This Network Rail standard contains colour-coding according to the following Red–Amber–
Green classification.
Red requirements – no variations permitted
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 2 of 47
Compliance
This Network Rail standard/control document is mandatory and shall be complied
with by Network Rail Limited and its contractors if applicable from 2nd March 2019.
Where it is considered not reasonably practicable1 to comply with the requirements in
this standard/control document, permission to comply with a specified alternative
should be sought in accordance with the Network Rail standards and controls
process, or with the Railway Group Standards Code if applicable.
If this standard/control document contains requirements that are designed to
demonstrate compliance with legislation they shall be complied with irrespective of a
project’s GRIP stage. In all other circumstances, projects that have formally
completed GRIP Stage 3 (Option Selection) may continue to comply with any
relevant Network Rail standards/control documents that were current when GRIP
Stage 3 was completed.
NOTE 1: Legislation includes Technical Specifications for Interoperability (TSIs).
NOTE 2: The relationship of this standard/control document with legislation and/or external standards
is described in the purpose of this standard.
Disclaimer
In issuing this standard/control document for its stated purpose, Network Rail Limited
makes no warranties, expressed or implied, that compliance with all or any
standards/control documents it issues is sufficient on its own to provide safety or
compliance with legislation. Users are reminded of their own duties under legislation.
Compliance with a Network Rail standard/control document does not, of itself, confer
immunity from legal obligations.
Where Network Rail Limited has granted permission to copy extracts from Network
Rail standards or control documents, Network Rail Limited accepts no responsibility
for, nor any liability in connection with, the use of such extracts, or any claims arising
there from.
This disclaimer applies to all forms of media in which extracts from Network Rail
standards and control documents might be reproduced.
Supply
Copies of standards/control documents are available electronically, within Network
Rail’s organisation. Hard copies of this document might be available to Network Rail
people on request to the relevant controlled publication distributor. Other
organisations can obtain copies of this standard/control document from an approved
distributor.
1
This can include gross proportionate project costs with the agreement of the Network Rail Assurance
Panel (NRAP).
Page 3 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Issue record
Issue Date Comments
1 December 2017 First Issue
Reference documentation
Railway Group Standards
GE/RT8006 Assessment of compatibility of rail vehicle weights
and underline bridges
GC/RT5100 Safe management of Structures
Network Rail Company Standards
NR/L2/CIV/035/MOD02 Carry out Structural Assessment
NR/L2/CIV/035 Structural Assessments Manual
NR/L3/CIV/006 Handbook for the Examination of Structures
NR/L3/CIV/142 Manage Abnormal Load requests
NR/L3/CIV/031 Control Operation of Exceptional Loads
NR/L3/CIV/022 Restrict Use of Asset
NR/L3/CIV/021 Carry out risk assessment for non-compliant asset
NR/SP/CIV/044 Managing Structures Works
NR/L1/CIV/032 The management of Structures
NR/L3/CIV/076 Management of Risk of Bridge Strikes from Road
Vehicles and Waterborne Vessels
NR/GN/CIV/202 Management of the risk of Bridge Strikes
NR/L3/CIV/023 Assessment of Footbridges
NR/L3/CIV/024 Assessment of Operational Properties
NR/GN/CIV/025 The Structural Assessment of Underbridges
NR/L3/CIV/006/1C Handbook for the examination of Structures Part 1C:
Risk Categories and examination intervals
RT/CE/C/041 Structures Condition Marking Index Handbook for
Bridges
NR/L2/OCS/009 Network Capability Management Procedure
RT/CE/P/016 The Assessment of Bridge Capacity, June 1995
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 4 of 47
Contents
1 Purpose 6
2 Scope 6
3 Terms and abbreviations 7
4 Responsibilities and accountabilities 7
5 Procedure 8
6 Assessment Programme 11
7 Create and issue task list 17
8 Inspection for assessment and other input data 17
9 Quantitative Assessment 19
10 Technical Approval 20
11 Assessment Review 23
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
12 Evaluation 32
13 Initiate actions 32
14 Records 32
Appendix A Permissible assessment techniques 33
Appendix B Assessment of modern structures 35
Appendix C Recommendations for prioritisation of structural assessments 37
Appendix D Assessed categories for footbridges, under bridges and operational
properties 40
Appendix E Review of assessment results 42
Appendix F Assessed category 44
Figure 1 Assessment process 9
Figure 2 Planned date for review of validity of the recorded load capacity of the asset12
Figure 3 – Assessment review procedure 24
Figure 4 – Assessment and intervention timescales 28
Table 1 – RACI matrix 7
Table 2 – Assessment level definition 10
Table 3 – Requirements for first time structural assessment 13
Table 4 – Re-assessment of structures 14
Table 5 – Safety measures applicable to the assessed category for all structures
(excluding fatigue) 27
Table 6 – Safety measures against fatigue for fatigue susceptible details in steel and
wrought iron underline bridges 30
Table A.1 – Permitted assessment techniques 34
Table B.1 – Criteria for structure design to modern codes 36
Table C.1 – Status of previous assessment 37
Table C.2 – Construction type, age and form of structure 38
Table C.3 – Usage and type of loading 38
Table C.4 – Condition of the structure 38
Table C.5 – Risk assessment appraisal 39
Table F.1 – Derivation of assessed category limit state principles for structures 44
Table F.2 – Values of coefficients 45
Table F.3 – Derivation of assessed category permissible stress approach structures46
Page 5 of 47
1 Purpose
This document sets out the procedures for managing the load capacity of structures
through structural assessment.
