893 2.772 OK
1168 112.973 158.952 451.893 4.102 OK
1171 112.973 158.952 451.893 11.442 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 49

1172 112.973 158.952 451.893 14.618 OK


1173 112.973 158.952 451.893 6.596 OK
1174 112.973 158.952 451.893 9.772 OK
1175 112.973 158.952 451.893 6.041 OK
1176 112.973 158.952 451.893 16.627 OK
1177 112.973 158.952 451.893 4.587 OK
1178 112.973 158.952 451.893 15.173 OK
1179 112.973 158.952 451.893 0.498 OK
1180 112.973 158.952 451.893 3.222 OK
1181 112.973 158.952 451.893 1.392 OK
1182 112.973 158.952 451.893 1.332 OK
X 1183 112.973 158.952 451.893 3.34 OK
1184 112.973 158.952 451.893 5.738 OK
1185 112.973 158.952 451.893 3.907 OK
1186 112.973 158.952 451.893 5.171 OK
1191 112.973 158.952 451.893 6.141 OK
1192 112.973 158.952 451.893 0.603 OK
1193 112.973 158.952 451.893 6.604 OK
1194 112.973 158.952 451.893 1.066 OK
1195 112.973 158.952 451.893 3.617 OK
1196 112.973 158.952 451.893 1.338 OK
1197 112.973 158.952 451.893 5.49 OK
1198 112.973 158.952 451.893 0.535 OK
1111 112.973 158.952 451.893 4.077 OK
1112 112.973 158.952 451.893 8.978 OK
1121 112.973 158.952 451.893 0.258 OK
1131 112.973 158.952 451.893 17.929 OK
1132 112.973 158.952 451.893 0.006 OK
1133 112.973 158.952 451.893 17.935 OK
1134 112.973 158.952 451.893 0 OK
1141 112.973 158.952 451.893 21.426 OK
1142 112.973 158.952 451.893 10.236 OK
Y
1143 112.973 158.952 451.893 3.491 OK
1144 112.973 158.952 451.893 7.699 OK
1145 112.973 158.952 451.893 14.438 OK
1146 112.973 158.952 451.893 25.628 OK
1147 112.973 158.952 451.893 3.497 OK
1148 112.973 158.952 451.893 7.693 OK
1151 112.973 158.952 451.893 10.501 OK
1152 112.973 158.952 451.893 0.26 OK
1153 112.973 158.952 451.893 11.017 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 50

1154 112.973 158.952 451.893 0.256 OK


1161 112.973 158.952 451.893 4.612 OK
1162 112.973 158.952 451.893 4.635 OK
1163 112.973 158.952 451.893 4.64 OK
1164 112.973 158.952 451.893 4.617 OK
1165 112.973 158.952 451.893 1.347 OK
1166 112.973 158.952 451.893 1.423 OK
1167 112.973 158.952 451.893 1.428 OK
1168 112.973 158.952 451.893 1.352 OK
1171 112.973 158.952 451.893 9.561 OK
1172 112.973 158.952 451.893 9.509 OK
1173 112.973 158.952 451.893 1.763 OK
1174 112.973 158.952 451.893 1.815 OK
1175 112.973 158.952 451.893 5.658 OK
1176 112.973 158.952 451.893 5.486 OK
1177 112.973 158.952 451.893 2.26 OK
Y 1178 112.973 158.952 451.893 2.088 OK
1179 112.973 158.952 451.893 2.057 OK
1180 112.973 158.952 451.893 1.905 OK
1181 112.973 158.952 451.893 15.153 OK
1182 112.973 158.952 451.893 15.001 OK
1183 112.973 158.952 451.893 6.819 OK
1184 112.973 158.952 451.893 6.311 OK
1185 112.973 158.952 451.893 10.748 OK
1186 112.973 158.952 451.893 10.24 OK
1191 112.973 158.952 451.893 5.033 OK
1192 112.973 158.952 451.893 2.054 OK
1193 112.973 158.952 451.893 2.223 OK
1194 112.973 158.952 451.893 4.864 OK
1195 112.973 158.952 451.893 6.396 OK
1196 112.973 158.952 451.893 0.055 OK
1197 112.973 158.952 451.893 2.013 OK
1198 112.973 158.952 451.893 4.328 OK
1111 112.973 158.952 451.893 0.568 OK
1112 112.973 158.952 451.893 8.903 OK
1121 112.973 158.952 451.893 1.177 OK
1131 112.973 158.952 451.893 0.399 OK
2 X
1132 112.973 158.952 451.893 6.174 OK
1133 112.973 158.952 451.893 1.229 OK
1134 112.973 158.952 451.893 7.803 OK
1141 112.973 158.952 451.893 0.072 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 51

1142 112.973 158.952 451.893 7.216 OK


1143 112.973 158.952 451.893 6.502 OK
1144 112.973 158.952 451.893 0.642 OK
1145 112.973 158.952 451.893 0.902 OK
1146 112.973 158.952 451.893 8.046 OK
1147 112.973 158.952 451.893 7.476 OK
1148 112.973 158.952 451.893 14.62 OK
1151 112.973 158.952 451.893 0.928 OK
1152 112.973 158.952 451.893 3.016 OK
1153 112.973 158.952 451.893 1.426 OK
1154 112.973 158.952 451.893 5.371 OK
1161 112.973 158.952 451.893 0.467 OK
1162 112.973 158.952 451.893 1.688 OK
1163 112.973 158.952 451.893 0.287 OK
1164 112.973 158.952 451.893 1.868 OK
1165 112.973 158.952 451.893 2.92 OK
1166 112.973 158.952 451.893 4.266 OK
1167 112.973 158.952 451.893 2.866 OK
1168 112.973 158.952 451.893 4.32 OK
1171 112.973 158.952 451.893 3.283 OK
X 1172 112.973 158.952 451.893 0.483 OK
1173 112.973 158.952 451.893 1.563 OK
1174 112.973 158.952 451.893 4.363 OK
1175 112.973 158.952 451.893 4.855 OK
1176 112.973 158.952 451.893 4.481 OK
1177 112.973 158.952 451.893 3.401 OK
1178 112.973 158.952 451.893 5.935 OK
1179 112.973 158.952 451.893 5.759 OK
1180 112.973 158.952 451.893 9.266 OK
1181 112.973 158.952 451.893 7.649 OK
1182 112.973 158.952 451.893 11.156 OK
1183 112.973 158.952 451.893 2.328 OK
1184 112.973 158.952 451.893 14.02 OK
1185 112.973 158.952 451.893 2.895 OK
1186 112.973 158.952 451.893 14.587 OK
1191 112.973 158.952 451.893 0.229 OK
1192 112.973 158.952 451.893 4.753 OK
1193 112.973 158.952 451.893 0.882 OK
1194 112.973 158.952 451.893 5.406 OK
1195 112.973 158.952 451.893 1.812 OK
1196 112.973 158.952 451.893 2.237 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 52

