13/12/2022
B2 Subcontractor name and details (if any) Fairways Building Contracting LLC No of Workers: 4
B3 Contact Person Name: Emad Yosry B4
Contact number: 0558664544
B5 Safety Supervisor Name: Jovin Mathew B6 Contact number: 0554501207
B7 List of Subcontractors: Fairways Building Contracting LLC No of Workers: 4
C Request Details:
C1 Date From: 12/12/2022 To: 12/01/2023 General Permit Duration: ………
Hot Work: 12 hours
C2 Time From: 3 AM To: 3 PM High Risk: 12hours
C3 Work Description: (Attach Method Statement)
1. Removal of the existing Door
2. Fixing new Door - As per existing design
- No noisy works during Mall trading hours
1. Permit is intended for the stated scope only, no other work is permitted.
Mall Management Comments: 2. Safe working procedures to be followed at all times.
3. Permitted ladder use up to 2 metres maximum.
4. Work to be carried out by competent personnel and under competent supervision.
5. HSE supervision is the responsibility of the contractor and are liable for any mishaps.
6. PPE is mandatory as required.
C4 Type of Work
Any violation or deviation from stated scope will result in immediate termination of permit.
(a)General (b) Hot Works (Required to Fill Hot work (c) High Risk Activities (Required to Submit MSRA and required
□ Window Display permit form Appendix A and submit MSRA and safety certificates)
□ Merchandise required safety certificates) □ Working at height – Ladder only
□ Branding □ Welding □ Working at height - Scaffolding
□ Delivery □ Gas / flame Cutting □ Working at height - MEWP (boom, Manlift, scissor lifts).
□ Stock/Take inventory □ Waterproofing □ Confined space –
□ Cleaning □ Metal Grinding/Cutting □ Electrical LV
□ Painting □ Others, please specify □ Electrical HV - Isolation
□ Duct Cleaning □ Lifting work (using lifting equipment/ heavy vehicles)
□ Shop Front Signage □ MEP work
□ Pest Control □ Structural Erection – Events Set up
□ Fire alarm/fighting maintenance □ Heavy Vehicles entry (Crane, excavator, forklift, drill rig etc)
ü
□ Others, Please Specify □ Work affecting Evacuation routes
Replacement of existing door □ Chemicals – Hazardous substances
□ Isolation (MEP, Electrical, Gas,)
□ LPG maintenance
□ Pressure testing
□ Demolition
□ Others, Please Specify
C5 PPE Required (Please select the ones that are applicable and will be provided)
ü
□ Safety Boots / shoes
□ Hard hat
ü
□ Gloves (Specify type)
ü
□ Dust mask / respiratory protective equipment
□ Fall arrest Harness
□ Eye protection
□ Ear defenders
□ Reflecting vest
F4 All kinds of waste generated by the work activities will be disposed of by the contractor.
F5 Tenant and Contractor are fully responsible for ensuring the operation is carried out safely and the workplace is safe for anyone that may be
affected.
G Approval Status – to be filled by Mall Management Team & Contractor
Permit will be suspended and re-issued after one of the following scenarios has occurred: PTW Acceptance by Signature
Contractor
• One work shift, with a maximum time of 12 hours, has ended (for Hotwork).
• When the work plan deviates from the original plan
• If work scope changes Note:
• When there is a change in the personnel involved - Permit is intended for the stated scope only
- No High risk work allowed
• Whenever an emergency/evacuation alarm is sounded - Competent person to carry out the manual handling work.
• Any noisy work during operation hours - Work area to be barricaded/signage to be placed
- ensure use of PPE
- Work area ro be cleaned well after completion of work
Parking Validation: YES NO
Pre-Approval of MSRA by HSE Department (For Hot works & High-Risk Works)
Jeston Nelson
Name: _________________________________________ Signature: ______________________________________
Department: HSE
Completion Management
FM Department / Marketing / RDD: _______________________ Signature: _____________________________ Of work Signature
Samuel Lenny
Mall Management: ______________________________ Signature: ________________________________________
Approval Stamp:
Cancellation
Date:
Work Access Form must be submitted by email, 72 business hours before the work takes place. Tracking No.: