EHS Report - Thalassery
EHS Report - Thalassery
LEVEL D PPE must be issued for all workers and for those who
engaged on additional activities such as WAT, PPE review must Mr Pramod C
11 Working at height without PPE, Full body harness Thalassery 31.03.2022 02.04.2022 Status: Open
be carried out as per specified on JHA before conducting work Mr Shihab
and proper supervision must be maintained
Sub standard fall protection net used at site and absent on multiple Fall protection net must be implemented as of standard Mr Pramod C
12 Thalassery 31.03.2022 02.04.2022 Status: Open
areas. IS:5175:1992 & Safety Net Made By IS :11057:1984 Mr Shihab
Lift shaft must be closed on all floors to avoid men and materials Mr Pramod C
13 Lift shaft left open on multiple floors Thalassery 31.03.2022 02.04.2022 Status: Open
falling from height . Mr Shihab
2 of 3
Cable trailing must be done least 8 feet above ground level
without any obstruction or wet condition, insulated hooks should
Improper cable trailing through out site / sub standard cables used. No Mr Pramod C
14 Thalassery be considered on running floors. Additional HDPE hose and 31.03.2022 02.04.2022 Status: Open
certified electrician available at site. Mr Shihab
provision by UG should be considered where above ground level
is not applicable.
Periodic inspection must be carried out for all hand tools and
power tools PPM register must be maintained for all equipment's.
Power tools operated at site without proper connection procedure, Mr Pramod C
15 Thalassery Faulty equipment's must be suspended from work with immediate 31.03.2022 02.04.2022 Status: Open
inspection tag absent, PPM not maintained Mr Shihab
effect and all equipment's must be inspected before conducting
work.
3 of 3