1197 112.973 158.952 451.893 0.448 OK


X
1198 112.973 158.952 451.893 4.496 OK
1111 112.973 158.952 451.893 4.777 OK
1112 112.973 158.952 451.893 8.816 OK
1121 112.973 158.952 451.893 0.346 OK
1131 112.973 158.952 451.893 17.936 OK
1132 112.973 158.952 451.893 0.012 OK
1133 112.973 158.952 451.893 17.93 OK
1134 112.973 158.952 451.893 0.006 OK
1141 112.973 158.952 451.893 22.027 OK
1142 112.973 158.952 451.893 10.377 OK
1143 112.973 158.952 451.893 4.103 OK
1144 112.973 158.952 451.893 7.547 OK
1145 112.973 158.952 451.893 13.839 OK
1146 112.973 158.952 451.893 25.489 OK
1147 112.973 158.952 451.893 4.085 OK
1148 112.973 158.952 451.893 7.565 OK
1151 112.973 158.952 451.893 11.105 OK
1152 112.973 158.952 451.893 0.351 OK
1153 112.973 158.952 451.893 10.414 OK
1154 112.973 158.952 451.893 0.34 OK
Y 1161 112.973 158.952 451.893 4.626 OK
1162 112.973 158.952 451.893 4.631 OK
1163 112.973 158.952 451.893 4.626 OK
1164 112.973 158.952 451.893 4.621 OK
1165 112.973 158.952 451.893 1.381 OK
1166 112.973 158.952 451.893 1.399 OK
1167 112.973 158.952 451.893 1.394 OK
1168 112.973 158.952 451.893 1.376 OK
1171 112.973 158.952 451.893 10.24 OK
1172 112.973 158.952 451.893 10.16 OK
1173 112.973 158.952 451.893 1.084 OK
1174 112.973 158.952 451.893 1.164 OK
1175 112.973 158.952 451.893 6.369 OK
1176 112.973 158.952 451.893 6.105 OK
1177 112.973 158.952 451.893 2.971 OK
1178 112.973 158.952 451.893 2.707 OK
1179 112.973 158.952 451.893 1.893 OK
1180 112.973 158.952 451.893 1.769 OK
1181 112.973 158.952 451.893 14.981 OK
1182 112.973 158.952 451.893 14.857 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 53

1183 112.973 158.952 451.893 6.619 OK


1184 112.973 158.952 451.893 6.205 OK
1185 112.973 158.952 451.893 10.545 OK
1186 112.973 158.952 451.893 10.131 OK
1191 112.973 158.952 451.893 5.413 OK
1192 112.973 158.952 451.893 1.965 OK
Y
1193 112.973 158.952 451.893 2.593 OK
1194 112.973 158.952 451.893 4.786 OK
1195 112.973 158.952 451.893 6.742 OK
1196 112.973 158.952 451.893 0.139 OK
1197 112.973 158.952 451.893 2.324 OK
1198 112.973 158.952 451.893 4.278 OK
1111 112.973 158.952 451.893 19.246 OK
1112 112.973 158.952 451.893 0.018 OK
1121 112.973 158.952 451.893 0.298 OK
1131 112.973 158.952 451.893 0.278 OK
1132 112.973 158.952 451.893 13.192 OK
1133 112.973 158.952 451.893 0.274 OK
1134 112.973 158.952 451.893 13.188 OK
1141 112.973 158.952 451.893 16.22 OK
1142 112.973 158.952 451.893 0.26 OK
1143 112.973 158.952 451.893 3.306 OK
1144 112.973 158.952 451.893 13.174 OK
1145 112.973 158.952 451.893 16.772 OK
1146 112.973 158.952 451.893 0.292 OK
1147 112.973 158.952 451.893 29.686 OK
3 X 1148 112.973 158.952 451.893 13.206 OK
1151 112.973 158.952 451.893 0.132 OK
1152 112.973 158.952 451.893 7.616 OK
1153 112.973 158.952 451.893 0.463 OK
1154 112.973 158.952 451.893 8.212 OK
1161 112.973 158.952 451.893 2.155 OK
1162 112.973 158.952 451.893 1.973 OK
1163 112.973 158.952 451.893 1.977 OK
1164 112.973 158.952 451.893 2.151 OK
1165 112.973 158.952 451.893 6.908 OK
1166 112.973 158.952 451.893 6.852 OK
1167 112.973 158.952 451.893 6.855 OK
1168 112.973 158.952 451.893 6.905 OK
1171 112.973 158.952 451.893 19.556 OK
1172 112.973 158.952 451.893 25.916 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 54

