CHINA HARBOUR ENGINEERING COMPANY LIMITED

BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE


8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 1: PRELIMINARIES

1.1 Contractor's Site Office Sum -

1.2 NROCC's Resident Engineer's Site Office(400 sq. ft) and Facilities Sum -

1.3 To Maintain (Cleaning, Electricity, Air Conditioning, Water, Etc.)

a. Contractor's and NROCC's Resident Engineer's Site Office MTHS -

b. Safety, Health Facilities: Personal equipment; First Aid Facilities, for duration of contract. Sum -

c. Water and Power Facilities for the Works Sum -

d. Removal of rubbish and debris during and after the contrct MTHS -

1.4 Temporary Traffic Controls and Signs

Temporary traffic controls( including temporary lighting, flagmen, temporary


traffic signs, temporary barriers, etc.) for the duration of the contract
MTHS -

1.5 Setting out, Checks on elevations and as-built Sum -

1.6 Samples and Testing Sum -

1.7 Temporary Precast Girder Yard Sum -

1.8 Mobilization and Demobilization of Heavy Plant and Equipment Sum -

1.9 Environment Protection Fees Sum -

1.10 Security Fee MTHS -

Carried to Summary -

BQ/1
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 2: DEMOLITION AND SITE CLEARANCE

2.1 Cut bushing

Cut away and remove from site all bush, roots silt and debris. Cut back overhanging trees on both
side to create a minimum overhead clearance of 3.3meter above finish road surface and dispose of m2 -
all debris to an approved dump site.

2.2 Cut trees & Dig Roots (average trunk diameter>50cm)

Cut away and remove from site all trees (diameter of the tree-trunk no less than 20cm) and dig out
the root of the trees, dispose of all debris to an approved dump site.
NR -

2.3 Rermoval of Topsoil & Compaction before fill


Remove the 30cm thick soil at the top, compact to the requirement of subgrade filling after topsoil
removal, dispose of all debris to an approval dump site

a. Remove topsoil m3 135123.00 - 39123 54407 41593

b. Compacting area m2 200262.00 - 54482 65724 80056

2.4 Removal of Culverts


Excavate and demolish existing culverts and dispose of debris to an approved dump site. NR -

2.5 Removal of Masonry Structures


Excavate and demolish existing masonry structures and dispose of debris to an approved dump site. m3 -

2.6 Dewatering

Provide all necessary labour and equipment to remove the water tank Item -

2.7 Removal of Mud


Excavate the mud in the existing drainage ditch or swamp and dispose of debris to an approved
dump site.
m3 -

2.8 Digging out existing road


Excavate and demolish existing earth shoulder of the A2 road, dispose of debris to an approved
dump site.
m3 -

2.9 Remove the exsiting billboards NR -

2.10 Milling asphalt pavement m2

Carried to Summary -

BQ/2
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 3A: EARTHWORKS


Longhill Bypass

3.1 Subgrade Excavation


Excavate existing ground surface higher than the design elevation in the highway subgrade
construction, transport the earth to designated position to fill the embankment or to an approved m3 700270.00 - 198940 438049 57737
dump site.
949269.00 275340 492318 181611
3.2 Subgrade Filling

Transport the filling material (pebble and clay) from the designated borrowing area/quarry to the
position for the highway subgrade filling, compacted the filling material (pebble and clay) by m3 975434.00 - 253030.00 522046 196662
construction equipment to the degree of density as designed.

3.3 Soft Soil Improvement by riprap and dynamic


Soft soil on the ground is not deeper than 3m,riprap is rock.

a. dimension stone m3 0.0

b. Sand Grave layer m3 0.0

c. Crushed Stone layer m3 0.0

d. dynamic compaction m2 0.0

3.4 Backfill Behind the Abutment (Culvert、Bridge and Underpass)


After construction the abutment of bridges and culverts, backfill the area behind the abutment with
gravel and compact by construction equipment to the degree of density as designed. Backfill with
C15 concrete if construction equipment can not reach these areas.

a. Backfill with Macadam m3 17150.6 - 5548.5 8753.9 2848.1

b. Cohesive soil with cover layer m3 -

c. Φ10cm PVC drain pipe m -

d. Soil replacement(gravel) m3 -

3.5 Conical Slope(Culvert、Bridge and Underpass)


Backfill the conical slope with caly and compacted to the degree of density needed

a. Backfill of Earth m3 -

b. M7.5 mortared rubble paving at the surface of slope m3 -

c. Gravel cushion layer at the bottom of Paved surface m3 -

d. M7.5 mortar rubble or hollow six-edge block m2 -

e. 20cm cement concrete m3 -

f. M10 cement mortar m3 -

g. Excavation m3 -

3.6 Renovate sideslope


Provide labour and machine to renovate slopeside after subgrade filling, compact and for all other
incidentals necessary for completing the work as specified.
m 22870.0 - 6800.0 8280.0 7790.0

