ID – 21307-001

Infrastructure asset handover document

Infrastructure asset handover document12

Project Title/ Work Title Joint Police Programme/ Construction of Police Station in Bossaso, Puntland State,
Somalia.
Contract No: 006-2021-SOCO-SFC

Description of the Joint Police Programme, Infrastructure Work Package - Construction of


Project/Work Package ( as
Police Station in Station in Bossaso, Puntland State, Somalia
per the name indicated the
legal agreement)

Project Location: Bossaso, Puntland State, Somalia

Client (Beneficiary): Puntland Ministry of Internal Security

Funding Source: EU, DFID, German Federal Foreing Office

Implementing Agency: UNOPS

Contractor: Ugbaad Deveolpers Limited

Purpose: A record that all of the project’s deliverables have been accepted as
complete and states that the project is regarded as having achieved its
overall goal.

Your Project Deliverables

S.N Deliverables

1 Main Police Station building.


2 Male and female Ablution units
3 Battery room.
4 Guard House
5 Boundary wall, approximately 250 m long new wall
6 Septic tank and cesspool.

1
2

© UNOPS 2018 21 Infrastructure asset handover document 1


ID – 21307-001
Infrastructure asset handover document

7 Entrance Gate and Boom gate


8 External Mechanical and Electrical reticulation

Related Handover Documents:

Substantial/Final Completion Certificate

Final Joint Inspection Report

Handover Sign Off


On behalf of the client (beneficiary)

Name: Omer Ali Mohamed


Ministry of Puntland Internal Security
Bosaso Police Station Commander

Signature

Date April 02, 2023

On behalf of UNOPS

Name Milaim Reshani , Project Manager, UNOPS SOCO

Signature

Date

© UNOPS 2018 21 Infrastructure asset handover document 2


ID – 21307-001
Infrastructure asset handover document

PHOTOS

Main B: lighting lamps Fixing Main B: Fixed lighting lamps

Ablution: pipe leakages fixing Ablution: Pipe leakages completed

© UNOPS 2018 21 Infrastructure asset handover document 3


ID – 21307-001
Infrastructure asset handover document

Ablution: Disability Toilet Completed Ablution: the Damaged Door was Replaced

Ablution: External walls was painted Ablution: External walls was painted

© UNOPS 2018 21 Infrastructure asset handover document 4