WIR INSPECTION LIST

Project: Techo International Ariport


Company: DBD Engineering PLC,
Date : 19-Dec-23

No Work Description Date Time location Area RFI Referencce No. Remark Incharge person in charge

DT_HEERIM_TIA_DBD_WIR_264_Inspection_Formwork_And_Reabar_of_Manhole
2 09-Dec-23 9:00 AM at DBD Storage DT_HEERIM_TIA_DBD_WIR_264 Soknet CIVIL
COM(3way)(E07,E08,E10)(1way)(A76,A42A,A59A)

3 DT_HEERIM_TIA_DBD_WIR_265 Boundary_And_Elevation_of_Manhole_(DW58,DW85, DW100, DW101) 09-Dec-23 9:30 AM at RW2-6-7 DT_HEERIM_TIA_DBD_WIR_265 Soknet CIVIL

DT_HEERIM_TIA_DBD_WIR_266_ Inspection Formwork And Leveling Lean Manhole of COM (


4 09-Dec-23 9:20 AM at PW-1 DT_HEERIM_TIA_DBD_WIR_266 Soknet CIVIL
D30,D31,D32,D33,D34,D35 )

5 Inspection Install PVC Grid Pipe of COMDuct Bank D15-D16 at AP 1-2 09-Dec-23 9:30 AM at AP 1-2 DT_HEERIM_TIA_DBD_WIR_27A Soknet MEP

7 Inspection Install HDPE Conduit for AGL Direct Buried DW190 To DW 192 at PTWB-1 09-Dec-23 11:00 AM PTW-A6 DT_HEERIM_TIA_DBD_WIR_093A Soknet MEP

9 Inspection Install PVC Grid Pipe of COMDuct Bank D14-D15 at AP 1-2 09-Dec-23 9:00 AM at AP 1-2 DT_HEERIM_TIA_DBD_WIR_199B Soknet MEP

10 Inspection Cofirm Location Before Excavation A19 to A68 09-Dec-23 2:00 PM at A19 to A68 DT_HEERIM_TIA_DBD_WIR_092A Soknet Civil

11 Inspection Install HDPE Conduit for Direct Buried DW71 DW72 09-Dec-23 9:00 AM At RW -4 DT_HEERIM_TIA_DBD_WIR_021A Soknet MEP

Inspection Sand bedding and Compaction Level of AGL Direct Buried DW71-DW72 09-Dec-23 9:00 AM At RW -4 DT_HEERIM_TIA_DBD_WIR_268 Soknet Civil+Survey

12 Inspection Sand bedding and Compaction Level of AGL Direct Buried DW190-DW192 09-Dec-23 11:00 AM PTW-A6 DT_HEERIM_TIA_DBD_WIR-269 Soknet Civil+Survey

13 Inspection Install PVC GRID PIPE for COM Duct Bank (D31-D32) Paved Area 19-Dec-23 at AP.1-3 , 1-6 DT-HEERIM-TIA-DBD-CIVIL-WIR-271

14 Inspection Rebar & Formwork for Concrete Casting of CommunicationDuct Bank at D31-D32 PAVED AREA 19-Dec-23 at AP-1-3 1-6 DT-HEERIM-TIA-DBD-CIVIL-WIR-272

DT_HEERIM_TIA_DBD_WIR_261 Rev A_Inspection Rebar Wall for Mahole AGL(DW53, DW58,


15 DW62,DW65,DW66,DW68,DW69, 19-Dec-23 At RW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-261A
DW70,DW79,DW80,DW81,DW82,DW83,DW86)
DT_HEERIM_TIA_DBD_WIR_262 Rev A_Inspection Foemwork Wall for Mahole (DW53, DW58,
16 DW62,DW65,DW66,DW68,DW69, 19-Dec-23 At RW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-262A
DW70,DW79,DW80,DW81,DW82,DW83,DW86

DT_HEERIM_TIA_DBD_WIR_270_ Inspection Formwork and Casting Lean Concrete of Manhole AGL ( DW176To
17 19-Dec-23 at PTW A-7 DT-HEERIM-TIA-DBD-CIVIL-WIR-270
DW177 )

18 DT_HEERIM_TIA_DBD_WIR_271_ Inspection Formwork For Lean Manhole of COM (D29,D30 ) 19-Dec-23 at RW-6 DT-HEERIM-TIA-DBD-CIVIL-WIR-271

DT_HEERIM_TIA_DBD_WIR_272_Inspection_Rebar wall for casting concrete COM(


19 19-Dec-23 At DBD Storage DT-HEERIM-TIA-DBD-CIVIL-WIR-272
A30,A31,A32,A33,A34,A35,A36,A37,A38,A39)

DT_HEERIM_TIA_DBD_WIR_273_Inspection_Formwork wall for casting concrete COM(


20 19-Dec-23 At DBD Storage DT-HEERIM-TIA-DBD-CIVIL-WIR-273
A30,A31,A32,A33,A34,A35,A36,A37,A38,A39)

