No Work Description Date Time location Area RFI Referencce No. Remark Incharge person in charge
DT_HEERIM_TIA_DBD_WIR_264_Inspection_Formwork_And_Reabar_of_Manhole
2 09-Dec-23 9:00 AM at DBD Storage DT_HEERIM_TIA_DBD_WIR_264 Soknet CIVIL
COM(3way)(E07,E08,E10)(1way)(A76,A42A,A59A)
3 DT_HEERIM_TIA_DBD_WIR_265 Boundary_And_Elevation_of_Manhole_(DW58,DW85, DW100, DW101) 09-Dec-23 9:30 AM at RW2-6-7 DT_HEERIM_TIA_DBD_WIR_265 Soknet CIVIL
5 Inspection Install PVC Grid Pipe of COMDuct Bank D15-D16 at AP 1-2 09-Dec-23 9:30 AM at AP 1-2 DT_HEERIM_TIA_DBD_WIR_27A Soknet MEP
7 Inspection Install HDPE Conduit for AGL Direct Buried DW190 To DW 192 at PTWB-1 09-Dec-23 11:00 AM PTW-A6 DT_HEERIM_TIA_DBD_WIR_093A Soknet MEP
9 Inspection Install PVC Grid Pipe of COMDuct Bank D14-D15 at AP 1-2 09-Dec-23 9:00 AM at AP 1-2 DT_HEERIM_TIA_DBD_WIR_199B Soknet MEP
10 Inspection Cofirm Location Before Excavation A19 to A68 09-Dec-23 2:00 PM at A19 to A68 DT_HEERIM_TIA_DBD_WIR_092A Soknet Civil
11 Inspection Install HDPE Conduit for Direct Buried DW71 DW72 09-Dec-23 9:00 AM At RW -4 DT_HEERIM_TIA_DBD_WIR_021A Soknet MEP
Inspection Sand bedding and Compaction Level of AGL Direct Buried DW71-DW72 09-Dec-23 9:00 AM At RW -4 DT_HEERIM_TIA_DBD_WIR_268 Soknet Civil+Survey
12 Inspection Sand bedding and Compaction Level of AGL Direct Buried DW190-DW192 09-Dec-23 11:00 AM PTW-A6 DT_HEERIM_TIA_DBD_WIR-269 Soknet Civil+Survey
13 Inspection Install PVC GRID PIPE for COM Duct Bank (D31-D32) Paved Area 19-Dec-23 at AP.1-3 , 1-6 DT-HEERIM-TIA-DBD-CIVIL-WIR-271
14 Inspection Rebar & Formwork for Concrete Casting of CommunicationDuct Bank at D31-D32 PAVED AREA 19-Dec-23 at AP-1-3 1-6 DT-HEERIM-TIA-DBD-CIVIL-WIR-272
DT_HEERIM_TIA_DBD_WIR_270_ Inspection Formwork and Casting Lean Concrete of Manhole AGL ( DW176To
17 19-Dec-23 at PTW A-7 DT-HEERIM-TIA-DBD-CIVIL-WIR-270
DW177 )
18 DT_HEERIM_TIA_DBD_WIR_271_ Inspection Formwork For Lean Manhole of COM (D29,D30 ) 19-Dec-23 at RW-6 DT-HEERIM-TIA-DBD-CIVIL-WIR-271
DT_HEERIM_TIA_DBD_WIR_279_ Inspection Formwork and Casting Lean Concrete of COM Duct Bank( D39 To
21 19-Dec-23 at PW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-279
D40 )
22 DT_HEERIM_TIA_DBD_WIR_280_ Inspection Rebar and Formwork of COM Duct Bank (D30 To D31) 19-Dec-23 at PW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-280
DT_HEERIM_TIA_DBD_WIR_297_ Inspection confirmation location before excavation at A29 To A25 19-Dec-23 10:30am at A29 To A25 DT-HEERIM-TIA-DBD-CIVIL-WIR-297 MEP+Survey
DT_HEERIM_TIA_DBD_WIR_298_ Inspection confirmation location before excavation at A29 To A35 19-Dec-23 10:30am at A29 To A35 DT-HEERIM-TIA-DBD-CIVIL-WIR-298 MEP+Survey
26 DT_HEERIM_TIA_DBD_WIR_284_ Inspection Rebar and Formwork of COM Duct Bank (D13 To D14) 19-Dec-23 at PW-1 DT-HEERIM-TIA-DBD-CIVIL-WIR-284
DT_HEERIM_TIA_DBD_WIR_328_Inspection Formwork for Lean Concrete Manhole COM ( D19,D20 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-328
DT_HEERIM_TIA_DBD_WIR_343_Inspection Rebar and Formwork of AGL Duct Bank DW172 -DW173) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-343
DT_HEERIM_TIA_DBD_WIR_344 Inspection Rebar and Formwork of AGL Duct Bank DW133 -DW135 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-344
DT_HEERIM_TIA_DBD_WIR_348 Inspection Sand Bedding And Compaction Leveling of AGL Direct Buried DW70-
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-348
DW71
DT_HEERIM_TIA_DBD_WIR_350 Inspection Sand Bedding And Compaction Leveling of COM Direct Buried A18-
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-350
A19
DT_HEERIM_TIA_DBD_WIR_352 Inspection Sand Bedding And Compaction Leveling of AGL Direct Buried DW57-
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-352
DW58-DW59
DT_HEERIM_TIA_DBD_WIR_354 Inspection Sand Bedding And Compaction Leveling of AGL Direct Buried DW67-
19-Dec-23 9:00AM DT-HEERIM-TIA-DBD-CIVIL-WIR-354
DW68-DW69-DW70
DT_HEERIM_TIA_DBD_WIR_359 Inspection Rebar and Formwork of COM Duct Bank D09-D10 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-359
DT_HEERIM_TIA_DBD_WIR_356_Inspection Formwork for Casting Lean Concrete Manhole COM ( D13,D14 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-356
DT_HEERIM_TIA_DBD_WIR_357- Inspection sand bdding compaction level for COM at (A20 To A21)( A24 To
19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-357 Civil + Survey
A45)
DT_HEERIM_TIA_DBD_WIR_371_Inspection Formwork and Leveling for Lean Duck bank ( D20-D21 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-371
DT_HEERIM_TIA_DBD_WIR_372_Inspection Formwork and Leveling for Lean Duck bank ( D40-D41 ) 19-Dec-23 DT-HEERIM-TIA-DBD-CIVIL-WIR-372
DT_HEERIM_TIA_DBD_WIR_382- Inpsection sand bedding compaction level for AGL. At DW185 To 187) 9:30am TW.B.2 DT_HEERIM_TIA_DBD_WIR_382 Civil