Structural assessment is a form of structural analysis that uses the existing
geometry, dimensions, material properties and contemporary condition of a structure
to understand its load capacity.
It forms part of the control barrier ‘Carry out Structural Assessment and implement
actions’ to prevent functional failure of the structure.
2 Scope
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
The scope of this process relates to the structural assessment of structures (and their
elements) for which Network Rail has responsibility, either as the owner or as a result
of specific agreement.
It specifically applies to the following asset types and blocks:
a) Underline bridges
b) Overline bridges
c) Footbridges
d) Culverts (except where the primary method of support is by arching action)
e) Undercrofts
f) Canopies
g) Train and depot sheds
h) Tunnels that directly support external traffic loads
i) Side bridges
j) Other Structures where examination of condition alone is insufficient to inform
management decisions.
Further guidance on the requirements for structural assessment of different asset
types and blocks is provided in Appendix A.
This document is mandated for use by everyone managing the load capacity of
existing structures.
Do not use structural assessment techniques for design unless directed by structures
controls for ‘design, construct and commission’ or specifically instructed by a
representative of Network Rail.
Page 6 of 47
Responsible Engineer
Route Asset Manager
Asset Engineer
(Assessment)
Contractors
Assessor
Checker
Process task
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 7 of 47
5 Procedure
5.1 Structural assessments process
The objective of structural assessment is to establish the capacity of the structure to
carry existing or future loads.
The process of structural assessment as defined in Figure 1 is intended to:
a) determine, check and identify changes in the stability, load bearing capacity,
condition and use of the structure
b) define actions that are required to maintain the safe use and performance of
the railway infrastructure
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 8 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Figure 1 Assessment process
Page 9 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
c) any effects due to settlement
d) age and properties of the materials
e) construction form
f) elements and connections which are subject to high local loading.
5.2.3 Levels of assessment
Assessments should be carried out in levels. The levels have increasing refinement
from Level 0 (most simple) to Level 3 (most complex), as in Table 2.
Level Assessment definition
0 A simplified assessment based on principal checks of critical sections and
conservative load distribution.
Network Rail has developed a suite of Level 0 assessment tools to
support Level 0 assessment
First time assessment of structures using a Level 0 approach is generally
based on record information and supplementary site investigations as
determined by the Asset Engineer (AE).
1 A detailed assessment based on standard structural engineering design
principles that takes greater account of load distribution, beneficial effects
and other analytical assumptions.
First time assessment of structures using a Level 1 approach is generally
based on an Inspection for Assessment (I for A).
2 Use of more refined analysis, better structural idealisation and potentially
material test information to refine a Level 0 or Level 1 Assessment.
3 Most complex level, using some or all of: advanced analysis, statistical live
load models, load tests or worst credible material strengths.
Table 2 – Assessment level definition
NOTE: Refer to NR/L2/CIV/035/MOD02 for detailed requirements for each level of Structural
Assessment.
Page 10 of 47
The AE shall determine and record the structural assessment regime for assets
identified as requiring assessment.
NOTE: Requirements were introduced through ‘RT/CE/P/016: The Assessment of Bridge Capacity’ in
June 1995 for a programme of structural assessment of bridges to be established and prioritised by
December 1995. This exercise formed the basis of the structural assessment regime.
Page 11 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
To determine the structural assessment regime for each asset, the AE should
identify:
a) Network Rail’s capability or strength requirements;
b) the load capacity of the asset (if quantified);
c) the information on which the load capacity is based.
