Block 5 - AL SHAHEEN FIELD

Document Title PIPING MATERIAL CLASSES


Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

[SOR-FY-19.257]
Piping Material Classes
- Specification -

A 29-Sep-2021 IFC 1 Issue for Comments

Rev. Rev. date St. Class Description Remark

Approved by D. Lo Sterzo Project Engineering Manager

Reviewed by S. Cogoni Project Specialist Leader

Issued by A. Celant Project Specialist

Action Name Position E-Signature

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 1 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

REVISION HISTORY
(to be filled from the 2nd issue of the document with details of the previous revision(s))

Rev. Rev. Date Status History/Remark Issuer Reviewer Approver

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 2 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

TABLE OF CONTENTS

1. INTRODUCTION ..............................................................................................................................4

2. PURPOSE .........................................................................................................................................5
2.1. SCOPE .............................................................................................................................................. 5
3. HOLDS .............................................................................................................................................6

4. AMENDMENTS TO DOCUMENT SD-NOC-PVV-112 ...........................................................................6


4.1. APPENDIXES ................................................................................................................................... 14
4.1.1. APPENDIX 1 – LIST OF PIPING MATERIAL CLASSES ...................................................................................... 14
4.1.2. APPENDIX 2 – PIPING MATERIAL CLASSES ................................................................................................... 16
4.1.3. APPENDIX 3 – BRANCH CONNECTION TABLES .............................................................................................. 17
4.1.4. APPENDIX 6 – HUB CONNECTORS INTERCHANGEABILITY MATRIX................................................................. 18
4.1.5. APPENDIX 9 – WALL THICKNESS CALCULATION DETAILS .............................................................................. 19
4.1.6. APPENDIX 10 – FULL VACUUM THICKNESS CALCULATION DETAILS ............................................................... 20

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 3 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

1. INTRODUCTION

The Al-Shaheen field is QATAR’s largest oil field. It is a conventional oil field (of approximately 60 m water depth) situated offshore
the State of Qatar approximately 70 km north-north-east of Ras Laffan. The field overlays the giant pre-Khuff gas field known as
North Field.
Thirty-three platforms, including five production hubs, are installed in Al-Shaheen field. These are spread over nine different areas
across the field - Locations A to I. Crude is exported by tanker via tandem offloading from two FSOs which are permanently
moored in the field to two (of three) SPMs. Gas is gathered in a gas grid pipeline system and exported via North Field Alpha.
The field has been developed through several phases and further development phases are envisaged by COMPANY as operator
of the Al-Shaheen concession.

Figure 1-1: Al-Shaheen Field Layout – Batch 3


To sustain and further increase current production rate with a strategy to achieve a plateau of 300 kbopd, COMPANY has initiated
Gallaf project (Phase 2) to install seven new WHPs, in three batches as detailed below:

1. Batch - 1: New bridge-linked Wellhead platform (24 Slots) including jackets (DC / FC / EG), shall be installed and the new
WHP’s shall be integrated with their respective existing host platforms (DA / FA / ED) facilities.
2. Batch - 2: New bridge-linked Wellhead platform (24 Slots) including jackets (CE / EH) shall be installed and the new WHP’s
shall be integrated with their respective host platforms (CD / EG) facilities.
3. Batch - 3: New WHP’s (JA / KA) shall be remote connected to a new Process Platform (GE), bridge-linked to existing
facilities GD and corresponding brownfield integration of G location facilities (GA / GC / GD). A new subsea connection will
be connected to GE from F location existing facilities.

F-DBN Project is the EPCIC8 Package of Gallaf Batch 3 which consists of the integration of the new 20” subsea LP Wet Gas pipeline
and riser (by EPCI7) tie-in from the new GE (CPP) and brownfield upgrade scope of existing FA and FB facilities at F-Location,
including RO removal at AB Location with the main purpose of debottlenecking F-location gas and liquid exports.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 4 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

2. PURPOSE

The COMPANY standard specification SD-NOC-PVV-112 (Piping Material Classes) provides piping material classes and
requirements which are to be followed for the project. The purpose of this document is to further develop the document to include
project requirements for Greenfield and Brownfield scope for F-DBN including FA, FB platforms and associated bridge piping.

The brownfield SoW consists of, but not limiting to the following.

 FA new Flare KO Drum module, including PSV’s & FKOD pumps.


 Fabrication of FA 20” x 24” Pig launcher skid.
 Fabrication of laydown deck extension at west end of FA Location.
 Fabrication of deck extension and runway beam for new FB 20” Riser ESDV valve.
 Topside pipeline interface for 20” LP wet gas pipeline from FA Pig launcher via FA-FB bridge and FB 20” Riser ESDV
connecting to top of riser.
 Upgrade of FA flare system with new header and PSV’s.
 Removal of flow restriction orifice at AB platform, crude oil manifold.

Further, modifications deemed sub-components are stated below, but currently not exhaustive.

• Modifications to FA Well Head control Panel.


• Modifications and installation of additional MCB’s in FA Low Voltage switchgear & distribution panels.
• Relocations of existing lightning fixtures and Navigation Aids.
• Relocations of existing safety equipment.
• Modifications and installation of additional PAGA, Fire & Gas/ ESD and SCADA control systems. Upgrade of Inlet
Separator internals, level control system and PSV’s.
• Change out of 2 DBNPP FCVs on FA wet crude export.
• Structural reinforcement on FA/FB platforms and Bridge.
• Installation of drop object protection and fire walls on FA.
• Installation FA / FB deck extensions East and West sides.
• Modifications at both platforms including demolition and construction to facilitate the new installations.
• Integration items (including tie-ins and hook-up) to be constructed in the existing facilities

2.1. SCOPE

This particular specification is an addendum to COMPANY standard specification SD-NOC-PVV-112 (Piping Material Classes) and
defines additional requirements to those already specified therein.
This specification shall be therefore implemented along with requirements specified in COMPANY standard specification SD-NOC-
PVV-112 unless otherwise updated and/or modified in this document.
In case of any conflict, the more stringent requirement shall be applied. Any conflict shall also be brought to the notice of
COMPANY for resolution which shall be considered for implementing without any schedule or cost impact.
The type of modifications have been defined and indicated in this specification as follows:
- ADD  Additional statement(s)/requirement(s) with respect to SD-NOC-PVV-112
- REPLACE WITH  Statement(s)/requirement(s) reported into SD-NOC-PVV-112 which needs to be modified.
In case a statement/requirement reported into SD-NOC-PVV-112 shall be deleted, it will be reported in this specification
with the text barred, while the new or additional part will be reported in italics.
- DELETE  A particular statement/requirement/section from SD-NOC-PVV-112 which has been deleted.

This document also includes the new Piping Class required for Topside Pipeline Section (PVV) between riser-side ESDV and pig
trap, which is designed as per ASME B31.3 and defined as AD3 (see Appendix 2).

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 5 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

3. HOLDS

HOLD Points Description


Dissimilar FLG materials weld overlay in the case where SW gaskets shall be specified and
HOLD 1
type of weld overlay material
TQ numbering regarding the non-applicability of FV conditions for FA platform HP Flare
HOLD 2
system will be provided in next revision
HOLD 3 Wall thickness of ESDV’s transition spool

4. AMENDMENTS TO DOCUMENT SD-NOC-PVV-112

The following section/paragraph numbers correspond to those indicated in Company Standard SD-NOC-PVV-112 “Piping Material
Classes” and are those which require an addition or a modification.

• 2. Reference Documents

The full list of relevant regulations, standards and design codes are summarized in the following order of precedence.

• Qatar legislation including applicable regulations,


• Contract,
• FEED specifications/documents,
• NOC specifications referencing codes and standards,
• Other codes and standards,
• Industry best practice.