DT_HEERIM_TIA_DBD_WIR_279_ Inspection Formwork and Casting Lean Concrete of COM Duct Bank( D39 To
21 19-Dec-23 at PW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-279
D40 )

22 DT_HEERIM_TIA_DBD_WIR_280_ Inspection Rebar and Formwork of COM Duct Bank (D30 To D31) 19-Dec-23 at PW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-280

DT_HEERIM_TIA_DBD_WIR_281_Inspection_sand_bedding_compaction_leveling ( D46, D47, D48 ) of COM


23 19-Dec-23 at Apron-3.3 DT-HEERIM-TIA-DBD-CIVIL-WIR-281
direct Buried

DT_HEERIM_TIA_DBD_WIR_282_Inspection_sand_bedding_compaction_leveling ( DW52,DW53 ) of AGL direct


24 19-Dec-23 at RW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-282
Buried

DT_HEERIM_TIA_DBD_WIR_283_Inspection_sand_bedding_compaction_leveling ( DW187,DW190 ) of AGL


25 19-Dec-23 at RW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-283
direct Buried

DT_HEERIM_TIA_DBD_WIR_297_ Inspection confirmation location before excavation at A29 To A25 19-Dec-23 10:30am at A29 To A25 DT-HEERIM-TIA-DBD-CIVIL-WIR-297 MEP+Survey

DT_HEERIM_TIA_DBD_WIR_298_ Inspection confirmation location before excavation at A29 To A35 19-Dec-23 10:30am at A29 To A35 DT-HEERIM-TIA-DBD-CIVIL-WIR-298 MEP+Survey

26 DT_HEERIM_TIA_DBD_WIR_284_ Inspection Rebar and Formwork of COM Duct Bank (D13 To D14) 19-Dec-23 at PW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-284

DT_HEERIM_TIA_DBD_WIR_195B_Inspection_Rebar_&_Formwork_for_Concrete Duct Bank at D09-D10


27 19-Dec-23 at AP-1-2 DT-HEERIM-TIA-DBD-CIVIL-WIR-195B
PAVED AREA

DT_HEERIM_TIA_DBD_WIR_286_Inspection_Rebar and Formwork Pre-Casting for Mahole AGL Type


28 19-Dec-23 At DBD Storage DT-HEERIM-TIA-DBD-CIVIL-WIR-286
B(1way)(DW50)(2way)(DW253,Dw254,DW255,DW257,DW258,DW259,DW261,DW263,D W265)

DT_HEERIM_TIA_DBD_WIR_328_Inspection Formwork for Lean Concrete Manhole COM ( D19,D20 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-328

DT_HEERIM_TIA_DBD_WIR_329_Inspection_Rebar wall for casting concrete COM(


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-329
A14,A15,A16,A17,A18,A20,A21,A22,A23,A24,A26,A27,A28)

DT_HEERIM_TIA_DBD_WIR_330_Inspection_Rebar and Formwork Pre-Casting for Mahole AGL Type


B(2way)(DW21,DW300)(2way)(DW269,DW270,DW271,DW274,DW276,DW277,DW278,DW279,DW280,DW281 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-330
,DW282)

DT_HEERIM_TIA_DBD_WIR_341 Inspection Rebar and Formwork Casting Concrete of COM ( DW133 To


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-341
DW135 )

DT_HEERIM_TIA_DBD_WIR_342_Inspection_Formwork wall for casting concrete COM(


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-342
A14,A15,A16,A17,A18,A20,A21,A22,A23,A24,A26,A27,A28)

DT_HEERIM_TIA_DBD_WIR_343_Inspection Rebar and Formwork of AGL Duct Bank DW172 -DW173) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-343
DT_HEERIM_TIA_DBD_WIR_344 Inspection Rebar and Formwork of AGL Duct Bank DW133 -DW135 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-344

DT_HEERIM_TIA_DBD_WIR_348 Inspection Sand Bedding And Compaction Leveling of AGL Direct Buried DW70-
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-348
DW71

DT_HEERIM_TIA_DBD_WIR_350 Inspection Sand Bedding And Compaction Leveling of COM Direct Buried A18-
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-350
A19

DT_HEERIM_TIA_DBD_WIR_352 Inspection Sand Bedding And Compaction Leveling of AGL Direct Buried DW57-
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-352
DW58-DW59

DT_HEERIM_TIA_DBD_WIR_354 Inspection Sand Bedding And Compaction Leveling of AGL Direct Buried DW67-
19-Dec-23 9:00AM DT-HEERIM-TIA-DBD-CIVIL-WIR-354
DW68-DW69-DW70

DT_HEERIM_TIA_DBD_WIR_359 Inspection Rebar and Formwork of COM Duct Bank D09-D10 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-359

DT_HEERIM_TIA_DBD_WIR_346_Inspection Formwork For Casting Lean Concrete of Manhole AGL( DW95,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-346
DW96, DW97)

DT_HEERIM_TIA_DBD_WIR_347_Inspection Formwork For Casting Lean Concrete of Manhole AGL( DW98,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-347
DW99)