The AE should review this information taking account of the following:
a) Engineering knowledge (as it affects the asset);
b) Environmental changes (or predicted changes);
c) Confidence in the information on which the load capacity of the asset is based;
d) Network Rail’s licence obligations;
e) Proposed network changes;
f) The condition of the structures stock.
The AE then should define and record the structural assessment regime for each
structure by establishing the assessment regime shown in Figure 2:
Figure 2 Planned date for review of validity of the recorded load capacity of the
asset
The AE shall set the planned date for first time assessment:
a) to comply with clause 6.4 for modern structures where the load capacity is
based on design information.
b) to comply with Table 3 for asset types and blocks where a date for completion
of the assessment programme has been mandated and the asset is not
modern. Where the mandated date is in the past the structure shall be risk
assessed in accordance with 6.8 and assessed within 2 years.
NOTE 1: For example, where a structure is transferred into Network Rail ownership.
NOTE 2: The requirements introduced through RT/CE/P/016 have subsequently been developed and
the dates for completion of the programme of first time structural assessment of specific asset types
and blocks have been mandated as shown in Table 3.
c) based on their priority for all other structures
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 12 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
assessment review process, are set out in clause 11.
6.4 Modern Structures
The AE determines whether design loading information can be used as the basis of
the load capacity for modern structures (refer to Appendix B for more detail).
Where original design information is used as the basis of the load capacity of the
structure, the AE shall determine the assessed category and the fatigue category and
review its validity in accordance with 6.5.
If the existing records are not sufficient to confirm the load capacity, the AE shall risk
assess the structure in accordance with 6.8 and include it in the task list for structural
assessment.
The first time structural assessment of a modern structure shall be carried out either:
a) when it reaches half its intended design life without previously being
assessed; or
b) earlier where the factors listed in 6.5 apply.
Page 13 of 47
I for A Examination
Interval(2) Detailed
Other
2 x Detailed Examination(3)
Other than I
Examination
for A
Interval(2)
Page 14 of 47
6.5 Review the validity of the recorded load capacity of the asset
The AE shall review whether the recorded load capacity of the asset is still valid:
a) upon completion of a detailed examination for structures managed by the
Route Asset Manager (RAM) (Structures) and the RAM (Buildings); and
b) where any of the following factors apply:
i. a structure is reported or observed as showing new signs of distress
ii. a significant deterioration in condition has occurred which may indicate
that the assessed capacity of any element of the structure has been
reduced
iii. a significant change in engineering knowledge is reported including
fundamental changes in design or assessment philosophy as defined in
British Standards or company standards
iv. following an incident, such as accidental damage from bridge strike or
other accidental collision, scour or flooding
v. a proposed change may result in an increase of the applied loading and
its effects
vi. works affecting the load capacity of a structure
vii. when the programmed date for review is due
viii. other works on the asset
The AE shall review the asset and take account of the factors set out in 6.3.
NOTE 1: The review of the asset is to include all structural elements whether assessed qualitatively
or quantitatively.
The AE should use record and management information to support the review.
The information required to undertake the review may comprise of any of the
following:
a) Current condition of the structure
b) Current assessed load capacity of the structure
c) Repairs introduced to the structure since the previous structural assessment
d) Existing safety measures
e) Record information
The AE determines whether to collect further information or instruct a re-assessment
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
if:
a) the available records are not sufficient to confirm that the recorded load
capacity remains valid;
b) the available records are not sufficient to confirm that the structure meets or
exceeds the required capacity;
c) the current assessment is not a proven Level 0 assessment.
All Level 0 assessments shall be proven by the end of 31st March 2024.
Page 15 of 47
The AE can update the calculations more frequently than the maximum interval for
re-assessment.
The AE shall update the records following works to restore or enhance the load
capacity of the asset and determine whether to change the assessment regime,
defined in clause 6.3, based on the date of completion of the works.
The AE shall update the records where the compliance date is changed based on the
most current Detailed Examination (DE), Supplementary Site Inspection (SSI) or I for
A.
Note 3: The AE should seek where practicable to align the assessment and examination regimes for
the assets.
6.6 Actions following a review of the validity of the recorded load capacity.
If the recorded load capacity is confirmed as valid the AE shall record the outcome
and the date for the next review.
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
If the recorded load capacity cannot be confirmed to be valid the AE shall risk assess
the structure (in accordance with clause 6.8) and include it in the task list as set out
in clause 7.