In case of conflict, the more stringent requirements shall apply.


Where this specification makes reference to British, European, international or industry standards, regulations or
specifications, the latest revision or issues shall be used unless otherwise stated.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 6 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

ADD (External Documents)

Reference Number Description

[1] API 6FA Specification for Fire Test for Valves


[2] API 598 Valve Inspection & Testing
Recommended Practice for Design and Installation of Offshore Production Platform
[3] API 14E
Piping Systems
[4] MSS SP-44 Steel Pipeline Flanges
[5] MSS SP-75 High Strength Wrought Butt Welding Fitting

ADD (North Oil Company Documents)

Reference Number Description

[6] SD-NOC-PVV-101 List of Piping Documents to be Supplied to NOC


[7] SD-NOC-PVV-107 Piping Stress Analysis
[8] SD-NOC-PVV-119 Design and Fabrication of Metallic Piping Supports – Standard for Piping Supports
[9] SD-NOC-PVV-178 Design and Erection of Glass Reinforced Plastic (GRP) Piping System
[10] SD-NOC-PVV-611 Welding of Pressure Containing Piping and Equipment
[11] SD-NOC-PVV-613 Valves Material Requirements for use in Sour Service
[12] SD-NOC-PVV-615 Stainless Steel type 6Mo: Material and Welding
[13] SD-NOC-INS-900 Instrument Hook-Up Diagram

ADD (Project Specifications)

Reference Number Description

[14] [SOR-FY-19.257]-ROMA-
Piping Stress Design Basis
ASFYY-06-640001-0001
[15] [SOR-FY-19.257]-ROMA-
Piping & Topside Pipeline – Basis of Design
ASFYY-06-640002-0001
[16] [SOR-FY-19.257]-ROMA-
Painting – Specification
ASFYY-12-390002-0001
[17] [SOR-FY-19.257]-ROMA-
3D Bend – Piping Special Item Datasheet
ASFAA-06-112003-0001
[18] [SOR-FY-19.257]-ROMA-
Instrument Bulk – Material Take-Off
ASFYY-08-240001-0001
[19] [SOR-FY-19.257]-ROMA-
FA/FB/AB Platforms – Tie-in Schedule
ASFAA-06-202004-0001
[20] [SOR-FY-19.257]-ROMA-
FA Platform – Material Selection Report
ASFAA-12-342002-0001
[21] [SOR-FY-19.257]-ROMA-
Material Selection & Corrosion Control Philosophy
ASYYY-12-262006-0001
ADD (Existing FEED Technical Queries)

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 7 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

Reference Number Description

[22] WHP03-FEED3-TFM2-MPGF-TQR-
Flare knock Out Drum Sizing Basis
000028_rev01
[23] WHP03-FEED3-TFM2-MPGF-TQR-
Short Radius Elbow
000057_rev00
[24] WHP03-FEED3-TFM2-MPGF-TQR-
Surface Treatment of Pipe Supports
000064_rev00
[25] WHP03-FEED3-TFM2-MPGF-TQR-
Trunnion support on elbow
000081_rev01
[26] WHP03-FEED3-TFM2-MPGF-TQR-
FDBN HP Flare KO Drum Inlet Nozzle Size
000123_rev00
[27] WHP03-FEED3-TFM2-MPGF-TQR-
Isolation Arrangement for 150# Rated System with Toxic Service
000141_rev00
[28] WHP03-FEED3-TFM2-MPGF-TQR-
Flare knock Out Drum Sizing Basis
000028_rev01
[29] WHP03-FEED3-TFM2-MPGF-TQR-
Short Radius Elbow
000057_rev00

ADD (Existing FEED Deviations)

Reference Number Description

[30] FDBN1-PFE03-DOE1-PDCE-DEV- Tapping connection at Flare Branch Lines


000001_rev00
[31] FDBN1-PFE03-DOE1-PDCE-DEV- Deviation of Closed Drain Connection from the Arrangement Specified in
000002_rev00 Standard SD-NOC-SAF-007
[32] FDBN1-PFE03-DOE1-PDCE-DEV- Use of 2” ball valve for bleed in Double Block and Bleed arrangement for
000003_rev00 the 4th Crude Export Pump (ASFAA-P-3641)
[33] FDBN1-PFE03-DOE1-PDCE-DEV- Use of Double Block and Bleed (DBB) in place of Double Block and Bleed
000004_rev01 (DBB) for the inlet isolation of PSVs (ASFAA-PSV-340015/16/17/18/19)
[34] FDBN1-PFE03-DOE1-PDCE-DEV- Butt Welded end & Flanged end – ESD Valve battery limited
000005_rev00
Use of Nitrogen (N2) to Drain Liquid inventory in the isolated section of
[35] FDBN1-PFE03-DOE1-PDCE-DEV-
Crude Export Pump (ASFAA-P-3641) and HP Flare KOD Pumps (ASFAA-P-
000006_rev00
4002/!2) to Closed Drain Pump (ASFAA-V-5001) during maintenance
[36] WHP03-00000-MPEN-MPGF-DEV- CRA bolting material for pressure vessel application
000014
[37] WHP03-00000-MPEN-MPGF-DEV- Instrument hook-up for toxic services
000019
[38] WHP03-00000-MPEN-MPGF-DEV- Corrosion allowance for topside pipeline section designed to ASME
000020_00 B31.3/PVV specifications
[39] WHP03-00000-MPEN-MPGF-DEV- Stem Material for Valves in AK1 piping class
000021_00
[40] WHP03-00000-MPEN-MPGF-DEV- Length of Pup/Transition Piece for welded valves
000023_00
[41] WHP03-FEED3-TFM2-MPGF-DEV- Exclusion of 1.5m Deluge Coverage around F-DBN Pump Foundation/Skid
000005_rev00
[42] WHP03-FEED3-TFM2-MPGF-DEV- Dead end near Pig Launcher cantilever (ASFAA-EP-3867) on FA platform
000007_rev00 deck level 2

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 8 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

[43] WHP03-FEED3-TFM2-MPGF-DEV- FDBN Crude Export Piping & Header Overpressure Excursion
000010_rev01
[44] WHP03-FEED3-TFM2-MPGF-DEV- Deluge Provision on F-DBN Escape Ways
000024_rev00
[45] WHP03-FEED3-TFM2-MPGF-DEV- F-DBN Deluge Nozzles Internal Diameter Less than 5mm
000025_rev00
[46] WHP03-FEED3-TFM2-MPGF-DEV- Excessive Flow through Deluge Valves on FA platform
000026_rev00
[47] WHP03-FEED3-TFM2-MPGF-DEV- Flange support on existing inlet separator (ASFAA-V3401) PSV outlet line
000028_rev00
[48] WHP03-FEED3-TFM2-MPGF-DEV- No slope on closed drain piping to Closed Drain Drum
000029_rev01
[49] WHP03-FEED3-TFM2-MPGF-DEV- SS316L Clad Equipment Subjected to PWHT
000035_rev00

• 3. Definitions & Units

ADD

Definition Description
COMPANY NORTH OIL COMPANY
The Engineering, Procurement, Supply, Construction and Commissioning of EPCIC8:
CONTRACT
F-DBN F-Location Debottlenecking Project Al Shaheen Field – Block 5
CONTRACT / PO No. 4600000750
CONTRACTOR Rosetti Marino Qatar Branch
CALL OFF WORK ordered by COMPANY to be performed by the CONTRACTOR
PROJECT Gallaf Batch-3
The party who has manufactured, assembled, tested and supplied the existing equipment
OEM / VENDOR / and accessories which is proposed to be modified under PROJECT scope AND / OR the
MANUFACTURER party who is responsible for manufacturing, assembling, testing and supplying new
equipment and accessories which is proposed to be installed under PROJECT scope
SHALL Indicates a requirement that is mandatory
SHOULD Indicates a preference

Pressure/Temperature rating of Cu-Ni alloy piping is based on the latest EEMUA 234 revision.
Pressure/Temperature rating of Ni-Al bronze alloy valves is based on ASME B16.24, with yield and tensile strength at
design temperature, established from ASME BPVC Section II – Part D.

