PROJECT NAME- ALL HADEETHA RESOURCES LLC,AL WASHI MAJAZA COPPER PROJECT
PRE-COMMISSIONING CHECK
OBSERVATIONS STATUS
LIST
LOTOTO OF BALL MILL HVS Done at Site
Values are
Input Power Cable IR Test of All phases Tested by client
acceptable
from HVS
Found Okay
SPACE HEATER Wiring & tested
Values are
HT Motor IR of Three Phases Tested at site
acceptable
Glanding Of Panel for Control and
Done by Client
Power Cables, Sealing
Ie=0.5 ohm
Control Panel Earthing Done by Client & tested
1|Page
CITIC HEAVY INDUSTRIES CO. LTD
okay
Brush Lifting operation
Okay
LRS Resistance R max & R min
In order
LRS VFD
In order
Rotor winding of Motor
2|Page
CITIC HEAVY INDUSTRIES CO. LTD
okay
Input Voltage Variations With in the limit
Found okay
Main Power Cable terminations Done by Client
Motor Run for 6Hrs (Without Gear Done at site All parameters are
Box & Load) in order
EARTH TESTING
REMARKS
TYPE VALUE
ACCEPTED
IE 0.5 OHM
ACCEPTED
PE 0.5 OHM
IR OF HVS CABLE
Phase Sequence found in order.
REMARKS
MODE VALUE
ACCEPTED
R-Y 475 G OHM
ACCEPTED
Y-B 418 GOHM
ACCEPTED
R-B 481 G OHM
ACCEPTED
R-AR 223 G OHM
Y-AR ACCEPTED
182 G OHM
ACCEPTED
B-AR 260 G OHM
3|Page
CITIC HEAVY INDUSTRIES CO. LTD
ROTOR IR VALUES
ACCEPTED
R- AR 524 G OHM
ACCEPTED
Y-AR 586 G OHM
ACCEPTED
B-AR 743 G OHM
HT MOTOR IR & PI
LEGEND VALUE PI REMARKS
MOTOR PARAMETERS:
SL.NO & MAKE-MODEL NOMINAL NOMINAL KW NO. OF NS HZ STATOR
VOLATGE CURRENT POLES RESISTANCE IN
OHM
MAF 630, SL.NO. - 11000 140 A 2200 6 994 50 0.94
1069488233/05/2200
KW
NO LOAD
CURRENT-
46 A
*FRAME EARTHING MUST BE TESTED. -OKAY
*BEFORE IR TEST ALL THE SENSORS CONNECTIONS MUST BE OUT FROM TERMINAL BOX- OKAY
4|Page
CITIC HEAVY INDUSTRIES CO. LTD
Remarks: All Parameters are in order & performance of LRS & MOTOR are found Good.
5|Page
CITIC HEAVY INDUSTRIES CO. LTD
6|Page
CITIC HEAVY INDUSTRIES CO. LTD
Remarks: Main Motor +Gear Box test period from the operation of whole system found
healthy, and parameters are normal.
7|Page
CITIC HEAVY INDUSTRIES CO. LTD
INTRUMENTS
Mill
1. Fixed side- TE ½/3
2. Floating Side- TE 4/5/6
Pinion
1. Floating Side
VT 009 -AXIAL
VT 008- RADIAL
TE 007
2. Fixed Side
VT 015-AXIAL
VT 014-RADIAL
TE013
Infrared
TIA 010
TIA011
TIA012
Gear Box
1. LOW SPEED
DE
VT017
TE 016
NDE
VT019
TE018
GB LUBE FLOW
ELETTA-40-200 L/MIN
GB PIPE FLOW
KOLBOLD-40-150 L/MIN
2. HIGH SPEED
DE
TE020
VT021
NDE
TE022
VT023
SUMP
TE024
3. MOTOR
DE
VT026
TE 036
TEO37
NDE
VT 027
TE029
STATOR- TIA 035/034/033/032/031/030
8|Page
CITIC HEAVY INDUSTRIES CO. LTD
1. LUBRCATION SYSTEM, GREASE SPRAY, SEAL GREASE SYSTEM STARTED IN AUTO MODE
2. RANGE & ALARMS ARE CHECKED
3. FLOW DEVIDERS SENSORS ARE INSTALLED ARE OPERATING NORMALLY.
4. MILL MAIN MOTOR STARTING CURRENT IS NORMAL AND LRS OPERATION IS OKAY
5. BRUSH LIFT PANEL IS OPARTED FORM PLC IN AUTO MODE & FOUND SATISFACTORY.
6. GEAR BOX LUBRICATION SYSTEM & MILL LUBRACTION SYSTEM ALL PARAMETERS ARE IN ORDER.
7. ALL SYSTEM OPERATION ARE FOUND SATISFACTORY
9|Page