Professional Documents
Culture Documents
Combuster Project - Survey
Combuster Project - Survey
Access to the
32.409218, -
LOUISE FEE 2 BATTERY facility is
1 104.183403 - - -
restricted.
Site Name Coordinates PLC / IP adress AI (2) DO (1) Comments
This facility
LUSK DEEP UNIT A 17 32.640539,-
does not have a
2 BATTERY 103.794064 - - -
PLC.
Site Name Coordinates PLC / IP adress AI (2) DO (1) Comments
SRO STATE UNIT COM 11H 32.079833 - Direct Logic 06 There is no available spare, so it is necessary
4 BATTERY 104.081521 IP: 10.202.60.225 to change an analog module for one with 8 Y7
inputs.
Site Name Coordinates PLC / IP adress AI (2) DO (1) Comments
This facility
UNOCAL HPC FEDERAL 32.423267,-
does not have a
5 BATTERY 103.729349 - - -
PLC.
Site Name Coordinates PLC / IP adress AI (2) DO (1) Comments
The pipes to
32.311583,- Direct Logic 205 There is no available spare, so adding an
Y6 the tanks are
6 USP FEE 2 BATTERY 103.995196 IP: 10.102.136.11 analog module is required.
dismantled.
Site Name Coordinates PLC / IP adress AI (2) DO (1) Comments