• 5. Abbreviations Used

ADD

Abbreviation Description

NOC NORTH OIL COMPANY


WHP Wellhead Platform
FEED Front End Engineering Design
CCR Central Control Room
ICSS Integrated Control and Safety System
HFE Human Factor Engineering
HMI Human Machine Interface

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 9 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

HSCS High Strength Carbon Steel


RTJ Ring Type Joint
ESDV Emergency Shutdown Valve
IDBB Integral Double Block & Bleed
SDBB Slim-line Double Block & Bleed
SPP Special Piping Part

• 6.1.2 Pipe Wall Thickness Calculation Principle

ADD
The calculation of pipe wall thickness values for each piping class, included the new piping class AD3 for Topside Pipeline
(PVV) section (Wet Gas), has been performed in accordance with ASME B31.3. See Appendix 9 for the detailed calculation.

Vacuum condition (full or partial) has been verified for all piping material classes according to ASME B31.3 Sect. 304.1.3
and corresponding ASME BPVC sections indicated therein. See Appendix 10 for the detailed calculation.

• 6.1.2.1 Corrosion Allowance

ADD
A minimum corrosion allowance of 3 mm shall be considered for all the topside piping in carbon steel and low alloy steel
materials, including new piping material class AD3 for the topside pipeline (PVV) section, except for galvanized carbon
steel (piping material class AG1) which has a corrosion allowance of 1.3 mm.

• 6.1.2.4 Pipe Sizes

ADD
The minimum nominal pipe size (except for instrument and chemical injection tubing) shall be as follows:
o ¾” for local vent/drain connections
o 2” for all other process and utility services

ADD
In case any stainless steel piping class size would require a thickness which is higher than the maximum thickness listed
inside ASME B36.19M, ASME B36.10M shall be used in lieu of ASME B36.19M.
Dimensions of Cu-Ni pipe shall be in accordance with EEMUA 234.

• 6.2.1 Carbon Steel and Stainless Steel

REPLACE WITH
For NPS 18 and above welded pipe will be following ASTM A671 CC65 Class 22 with supplementary requirement S2 (Charpy
V-Notch Test).

ADD
Only low carbon grade SS316L material shall be considered for all Stainless Steel material welded constructions.
Dual grade SS316/316L material is also acceptable, however material properties of SS316L (allowable stress as per ASME
B31.3 Appendix A) shall be considered for all the design calculations.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 10 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

• 6.2.2 Corrosion Resistant Alloy Materials

ADD
Super Austenitic Stainless Steel (6Mo) piping and components shall comply with SD-NOC-PVV-615.

• 6.5.3 Flange Facing

REPLACE WITH
Raised Face (RF): ASME Classes 150 and 300 and 600
Grooved, for Ring Joint (RJ): ASME Classes 600 900 and above.

• NEW SECTION TO BE ADDED: 6.5.5 Connection Between Dissimilar Materials

In order to minimize galvanic corrosion when connecting carbon steel to Corrosion Resistant Alloys (CRA), weld overlay
shall be applied on carbon steel side (flange) according to SD-NOC-PVV-111.
The overlay shall be applied only on the carbon steel flange including the seal joint contact surface, but with no overlap
inside the flange. This requirement is only applicable for:
o Flanges with RJ facing (ASME Class 600 and above)
o Flanges ASME Class 150 and 300 if used with flat graphite gasket

CRA weld overlaid layer shall be 3 mm thick. Weld overlay material shall be Alloy 625 for any CS – CRA coupling. SS309L
is an acceptable weld overlay material for CS – SS316L couplings.

Bolting and gasket shall be as per CRA piping class.


Refer to SD-NOC-PVV-111 Appendix 1 for sample drawing of weld overlay flange (both RF and RJ).

Carbon steel flanges with CRA weld overlay shall be considered as Special Piping Part (SPP) items (ref. new section 6.12).

HOLD 1: A TQ will be issued to ask CPY confirmation that CRA weld overlay on CS flange face is needed only in case of
flat graphite gasket for ratings 150# and 300#.

• 6.6.1 General

ADD
BW fittings shall comply with ASME B16.9
Threaded fittings shall comply with ASME B16.11
Dimensions of non-metallic fittings shall be in accordance with their respective manufacturer information.
Wall thickness of BW fittings shall be the same nominal wall thickness as the attached pipe.

• 6.6.2 Bends and Elbows in Small Bore Piping

ADD
Only 3D Hot Induction Bends (HIB) shall be used for Topside Pipeline (PVV) Section (if required).
HIBs shall comply with its project datasheet [SOR-FY-19.257]-ROMA-ASFAA-06-112003-0001.

• 6.7.1 General

ADD
Bolting material used for SDBB valves shall also comply with the requirements of SD-NOC-PVV-155.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 11 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

• 6.11.1 Ball Valves

ADD
Metal seated ball valves shall be used in the fluid services listed inside SD-NOC-PVV-111 Sect. 4.6, and all their technical
requirements shall be in accordance with SD-NOC-PVV-154.

• 6.11.2 Gate, Globe, Butterfly and Check Valves

ADD
For dissimilar type check valves requirement, nozzle check valves (short pattern) shall be used instead of swing check
valve if density of the medium if below 0.7 g/cm3.

• 6.11.3 Integral Block and Bleed Valves

ADD
Slim Line Double Block and Bleed (SDBB) valves shall be used for all pressure instruments without diaphragm seal, as per
piping hook-up standard, P&ID and P&ID legend.

Integral Double Block and Bleed (IDBB) valves with flanged ends shall be used for instrument connections such as LG, LT,
PG, PT with diaphragm seal as per P&ID and P&ID legend. IDBB valves have been assigned digit “9” for “type of valve”
(ref. SD-NOC-PVV-154 Appendix 11 “Valve tagging philosophy”).
IDBB valves used in lines carrying solid particles/sand shall be metal seated.

• NEW SECTION TO BE ADDED: 6.12 Special Piping Parts (SPP) Items

According to SD-NOC-PVV-111 Sect- 4.9, SPPs comprise non-standard pressure containing inline items not covered by this
document or valve specifications.
Any SPP shall be assigned an SPP number and be identified as such on the P&IDs.
SPP item tag index and datasheets shall be prepared to include a material description, design, inspection & testing
requirements and any drawing or sketches as required, for each SPP item. SPP tag numbering shall be done according to
SD-NOC-EC-106.
SPP items shall be identified with a permanently attached corrosion resistant metal plate.
A register of SPP items shall be prepared and maintained. This list shall include all data necessary to identify and locate
the SPP items.

• NEW SECTION TO BE ADDED: 6.13 Chemical Injection Tubing

High pressure Tubing shall be used for Chemical Injections identified in P&IDs as Tubing. Tubing shall be used for Chemical
Injections for sizes up to and including 1” only. For sizes 1.1/2” and above piping material as per respective piping classes
shall be used.
The Tubing material shall be 6Mo (UNS S31254). All Tubing shall be new, seamless, fully annealed, complying to ASTM
A269 and ASTM A1016/1016M, free from scratches and suitable for bending and flaring.
Impulse tubing for process / utility fluids shall be minimum of ½” OD.