The AE shall initiate safety measures in accordance with clause 11.3 where it is
determined these are required.
6.7 Re-assessment of structures
The objective of the re-assessment of a structure is to update or verify the capacity of
the structure to carry existing or future loads using information collected through site
investigation.
The re-assessment of structures shall be based on a site investigation that meets the
minimum requirements set out in Table 4 and is to comprise:
a) validation of the current structural assessment; or
b) completion of a new structural assessment
NOTE 1: The procedure of validation of a current structural assessment is included in
NR/L2/CIV/035/MOD02.
NOTE 2: The procedure to carry out a new structural assessment at different levels is shown in
NR/L2/CIV/035/MOD02.
The AE shall instruct a re-assessment of a structure in accordance with the
timescales in Table 4.
The assessment regime for an asset may be changed at the point of re-assessment.
NOTE 3: Requirements for the use of existing design, assessment and check calculations for the re-
assessment are included in NR/L2/CIV/035/MOD02.
The AE shall use the outcome of the re-assessment to evaluate the structure in
accordance with the requirements in clause 11 and 12 and reconfirm or otherwise the
assessment regime of the structure and the requirements for safety measures.
The AE shall revise, sign and date Form BA.
6.8 Risk assessment
The AE should risk assess structures that:
Page 16 of 47
a) have not received the minimum site investigation for re-assessment within the
task list year in which their compliance date falls; or
b) are not compliant against the limits of the assessment regime defined in 6.3;
or
c) have records that are not sufficient to confirm their load capacity
This shall be carried out by the AE in accordance with the procedure set out in
NR/L3/CIV/021.
6.9 Prioritisation
The AE may prioritise the programme of structural assessments to assist in
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 17 of 47
features
ii. previous strengthening and repairs
iii. reduction in strength due to services laid through, or near the structure
iv. to establish any non-conformance with the asset.
NOTE 1: For example non-conformance with the asset could be construction out of tolerance and
imperfections.
Detailed requirements for completing an I for A are included in:
NR/L2/CIV/035/MOD02,
NR/L3/CIV/023,
Page 18 of 47
NR/L3/CIV/024,
NR/GN/CIV/025,
The Inspection for Assessment Procedure is shown in NR/L2/CIV/035/MOD02.
The AE should arrange for record information to be provided to the assessing
organisation for review.
NOTE 2: Record information includes all relevant information such as the form of structure, material
identification, design drawings and calculations, as built drawings, previous examination reports,
previous assessment reports, maintenance records, soils data, details of local mineral extraction and
health and safety files.
Prior to undertaking the I for A, the AE shall agree to the scope of the I for A and all
proposed intrusive investigations and the arrangements for making good when the
work is complete.
8.3 Supplementary Site Inspection
A targeted inspection may be used to collect data missing from the records using the
requirements and procedure for completing an I for A (refer to 8.2).
8.4 Use of detailed examinations
Prior to undertaking the assessment, the AE provides to the assessing organisation
an approval for the use of the current detailed examination considering the
requirements in NR/L2/CIV/035/MOD02.
9 Quantitative Assessment
9.1 General
The assessment report is to state the following:
a) The identity of the structure (by unique structure name, number and location);
b) The name, address and contact details of the assessing organisation,
assessor and checker;
c) The date and results of the site investigation used to inform the assessment;
d) Assessment results identifying the overall load capacity of the structure and
identifying the limiting elements;
e) Conclusions and recommendations for subsequent actions, including any
safety measures;
f) Identification of any means by which the load capacity of a substandard
structure may be improved;
g) A synopsis identifying the assessment methods used, any critical assumptions
adopted and the important results of the inspection and assessment relating to
the load capacity of the structure;
h) The assessed category used for each assessed element (refer to clause 9.2)
and the load used to determine the Assessed Category (if applicable);
i) The fatigue assessed category (if applicable);
j) Results for each element under each load combination.
Page 19 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
The assessment report is signed by the assessor.
The assessment report shall only be regarded as complete and valid when the
completed and signed certificate of assessment and checking (Form BA/BA0) is
included.
The maximum period for completion of the assessment from the date of the site
investigation (refer to Figure 4) is two years.
9.2 Assessed category of a structure
The assessed category shall be determined for each assessed element of the
structure.
The overall assessed category for the structure is determined based on the element
with the lowest assessed category.
