CEEC HUNAN THERMAL POWER (M) SDN.

BHD

No. Inspection Date Findings Control measure


The metal waste been cutting
The metal waste are not into pieces and will be
UAUC 0712 07.12.2022 properly been disposed. 金属 disposed accordingly. 金属废
废料没有得到妥善处理。 料被切割成碎片,将被相应
地处理。
The oxygen cylinder been
Oxygen cylinder not be place
place safely in the cylinder
UAUC 0712 07.12.2022 safely in the rack. 氧气瓶不
rack. 氧气瓶已安全放置在
能安全地放在架子上。
气瓶架上。
Workers not wearing the Brief the workers and ask
complete PPE. Stop the work them to wear the complete
until full PPE are applied. 工 PPE before start any work.
UAUC 0712 07.12.2022 人没有穿戴完整的 PPE。停 向工人简要介绍并要求他们
止工作,直到应用完整的 在开始任何工作之前穿戴完
PPE。 整的 PPE。
SDN. BHD
HSE DAILY SUMMARY REPORT

Before
SUMMARY REPORT

After Rectification Date Department Finding category


Closed 07/12/2022 Safety Safety & Health
Closed 07/12/2022 Safety Safety & Health
Closed 07/12/2022 Safety Safety & Health