The minimum wall thickness of Tubing shall be selected / finalized based on the final tubing size and line design pressure
/ temperature conditions. Piping shall be used if tubing is not available due to the higher design pressure requirements.

All Tubing fittings shall be of 6Mo (UNS S31254 / UNS N08367) material. Tubing fitting shall be of double compression
type or C&T type. Instrument fittings shall be manufactured by Swagelok or Parker. C&T fittings shall be manufactured by
Swagelok or Parker or BUTECH.
Fitting rating shall be determined based on suitable allowable working pressure.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 12 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

All valves shall be of 6Mo (UNS S31254) material complying to ASTM A276 or ASTM A479. Valves shall be forged / one
piece bar stock design. Needle valve (except pressure gauge multiport valve) shall have lockable + circular dial type
handle. T-bar handle is not acceptable.
Ball valves may also be one piece forged body, one piece ball and stem design. Handle shall include indication of flow
direction. Ball valves shall be full bore. Ball seals shall have Viton O-ring, PEEK or PTFE seats and PTFE or Graphite packing.
The material of construction and pressure rating of all process connected instrument tubing, fittings, valves & accessories
shall be compatible with and meet applicable piping material specifications / piping class it is connected to for the process
services.

For the two check valves used / installed in series for Downhole Chemical injection tubing, these valves shall be of dissimilar
type. One valve shall be of piston/ball lift type and the other one will be of poppet type.

All tubing items shall be in compliance with [SOR-FY-19.257]-ROMA-ASFYY-08-240001-0001 “INSTRUMENT BULK –


MATERIAL TAKE-OFF”.

• NEW SECTION TO BE ADDED: 6.14 Topside Pipeline (PLR) / Topside Pipeline (PVV) Interface

The Topside Pipeline (PLR) section downstream of ESDV (riser side) shall be designed to DNV code, while the Topside
Pipeline (PVV) section upstream of ESDV (platform side) shall be designed to ASME B31.3.
Topside Pipeline (PLR) / Topside Pipeline (PVV) battery limit shall be as per figure below:

HOLD 3: ESDV’s transition piece wall thickness is under definition. The proposal is to have the same wall thickness of
15.09 mm for both ESDV’s transition spool and pipeline (PLR).

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 13 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

4.1. APPENDIXES

Also for Appendixes, in the following only the changes to a specific Appendix No. coming from SD-NOC-PVV-112 will be highlighted.

4.1.1. APPENDIX 1 – LIST OF PIPING MATERIAL CLASSES

ADD

TOPSIDE PIPELINE (PVV) PIPING CLASS

PIPING AS PER SD-NOC-PVV- AS PER THIS


ITEM REASON
CLASS 112 DOCUMENT
FOR WET GAS PIPELINE (PVV)
TOPSIDE PIPELINE FROM FB TO GE (FROM/TO PIG
AD3 NOT AVAILABLE NEW PIPING CLASS
(PVV) PIPING CLASS TRAP UP TO SUBSEA PIPELINE
(PLR) BATTERY LIMIT)

SERVICE INDEX OF PIPING MATERIAL CLASSES

SR. PIPING C.A. NACE


RATING MATERIAL SERVICE
NO. CLASS (mm) (YES/NO)
CLOSED DRAIN (SOUR), FUEL GAS (SOUR), HP FLARE
1 AD1 150# LTCS 3 Y
(SOUR), PROCESS GAS (SOUR), VENT (SOUR), WET GAS
2 AG1 150# GALVANIZED CS 1.3 Y INERT GAS, INSTRUMENT AIR, UTILITY AIR
RUBBER
3 AJ1 150# 0 N FIREWATER (DRY), SEAWATER
ELASTOPIPE
4 AK1 150# Cu-Ni 0 N FIREWATER, SERVICE WATER
5 AM1 150# 6Mo 0 Y CLOSED DRAIN (SOUR), INERT GAS, OPEN DRAIN
6 AR1 150# GRE 0 N FIREWATER
7 AZ1 150# LTCS 6 Y CLOSED DRAIN (SOUR), INERT GAS, OPEN DRAIN
8 BD1 300# LTCS 3 Y CRUDE OIL (SOUR)
9 BM1 300# 6Mo 0 Y PROCESS GAS (SOUR), SEAWATER, CHEMICAL INJECTION
10 DD1 600# LTCS 3 Y PROCESS GAS (SOUR)
11 ED1 900# LTCS 3 Y PROCESS GAS (SOUR), WATER INJECTION
AD3
12 150# LTCS 3 Y PROCESS GAS (SOUR), WET GAS
(NOTE 1)

NOTE 1: Piping Material Class AD3 developed only for Topside Pipeline (PVV) section designed to ASME B31.3.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 14 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

TOPSIDE PIPELINE (PVV) PIPING CLASS FOR WET GAS FROM FB TO GE – DATA SUMMARY

GENERAL DETAILS

SIZE NPS 20

PIPE OD mm 508

DESIGN PRESSURE BARG 17


CORROSION
mm 3
ALLOWANCE

DESIGN TEMPERATURE DEG.


-15 / 82
(MIN/MAX) C

TOPSISE PIPING (FROM PIG TRAP TO ESDV)


AS PER ASME B31.3
MATERIAL - A671 CC65

NEW PIPING CLASS - AD3

RATING - 150#

WALL THICKNESS (SCH) - STD

WALL THICKNESS (NOTE-1) mm 9.53

BARRED TEE ID mm 488.94

NOTE 1: FB-GE Topside Pipeline (PVV) wall thickness includes bend wall thinning allowance.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 15 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

4.1.2. APPENDIX 2 – PIPING MATERIAL CLASSES

Appendix 2 contains only the new piping material class AD3 required for the 20” line from Pig Launcher module to ESDV on FB
platform. All other piping material classes applicable for F-DBN project will remain as they are listed and specified in SD-NOC-
PVV-112.

New piping material class AD3 for Topside Pipeline (PVV) section had been designed to ASME B31.3 and added to the list of
applicable project piping material classes.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 16 of 20]
APPENDIX 2

[SOR-FY-19.257]-ROMA-ASYYY-06-392010-0001
PIPING MATERIAL CLASS

MATERIAL: LOW TEMPERATURE CARBON STEEL / NACE (A,B,C,2,4) FLANGE RATING: ASME CLASS 150 RF
SERVICES: TOPSIDE PIPELINE (PVV) WET GAS
(SEVERE SOUR SERVICE) (47)
PRESSURE / TEMPERATURE LIMITS (MATL GRP 1.1)
PRESS. (BARG) 17 17
(46) CLASS
AD3
TEMP. (°C) -46 +82 SHEET 1 OF 2
CORROSION ALLOWANCE: 3.0 mm DATE: 16/12/2020 REVISION: 03
NPS 0.5 0.75 1 1.5 2 20 NOTES
SCHEDULE 160 160 160 160 80 STD
WALL THICK (mm) 4.78 5.56 6.35 7.14 5.54 9.53 109
OD (mm) 21.3 26.7 33.4 48.3 60.3 508
PIPE SEAMLESS, ASME B36.10, ASTM A333 GRADE 6 WELDED, EFW 100% RADIOGRAPHY, ASME B36.10, ASTM A671 CC65 CL22 S2 112
ENDS BE
FLANGES

FLANGE WNF, RF, CL150, ASME B16.5, HUB THK AS PER PIPE SCHEDULE, ASTM A350 LF2 CL1 262

BLIND BLIND, RF, CL150, ASME B16.5, ASTM A350 LF2 CL1 262

ELBOW 45/90 DEG LR, ASME B16.9, THK AS PER PIPE SCHEDULE, ASTM A420 WPL6 45/90 DEG LR, ASME B16.9, THK AS PER PIPE SCHEDULE, ASTM A420 WPL6W YYY

