You are on page 1of 2

s,

Sa
is
m
in
pl
eth
eda
Ab
ta
ou
is
tin
w
cel
or
ls Auto-
ks Project Tracker
B6 calcula
he
to ted.
et.
E2 The
1. data
Th Start date: 9/30/2022 below,
The Start date can under
e
ne this
xt
End date: 10/26/2022 column
The End date can b , is
ins
tr used
uc for
tio chartin Auto-
n g the calculat
is Enter a milesto ed.
in sequential set Enter the end date Enter the milestone and/or nes Duratio
cel of numbers in Enter the start date for for the milestone activity description in the and n of
l the column the milestone or activity or activity in the column below. This description activiti each
Inf
A2 below. in the column below. column below will appear in the Project Chart. es. task
2. Position Start Date End Date Milestone/Activity Start-onTask Duration
1 9/30/2022 9/30/2022 Travel to Mombasa $400.00 0 1 $200.00
2 10/3/2022 10/6/2022 Summary of renovation cost as described3 belowwith
4 total estimated cost of $21,350.00
3 10/6/2022 10/16/2022 PAINTING THE WHOLE HOUSE IN 6 11
4 10/6/2022 10/26/2022 RENOVATION AND TEMPORARY PI 6 21
5 10/6/2022 10/26/2022 SLIDING WINDOWS REPAIRS AND 6 21
6 10/6/2022 10/26/2022 Doors repair $250.00 6 21
7 10/6/2022 10/26/2022 NEW SLIDING ALUMINIUM DOOR 6 21
8 10/6/2022 10/26/2022 KITCHEN LOUVRES AND GLASSES 6 21
9 10/6/2022 10/26/2022 NEW WOODEN SHUTTERS IN THE 6 21
10 10/6/2022 10/26/2022 MIRROR REPLACEMENT IN THE 6 21
11 10/6/2022 10/26/2022 ROOF WATERPROOFING THE ENTI 6 21
12 10/6/2022 10/26/2022 NEW WATER TANK WITH PIPING 6 21
13 10/6/2022 10/26/2022 ELECTRICAL WORKS WIRING AN 6 21
14 10/6/2022 10/26/2022 REPLACING DAMAGED SWITCHES 6 21
15 10/6/2022 10/26/2022 WOODEN SHUTTERS IN THE BAT 6 21
To add more 10/6/2022insert new rows
16 milestones/activities, 10/26/2022
above this INSTALLING
line. GREEN AIR-CONDITI 6 21
ThisTo
is add
the last
moreinstruction in this worksheet.
Milestones/Activities, insert new rows above this line
About this workbook

Enter your data in the Project Tracker worksheet, then scroll through a visual representation of
your timeline in the Gantt chart worksheet.

The position column in the Project Tracker worksheet allows you to chart milestones and
activities on separate lines. You could, for instance, have two milestones/activities that start on
the same day and run in parallel. They would overlap in the chart if they had the same position
value. Provide two unique values to chart on separate lines. Try it!

As the chart concludes, you may notice markers with no text and no duration set at a specific
timeline. As the last milestone scrolls off the chart, these markers indicate the end of the
milestones in the Project Tracker to chart. Simple scroll back or to the beginning to see the
chartable milestones. You can scroll back and forth by entering value in 'Gantt chart!C1'

Guide for screen readers

There are 4 worksheets in this workbook.

Project Tracker
Gantt chart
About
Dynamic Chart Data (Hidden)

The instructions for each worksheet are in the A column starting in cell A1 of each worksheet.
They are written with hidden text. Each step guides you to the information in that row. Each
subsequent step continues in cell A2, A3 and so on, unless otherwise explicitly directed. For
example, instruction text might say “continue to cell A6” for the next step.

Hidden text will not print.

To remove these instructions from any worksheet, simply delete column A.

This is the last instruction in this worksheet.

Page 2 of 2

You might also like