The assessed category for an element is obtained with reference to the utilisation
factor ‘U’ in accordance with:
NR/L3/CIV/023;
NR/L3/CIV/024;
NR/GN/CIV/025.
NOTE 1: See Appendix F for all other structures except masonry arches
NOTE 2: The utilisation factor U is the total assessment load effects divided by the corresponding
assessment resistance. A value of U less or equal to 1.0 indicates that the structure is able to safely
carry the normal specified loading, and that no safety measures are necessary. A value of U greater
than 1.0 indicates that the structure is a substandard structure, and that safety measures may be
necessary in order to restore the safety of the structure. Evaluation should be carried out to determine
if further actions are required.
The assessed categories are described in Appendix D.
The assessed category of a substandard structure could be changed to an improved
mitigation assessed category (refer to Table 5) provided that an evaluation of the
structure is undertaken and the required safety measures against overload are
implemented.
NOTE 3: Factors that might be considered to improve the assessed category are reduction of RA
loading, speed restriction, real traffic assessment, a less conservative assessment approach (e.g.
shape limitations, rivets capacity, effective length) and holding repairs.
10 Technical Approval
10.1 General
Requirements regarding the format and contents of the technical approval
documentation are included in NR/L2/CIV/035/MOD02.
Page 20 of 47
In the case of Network Rail owned public road overline bridges where the
Highway/Roads Authority is approached to arrange interim safety measures and
discuss options for renewal in the event the bridge is determined to be substandard:
Page 21 of 47
NOTE 2: This review is not a formal check of the assessment. Checking remains the responsibility of
the assessing organisation.
The AE shall sign the Form BA or BA0 as the reviewer if the assessment report is
satisfactory based on the requirements set out in this clause and includes information
for any actions that are required in response to the assessment report.
The RAM or their nominated representative shall countersign Form BA/BA0 to
confirm the:
a) conclusions of the assessment report and assessment review are valid; and
b) procedures set out in control documents have been followed.
Page 22 of 47
Page 23 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 24 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 25 of 47
Page 26 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
A2 - - -
(4)
A3 15 - -
(3) (2)
B 10 A2 -
C(3) 6 A2 -
A3 15
B 10(2)
D(3) 4 A2 -
A3 15
B 10(2)
C 6
(3
E ) Unacceptable A2 -
A3 15
B 10(2)
C 6
D 4
(5)
F Unacceptable A2 -
A3 15
B 10(2)
C 6
D 4
Table 5 – Safety measures applicable to the assessed category for all
structures (excluding fatigue)
(1)
If necessary an improved mitigation assessed category may be obtained by
considering a reduction in load effects and/or other measures (refer to 9.2), subject
to an evaluation of the substructure and implementation of the required safety
measures.
(2)
For non-bridge structures with elements sub-standard due to snow or wind
loading safety measures are not required.
(3)
Safety measures to be applied within three months
(4)
For assessed category A3 where direct monitoring in accordance with 11.9 is
carried out, strengthening or reconstruction is not required
(5)
Safety measures to be applied without delay and within one month.
Page 27 of 47
If a load restriction will be in place for more than 6 months, the AE shall apply for
permanent or short term Network Change in accordance with Network Code (refer to
NR/L2/OCS/009)
The AE shall arrange for strengthening or reconstruction to be carried out within the
maximum periods specified in Table 5.
NOTE 2: The actual period before strengthening or reconstruction is to take account of the rate of
deterioration and the nature of the potential modes of failure.
The limits of the intervals for completion of the assessment is measured from the
date of the site investigation used to inform the assessment.
The limits of the intervals for further assessment, subsequent completion of repair,
strengthening or reconstruction is measured from the sign off of the Form BA/BA(0).
NOTE 3: The date of the sign off of the Form BA is the date of the structural assessment when
determining the limits of the period for completion of strengthening and reconstruction (refer to Figure
4).
Page 28 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 29 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 30 of 47
Page 31 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
12 Evaluation
The AE shall carry out and document an evaluation of the asset and its management
on completion of the assessment review as set out in NR/L1/CIV/032.
13 Initiate actions
The AE should initiate the required actions on completion of the Structure Evaluation
as per the process set out in NR/L1/CIV/032.
14 Records
The AE shall keep and maintain assessment records, including any review of an
assessment, for the lifetime of the structure.