1173 112.973 158.952 451.893 10.652 OK


1174 112.973 158.952 451.893 17.012 OK
1175 112.973 158.952 451.893 9.019 OK
1176 112.973 158.952 451.893 30.219 OK
1177 112.973 158.952 451.893 6.348 OK
1178 112.973 158.952 451.893 27.548 OK
1179 112.973 158.952 451.893 1.224 OK
1180 112.973 158.952 451.893 4.228 OK
1181 112.973 158.952 451.893 4.194 OK
1182 112.973 158.952 451.893 1.258 OK
1183 112.973 158.952 451.893 8.623 OK
X
1184 112.973 158.952 451.893 9.549 OK
1185 112.973 158.952 451.893 9.514 OK
1186 112.973 158.952 451.893 8.658 OK
1191 112.973 158.952 451.893 10.424 OK
1192 112.973 158.952 451.893 0.014 OK
1193 112.973 158.952 451.893 11.57 OK
1194 112.973 158.952 451.893 1.132 OK
1195 112.973 158.952 451.893 5.649 OK
1196 112.973 158.952 451.893 3.69 OK
1197 112.973 158.952 451.893 9.823 OK
1198 112.973 158.952 451.893 0.483 OK
1111 112.973 158.952 451.893 6.093 OK
1112 112.973 158.952 451.893 10.741 OK
1121 112.973 158.952 451.893 0.494 OK
1131 112.973 158.952 451.893 20.653 OK
1132 112.973 158.952 451.893 0.098 OK
1133 112.973 158.952 451.893 20.849 OK
1134 112.973 158.952 451.893 0.098 OK
1141 112.973 158.952 451.893 25.973 OK
1142 112.973 158.952 451.893 11.545 OK
Y 1143 112.973 158.952 451.893 5.222 OK
1144 112.973 158.952 451.893 9.206 OK
1145 112.973 158.952 451.893 15.529 OK
1146 112.973 158.952 451.893 29.957 OK
1147 112.973 158.952 451.893 5.222 OK
1148 112.973 158.952 451.893 9.206 OK
1151 112.973 158.952 451.893 11.956 OK
1152 112.973 158.952 451.893 0.494 OK
1153 112.973 158.952 451.893 12.945 OK
1154 112.973 158.952 451.893 0.494 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 55

1161 112.973 158.952 451.893 4.713 OK


1162 112.973 158.952 451.893 4.713 OK
1163 112.973 158.952 451.893 4.881 OK
1164 112.973 158.952 451.893 4.881 OK
1165 112.973 158.952 451.893 1.355 OK
1166 112.973 158.952 451.893 1.355 OK
1167 112.973 158.952 451.893 1.523 OK
1168 112.973 158.952 451.893 1.523 OK
1171 112.973 158.952 451.893 12.569 OK
1172 112.973 158.952 451.893 12.575 OK
1173 112.973 158.952 451.893 0.999 OK
1174 112.973 158.952 451.893 0.993 OK
1175 112.973 158.952 451.893 7.812 OK
1176 112.973 158.952 451.893 7.834 OK
1177 112.973 158.952 451.893 3.742 OK
1178 112.973 158.952 451.893 3.764 OK
Y
1179 112.973 158.952 451.893 3.197 OK
1180 112.973 158.952 451.893 3.199 OK
1181 112.973 158.952 451.893 17.209 OK
1182 112.973 158.952 451.893 17.211 OK
1183 112.973 158.952 451.893 8.098 OK
1184 112.973 158.952 451.893 8.106 OK
1185 112.973 158.952 451.893 12.302 OK
1186 112.973 158.952 451.893 12.31 OK
1191 112.973 158.952 451.893 6.278 OK
1192 112.973 158.952 451.893 2.861 OK
1193 112.973 158.952 451.893 3.308 OK
1194 112.973 158.952 451.893 5.831 OK
1195 112.973 158.952 451.893 7.396 OK
1196 112.973 158.952 451.893 0.78 OK
1197 112.973 158.952 451.893 2.959 OK
1198 112.973 158.952 451.893 5.217 OK
1111 112.973 158.952 451.893 1.557 OK
1112 112.973 158.952 451.893 14.311 OK
1121 112.973 158.952 451.893 0.21 OK
1131 112.973 158.952 451.893 0.28 OK
4 X 1132 112.973 158.952 451.893 13.155 OK
1133 112.973 158.952 451.893 0.272 OK
1134 112.973 158.952 451.893 13.163 OK
1141 112.973 158.952 451.893 1.058 OK
1142 112.973 158.952 451.893 12.542 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 56

1143 112.973 158.952 451.893 14.493 OK


1144 112.973 158.952 451.893 0.893 OK
1145 112.973 158.952 451.893 1.61 OK
1146 112.973 158.952 451.893 11.99 OK
1147 112.973 158.952 451.893 11.825 OK
1148 112.973 158.952 451.893 25.425 OK
1151 112.973 158.952 451.893 0.044 OK
1152 112.973 158.952 451.893 8.105 OK
1153 112.973 158.952 451.893 0.376 OK
1154 112.973 158.952 451.893 7.685 OK
1161 112.973 158.952 451.893 2.066 OK
1162 112.973 158.952 451.893 2.25 OK
1163 112.973 158.952 451.893 2.244 OK
1164 112.973 158.952 451.893 2.072 OK
1165 112.973 158.952 451.893 7.164 OK
1166 112.973 158.952 451.893 7.224 OK
1167 112.973 158.952 451.893 7.218 OK
1168 112.973 158.952 451.893 7.17 OK
1171 112.973 158.952 451.893 8.739 OK
1172 112.973 158.952 451.893 3.123 OK
X 1173 112.973 158.952 451.893 0.165 OK
1174 112.973 158.952 451.893 5.781 OK
1175 112.973 158.952 451.893 12.175 OK
1176 112.973 158.952 451.893 6.545 OK
1177 112.973 158.952 451.893 9.503 OK
1178 112.973 158.952 451.893 9.217 OK
1179 112.973 158.952 451.893 8.593 OK
1180 112.973 158.952 451.893 15.627 OK
1181 112.973 158.952 451.893 11.563 OK
1182 112.973 158.952 451.893 18.597 OK
1183 112.973 158.952 451.893 1.427 OK
1184 112.973 158.952 451.893 24.873 OK
1185 112.973 158.952 451.893 2.318 OK
1186 112.973 158.952 451.893 25.764 OK
1191 112.973 158.952 451.893 0.822 OK
1192 112.973 158.952 451.893 7.792 OK
1193 112.973 158.952 451.893 0.337 OK
1194 112.973 158.952 451.893 8.951 OK
1195 112.973 158.952 451.893 4.398 OK
1196 112.973 158.952 451.893 3.309 OK
1197 112.973 158.952 451.893 0.073 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 57

