Professional Documents
Culture Documents
Contract no.
Reply
To the PMC NEOM/AECOM 27/06/2023
required date
Building 10 Second Floor Façade Walls need to shift as per Location of FHC and
Subject
Chilled Water layout.
Drawings(s): Specification(s):
Reference(s) Location(s)
Cluster 1
Other (specify)
Description FLS
Attachment(s)
Contractor’s authorized
Muthu Vijendran Date 25/04/2023
signatory
Signature
Narrative
Building 10 BUILDERWORK CLASHES. Please find attached File for RFI.
With regard to the drawings numbers mentioned hereinafter, the Architectural Façade walls at the core lift area
are found not to match the Mechanical Layout Drawings. Screenshot No. 1 should be referred to for the
Architecture Façade Walls, while Screenshot No. 2 should be consulted for the Mechanical Layout.
If the Architectural Drawing is followed and the Mechanical FHC (Fire Hose Cabinet) is revised as per the
Architectural Layout, clashes at the Chilled Water Pipes will be encountered. It is proposed to follow the
Mechanical Layout for Façade Walls, where no clashes are present. Please Advice.
Classification | Internal
FIRST FLOOR
Classification
13-211002-4200000002-RAM-ARC-DRG-110101_02 | Internal
First Floor Architectural Layout
Classification | Internal
Classification | Internal
Attachment(s)
Information Provided
Status
Request Incomplete, returned
Signature
Received by Contractor
Name Date
Signature
Disclaimer: The above information is in no way a directive to execute work contrary to the Contract documents. If
the Contractor feels that the above noted REPLY to the RFI conflicts with the Drawings/Specifications or other
Contract Documents or not within the scope of his Contractual obligations, DO NOT PROCEED and notify PMC
immediately.
Classification | Internal