Records should include, but not be limited to:
a) The nature and extent of the assessment or assessment review
b) Any calculations with their applicability to current loading, and records of
technical approval
c) Assessed load capacities under each loading scenario
d) Assessed category prior to, and the reduced loading assessed category after
imposition of recommended safety measures
e) Fatigue assessed category
f) Records of the evaluation and follow up management actions
g) Any safety measures taken (either as a temporary or as a permanent
measure) including any additional measures against fatigue as a result of the
assessment
h) The abnormal load capacity of the structures with road vehicle access, and
any applicable conditions
i) Structure condition, including details of critical members, and for bridges
fatigue susceptible details that require particular monitoring
j) Date of current assessment and next programmed review of validity of the
assessment determined in accordance with 6.3
k) When calculations are reviewed as part of a review of an Assessment, if
confirmed, the current validity of calculations shall be documented.
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 32 of 47
Appendix A
Permissible assessment techniques
The AE shall select the level of assessment to be instructed for each asset
determined to require structural assessment.
Knowledge of the current usage of the asset can be taken into account in
determining the scope of structural assessment required.
Table A.1 provides guidance on the following:
a) Requirements for routine assessment of different asset groups (refer to clause
2).
b) Methods of assessment applicable to each asset group (refer to clause 5.2).
Assessment levels differentiate between levels of complexity to be used when
carrying out a structural assessment.
An assessment is progressed, through the levels of increasing complexity to the right
in Table A.1 until the assessment review confirms:
a) The asset meets Network Rail’s capability requirements
b) Further assessment is not worthwhile and works or permanent load controls
are planned within the timeframes set out in Table 7.
Structures that do not require routine structural assessment can still be assessed
where a specific cause of concern has been identified.
These exceptional circumstances could include one or more of the following:
a) The structure is reported or observed as showing signs of distress
b) A significant deterioration in condition has occurred which may indicate that
the assessed capacity of any element of the structure has been reduced
c) A significant change in engineering knowledge is reported including
fundamental changes in design and assessment Philosophy as defined in
Eurocodes, British Standards or Company Standards
d) There has been or is proposed to be a change in the loading on the structure
since it was built or assessed.
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 33 of 47
Use of design
assessment
assessment
required
Routine
Level 0
Level 1
Level 2
Level 3
Risk
Asset group/block
Bridges Y# Y N Y Y Y Y
Viaducts Y Y N Y Y Y Y
Culverts Y #
Y N Y Y Y Y
Tunnels that directly support traffic
Y Y N Y Y Y Y
loads
Buildings including light
maintenance depots, maintenance
N Y Y N Y Y Y
delivery units and national delivery
service buildings
Critical lineside buildings N Y Y N Y Y Y
Canopies lineside Y Y Y N Y Y Y
Canopies non-lineside N Y Y N Y Y Y
Car park N Y Y N Y Y Y
Concourses N Y Y N Y Y Y
Depot sheds Y Y Y N Y Y Y
Footbridges Y Y N Y Y Y Y
Lifts/escalators N Y Y N Y Y Y
Non-passenger platform/loading
N Y Y N Y Y Y
dock
Platform N Y Y Y Y Y Y
Road/side bridge Y Y N Y Y Y Y
Subway Y Y N N Y Y Y
Train shed Y Y N N Y Y Y
Undercroft spanning track Y Y N Y Y Y Y
Undercroft not spanning track N Y Y Y Y Y Y
Waiting shelters N Y Y N Y Y Y
Freestanding masonry walls N Y Y N Y Y Y
Other asset which cannot be
managed through review of Y Y Y N Y Y Y
condition
Table A.1 – Permitted assessment techniques
# Routine assessment is not required where the primary method of support is by arching
action for culverts and bridges with spans less than 2.0m.
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 34 of 47
Appendix B
Assessment of modern structures
The design loading can be used as the basis for the load capacity of structures
provided:
a) There has been no significant change in engineering knowledge
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
b) The structure is designed to modern loading requirements
c) Sufficient design records are available for review to confirm design loading
d) The structure forms a simple static load system
e) The structure is in a good condition and no defects are recorded through the
examination process that compromises the load capacity
f) No anomalies are identified during desk study or site investigation, for
example:
i. Misalignment of connections
ii. Absence of bracing
iii. Eccentric loadings
iv. The structure is not subject to ground movement
Table B.1 sets out criteria for establishing whether a structure has been designed to
modern codes (current engineering knowledge and loading requirements) based on
its year of construction.
Asset group Primary Material Year of
construction(1)(2)
Underline bridges All 1976
Page 35 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
and require structural assessment. A register of post tensioned concrete
footbridges is required to be held by each Route.