X 1198 112.973 158.952 451.893 7.634 OK


1111 112.973 158.952 451.893 6.147 OK
1112 112.973 158.952 451.893 10.032 OK
1121 112.973 158.952 451.893 0.545 OK
1131 112.973 158.952 451.893 20.847 OK
1132 112.973 158.952 451.893 0.096 OK
1133 112.973 158.952 451.893 20.655 OK
1134 112.973 158.952 451.893 0.096 OK
1141 112.973 158.952 451.893 26.02 OK
1142 112.973 158.952 451.893 12.152 OK
1143 112.973 158.952 451.893 5.269 OK
1144 112.973 158.952 451.893 8.599 OK
1145 112.973 158.952 451.893 15.482 OK
1146 112.973 158.952 451.893 29.35 OK
1147 112.973 158.952 451.893 5.269 OK
1148 112.973 158.952 451.893 8.599 OK
1151 112.973 158.952 451.893 12.995 OK
1152 112.973 158.952 451.893 0.545 OK
1153 112.973 158.952 451.893 11.906 OK
1154 112.973 158.952 451.893 0.545 OK
1161 112.973 158.952 451.893 4.88 OK
Y
1162 112.973 158.952 451.893 4.88 OK
1163 112.973 158.952 451.893 4.714 OK
1164 112.973 158.952 451.893 4.714 OK
1165 112.973 158.952 451.893 1.522 OK
1166 112.973 158.952 451.893 1.522 OK
1167 112.973 158.952 451.893 1.356 OK
1168 112.973 158.952 451.893 1.356 OK
1171 112.973 158.952 451.893 12.62 OK
1172 112.973 158.952 451.893 12.626 OK
1173 112.973 158.952 451.893 0.946 OK
1174 112.973 158.952 451.893 0.94 OK
1175 112.973 158.952 451.893 7.865 OK
1176 112.973 158.952 451.893 7.885 OK
1177 112.973 158.952 451.893 3.795 OK
1178 112.973 158.952 451.893 3.815 OK
1179 112.973 158.952 451.893 2.523 OK
1180 112.973 158.952 451.893 2.526 OK
1181 112.973 158.952 451.893 16.535 OK
1182 112.973 158.952 451.893 16.538 OK
1183 112.973 158.952 451.893 7.424 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 58

1184 112.973 158.952 451.893 7.434 OK


1185 112.973 158.952 451.893 11.628 OK
1186 112.973 158.952 451.893 11.638 OK
1191 112.973 158.952 451.893 6.307 OK
1192 112.973 158.952 451.893 2.476 OK
Y 1193 112.973 158.952 451.893 3.337 OK
1194 112.973 158.952 451.893 5.446 OK
1195 112.973 158.952 451.893 7.423 OK
1196 112.973 158.952 451.893 0.436 OK
1197 112.973 158.952 451.893 2.986 OK
1198 112.973 158.952 451.893 4.873 OK
1111 112.973 158.952 451.893 8.253 OK
1112 112.973 158.952 451.893 0.956 OK
1121 112.973 158.952 451.893 1.138 OK
1131 112.973 158.952 451.893 1.494 OK
1132 112.973 158.952 451.893 7.815 OK
1133 112.973 158.952 451.893 0.124 OK
1134 112.973 158.952 451.893 6.197 OK
1141 112.973 158.952 451.893 6.389 OK
1142 112.973 158.952 451.893 1.505 OK
1143 112.973 158.952 451.893 0.068 OK
1144 112.973 158.952 451.893 7.826 OK
1145 112.973 158.952 451.893 7.759 OK
1146 112.973 158.952 451.893 0.135 OK
1147 112.973 158.952 451.893 14.08 OK
1148 112.973 158.952 451.893 6.186 OK
5 X
1151 112.973 158.952 451.893 1.549 OK
1152 112.973 158.952 451.893 5.341 OK
1153 112.973 158.952 451.893 0.727 OK
1154 112.973 158.952 451.893 3.066 OK
1161 112.973 158.952 451.893 1.906 OK
1162 112.973 158.952 451.893 0.161 OK
1163 112.973 158.952 451.893 1.552 OK
1164 112.973 158.952 451.893 0.515 OK
1165 112.973 158.952 451.893 4.194 OK
1166 112.973 158.952 451.893 2.696 OK
1167 112.973 158.952 451.893 4.088 OK
1168 112.973 158.952 451.893 2.802 OK
1171 112.973 158.952 451.893 8.242 OK
1172 112.973 158.952 451.893 11.43 OK
1173 112.973 158.952 451.893 4.25 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 59

1174 112.973 158.952 451.893 7.438 OK


1175 112.973 158.952 451.893 3.126 OK
1176 112.973 158.952 451.893 13.752 OK
1177 112.973 158.952 451.893 1.929 OK
1178 112.973 158.952 451.893 12.555 OK
1179 112.973 158.952 451.893 1.746 OK
1180 112.973 158.952 451.893 0.99 OK
1181 112.973 158.952 451.893 2.806 OK
1182 112.973 158.952 451.893 0.07 OK
1183 112.973 158.952 451.893 5.309 OK
X 1184 112.973 158.952 451.893 3.811 OK
1185 112.973 158.952 451.893 5.627 OK
1186 112.973 158.952 451.893 3.493 OK
1191 112.973 158.952 451.893 4.379 OK
1192 112.973 158.952 451.893 0.62 OK
1193 112.973 158.952 451.893 5.023 OK
1194 112.973 158.952 451.893 0.024 OK
1195 112.973 158.952 451.893 1.897 OK
1196 112.973 158.952 451.893 2.577 OK
1197 112.973 158.952 451.893 4.072 OK
1198 112.973 158.952 451.893 0.401 OK
1111 112.973 158.952 451.893 7.755 OK
1112 112.973 158.952 451.893 12.531 OK
1121 112.973 158.952 451.893 1.343 OK
1131 112.973 158.952 451.893 17.699 OK
1132 112.973 158.952 451.893 0.139 OK
1133 112.973 158.952 451.893 17.983 OK
1134 112.973 158.952 451.893 0.145 OK
1141 112.973 158.952 451.893 24.488 OK
1142 112.973 158.952 451.893 7.1 OK
1143 112.973 158.952 451.893 6.65 OK
Y
1144 112.973 158.952 451.893 10.738 OK
1145 112.973 158.952 451.893 11.194 OK
1146 112.973 158.952 451.893 28.582 OK
1147 112.973 158.952 451.893 6.644 OK
1148 112.973 158.952 451.893 10.744 OK
1151 112.973 158.952 451.893 9.362 OK
1152 112.973 158.952 451.893 1.341 OK
1153 112.973 158.952 451.893 12.047 OK
1154 112.973 158.952 451.893 1.345 OK
1161 112.973 158.952 451.893 4.542 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 60

