The document summarizes several issues at a Rabigh site:
1) Work completed months ago has not been invoiced or paid for.
2) A purchase order or service order was not received for work on a water tank.
3) Safety requirements have led to weeks of being idle, as third-party certification was required but not provided.
The document summarizes several issues at a Rabigh site:
1) Work completed months ago has not been invoiced or paid for.
2) A purchase order or service order was not received for work on a water tank.
3) Safety requirements have led to weeks of being idle, as third-party certification was required but not provided.
The document summarizes several issues at a Rabigh site:
1) Work completed months ago has not been invoiced or paid for.
2) A purchase order or service order was not received for work on a water tank.
3) Safety requirements have led to weeks of being idle, as third-party certification was required but not provided.
1. Service Order - Tank 14 additional job - Work completed 3
months before - not received either P.O or invoice
2. Service Order - Water tank #3, NDT P.O/S.O not received
3. Safety first set of Requirements - confined space, work at
height 3 rd party - 3 weeks idle at site - provided from GEMS side
4. Safety second set of Requirement - medical certificate, 3
rd party first aid training, rescue team - 3 weeks idle and confined space activities are on hold.
5. Safety third set of Requirement - Diesel barrel cannot be
used inside the power plant instead use the diesel trucks - work has been stopped for 2 days. SAFETY OBSERVATIONS FROM SEC SAFETY DEPARTMENT Status # Detail of Observations Action taken (Open/Closed) DATE Acetylene and organ gas Immediately removed from site 06-09-2022 1 closed cylinders in direct sunlight. and shifted to storage are. Unwanted material and poor Unwanted material removed 06-09-2022 2 closed housekeeping at workplace. from site and cleaned the area. Old green mash around the Immediately removed the old 06-09-2022 3 scaffold platform obstructing the green mash and clear the closed access. (LADDER) access. (ladder) Immediately instruct to build 07-09-2022 Paint storage in open area the proper paint storage shelter 4 without shelter and proper closed and provide fire extinguisher arrangements. and safety data sheet. Immediately build the shelter 07-09-2022 for temporary diesel storage, Diesel drums in direct sunlight cover the sides by using green 5 closed with proper arrangements. mash and diesel drum placed inside dip tray to avoid any spillage.