Page 36 of 47
Appendix C
Recommendations for prioritisation of structural assessments
C.1 Principles
The objectives of the structural assessment as described in 5.1 address safety and
economy reasons which impact on the prioritisation.
Consider safety reasons as prime consideration for prioritisation.
To assign prioritisation rating and a risk score for structural assessment, multiply
together the factors given in Tables C.1-C.4.
NOTE: The highest score denotes the greatest urgency.
C.2 Prioritisation Rating System
Prioritise the structural assessment and determine the risk score based on following
attributes governing the structural safety:
a) usage and applied type of loading to the structure
b) type and form of structure
c) condition of the structure
d) vulnerability of the structure to accidental damage
e) any strengthening or repairs
f) the consequence of failure to the structure
g) status of the previous assessment except for structures in steady state with
respect to assessment.
No factors are given for the last two attributes. The failure of a structure is considered
catastrophic in all cases, and thus a constant factor applies to all structures for
consequences of failure.
The attribute vulnerability of a structure to accidental damage is included in the
factors in Table C.2 and C.3.
NOTE: The vulnerability of a structure to accidental damage is dependent on the construction type,
age and form and also usage and type of loading. --`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 37 of 47
Page 38 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
poor/fair/good by marking the structure on a scale of 0-100, where 100 indicates a structure
in 2perfect condition.
C.3 Risk Assessment Appraisal
For structures that require structural assessment in accordance with 6.4 and 6.3
consider the timescales for assessment shown in C.5.
Risk score Assessment
Structure showing Include to current
signs of distress year task list urgently
640-180 Next year assessment
task list
1-179 Within 2 years
Table C.5 – Risk assessment appraisal
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 39 of 47
Appendix D
Assessed categories for footbridges, under bridges and operational properties
D.1 Assessed Category A1
Assessed category A1 corresponds to an utilisation factor (U) = 0.8 such that the
element has significant spare design capacity under the assessment loading.
No safety measures are necessary, and there is scope to increase the loading up to
a limit of U = 1.0.
D.2 Assessed Category A2
Assessed category A2 corresponds to an utilisation factor (U) of 0.8 < U = 1.0 such
that the element has adequate capacity under the assessment loading.
No safety measures are necessary.
D.3 Assessed Category A3
Structures in this category are defined as Sub-standard Structures.
Assessed Category A3 corresponds to an utilisation factor (U) of U >1.0 up to the
maximum in accordance with relevant standards:
NR/L3/CIV/023
NR/L3/CIV/024
NR/GN/CIV/025
The risk of overload of an element in assessed category A3 is managed by a
reduction in the partial factor for materials only with monitoring of condition until
strengthening or reconstruction within a maximum 15 years.
Where direct monitoring is carried out strengthening or reconstruction is not
necessary provided the condition at assessment is maintained.
D.4 Assessed Category B
Structures in this category are defined as substandard structures.
Assessed category B is a lower categorisation than A3.
The risk of overload of an element in assessed category B is managed by a reduction
in the partial safety factors for both materials and loading and monitoring of condition
until strengthening or reconstruction within a maximum period of 10 years.
D.5 Assessed Category C
Structures in this category are defined as substandard structures.
Assessed category C is a lower categorisation than B.
The risk of overload of an element in assessed category C is managed by a
reduction in the partial safety factors and monitoring of condition until strengthening
or reconstruction within a maximum period of 6 years.
More severe safety measures are required compared to assessed category B.
D.6 Assessed Category D
Structures in this category are defined as Sub-standard Structures.
Page 40 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 41 of 47
Appendix E
Review of assessment results
E.1 General
When on completion of an assessment (including subsequent levels of assessment)
an element of a structure does not meet the capability or strength requirements, the
AE will evaluate the assessment results.
Following the evaluation the AE confirms whether the structure is substandard and
requires safety measures or no further actions are necessary to manage the
structure safely.
E.2 Masonry Arches
For masonry arches with insufficient capacity, undertake structural review to
determine the required Safety Measures and the date of the review of the Structural
Assessment considering:
a) structural assessment results
NOTE: A bridge that has been initially assessed and found to have <RA10 capacity could be
carrying RA10 traffic each day and may be showing some signs of deterioration. However, if the
asset is performing as expected and the deterioration trend is not cause for concern then the arch
can be considered to have sufficient capacity. This is provided that the examination regime is
appropriate to monitor changes in precursor defects, allowing maintenance to address
deterioration to be planned and implemented.
b) condition of the structure
c) behaviour of the structure under the passage of rail traffic
d) potential for increased capacity that may be derived from hidden details (such
as haunching, or internal spandrel walls) and which can be proved by site
investigation
e) effect that a reduction in impact factor would have on the assessed capacity
(limit state methods of structural assessment only)
f) type and frequency of the regular traffic on the structure
NOTE: A masonry arch which regularly carries lightly loaded vehicles will often be capable of
sustaining infrequent heavy freight loads without danger of collapse. However, regular
application of heavy freight loading may well induce more rapid deterioration of the arch.