1162 112.973 158.952 451.893 4.519 OK


1163 112.973 158.952 451.893 4.764 OK
1164 112.973 158.952 451.893 4.787 OK
1165 112.973 158.952 451.893 1.312 OK
1166 112.973 158.952 451.893 1.236 OK
1167 112.973 158.952 451.893 1.48 OK
1168 112.973 158.952 451.893 1.556 OK
1171 112.973 158.952 451.893 14.864 OK
1172 112.973 158.952 451.893 14.909 OK
1173 112.973 158.952 451.893 0.176 OK
1174 112.973 158.952 451.893 0.131 OK
1175 112.973 158.952 451.893 9.548 OK
1176 112.973 158.952 451.893 9.698 OK
1177 112.973 158.952 451.893 5.036 OK
1178 112.973 158.952 451.893 5.186 OK
Y 1179 112.973 158.952 451.893 4.572 OK
1180 112.973 158.952 451.893 4.722 OK
1181 112.973 158.952 451.893 19.088 OK
1182 112.973 158.952 451.893 19.238 OK
1183 112.973 158.952 451.893 9.477 OK
1184 112.973 158.952 451.893 9.977 OK
1185 112.973 158.952 451.893 13.832 OK
1186 112.973 158.952 451.893 14.332 OK
1191 112.973 158.952 451.893 7.032 OK
1192 112.973 158.952 451.893 3.981 OK
1193 112.973 158.952 451.893 4.2 OK
1194 112.973 158.952 451.893 6.813 OK
1195 112.973 158.952 451.893 8.2 OK
1196 112.973 158.952 451.893 1.653 OK
1197 112.973 158.952 451.893 3.734 OK
1198 112.973 158.952 451.893 6.119 OK
1111 112.973 158.952 451.893 1.697 OK
1112 112.973 158.952 451.893 5.403 OK
1121 112.973 158.952 451.893 1.441 OK
1131 112.973 158.952 451.893 0.129 OK
1132 112.973 158.952 451.893 7.804 OK
6 X
1133 112.973 158.952 451.893 1.5 OK
1134 112.973 158.952 451.893 6.175 OK
1141 112.973 158.952 451.893 0.769 OK
1142 112.973 158.952 451.893 5.316 OK
1143 112.973 158.952 451.893 8.444 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 61

1144 112.973 158.952 451.893 2.359 OK


1145 112.973 158.952 451.893 2.139 OK
1146 112.973 158.952 451.893 3.946 OK
1147 112.973 158.952 451.893 5.536 OK
1148 112.973 158.952 451.893 11.621 OK
1151 112.973 158.952 451.893 1.03 OK
1152 112.973 158.952 451.893 5.635 OK
1153 112.973 158.952 451.893 1.852 OK
1154 112.973 158.952 451.893 2.753 OK
1161 112.973 158.952 451.893 1.604 OK
1162 112.973 158.952 451.893 0.557 OK
1163 112.973 158.952 451.893 1.958 OK
1164 112.973 158.952 451.893 0.203 OK
1165 112.973 158.952 451.893 4.248 OK
1166 112.973 158.952 451.893 2.954 OK
1167 112.973 158.952 451.893 4.355 OK
1168 112.973 158.952 451.893 2.847 OK
1171 112.973 158.952 451.893 5.017 OK
1172 112.973 158.952 451.893 2.199 OK
1173 112.973 158.952 451.893 1.025 OK
X 1174 112.973 158.952 451.893 1.793 OK
1175 112.973 158.952 451.893 6.907 OK
1176 112.973 158.952 451.893 2.485 OK
1177 112.973 158.952 451.893 5.709 OK
1178 112.973 158.952 451.893 3.683 OK
1179 112.973 158.952 451.893 2.842 OK
1180 112.973 158.952 451.893 6.363 OK
1181 112.973 158.952 451.893 3.902 OK
1182 112.973 158.952 451.893 7.423 OK
1183 112.973 158.952 451.893 0.894 OK
1184 112.973 158.952 451.893 10.84 OK
1185 112.973 158.952 451.893 0.576 OK
1186 112.973 158.952 451.893 11.158 OK
1191 112.973 158.952 451.893 0.82 OK
1192 112.973 158.952 451.893 3.034 OK
1193 112.973 158.952 451.893 0.35 OK
1194 112.973 158.952 451.893 3.504 OK
1195 112.973 158.952 451.893 2.606 OK
1196 112.973 158.952 451.893 0.843 OK
1197 112.973 158.952 451.893 0.656 OK
1198 112.973 158.952 451.893 2.792 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 62

