CORRECTIVE ACTION

REPORT
Project-
CONSTRUCTION OF MUMBAI
AHEMADABAD SOR NO-12 Date-02.03.2024
HIGH SPEED
RAIL, C4 PACKAGE
PART-A; -SOR Description-
Deformation observed on Structural steel material (4-BR1-20 (2 No’s).

Root cause of the SOR condition:


Proper stacking at the time of consignment unloading at site.
PART B: Corrective Action to be taken by ZETWERK
Replaced the affected mark numbers [4-BR1-20 ( 2 No’s)] with new.

Performed by: Completion Date-


PART C: Action to be taken to preclude recurrence:

Performed by: Completion Date-


PART D: Verification and Acceptance by L&T:

Date-
Acceptance by-
Execution Manager

Date-
Acceptance by-
Quality Assurance
Officer
Corrective Action(s) completed by: - Verification completed by: -