The process of the evaluation may conclude that:
a) No further actions are necessary to manage the structure safely
b) Further actions are necessary to manage the structure safely (such as carry
out further structural assessments)
NOTE 1: More sophisticated analysis is likely to improve the assessment result for a masonry arch but
is a time consuming and costly exercise, making it not always appropriate.
NOTE 2: Further assessment of masonry arch bridges may be considered in cases where the
engineer’s review has determined that the additional information that it would provide would be
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
beneficial to the management of the structure (for example where load paths are not understandable
and greater confidence is required, to inform requirements for strengthening, to confirm the arch has
capability to carry higher loads than it is currently experiencing and where this cannot be assumed
through evidence of performance of arches of the same construction).
Page 42 of 47
Page 43 of 47
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Appendix F
Assessed category
F.1 Introduction
Obtain the assessed category for an element from the utilisation factor ‘U’ derived for
the normal specified loading.
A value of U less than or equal to 1.0 indicates that the structure is able to carry
safely the normal specified loading.
A value of U greater than 1.0 indicates that the structure is a sub-standard structure.
F.2 Limit state assessments
For structures that have been assessed using limit state principles (e.g. steel to BS
5950 or concrete to BS 8110), use Table F.1 to obtain the assessed category,
supplemented by 0 for values of the coefficients KmB, KmC and KmD.
In Table F.1:
a) Utilisation factor U = SA* / R*, where:
b) SA* is the assessment load effects as defined by the dead, superimposed and
live loading
c) R* is the corresponding assessment resistance as defined by BS 5950 or BS
8110 or other limit state codes having equivalent partial factors.
Utilisation factor U Assessed
category
Min Max
< 0.8 0.8 A1
> 0.8 1.0 A2
> 1.0 KmB A3
> KmB KmB x 1.05 B
> KmB KmC x 1.15 C
> KmC x 1.15 KmC x 1.30 D
> KmD x 1.30 KmD x 1.56 E
> KmD x 1.56 - F
Table F.1 – Derivation of assessed category limit state principles for structures
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`--- Page 44 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=AECOM UK - NRACT & LUL/5906698027, User=Das, Abhishek
No reproduction or networking permitted without license from IHS Not for Resale, 04/08/2019 00:05:54 MDT
Ref: NR/L2/CIV/035/Mod01
Issue: 1
Date: 02 December 2017
Compliance date: 02 March 2019
Concrete and
concrete wall
Wrought iron
River shear *
Reinforceme
Co-efficient
connectors
Steel post
Steel pre
concrete
Shear in
tendons
nt and
Shear
Bond
plain
1905
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 45 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=AECOM UK - NRACT & LUL/5906698027, User=Das, Abhishek
No reproduction or networking permitted without license from IHS Not for Resale, 04/08/2019 00:05:54 MDT
Ref: NR/L2/CIV/035/Mod01
Issue: 1
Date: 02 December 2017
Compliance date: 02 March 2019
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 46 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=AECOM UK - NRACT & LUL/5906698027, User=Das, Abhishek
No reproduction or networking permitted without license from IHS Not for Resale, 04/08/2019 00:05:54 MDT
Ref: NR/L2/CIV/035/Mod01
Issue: 1
Date: 02 December 2017
Compliance date: 02 March 2019
accordance with BRE Digest 332: Loads on Roofs from Snow Drifting against
Vertical Obstructions and in Valleys, a similar increase of permissible stresses is
permitted provided the increase in stress is due to drift snow loads and wind only.
The maximum increase is limited to 25%
--`,`,,`````,,`,`,`,```,,``,`,``-`-`,,`,,`,`,,`---
Page 47 of 47
Copyright Network Rail
Provided by IHS Markit under license with Network Rail Licensee=AECOM UK - NRACT & LUL/5906698027, User=Das, Abhishek
No reproduction or networking permitted without license from IHS Not for Resale, 04/08/2019 00:05:54 MDT