CV of Rabin Raut

CURRICULUM VITAE

Position Title and No. Senior Surveyor


Name of Firm Victor Engineering Solutions Pvt. Ltd.
Name of Expert Mr. Rabin Raut
Date of Birth 04 December 1976
Citizenship Nepali

Education: :
Diploma in Surveying, 2007

Employment Record:

Employing organization and


Summary of activities performed
Period your title/position. Contact Country
relevant to the assignment
information for references
GIS related data collection, analysis,
From May Victor Engineering Solutions Pvt.
data processing and report preparation
2019 - Till Ltd. Nepal
of various projects undertaken by this
Date Position Held: Senior Surveyor
Consultancy.
Responsible for topographic data
From Jan Victor Engineering Solutions Pvt. collection, analysis and preparation map
2021 to April Ltd. Nepal for construction of Hospital Building at
2021 Position Held: Surveyor Kalikot. Client: Rabi Lamichhane
Foundation.
Responsible for collecting the
From Oct. Victor Engineering Solutions Pvt. topographic data, analysis and
2020 to Jan Ltd. Nepal preparation of contour map for
2021 Position Held: Surveyor construction the park at Budhanilkantha.
Client: Budhanilkantha Municipality.
Responsible for collecting the
NJS in JV with Nepal consults
From Jan 14 topographic data, analysis and
Pvt. Ltd. Nepal
To May 2014 preparation for DPR.
Position Senior Surveyor
Responsible for collecting the
From Extreme Engineering Solution
topographic data, analysis and
March2013 Pvt..Ltd. Nepal
To March 013 Position Senior Surveyor preparation for DPR.

Government of Nepal, Ministry Responsible for collecting the


From Nov
Physical Planning and topographic data, analysis and
2012 To Nov Nepal
infrastructure development preparation for DPR.
2012
Position Senior Surveyor
Responsible for collecting the
MMM Group Canada, Sai topographic data, analysis and
From June
Consulting Eng. P Ltd., India in
2011 To Nov. Nepal preparation for DPR. Client: Road Sector
JV with ITECO Nepal and TMS
2011 Development Project
Position Held: Senior Surveyor

Responsible for collecting the


From topographic data, analysis and
ITECO Nepal (P) Ltd.
Nov.2010 To Nepal preparation for DPR. Client: Upper and
Position Held: Surveyor
Feb 2011 Lower Solu Hydropower Projects

Responsible for collecting the


topographic data, analysis and
From April
ITECO Nepal (P) Ltd. preparation for DPR. Client: Likhu 1,
2007 To April Nepal
Position Held: Surveyor Likhu 2 and Likhu A Hydropower Projects,
2009
RNDP Project, Chainpur

1
CV of Rabin Raut

Memberships in Professional Associations and Publications:

Trainings:

• 6 Months Japanese Language Training


• Training on the use of AutoCad and Land Developer Software On the job training on the use of
Pentax and Sokia Total Station Survey Equipment.

Language:

Speaking Reading Writing


English Good Good Good
Nepali (Mother Tongue) Excellent Excellent Excellent
Hindi Good Good Good
Japanese Fair Basic Basic

Adequacy for the Assignment:


Detailed Task Assigned on Reference to Prior Work/Assignments that Best
Consultant's Team of Experts: Illustrates Capability to Handle the Assigned Tasks
Name of assignmIent or project:Melamchi water supppply
project
Year:jan 2014,
Location:Water treatment plant at Sundarijal
Position held: Senior surveyor
Activity performed:
He will be assigned the responsibility  Joint survey with contractor in order to established
for Total Station related collecting basis for earthwork.
cadastral data as well as plot,  Checking the final lines and levels of the finished
preparation of plot wise map & works of associated structure.
calculate the area. The Surveyor will
Name of assignment or project: Acess road from Tokha to
be responsible for Identify Control Nuwakot
Points, Detail by TS, Data Plot and Year: March 2013, (total 10 days)
calculate the land area. Location: Tokha, kathmandu
Client: Extreme Engineering Pvt. Ltd
Main project features: an inner access road joining Nuwakot
with Kathmandu
Positions held: Senior Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Cross-section and L-section of the road
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: Fast track road project


Year :2012 Nov ( 20 days assignment)
Location: Dakshinkali to sisneri (15 km stretch)
Client: Government of Nepal, Ministry of Physical Planning
and infrastructure development
Main project features: 75 km road linking Kathmandu o
Nijgad
Positions held: Senior Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Cross-section and L-section of the road
• Detailed topographical survey
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: (STEP) Sub Regional

2
CV of Rabin Raut

Transport Enhancement Project


Year: Jan 2012 to May 2012, (total 4 months)
Location: Okhaldunga to Salleri, Solukumbhu
Client: Department of Roads
Main project features: Construction Supervision of the
Upgrading of roads in mountainous terrain
Positions held: Senior Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Joint survey with the Consultant
• Cross-section and L-section of the road
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: Road Sector Development


Project
Year: June 2011 to November 2011, (total 6 months)
Location: Darchula District of Nepal
Client: Department of Roads
Main project features: Construction Supervision of the
Upgrading of roads in mountainous terrain
Positions held: Senior Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Joint survey with the Contractor
• Cross-section and L-section of the road
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: Lower Solu Khola


Hydropower Project, 75 MW
Year: April 2011, (total 15days)
Location: Solu District of Nepal
Client: Clean Energy Developers
Main project features: Survey of ERT Lines
Positions held: Surveyor
Activities performed: Responsible for:
• Field alignment of ERT lines
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: DPR Preparation for Deomai


