TM INSPECTION REPORT Date :

(A) Suppliers Name : M/S. .

(B) P.O Number & Date : .

Sr. Description of material & Drg. No. Offered Qty Accepted Remark
No. Qty
1)Please remove
1 TOP TANK ASSEMBELY welding lumps
from inner/outer
2 BOTTOM TANK ASSEMBELY side of tank.
2)HDG thickness
3 EXPANSION CHAMBER must be > 85μm.
3)Top cover tank
4 TERMINAL BOX COVER flange must be
straightened after
HDG.
4) Finishing after
HDG should be
done properly

Observation

During inspection of ___ Nos of ( Top tank,Bottom tank,Expansion Chamber, Terminal box
cover)
1) Bottom tank Assly. Dimension as per our drawing found ok.
2) Top tank Assly. Dimension as per our drawing found ok.
3) Expansion chamber Assly. Dimension as per our drawing found ok.
4) PCD Φ OK.
5) Leakage Testing check and found ok.
6) Material can be for HDG Work.
7) Please check all finishing and check points properly after HDG work before dispatch
to us.
8) If HDG and finishing of material are not proper it will be rejected by us.
Note: Disapatch only after finishing work.
SR.No of ASSLY Leakage Observed

Supplier’s Representative Inspected By