NOTES

A B 1.THIS DRAWING SHALL BE READ ALONG WITH ARCHITECTURAL


DRAWING.

2.DISCREPANCY IF NOTICED IN BETWEEN THIS DRAWING AND


CONCERNED ARCHITECTURAL DRAWING SHALL BE BROUGHT TO THE
NOTICE OF THE ENGINEER.
200 200 200 200

3.ALL DIMENSIONS ARE IN MM UNLESS OTHERWISE NOTED.


1 T.B.-01

200

200

200

200
500

500

500

500
500 500 B1 500 B1 500
4.ONLY FIGURED DIMENSIONS SHALL BE FOLLOWED AND NO DIMENSION
A1 A1
F1 F1 SHALL BE SCALED.

T.B.-02

T.B.-02
2000

5.ALL R.C.C. WORK SHALL BE OF M20 GRADE.

6. CLEAR COVER TO MAIN REINFORCEMENT SHALL BE AS FOLLOWS :-


200 200 200 200
A) FOOTING : 50 MM
2
200

200

200

200
500

500

500

500
B) BEAM : 25 MM
C) SLAB : 15 MM
500
A2
500 B2 A2
500 B2 500
D) PEDESTAL : 40 MM
F1 F1

T.B.-02

T.B.-02
2000

7. ALL REINFORCEMENT SHALL BE OF HIGH STRENGTH DEFORMED


STEEL BARS CONFORMING TO IS: 1786-1985 (GRADE Fe-500) WITH
0.2%PROOF STRESS NOT LESS THAN 500N/sqmm.
200 200 200 200
8. THE BEARING CAPACITY OF THE SOIL IS TAKEN AS 15.00 ton/ sqrmtr. AT
A DEPTH OF 1.50 MTR. FROM E.G.L. IT IS ADVISABLE TO CONFIRM THIS
3 T.B.-01
200

200

200

200
500

500

500

500
CAPACITY BY PERFORMING A PLATE LOAD TEST AT THE SITE.
500
A3
500
B3 A3
500
B3 500

A1 F1 F1 A1 9. THE POSITION OF HOOKS OF COLUMN TIES SHALL BE VERTICALLY


STAGGERED AND PLACED OPPOSITE FACE FOR ALTERNATE TIES.
7100
10. NOT MORE THAN 50% OF BARS SHALL BE SPLICED AT ONE SECTION .

* LAPS

LAYOUT OF COLUMNS, FOOTINGS & TIE-BEAMS 11. AVOID LAPS IN BOTTOM BARS NEAR MID SPAN (EXCEPT FDN.)
COLUMN LAYOUT WITH CENTRE-LINE DIMENSION & OFFSET 12. AVOID LAPS IN TOP BARS NEAR SUPPORTS. (EXCEPT FDN.)

13. DO NOT LAP MORE THEN 50% OF THE BARS AT ANY ONE SECTION
AND THE SAME SHALL BE STAGGERED.

COLUMN
14. EMBBEDENMENT/ LAP LENGTH SHALL = 50 TIMES THE DIA OF BAR.
SHS 220X220X6

R1 SHS 220X220X6
'A'
EL.+0.60 CONCRETE WORKS
E.G.L.

600
0.00 LVL GRADE OF CONCRETE­ M20
PLINTH LVL GRADE OF ReBAR ­ Fe 500D

R.C.C. PEDESTAL

EL. 0.00 TOP OF TIE­BEAM

1500
600

EGL SEISMIC ZONE­ V


A A 100 MM THK. PCC(1:3:6) IMPORTANCE FACTOR ­ 1.0
E.G.L.
BASIC WIND SPEED ­ 50 m/sec
SZ

250 THK. COMPACTED


Tie Beam
R1
SECTION A1-A1 SAND & GRAVEL FILL
FOUNDING DEPTH

8 TOR @125 C/C

R1
1500

R2

COLUMN
400

SP1(10 Thk) SHS 220X220X6


SX 150 400 (350X110X10)

PLAN OF ISOLATED FOOTING SHOWING BOTTOM MESH 100 MM THK. PCC(1:3:6) 110

350
250 THK. COMPACTED 3-16
SAND & GRAVEL FILL BP1 (16 Thk)
SECTION 'A-A'

300
C (460X460X16) C
ISOLATED FOOTING SCHEDULE 2-12
2 LEG 8 @ 125 C/C
PEDESTAL

TYPE SX SZ H R1 R2 2-12 20MM DIA.


BOLTS
FLAT BRICK SOLING
F1 1500 1500 400 10 @125 C/C 10 @1 50 C/C OVER COMPACTED
GROUND DETAIL 'A'
3-16 TYPICAL CONNECTION DETAILS
BETWEEN COLUMN & PEDESTAL
TYPICAL SECTION OF TIE­BEAM 'TB­1'
SCHEDULE OF COLUMN REINFORCEMENT COLUMN TO COLUMN TIE
(SIZE 250 X 450) COLUMN
SHS 220X220X6
20MM DIA.
COLUMN SIZE REINF. BAR SIZE COLUMN MKD. SCHEDULE OF STIRRUP ARRANGEMENT 3-12 BOLTS
STIFFNER PLATE PROJECT
SP1 (10 Thk)
PROPOSED CAFE BLOCK ATTACHED TO EXISTING DATE 28­09­2023

OFFICER'S MESS AT ASSAM RIFLES CAMPUS, LAITKOR,


REVISION 0

50
MEGHALAYA
2 LEG 8 @ 125 C/C 50
BP1 (16 Thk) SCALE NTS

12 - 16 500X500 A1, A2, A3, 3-12


(460X460X16)
CLIENT
JOB NO. 23­076
B1, B2, B3
500

TRACTORS MACHINERY AND COMPONENTS

460
200
8 TIE FLAT BRICK SOLING DRG NO. 23­076­02
PEDESTAL
OVER COMPACTED TITLE
DRN. BY AB
GROUND LAYOUT & DETAILS OF FOUNDATION
80 200 80 CHKD. BY BD
TYPICAL SECTION OF TIE­BEAM 'TB­2' 460 STRUCTURAL CONSULTANT:
500 ONE TIES & FIVE LINKS COLUMN TO COLUMN TIE
VIEW C­C CONSTELLATION
(SIZE 250 X 400)
HOUSE NO.-3, BYE-LANE: - 1
SUNDARPUR, R.G.B. ROAD,
GUWAHATI-5