30/45/90 DEG INDUCTION BEND, ASME B16.9 / ASME B16.49 / MFG. STANDARD, THK AS PER PIPE
BENDS
FITTINGS

SCHEDULE, ASTM A333 GRADE 6


BARRED TEE, ASME B16.9, MANUFACTURER'S STANDARD, THK AS PER PIPE SCHEDULE, ASTM A420
TEE EQUAL TEE/REDUCING TEE, ASME B16.9, THK AS PER PIPE SCHEDULE, ASTM A420 WPL6 202
WPL6
REDUCER ECC/CONC, ASME B16.9, THK AS PER PIPE SCHEDULE, ASTM A420 WPL6
OLET WELDOLET, MSS SP-97, ASTM A350 LF2 CL1 202,214
SDBB VAS1-1F/S2-B 547
VALVES

IDBB VAD1-9FR1-B1 ZZZ


CHECK VAD1-4W2-B
BALL VAD1-6FF1-B1 VAD1-6FR1-B1, VAD1-6FF1-B1
GASKETS SPIRAL WOUND, CL150, ASME B16.20, SS316L WINDING 4.8 MM THICK, THERMICULITE FILLER, SS316 INNER AND CENTERING RING 3.2 MM THICK
STUD BOLTS, 2 HEAVY HEX NUTS, ASTM A320 GRADE L7, ASTM A194 GRADE 7L S3, HOT DIP GALVANIZED AS PER ASTM A153
BOLTING
STUD BOLTS, 2 HEAVY HEX NUTS, ASTM A276 S32760-S, ASTM A276 S32760-A, FLT, IMPACT TESTED @ -101°C 359

NOTES:
A THIS PIPING CLASS IS DESIGNED TO ASME B31.3
B THIS PIPING CLASS IS SUITABLE FOR PIGGING AND SHALL BE USED FOR WET GAS LINE FROM PIG TRAP ON FA PLATFORM UP TO ESDV-XXXXXX ON FB PLATFORM. WET GAS LINE PROCESS MDMT TEMPERATURE IS -15 °C.
C ALL 20" SIZE COMPONENTS IN PIGGABLE PIPELINE SECTION SHALL BE SUBJECT TO PIG GAUGE TRIAL TEST.
2 MATERIAL SHALL COMPLY WITH NACE MR0175/ISO 15156 PART 2
4 MATERIAL SHALL COMPLY WITH SD-NOC-PVV-612 & WHP03-TFM2-ASYYY-06-392009-0001
APPENDIX 2

[SOR-FY-19.257]-ROMA-ASYYY-06-392010-0001
PIPING MATERIAL CLASS

MATERIAL: LOW TEMPERATURE CARBON STEEL / NACE (A,B,C,2,4) FLANGE RATING: ASME CLASS 150 RF
SERVICES: TOPSIDE PIPELINE (PVV) WET
GAS (SEVERE SOUR SERVICE) (47)
PRESSURE / TEMPERATURE LIMITS (MATL GRP 1.1)
PRESS. (BARG) 17 17
(46) CLASS
AD3
TEMP. (°C) -46 +82 SHEET 2 OF 2
CORROSION ALLOWANCE: 3.0 mm DATE: 16/12/2020 REVISION: 03
NPS 0.5 0.75 1 1.5 2 20 NOTES
SCHEDULE 160 160 160 160 80 STD
WALL THICK (mm) 4.78 5.56 6.35 7.14 5.54 9.53 109
OD (mm) 21.3 26.7 33.4 48.3 60.3 508

NOTES:
46 THIS PIPING CLASS IS DEVELOPED BASED ON PIPELINE DESIGN CONDITIONS (PL-68*) AND NOT BASED ON FULL FLANGE RATING.
47 ALTHOUGH PIPELINE MATERIAL SELECTION REPORT ASSIGNS SSC REGION 2 TO THIS PIPELINE, FOR TOPSIDE (PVV) PART THIS SERVICE IS CONSIDERED AS SEVERE SOUR SERVICE.
109 MILL TOLERANCE SHALL BE IN ACCORDANCE WITH SD-NOC-PVV-112
112 SHALL BE SUPPLIED WITH WELD COEFFICIENT OF 1
202 BRANCH CONNECTIONS SHALL BE IN ACCORDANCE WITH CORRESPONDING BRANCH TABLE IN APPENDIX 3
214 WELDOFLANGE CAN BE USED INSTEAD OF WELDOLET- REFER TO SD-NOC-PVV-112
262 FLANGE FACE FINISH SHALL BE IN ACCORDANCE WITH SD-NOC-PVV-145
359 BOLTS FOR SDBB VALVES
547 SDBB VALVE SHALL BE USED ONLY FOR INSTRUMENT CONNECTION.
YYY TO BE USED ON BARRED TEE BRANCH ONLY (IF REQUIRED.)
ZZZ IDBB VALVES SHALL BE USED FOR INSTRUMENT CONNECTIONS ONLY AS PER PID / LEGEND SHEETS.
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

4.1.3. APPENDIX 3 – BRANCH CONNECTION TABLES

ADD
Refer to Table 9 for 90 Deg. branching for new piping material class AD3.
Refer to Table 10 for new 45 Deg. branching for piping material classes AD1 (Flare service) and AZ1 (Open Drain service).

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 17 of 20]
Appendix 3 [SOR-FY-19.257]-ROMA-ASFYY-06-390004-0001

