You are on page 1of 4

2075

587.5
300
A B C
4025 3750 C C

2075

300
1475 1625 1475

1475

1625

1475

300
3 3
F1 F2 F1

587.5
3975

3975
2075
1625 1625 587.5 300 300 300 587.5

2075
1625

1625
2 2
F2 F2 ISOLATED FOOTING-F3 PLAN
F3
3450

3450
300

1475 1625 1475


1475

1625

1475
1 1
F1 F2 F1 Plinth Level
Upper Tie beam

4025 3750

450
A B C G.L.

TRENCH PLAN

850
1075
1500
Foundation Tie beam

225
7575 200 150
3" Thick PCC (1:2:4)

One layer flat Brick-Soling

2075

SECTION AT C-C
A B C
4025 3750

3 3
C1 C2 C1

FLOOR HEIGHT
3975

3975
2
C2 C2
2 C
C3
3450

3450

FLOOR HEIGHT
DETAIL AT C
C1 C2 C1
1 1
4025 3750

A B C
COLUMN PLAN

Field Requirement Depth


COLUMN DETAIL
Steel grade : Fe500
Lower Footing
Lateral Ties Tie beam
Type Concrete GROUND FLOOR FIRST FLOOR SECOND FLOOR STIRRUPS DETAILS
Grade Not in the scale
End Ties Mid Ties

75
COLUMN REINFORCEMENT
300 300 300
DETAIL
Internal
300

300

300

Column C3 M20

75
LONGITUDINAL STEEL IN BEAM
A B C
4025 3750 SECTION END SECTION INTERMEDIATE SECTION
FLOOR

3 3

225

225
Foundation
Tie Beam
225 225
3975

3975

225

225
Plinth
Tie Beam
225 225

2 2

125

125
350
First Floor

350
225

225
Beam
225 225
3450

3450

125

125
Second Floor

350

350
225

225
1 1 Beam

225 225
4025 3750
DETAIL AT
A B C BEAM-COLUMN JOINT

125

125
Roof Beam

350

350
225

225
BEAM PLAN
225 225

TRANSVERSE STIRRUPS IN BEAMS


300
End Zone Remaining Mid Zone, 37.5 225 37.5
Special Confining Reinforcement (remaining mid part)
(up to 2d from face of column)

37.5
Level
Fe415 Fe500 Fe415 Fe500

300
225

225
Roof and stair
cover Beam

37.5
BEAM
Second Floor Beam COLUMN

BEAM & COLUMN JUNCTION DETAIL PLAN


First Floor Beam

Plinth Tie Beam

Foundation
Tie Beam
2 3

125
7 8 7

350
225

225
3rd Floor Level
225 225

SECTION - 1 SECTION - 2

4 5 6 6 5 4

125

125
350

350
225

225
2nd Floor Level
225 225

SECTION - 3 SECTION - 4

3 2 3
2 3 3

125

125
1st Floor Level

350

350
225

225
225 225

SECTION - 6
SECTION - 5

1 1 1 1 1 1
Plinth Level

125

125
350

350
225

225
225 225

3450 3975 SECTION - 7 SECTION - 8

BEAM DETAIL ALONG GRID B-B

You might also like