1111 112.973 158.952 451.893 9.008 OK


1112 112.973 158.952 451.893 11.102 OK
1121 112.973 158.952 451.893 1.206 OK
1131 112.973 158.952 451.893 17.985 OK
1132 112.973 158.952 451.893 0.136 OK
1133 112.973 158.952 451.893 17.697 OK
1134 112.973 158.952 451.893 0.152 OK
1141 112.973 158.952 451.893 25.562 OK
1142 112.973 158.952 451.893 8.325 OK
1143 112.973 158.952 451.893 7.713 OK
1144 112.973 158.952 451.893 9.524 OK
1145 112.973 158.952 451.893 10.12 OK
1146 112.973 158.952 451.893 27.357 OK
1147 112.973 158.952 451.893 7.729 OK
1148 112.973 158.952 451.893 9.508 OK
1151 112.973 158.952 451.893 11.911 OK
1152 112.973 158.952 451.893 1.201 OK
1153 112.973 158.952 451.893 9.499 OK
1154 112.973 158.952 451.893 1.211 OK
1161 112.973 158.952 451.893 4.78 OK
Y 1162 112.973 158.952 451.893 4.774 OK
1163 112.973 158.952 451.893 4.526 OK
1164 112.973 158.952 451.893 4.532 OK
1165 112.973 158.952 451.893 1.529 OK
1166 112.973 158.952 451.893 1.511 OK
1167 112.973 158.952 451.893 1.263 OK
1168 112.973 158.952 451.893 1.281 OK
1171 112.973 158.952 451.893 16.041 OK
1172 112.973 158.952 451.893 16.114 OK
1173 112.973 158.952 451.893 1.001 OK
1174 112.973 158.952 451.893 1.074 OK
1175 112.973 158.952 451.893 10.691 OK
1176 112.973 158.952 451.893 10.935 OK
1177 112.973 158.952 451.893 6.179 OK
1178 112.973 158.952 451.893 6.423 OK
1179 112.973 158.952 451.893 3.228 OK
1180 112.973 158.952 451.893 3.35 OK
1181 112.973 158.952 451.893 17.744 OK
1182 112.973 158.952 451.893 17.866 OK
1183 112.973 158.952 451.893 8.167 OK
1184 112.973 158.952 451.893 8.573 OK

Copyright (c) GS E&C. All Rights Reserved


12/09/2022

Project Na. : New Pipe Rack


Calculation Sheet
of Project No. : 186-PRK-4006

Pier Client : BP Page 63

1185 112.973 158.952 451.893 12.521 OK


1186 112.973 158.952 451.893 12.927 OK
1191 112.973 158.952 451.893 7.712 OK
1192 112.973 158.952 451.893 3.205 OK
1193 112.973 158.952 451.893 4.89 OK
Y
1194 112.973 158.952 451.893 6.027 OK
1195 112.973 158.952 451.893 8.803 OK
1196 112.973 158.952 451.893 0.964 OK
1197 112.973 158.952 451.893 4.372 OK
1198 112.973 158.952 451.893 5.396 OK

Copyright (c) GS E&C. All Rights Reserved


ATTACHMENT B
SOIL DATA
( Refer To Doc. No. TEP-900-SDY-CV-BP4-0015)
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Appendix 5 - Shallow foundations


Figure 5.1 - Bearing capacity of shallow foundations - Soft Soil - Shear failure - L/B = 1

Shallow Foundations Bearing Capacity


Shear Failure D = 0.7 m - Drained
320 D = 1.0 m - Drained
D = 1.5 m - Drained
280 FS = 3.00 D = 0.7 m - Undrained
H/V = 0.15 D = 1.0 m - Undrained
240 L/B = 1.00
D = 1.5 m - Undrained
qALLOWABLE (kPa)

200

160

120

80

40

0
0 1 2 3 4
B (m)

Figure 5.2 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 1

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=25mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 1.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 142 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Figure 5.3 - Bearing capacity of shallow foundations - Soft Soil - Shear failure - L/B = 2

Shallow Foundations Bearing Capacity


Shear Failure D = 0.7 m - Drained
320 D = 1.0 m - Drained
D = 1.5 m - Drained
280 FS = 3.00 D = 0.7 m - Undrained
H/V = 0.15 D = 1.0 m - Undrained
240 L/B = 2.00
D = 1.5 m - Undrained
qALLOWABLE (kPa)

200

160

120

80

40

0
0 1 2 3 4
B (m)

Figure 5.4 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 2

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=25mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 2.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 143 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Figure 5.5 - Bearing capacity of shallow foundations - Soft Soil - Shear failure - L/B = 3

Shallow Foundations Bearing Capacity


Shear Failure D = 0.7 m - Drained
320 D = 1.0 m - Drained
D = 1.5 m - Drained
280 FS = 3.00 D = 0.7 m - Undrained
H/V = 0.15
D = 1.0 m - Undrained
240 L/B = 3.00
D = 1.5 m - Undrained
qALLOWABLE (kPa)

200

160

120

80

40

0
0 1 2 3 4
B (m)

Figure 5.6 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 3

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=25mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 3.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 144 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Figure 5.7 - Bearing capacity of shallow foundations - Soft Soil - Shear failure - L/B = 6

Shallow Foundations Bearing Capacity


Shear Failure D = 0.7 m - Drained
320 D = 1.0 m - Drained
D = 1.5 m - Drained
280 FS = 3.00
D = 0.7 m - Undrained
H/V = 0.15
D = 1.0 m - Undrained
L/B = 6.00
240 D = 1.5 m - Undrained
qALLOWABLE (kPa)

200

160

120

80

40

0
0 1 2 3 4
B (m)

Figure 5.8 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 6

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=25mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 6.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 145 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Appendix 6 – Shallow Foundations – Additional settlements calculations


In this chapter, the allowable bearing pressure to be used for the design of foundations is determined
considering values of settlement induced by applied loads not exceeding the maximum allowable
settlement of 35 mm and 50mm.