TABLE 9

900 BRANCH TABLE FOR PIPING MATERIAL CLASSES

AD3

BRANCH

NPS 0.5 0.75 1 1.5 2 3 4 6 8 10 12 14 16 18 20 24 26 28 30 32 34 36 40 42 NPS

0.5 T 0.5

0.75 RT T T BW EQUAL TEE 0.75

1 RT RT T RT BW REDUCING TEE 1

1.5 RT RT RT T RC BW REDUCING TEE + BW CONCENTRIC REDUCER 1.5

2 W W RT RT T W WELDOLET / WELDOFLANGE (NOTE 1) 2

3 W W W RT RT T 3

4 W W W W RT RT T 4

6 W W W W W RT RT T 6

8 W W W W W W RT RT T 8

10 W W W W W W W RT RT T 10

12 W W W W W W W RT RT RT T 12

14 W W W W W W W W RT RT RT T 14
HEADER

HEADER
16 W W W W W W W W RT RT RT RT T 16

18 W W W W W W W W W RT RT RT RT T 18

20 W W W W W W W W W RT RT RT RT RT T 20

24 W W W W W W W W W RC RT RT RT RT RT T 24

26 W W W W W W W W W RC RC RT RT RT RT RT T 26

28 W W W W W W W W W RC RC RT RT RT RT RT RT T 28

30 W W W W W W W W W RC RC RC RT RT RT RT RT RT T 30

32 W W W W W W W W W RC RC RC RT RT RT RT RT RT RT T 32

34 W W W W W W W W W RC RC RC RC RT RT RT RT RT RT RT T 34

36 W W W W W W W W W RC RC RC RC RT RT RT RT RT RT RT RT T 36

40 W W W W W W W W W RC RC RC RC RC RT RT RT RT RT RT RT RT T 40

42 W W W W W W W W W RC RC RC RC RC RC RT RT RT RT RT RT RT RT T 42

0.5 0.75 1 1.5 2 3 4 6 8 10 12 14 16 18 20 24 26 28 30 32 34 36 40 42

NPS BRANCH NPS

NOTES

1. Weldoflange can be used for branch size upto NPS 2 only.


Appendix 3 [SOR-FY-19.257]-ROMA-ASFYY-06-390004-0001

TABLE 10
0
45 BRANCH TABLE FOR PIPING MATERIAL CLASSES

AD1, AZ1

BRANCH

NPS 0.5 0.75 1 1.5 2 3 4 6 8 10 12 14 16 18 20 24 26 28 30 32 34 36 40 42 NPS

L BW EQUAL LATERAL TEE

RL BW REDUCING LATERAL TEE

LC BW REDUCING LATERAL TEE + BW CONCENTRIC REDUCER

LTR BW LATROLET

6 LTR LTR LTR LTR LTR RL RL L 6

8 LTR LTR LTR LTR LTR LTR RL RL L 8

10 LTR LTR LTR LTR LTR LTR LTR RL RL L 10

12 LTR LTR LTR LTR LTR LTR LTR RL RL RL L 12

14 LTR LTR LTR LTR LTR LTR LTR LC RL RL RL L 14


HEADER

HEADER
16 LTR LTR LTR LTR LTR LTR LTR LC RL RL RL RL L 16

18 LTR LTR LTR LTR LTR LTR LTR LC LC RL RL RL RL L 18

20 LTR LTR LTR LTR LTR LTR LTR LC LC RL RL RL RL RL L 20

24 LTR LTR LTR LTR LTR LTR LTR LC LC LC RL RL RL RL RL L 24

26 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC RL RL RL RL RL L 26

28 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC RL RL RL RL RL RL L 28

30 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC LC RL RL RL RL RL RL L 30

32 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC LC RL RL RL RL RL RL RL L 32

34 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC LC LC RL RL RL RL RL RL RL L 34

36 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC LC LC RL RL RL RL RL RL RL RL L 36

40 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC LC LC LC RL RL RL RL RL RL RL RL L 40

42 LTR LTR LTR LTR LTR LTR LTR LC LC LC LC LC LC LC LC RL RL RL RL RL RL RL RL L 42

0.5 0.75 1 1.5 2 3 4 6 8 10 12 14 16 18 20 24 26 28 30 32 34 36 40 42

NPS BRANCH NPS

NOTES- 90 degree branch connections shall be used for NPS < 6" in accordance with section 10.5.1 of SD-NOC-ECP-103.
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

4.1.4. APPENDIX 6 – HUB CONNECTORS INTERCHANGEABILITY MATRIX

DELETE
This Appendix is not applicable (Ref. Sect. 6.9.1 of this document)

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 18 of 20]
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

4.1.5. APPENDIX 9 – WALL THICKNESS CALCULATION DETAILS

ADD
This is a new appendix showing the wall thickness calculation details for each piping material class.

The calculation hadn’t been performed for piping material classes AK1 and AR1: CuNi material (AK1) has specified wall thicknesses
depending on the design pressure, while GRE (AR1) has manufacturer’s standard wall thicknesses.

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 19 of 20]
APPENDIX 9

Wall Thickness Calculation piping material class AD1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class AD1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 3,60 4,78 160 YES y= 0,4
Rating ASME 150#
3/4" 20 26,7 3,64 5,56 160 YES S(MPa) = 138,00 for A333 Gr. 6
≤ 16" ASTM A333 GR.6 1" 25 33,4 3,70 6,35 160 YES S(MPa) = 149,00 for A671 CC65
Material
≥ 18" ASTM A671 CC65 1-1/2" 40 48,3 3,82 7,14 160 YES tf = 0,875
T - °C P - bar P - MPa 2" 50 60,3 3,92 5,54 80 YES
-46 ÷ 38 19,6 1,96 3" 80 88,9 4,15 5,49 40 YES
100 17,7 1,77 4" 100 114,3 4,35 6,02 40 YES
200 13,8 1,38 6" 150 168,3 4,79 7,11 40 YES
Corrosion 8" 200 219,1 5,20 6,35 20 YES
mm 3
Allowance 10" 250 273,1 5,63 6,35 20 YES
12" 300 323,9 6,04 8,38 30 YES
14" 350 355,6 6,30 7,92 20 YES
16" 400 406,4 6,71 7,92 20 YES
18" 450 457 6,85 7,92 20 YES
20" 500 508 7,23 9,53 STD YES
24" 600 610 7,99 9,53 STD YES
26" 650 660 8,36 9,53 STD YES
28" 700 711 8,75 9,53 STD YES
30" 750 762 9,13 12,7 XS YES
32" 800 813 9,51 12,7 XS YES
34" 850 864 9,89 12,7 XS YES
36" 900 914 10,26 12,7 XS YES
40" 1000 1016 11,03 12,7 XS YES
42" 1050 1067 11,41 12,7 XS YES
APPENDIX 9

Wall Thickness Calculation piping material class AG1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class AG1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 1,66 4,78 160 YES y= 0,4
Rating ASME 150#
3/4" 20 26,7 1,70 5,56 160 YES S(MPa) = 138,00
≤ 2" ASTM A53 Gr. B 1" 25 33,4 1,76 6,35 160 YES tf = 0,875
Material
≥ 3" ASTM A106 Gr. B 1-1/2" 40 48,3 1,88 7,14 160 YES
T - °C P - bar P - MPa 2" 50 60,3 1,97 5,54 80 YES
-46 ÷ 38 19,6 1,96 3" 80 88,9 2,20 5,49 STD YES
50 19,2 1,92 4" 100 114,3 2,41 6,02 STD YES
85 18,2 1,82 6" 150 168,3 2,84 7,11 STD YES
Corrosion 8" 200 219,1 3,25 8,18 STD YES
mm 1,3
Allowance 10" 250 273,1 3,69 9,27 STD YES
12" 300 323,9 4,10 9,53 STD YES
14" 350 355,6 4,36 9,53 STD YES
16" 400 406,4 4,77 9,53 STD YES
APPENDIX 9

Wall Thickness Calculation piping material class AJ1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class AJ1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 0,21 - - YES y= 0,4
Rating ASME 150#
3/4" 20 26,7 0,26 - - YES S(MPa) = 115,00
1" 25 33,4 0,33 3,38 40S YES tf = 0,875
Material ASTM B363 WPT2 (Fittings)
1-1/2" 40 48,3 0,48 3,68 40S YES
T - °C P - bar P - MPa 2" 50 60,3 0,60 2,77 10S YES
-29 ÷ 38 20 2,00 3" 80 88,9 0,88 3,05 10S YES
50 20 2,00 4" 100 114,3 1,13 3,05 10S YES
70 20 2,00 6" 150 168,3 1,66 3,4 10S YES
Corrosion 8" 200 219,1 2,16 3,76 10S YES
mm 0
Allowance 10" 250 273,1 2,70 - - YES
12" 300 323,9 3,20 - - YES
NOTE: pipe material is Flex Rubberpipe 14" 350 355,6 3,51 - - YES
Elastopipe, which wall thickness is 16" 400 406,4 4,01 - - YES
manufacturer standard.
The wall thicknesses here indicated and
calculated refer to fittings.
APPENDIX 9