Khola Hydropower Project,
Year: March 2010 to April 2011, (total 1.5 months 40 MW)
Location: Illam District of Nepal
Client: Himal Hydro.
Main project features: Preparation of topographical map,
river cross-sections, L-sections, for the detailed design of the
Project
Positions held: Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Detailed topographical survey of headworks area,
powerhouse area and surge tank area using Pentax Total
Station.
• Cross-section and L-section of river at Intake and
Powerhouse
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: DPR Preparation for Upper


and Lower Solu Hydropower Projects, upper (40 MW) and
lower (75 MW)
Year: Nov 2010 to Feb 2011, (total 3 months)

3
CV of Rabin Raut

Location: Solu District of Nepal


Client: Upper Solu Hydroelectric Company and Lower Solu
Hydroelectric Company.
Main project features: Preparation of DPR and Contract
Documents for these two projects in mountainous region of
Nepal with difficult accessibility.
Positions held: Field Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Detailed topographical survey of headworks area,
powerhouse area and surge tank area using Pentax Total
Station.
• Cross-section and L-section of river at Intake and
Powerhouse
Data download and preparation of map using Land
Development and Autocad software.

Name of assignment or project: Preparation of Land Use


Map of Panchkhal area in Kabhre District
Year: May 2010 to June 2010; 2 months
Location: Kabhre District of Nepal
Client: GoN, Department of Survey
Main project features: Collection of field data for preparation
of a GIS based Land use Map of the area.
Positions held: Field Surveyor
Activities performed: Responsibilities included:
• Conduct field survey using a standard questionnaire
• Field verification of completed questionnaire
• Compilation of data in a standard format.

Name of assignment or project: Preparation of Land Use


Map of Chitwan
Year: Mar 2010 to Apr 2010; 1 month
Location: Chitwan District, Nepal
Client: GoN, Department of Survey
Main project features: Collection of field data for preparation
of a GIS based Land use Map of the area.
Positions held: Field Surveyor
Activities performed:
• Conduct field survey using a standard questionnaire
• Field verification of completed questionnaire
Compilation of data in a standard format

Name of assignment or project: Feasibility Study and DPR


Preparation for Charnawati Hydropower Projects,(5 MW)
Year: Jan 2010 to Feb 2010, (total 1.5 months)
Location: Dolkha District of Nepal
Client: Charnawati Hydroelectric Company.
Main project features: Survey, Feasibility Level Design, Cost
Estimates and Preparation of DPR and Contract Documents
Positions held: Field Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Detailed topographical survey of headworks area,
powerhouse area and surge tank area using Pentax Total
Station.
• Cross-section and L-section of river at Intake and
Powerhouse
Data download and preparation of map using Land
Development and Autocad software.

Name of assignment or project: DPR Preparation for Tila


Hydropower Projects,(350 MW)
Year: Nov 2009 to Jan 2010, (total 2.5 months)

4
CV of Rabin Raut

Location: Kalikot District of Nepal


Client: Tila Hydroelectric Company.
Main project features: Survey, Feasibility Level Design, Cost
Estimates and Preparation of DPR and Contract Documents
for Tila Hydropower Project in the most remote location of
Nepal. (350 MW)
Positions held: Field Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Detailed topographical survey of headworks area,
powerhouse area and surge tank area using Pentax Total
Station.
• Cross-section and L-section of river at Intake and
Powerhouse
Data download and preparation of map using Land
Development and Autocad software.

Name of assignment or project: DPR Preparation for Likhu 1,


Likhu 2 and Likhu A Hydropower Projects.(40 MW)
Year: Mar 2009 to Apr 2009, (total 1.5 months)
Location: Dolkha District of Nepal
Client: Pan Himalayan Energy (P) Ltd.
Main project features: Survey, Design, Cost Estimates and
Preparation of DPR and Contract Documents for the 3
cascade Project in Likhu valley of Nepal.
Positions held: Field Surveyor
Activities performed: Responsible for:
• Establishment of benchmarks and control network
• Detailed topographical survey of headworks area,
powerhouse area and surge tank area using Pentax Total
Station.
• Cross-section and L-section of river at Intake and
Powerhouse
Data download and preparation of map using Land
Development and Autocad software

Name of assignment or project: Road Network Design


Project.
Year: Apr 2007 to Nov 2008, (total 18 months)
Location: Sankhuwasabha District of Nepal
Client: Department of Roads, GoN.
Main project features: Survey, Design, Cost Estimates, and
Costruction of new roads under contract and community
participation in the eastern hilly district of Nepal.
Positions held: Field Surveyor
Activities performed: Responsible for:
• Joint survey with contractor of the alignment in order to
establish basis for earthwork.
• Setting out for fixing construction lines and levels for road
and associated structures.
• Checking the final lines and levels of the finished works of
road and associated structures.

Expert's Contact Information: (+977-984103802)

5
CV of Rabin Raut

Certification:

I, the undersigned, certify to the best of my knowledge and belief that

(i) This CV correctly describes my qualifications and experience


(ii) I am not a current employee of the GoN
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of
the inputs specified for me in Form TECH 6 provided team mobilization takes place within the validity of
this proposal.
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank (In case of DP funded project]
(vi) I certify that I have been informed by the firm that it is including my CV in the Proposal for the
Preparation of Cadastral Map of Land Issue Resolving Program and GIS Mapping for Landless,
Unmanaged Settlement in Lalbandi Municipality. I confirm that I will be available to carry out the
assignment for which my CV has been submitted in accordance with the implementation arrangements
and schedule set out in the Proposal.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if
engaged.

………………………………………………………………………………… Date: 26/12/2079


[Signature of Expert] Day/Month/Year

………………………………………………………………………………… Date: 26/12/2079


[Signature of authorized representative of the firm] Day/Month/Year

Full name of Expert: Mr. Rabin Raut

Full name of authorized representative: Ms. Sushma Singh