Figure 6.1 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 1

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=35mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 1.00
0
0 1 2 3 4
B (m)

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=50mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 1.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 146 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Figure 6.2 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 2

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=35mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 2.00
0
0 1 2 3 4
B (m)

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=50mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 2.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 147 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Figure 6.3 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 3

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=35mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 3.00
0
0 1 2 3 4
B (m)

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=50mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 3.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 148 of 153 Rev. B02


© BP p.l.c. BP Internal
Tangguh Expansion Project – LNG EPC
Civil Study For Foundation Engineering Recommendations For BOG, Desalination, Tankage Flare, Access to
Jetty, Interconnecting Middle Road and Interconnecting Pipe Rack ORF to Train-Utility

Figure 6.4 - Bearing capacity of shallow foundations - Soft Soil - Settlements - L/B = 6

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=35mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 6.00
0
0 1 2 3 4
B (m)

Shallow Foundations Bearing Capacity


Long Term Conditions - Settlement Limitation (s=50mm)
320

280
D = 0.7 m

240 D = 1.0 m
qALLOWABLE (kPa)

D = 1.5 m
200

160

120

80

40
L/B = 6.00
0
0 1 2 3 4
B (m)

TEP-900-SDY-CV-BP4-0015 Page 149 of 153 Rev. B02


© BP p.l.c. BP Internal
ATTACHMENT C
PIPE STRESS ANALYSIS (PSA) REPORT
DRY FLARE LINE
(REFER TO DOC. TGH-090-CAL-PP-BEI-0001)
4

CAESAR II 2019 Ver.11.00.00.4800, (Build 190424) Date: JAN 7, 2022 Time: 8:12
Job:: BP_FLARE_VD
Licensed To:: Licensed To:: Edit name in <system>\company.txt

RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints


Various Load Cases

LOAD CASE DEFINITION KEY

CASE 1 (HYD) WW+HP


CASE 2 (OPE) W+T1+P1
CASE 3 (OPE) W+T2+P1
CASE 4 (OPE) W+T3+P1
CASE 5 (OPE) W+T1+P1+F1
CASE 6 (OPE) W+T1+P1+F2
CASE 7 (OPE) W+T1+P1+F3
CASE 8 (OPE) W+T1+P1+F4
CASE 9 (OPE) W+T1+P1+F5
CASE 10 (OPE) W+T1+P1+F6
CASE 11 (SUS) W+P1
CASE 12 (OPE) W+T1+P1+U1
CASE 13 (OPE) W+T1+P1-U1
CASE 14 (OPE) W+T1+P1+U2
CASE 15 (OPE) W+T1+P1-U2
CASE 16 (OPE) W+T1+P1+U3
CASE 17 (OPE) W+T1+P1-U3
CASE 18 (OPE) W+T1+P1+WIN1
CASE 19 (OPE) W+T1+P1+WIN2
CASE 20 (OPE) W+T1+P1+WIN3
CASE 21 (OPE) W+T1+P1+WIN4

Filters Used:
Node Number >= 10 and <= 800
Show only restraints without CNodes
Exclude bi-linear translation (soil) restraints

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm.


TYPE=Rigid
70
+Y;
1(HYD) 1363 -66411 -74 0 0 0 0.008 -0.000 -0.000
5

CAESAR II 2019 Ver.11.00.00.4800, (Build 190424) Date: JAN 7, 2022 Time: 8:12
Job:: BP_FLARE_VD
Licensed To:: Licensed To:: Edit name in <system>\company.txt

RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints


Various Load Cases

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm.


2(OPE) -19073 -75569 -12255 0 0 0 -23.302 -0.000 -14.971
3(OPE) -8030 -50168 -12729 0 0 0 -10.674 -0.000 -16.919
4(OPE) 5152 -39958 10824 0 0 0 0.417 -0.000 0.875
5(OPE) -19073 -75569 -12255 0 0 0 -23.302 -0.000 -14.972
6(OPE) -19073 -75569 -12255 0 0 0 -23.302 -0.000 -14.971
7(OPE) -19073 -75572 -12256 0 0 0 -23.299 -0.000 -14.972
8(OPE) -19070 -75565 -12258 0 0 0 -23.292 -0.000 -14.971
9(OPE) -17599 -78532 -15663 0 0 0 -14.770 -0.000 -13.146
10(OPE) -18746 -74554 -12199 0 0 0 -28.329 -0.000 -18.436
11(SUS) 963 -44744 -108 0 0 0 0.005 -0.000 -0.001
12(OPE) 10302 -86300 -23752 0 0 0 4.294 -0.000 -9.901
13(OPE) -16562 -58137 -5469 0 0 0 -69.947 -0.000 -23.097
14(OPE) -16841 -65502 -10126 0 0 0 -27.574 -0.000 -16.579
15(OPE) -21228 -84842 -14043 0 0 0 -21.167 -0.000 -14.003
16(OPE) -17905 -79868 15923 0 0 0 -39.818 -0.000 35.410
17(OPE) -7875 -70423 -19604 0 0 0 -24.459 -0.000 -60.886
18(OPE) -18184 -78411 -14922 0 0 0 -16.976 -0.000 -13.931
19(OPE) -19164 -73033 -10619 0 0 0 -29.443 -0.000 -16.315
20(OPE) -19780 -75197 -10848 0 0 0 -22.845 -0.000 -12.530
21(OPE) -18427 -75549 -13196 0 0 0 -25.511 -0.000 -18.270
- - - - -
MAX -21228/L15
86300/L12 23752/L12 69.947/L13 0.000/L12 60.886/L17

TYPE=Rigid
75
+Y;
1(HYD) 1123 -44931 -180 0 0 0 0.006 -0.000 -0.001
2(OPE) -1193 -12789 3646 0 0 0 -10.391 -0.000 31.753
3(OPE) -3618 -28334 -7692 0 0 0 -25.852 -0.000 -54.952
4(OPE) -3367 -32926 -9287 0 0 0 -0.174 -0.000 -0.480
5(OPE) -1193 -12789 3646 0 0 0 -10.391 -0.000 31.753
6(OPE) -1193 -12789 3646 0 0 0 -10.391 -0.000 31.753
7(OPE) -1193 -12788 3646 0 0 0 -10.388 -0.000 31.752
8(OPE) -1192 -12787 3646 0 0 0 -10.381 -0.000 31.752
6

CAESAR II 2019 Ver.11.00.00.4800, (Build 190424) Date: JAN 7, 2022 Time: 8:12
Job:: BP_FLARE_VD
Licensed To:: Licensed To:: Edit name in <system>\company.txt

RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints


Various Load Cases

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm.


9(OPE) -195 -11753 3520 0 0 0 -1.852 -0.000 33.473
10(OPE) -1878 -13340 3534 0 0 0 -15.416 -0.000 29.016
11(SUS) 793 -30386 -103 0 0 0 0.005 -0.000 -0.001
12(OPE) 1120 -8748 2373 0 0 0 17.225 -0.000 36.483
13(OPE) -5259 -19002 2200 0 0 0 -57.048 -0.000 23.865
14(OPE) -924 -7137 1931 0 0 0 -14.661 -0.000 30.649
15(OPE) -1393 -18741 5447 0 0 0 -8.257 -0.000 32.298
16(OPE) -1341 -11241 3094 0 0 0 -26.898 -0.000 62.089
17(OPE) -4418 -14892 663 0 0 0 -11.550 -0.000 1.734
18(OPE) -434 -11704 3484 0 0 0 -4.062 -0.000 32.634
19(OPE) -1966 -13751 3627 0 0 0 -16.534 -0.000 30.504
20(OPE) -1092 -12892 3710 0 0 0 -9.934 -0.000 33.760
21(OPE) -1537 -12828 3528 0 0 0 -12.599 -0.000 28.914
-
MAX -5259/L13 -44931/L1 -9287/L4 -0.000/L1
57.048/L13 62.089/L16

TYPE=Rigid
80
+Y;
1(HYD) 1002 -66840 97 0 0 0 0.006 -0.000 0.001
2(OPE) 469 -46664 13991 0 0 0 2.519 -0.000 75.225
3(OPE) -5649 -47562 -13103 0 0 0 -41.033 -0.000 -95.184
4(OPE) -3675 -44667 -12886 0 0 0 -0.766 -0.000 -2.687
5(OPE) 469 -46664 13991 0 0 0 2.519 -0.000 75.225
6(OPE) 469 -46664 13991 0 0 0 2.519 -0.000 75.225
7(OPE) 469 -46670 13993 0 0 0 2.522 -0.000 75.224
8(OPE) 470 -46637 13983 0 0 0 2.529 -0.000 75.223
9(OPE) 2050 -47436 14082 0 0 0 11.067 -0.000 76.025
10(OPE) -473 -46543 13955 0 0 0 -2.505 -0.000 73.924
11(SUS) 708 -45116 69 0 0 0 0.004 -0.000 0.000
12(OPE) 5382 -49380 13802 0 0 0 30.150 -0.000 77.325
13(OPE) -6682 -42262 10775 0 0 0 -44.146 -0.000 71.188
14(OPE) -262 -37406 11219 0 0 0 -1.749 -0.000 74.767
15(OPE) 1029 -55743 16691 0 0 0 4.652 -0.000 75.444
7

CAESAR II 2019 Ver.11.00.00.4800, (Build 190424) Date: JAN 7, 2022 Time: 8:12
Job:: BP_FLARE_VD
Licensed To:: Licensed To:: Edit name in <system>\company.txt

RESTRAINT SUMMARY EXTENDED REPORT: Loads On Restraints


Various Load Cases

Node Load Case FX N. FY N. FZ N. MX N.m. MY N.m. MZ N.m. DX mm. DY mm. DZ mm.


16(OPE) -2283 -47439 14047 0 0 0 -13.979 -0.000 85.997
17(OPE) 294 -45859 13755 0 0 0 1.357 -0.000 63.557
18(OPE) 1657 -47443 14136 0 0 0 8.852 -0.000 75.496
19(OPE) -669 -45990 13781 0 0 0 -3.625 -0.000 74.668
20(OPE) 544 -46470 13930 0 0 0 2.977 -0.000 76.184
21(OPE) 59 -46767 14030 0 0 0 0.311 -0.000 73.827
- -
MAX -6682/L13 -66840/L1 16691/L15 -0.000/L1
44.146/L13 95.184/L3

TYPE=Rigid
120
+Y;
1(HYD) 178 -67448 -18 0 0 0 0.001 -0.000 -0.000
2(OPE) 2991 -47984 14081 0 0 0 19.145 -0.000 90.139
3(OPE) -5796 -42794 -11455 0 0 0 -53.655 -0.000 -106.033
4(OPE) -4562 -45383 -12828 0 0 0 -1.404 -0.000 -3.948
5(OPE) 2991 -47985 14081 0 0 0 19.145 -0.000 90.139
6(OPE) 2991 -47984 14081 0 0 0 19.145 -0.000 90.139
7(OPE) 2991 -47973 14078 0 0 0 19.150 -0.000 90.139
8(OPE) 2996 -48034 14095 0 0 0 19.161 -0.000 90.139
9(OPE) 4057 -47724 13730 0 0 0 26.647 -0.000 90.187
10(OPE) 2425 -48013 14198 0 0 0 15.397 -0.000 90.129
11(SUS) 126 -45562 -13 0 0 0 0.001 -0.000 -0.000
12(OPE) 6309 -46863 12564 0 0 0 45.293 -0.000 90.196
13(OPE) -3593 -49368 14368 0 0 0 -22.534 -0.000 90.110
14(OPE) 2000 -38895 11496 0 0 0 15.690 -0.000 90.191
15(OPE) 3854 -57113 16695 0 0 0 20.796 -0.000 90.092
16(OPE) 119 -48258 14477 0 0 0 0.745 -0.000 90.430
17(OPE) 3485 -47702 13880 0 0 0 22.559 -0.000 89.848
18(OPE) 3894 -47548 13723 0 0 0 25.582 -0.000 90.156
19(OPE) 2137 -48322 14338 0 0 0 13.434 -0.000 90.127
20(OPE) 2996 -48183 14141 0 0 0 19.102 -0.000 90.165
21(OPE) 2809 -47804 14063 0 0 0 18.001 -0.000 90.117
WET FLARE LINE
(REFER TO DOC. TGH-090-CAL-PP-BEI-0002)