Wall Thickness Calculation piping material class AM1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class AM1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 0,12 3,73 80S YES y= 0,4
Rating ASME 150#
3/4" 20 26,7 0,15 3,91 80S YES S(MPa) = 207,00
≤ 16" ASTM A333 GR.6 1" 25 33,4 0,18 4,55 80S YES tf = 0,875
Material
≥ 18" ASTM A671 CC65 1-1/2" 40 48,3 0,27 5,08 80S YES
T - °C P - bar P - MPa 2" 50 60,3 0,33 3,91 40S YES
-46 ÷ 38 20 2,00 3" 80 88,9 0,49 3,05 10S YES
100 17,7 1,77 4" 100 114,3 0,63 3,05 10S YES
200 13,8 1,38 6" 150 168,3 0,93 3,4 10S YES
Corrosion 8" 200 219,1 1,21 3,76 10S YES
mm 0
Allowance 10" 250 273,1 1,50 4,19 10S YES
12" 300 323,9 1,78 4,57 10S YES
14" 350 355,6 1,96 4,78 10S YES
16" 400 406,4 2,24 4,78 10S YES
18" 450 457 2,51 4,78 10S YES
20" 500 508 2,79 5,54 10S YES
24" 600 610 3,35 6,35 10S YES
26" 650 660 3,63 7,92 10 (1) YES
28" 700 711 3,91 7,92 10 (1) YES

Note (1): Sizes not covered by ASME B36.19M, schedules from ASME B36.10M has been used.
APPENDIX 9

Wall Thickness Calculation piping material class AZ1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class AZ1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1" 25 33,4 7,13 9,09 XXS YES y= 0,4
Rating ASME 150#
1-1/2" 40 48,3 7,25 10,15 XXS YES S(MPa) = 138,00 for A333 Gr. 6
≤ 16" ASTM A333 GR.6 2" 50 60,3 7,34 8,74 160 YES S(MPa) = 149,00 for A671 CC65
Material
≥ 18" ASTM A671 CC65 3" 80 88,9 7,57 11,13 160 YES tf = 0,875
T - °C P - bar P - MPa 4" 100 114,3 7,78 11,13 120 YES
-46 ÷ 38 19,6 1,96 6" 150 168,3 8,22 10,97 80 YES
100 17,7 1,77 8" 200 219,1 8,63 10,31 60 YES
200 13,8 1,38 10" 250 273,1 9,06 12,7 60 YES
Corrosion 12" 300 323,9 9,47 10,31 40 YES
mm 6
Allowance 14" 350 355,6 9,73 11,13 40 YES
16" 400 406,4 10,14 12,7 40 YES
18" 450 457 10,27 11,13 30 YES
20" 500 508 10,66 12,7 30 YES
24" 600 610 11,42 12,7 XS YES
26" 650 660 11,79 12,7 XS YES
28" 700 711 12,17 12,7 XS YES
30" 750 762 12,55 15,88 30 YES
32" 800 813 12,94 15,88 30 YES
34" 850 864 13,32 15,88 30 YES
36" 900 914 13,69 15,88 30 YES
APPENDIX 9

Wall Thickness Calculation piping material class BD1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class BD1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 3,87 4,78 160 YES y= 0,4
Rating ASME 300#
3/4" 20 26,7 3,99 5,56 160 YES S(MPa) = 138,00 for A333 Gr. 6
≤ 16" ASTM A333 GR.6 1" 25 33,4 4,12 6,35 160 YES S(MPa) = 149,00 for A671 CC65
Material
≥ 18" ASTM A671 CC65 1-1/2" 40 48,3 4,44 7,14 160 YES tf = 0,875
T - °C P - bar P - MPa 2" 50 60,3 4,69 5,54 80 YES
-46 ÷ 38 51,1 5,11 3" 80 88,9 5,28 5,49 40 YES
100 46,6 4,66 4" 100 114,3 5,81 6,02 40 YES
200 43,8 4,38 6" 150 168,3 6,94 7,11 40 YES
Corrosion 8" 200 219,1 8,00 8,18 40 YES
mm 3
Allowance 10" 250 273,1 9,12 9,27 40 YES
12" 300 323,9 10,18 10,31 40 YES
14" 350 355,6 10,84 11,13 40 YES
16" 400 406,4 11,90 12,7 40 YES
18" 450 457 12,26 14,27 40 YES
20" 500 508 13,25 15,09 40 YES
24" 600 610 15,22 17,48 40 YES
26" 650 660 16,19 17,48 - YES
28" 700 711 17,17 19,05 - YES
30" 750 762 18,16 20,62 - YES
32" 800 813 19,15 20,62 - YES
34" 850 864 20,13 22,23 - YES
36" 900 914 21,10 23,83 - YES
APPENDIX 9

Wall Thickness Calculation piping material class BM1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class BM1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 0,30 3,73 80S YES y= 0,4
Rating ASME 300#
3/4" 20 26,7 0,38 3,91 80S YES S(MPa) = 207,00
≤ 16" ASTM A333 GR.6 1" 25 33,4 0,47 4,55 80S YES tf = 0,875
Material
≥ 18" ASTM A671 CC65 1-1/2" 40 48,3 0,68 5,08 80S YES
T - °C P - bar P - MPa 2" 50 60,3 0,85 3,91 40S YES
-46 ÷ 38 51,7 5,17 3" 80 88,9 1,26 3,05 10S YES
100 50,7 5,07 4" 100 114,3 1,62 3,05 10S YES
200 42,7 4,27 6" 150 168,3 2,38 3,4 10S YES
Corrosion 8" 200 219,1 3,10 3,76 10S YES
mm 0
Allowance 10" 250 273,1 3,86 4,19 10S YES
12" 300 323,9 4,58 6,35 20 (1) YES
14" 350 355,6 5,02 7,92 20 (1) YES
16" 400 406,4 5,74 7,92 20 (1) YES
18" 450 457 6,46 7,92 20 (1) YES
20" 500 508 7,18 9,53 20 (1) YES
24" 600 610 8,62 9,53 20 (1) YES

Note (1): SCH 20 is a special wall thickness for stainless steel. Use ASME B36.10M.
APPENDIX 9

Wall Thickness Calculation piping material class DD1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class DD1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 4,30 4,78 160 YES y= 0,4
Rating ASME 600#
3/4" 20 26,7 4,52 5,56 160 YES S(MPa) = 138,00 for A333 Gr. 6
≤ 16" ASTM A333 GR.6 1" 25 33,4 4,80 6,35 160 YES S(MPa) = 149,00 for A671 CC65
Material
≥ 18" ASTM A671 CC65 1-1/2" 40 48,3 5,41 7,14 160 YES tf = 0,875
T - °C P - bar P - MPa 2" 50 60,3 5,90 8,74 160 YES
-46 ÷ 38 102,1 10,21 3" 80 88,9 7,08 7,62 80 YES
100 93,2 9,32 4" 100 114,3 8,12 8,56 80 YES
200 87,6 8,76 6" 150 168,3 10,34 10,97 80 YES
Corrosion 8" 200 219,1 12,43 12,7 80 YES
mm 3
Allowance 10" 250 273,1 14,64 15,09 80 YES
12" 300 323,9 16,73 17,48 80 YES
14" 350 355,6 18,03 19,05 80 YES
16" 400 406,4 20,12 21,44 80 YES
18" 450 457 20,85 23,83 80 YES
20" 500 508 22,79 26,19 80 YES
24" 600 610 26,68 30,96 80 YES
26" 650 660 28,58 30,96 - YES
28" 700 711 30,53 33,02 - YES
30" 750 762 32,47 35,56 - YES
32" 800 813 34,41 38,1 - YES
34" 850 864 36,36 39,37 - YES
36" 900 914 38,26 41,66 - YES
APPENDIX 9