DT_HEERIM_TIA_DBD_WIR_351_Inspection Formwork for Casting Lean Concrete Manhole COM ( D04,D05,D06


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-351
)

DT_HEERIM_TIA_DBD_WIR_353_Inspection Formwork for Casting Lean Concrete Manhole COM ( D07,D08,D09


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-353
)

DT_HEERIM_TIA_DBD_WIR_355_Inspection Formwork for Casting Lean Concrete Manhole COM ( D10,D11,D12


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-355
)

DT_HEERIM_TIA_DBD_WIR_356_Inspection Formwork for Casting Lean Concrete Manhole COM ( D13,D14 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-356

DT_HEERIM_TIA_DBD_WIR_357- Inspection sand bdding compaction level for COM at (A20 To A21)( A24 To
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-357 Civil + Survey
A45)

DT_HEERIM_TIA_DBD_WIR_358_Inspection Formwork For Casting Lean Concrete of Mahole AGL( DW182-


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-358
DW183)

DT_HEERIM_TIA_DBD_WIR_360_Inspection Formwork For Casting Lean Concrete of Mahole AGL( DW184-


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-360
DW185)

DT_HEERIM_TIA_DBD_WIR_361_Inspection Formwork For Casting Lean Concrete of Mahole AGL(DW185,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-361
DW186)

DT_HEERIM_TIA_DBD_WIR_362_Inspection Formwork For Casting Lean Concrete of Mahole AGL( DW187,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-362
DW188)

DT_HEERIM_TIA_DBD_WIR_363_Inspection Formwork For Casting Lean Concrete of Mahole AGL(DW189,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-363
DW190)
DT_HEERIM_TIA_DBD_WIR_364_Inspection Formwork For Casting Lean Concrete of Mahole AGL( DW191 -
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-364
DW192)

DT_HEERIM_TIA_DBD_WIR_365_Inspection Formwork For Casting Lean Concrete of Mahole AGL (DW193,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-365
DW194)

DT_HEERIM_TIA_DBD_WIR_366_Inspection Formwork For Casting Lean Concrete of Mahole AGL(DW196,


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-366
DW197)

DT_HEERIM_TIA_DBD_WIR_367_Inspection Formwork For Casting Lean Concrete of Mahole AGL( DW198 -


19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-367
DW199)

DT_HEERIM_TIA_DBD_WIR_371_Inspection Formwork and Leveling for Lean Duck bank ( D20-D21 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-371

DT_HEERIM_TIA_DBD_WIR_372_Inspection Formwork and Leveling for Lean Duck bank ( D40-D41 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-372

DT_HEERIM_TIA_DBD_WIR_373_Inspection Rebar Wall for Mahole AGL(DW80,DW81,DW82) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-373

DT_HEERIM_TIA_DBD_WIR_374_Inspection Foemwork Wall for Mahole (DW80,DW81,DW82) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-374

DT_HEERIM_TIA_DBD_WIR_351_Inspection_installation_PVC GRID Pipe_ for COM Direct Buried at ( A18-A19-


19-Dec-23 DT_HEERIM_TIA_DBD_WIR_351
A20)

DT_HEERIM_TIA_DBD_WIR_358_Inspection_installation_PVC GRID Pipe_ for COM Direct Buried at (A20-A21,


19-Dec-23 DT_HEERIM_TIA_DBD_WIR_358
A24-A25)

DT_HEERIM_TIA_DBD_WIR_368_Inspection_installation_HDPE Conduit DW51-DW52, DW59-DW60 for AGL


19-Dec-23 DT_HEERIM_TIA_DBD_WIR_368
Direct Buried

DT_HEERIM_TIA_DBD_WIR_369_Inspection_installation_HDPE Conduit DW60-DW61, DW61-DW62 for AGL


19-Dec-23 DT_HEERIM_TIA_DBD_WIR_369
Direct Buried

DT_HEERIM_TIA_DBD_WIR_382- Inpsection sand bedding compaction level for AGL. At DW185 To 187) 9:30am TW.B.2 DT_HEERIM_TIA_DBD_WIR_382 Civil

DT_HEERIM_TIA_DBD_WIR_370_Inspection_installation_HDPE Conduit DW185-DW186, DW186-DW187 at


19-Dec-23 9:30am TW.B.2 DT_HEERIM_TIA_DBD_WIR_370 MEP +Survey
PTW-A2

DT_HEERIM_TIA_DBD_WIR_375 - Inspection rebar for wall MH COM(


19-Dec-23 8:30am at workshop DBD DT_HEERIM_TIA_DBD_WIR_375 Civil
A02,A03,A04,A05,A08,A07,A12,A13,B04,B05,B07,B11,B15,B16,B17,B18,B21,B22,B20

DT_HEERIM_TIA_DBD_WIR_376- Inspection rebar for wall MH COM(


19-Dec-23 8:30am at workshop DBD DT_HEERIM_TIA_DBD_WIR_376 Civil
A02,A03,A04,A05,A08,A07,A12,A13,B04,B05,B07,B11,B15,B16,B17,B18,B21,B22,B20