Wall Thickness Calculation piping material class ED1

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class ED1 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 4,72 4,78 160 YES y= 0,4
Rating ASME 900#
3/4" 20 26,7 5,05 5,56 160 YES S(MPa) = 138,00 for A333 Gr. 6
≤ 16" ASTM A333 GR.6 1" 25 33,4 5,46 6,35 160 YES S(MPa) = 149,00 for A671 CC65
Material
≥ 18" ASTM A671 CC65 1-1/2" 40 48,3 6,36 7,14 160 YES tf = 0,875
T - °C P - bar P - MPa 2" 50 60,3 7,09 8,74 160 YES
-46 ÷ 38 153,2 15,32 3" 80 88,9 8,83 11,13 160 YES
100 139,8 13,98 4" 100 114,3 10,37 11,13 120 YES
200 131,4 13,14 6" 150 168,3 13,65 14,27 120 YES
Corrosion 8" 200 219,1 16,74 18,26 120 YES
mm 3
Allowance 10" 250 273,1 20,02 21,44 120 YES
12" 300 323,9 23,10 25,4 120 YES
14" 350 355,6 25,03 27,79 120 YES
16" 400 406,4 28,11 30,96 120 YES
18" 450 457 29,22 34,93 120 YES
20" 500 508 32,10 38,1 120 YES
24" 600 610 37,85 46,02 120 YES
26" 650 660 40,67 44,39 - YES
28" 700 711 43,55 47,63 - YES
30" 750 762 46,43 50,8 - YES
32" 800 813 49,31 54,61 - YES
34" 850 864 52,19 57,15 - YES
36" 900 914 55,01 60,96 - YES
APPENDIX 9

Wall Thickness Calculation piping material class AD3

Minimum Pipe Wall Thickness shall be calculated according to ASME B31.3 using the following formula

Legenda:

tm = Minimum required thicness


P = Internal maximum design pressure as per piping class
D = Outside diameter
S = Stress value for material from ASME B31.3 table A-1
E = Quality factor from ASM B31.3 table A-1A
W = Weld joint strenght reduction factor from ASME B31.3 para. 302.3.5(e)
y = Temperature Coefficent from ASME B31.3 table 304.1.1 for t < D/6
c = Corrosion allowances
tf = Mill Tolerance (12,5%)

DN DN OD ASME B31.3 Selected PMC WT W= 1


Piping Class AD3 VERIFIED?
["] [mm] [mm] tmin [mm] mm schedule E= 1
1/2" 15 21,3 3,58 4,78 160 YES y= 0,4
Rating ASME 150#
3/4" 20 26,7 3,62 5,56 160 YES S(MPa) = 138,00 for A333 Gr. 6
≤ 2" ASTM A333 GR.6 1" 25 33,4 3,66 6,35 160 YES S(MPa) = 149,00 for A671 CC65
Material
20" ASTM A671 CC65 1-1/2" 40 48,3 3,77 7,14 160 YES tf = 0,875
T - °C P - bar P - MPa 2" 50 60,3 3,85 5,54 80 YES
-46 ÷ 82 17 1,70 20" 500 508 6,73 9,53 STD YES
Corrosion
mm 3
Allowance

NOTE: This piping class is developed based


on pipeline design conditions and not based
on full flange rating.
Block 5 - AL SHAHEEN FIELD
Document Title PIPING MATERIAL CLASSES
Contract / PO N° Phase
The document relates to [SOR-FY-19.257] – F-DBN – F LOCATION DEBOTTLENECKING PROJECT 4600000750 D
[SOR-FY-19.257]- Rev. Rev. date Status Class
Project ID/Orig. Code Doc. n° ASFYY-06-390004-0001
ROMA A 29-Sep-2021 IFC 1
CTR/VDR Loc./Plat./Mod Discipline Doc. Type System
TBD
Document Number F/Y/Y 06 SPE YY

4.1.6. APPENDIX 10 – FULL VACUUM THICKNESS CALCULATION DETAILS

ADD
This is a new appendix showing the wall thickness calculation details under external pressure only for piping material class AD1,
because HP Flare KO Drum is the only equipment designed for FV design condition.

The calculations show that FV verification fails for sizes 18”, 26” and 28”.
However, as per discussion with CPY, vacuum condition is unlikely for FA platform HP Flare system. Therefore, CTR asks to deviate
from requirement of FV for piping material class AD1 sizes 18”, 26” and 28” through a TQ, which is still under drafting (HOLD 2).

The information contained in this document is the proprietary to North Oil Company.
It must not be reproduced, stored, disclosed to any third party or used for any purpose not authorized by North Oil Company.
Printed documents are uncontrolled and considered as "for information only". Reference should always be made to the on-line EDMS for the updated version

[Page 20 of 20]
APPENDIX 10

WALL THICKNESS CALCULATION UNDER EXTERNAL PRESSURE (FULL VACUUM)


PIPING MATERIAL CLASS AD1
DATA:
P= 0,1 MPa
L= 20000 mm
E= 198000 MPa @ 100 °C (max des. T)
t = as per PMC
CA = 3 mm
MT = 0,125
S= 207 MPa
1.5x amm 207 MPa CS
0.9x yield 216,9 MPa CS

inch 1/2" 3/4" 1" 1.1/2" 2" 3" 4" 6" 8" 10" 12" 14" 16" 18" 20" 24" 26" 28" 30" 32" 34" 36"
Do 21,3 26,7 33,4 48,3 60,3 88,9 114,3 168,3 219,1 273,1 323,9 355,6 406,4 457 508 610 660 711 762 813 864 914
t 4,78 5,56 6,35 7,14 5,54 5,49 6,02 7,11 6,35 6,35 8,38 7,92 7,92 7,92 9,53 9,53 9,53 9,53 12,7 12,7 12,7 12,7
t*MT-C 1,1825 1,865 2,55625 3,2475 1,8475 1,80375 2,2675 3,22125 2,55625 2,55625 4,3325 3,93 3,93 3,93 5,33875 5,33875 5,33875 5,33875 8,1125 8,1125 8,1125 8,1125
Do/t 18,012685 14,3164 13,066 14,873 32,6387 49,2862 50,4079 52,2468 85,7115 106,836 74,7605 90,4835 103,41 116,285 95,1534 114,259 123,624 133,177 93,9291 100,216 106,502 112,666
L/Do 938,96714 749,064 598,802 414,079 331,675 224,972 174,978 118,835 91,2825 73,2332 61,7475 56,243 49,2126 43,7637 39,3701 32,7869 30,303 28,1294 26,2467 24,6002 23,1481 21,8818
USED L/D0 50 50 50 50 50 50 50 50 50 50 50 50 49,2126 43,7637 39,3701 32,7869 30,303 28,1294 26,2467 24,6002 23,1481 21,8818
A 0,00335 0,006 0,0069 0,0051 0,001 0,00043 0,00043 0,00042 0,00015 9,5E-05 0,0002 0,00015 0,0001 8,2E-05 0,00011 8,5E-05 0,00007 6,1E-05 0,00013 0,00011 0,0001 0,00009
B 117 120 120 120 87 47 47 46 21
Pa 8,6605634 11,176 12,2455 10,7578 3,55406 1,27148 1,24319 1,17392 0,23101 0,11738 0,37453 0,21882 0,12765 0,09308 0,1526 0,0982 0,07474 0,06046 0,18269 0,14489 0,12394 0,10544
Pa1
Pa2
Chosen Pa
Pa > P? YES YES YES YES YES YES YES YES YES YES YES YES YES NO YES NO NO NO YES YES YES YES

Notes: P = Maximum allowable external pressure (i.e. ambient pressure)


L = Distance between two adjacent stiff points (flanges, elbows, stiffening rings, etc)
E = Young's modulus
t = Wall thickness as per PMC
CA = Corrosion Allowance
MT = Mill Tolerance
S = Minimum stress value between 1.5x allowable stress and 0.9x yield stress

HOLD 2: Even though the sizes 18", 24", 26" and 28" fail the FV wall thickness calculation, for FA platform HP Flare system vacuum condition is unlikely.
Therefore, CTR asks to deviate from FV requirement for piping class AD1 inches 18", 24", 26" and 28".