3.7 Treatment of Low Fill and Shallow Cut Subgrade


Roadbed needs to backfill or fill gravel according to the requirement at low fill and shallow cut section.

a. Earthwork excavation m3 9616.5 - 6588.8 3027.8

b. Gravel soil m 3
10908.4 - 7373.3 3535.1

c. Backfilled with compacted earthwork m3 -

3.8 Treatment of Cut to Fill Subgrade

Subgrade treatment at the junction of filling and digging.Groundwater development, fill dig junction
should be set cut-off blind ditch, Φ15 cm perforated hard plastic drainage pipe, drain the upper part of
hole permeable part, when installation should be facing up.

a. Geogrid m2 96526.0 - 33764.0 40932.0 21830.0

b. U-type nail kg 2732.6 - 943.9 878.5 910.2

c. Rolling area m2 22310.0 - 9312.0 6790.0 6208.0

d. 96Area of compacted area m2 7768.8 - 2618.8 2423.3 2726.7

e. Earthwork excavation m3 14817.5 - 6090.4 3606.0 5121.2

f. Gravel soil m3 14817.5 - 6090.4 3606.0 5121.2

g. Overbreak m3 11338.4 - 4422.4 3413.6 3502.4

h. Crushed stone m3 11338.4 - 4422.4 3413.6 3502.4

i. Macadam m3 -

j. Φ15cm pipe m -

BQ/3
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 3A: EARTHWORKS (Cont'd)


Longhill Bypass

k. Impermeable geotextile m2 -

l. Anti-filter geotextile m2 -

3.9 Treatment of High Fill Subgrade

For high fill section with embankment filling height H≥15m,under roadbed is filled by hill cutting rock
ballast of site slope of excavation.After filling each 2.0m for embankment in height,25kJ trilateral
impact roller will be adopted for reinforcement.

a. Geogrid m2 28480.0 - 16640.0 8320.0 3520.0

b. U-type nail kg 3104.3 - 1813.8 906.9 383.7

c. Impact roller compaction(15~20times) m2 242960.0 - 138480.0 86000.0 18480.0

d. Earthwork excavation m3 128703.36 - 78641.92 50061.44

e. Rock ballast m3 -

f. Impact roller compaction of foundation(20times) m2 32750.0 14980.0 14140.0 3630.0

Carried to Collection -

COLLECTION

From page BQ/3 -

From page BQ/4 (above) -

Carried to Summary #REF!

BQ/4
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860
BILL NO. 4A: DRAINAGE
Longhill Bypass

4.1 Drainage Ditch


Provide materials for the construction of drainage ditch of filling section.

a. M7.5 Mortar Rubble m3 2256.8 - 496.1 1226.2 534.5

b. 3000Psi Concrete Cast-in-situ m3 52745.8 - 15787.1 10533.1 26425.6

c. Grassing m2 14391.2 - 4276.8 3516.7 6597.8

d. Earthwork & Stonework Excavation m3 -

e. 4000Psi Concrete Precast m3 -

f. ∅100mmPVC pipe m

g. Cement Mortar m3

h. Grade 420 rebar kg

4.2 Drainage Ditch for Platform


Provide materials for the construction of drainage ditch for paltform.

a. M7.5 Mortar Rubble m3 821.4 - 248.8 437.7 134.9

b. 3000PSI Concrete Precast m3 386.4 - 139.2 196.0 51.2

c. 3000PSI Concrete Cast-in-situ m3 188.2 - 62.2 109.4 16.6

d. Earthwork & Stonework Excavation m3 389.6 - 104.4 147.0 138.2

4.3 Intercepting Ditch for Hillside


Provide materials for the construction of intercepting ditch for hillside.

a. 3000PSI Concrete Precast m3 365.8 - 160.5 205.4

b. Gravel m3 182.9 - 80.2 102.7

c. Impervious Geotextile m2 -

d. Grassing m2 -

e. Earthwork & Stonework Excavation m3 1189.0 - 521.6 667.4

f. Cohesive Soil Tamping m3 91.5 - 40.1 51.3

4.4 Quantity of Chute


Provide materials for the construction of chute.

a. M7.5 Mortar Rubble m3 1653.0 - 605.0 569.3 478.8

b. 4000PSI Concrete Precast m3 1.9 - 0.6 0.6 0.6

c. Earthwork & Stonework Excavation m3 1578.8 - 618.4 563.6 396.9

4.6 Side Ditch


Provide materials for the construction of side ditch of cutting section.

a. M7.5 Mortar Rubble m3 6875.6 - 2305.4 3294.3 1275.9

b. 3000PSI Concrete Precast m 3


542.9 - 294.1 248.8

c. Grassing m 2
4865.9 - 2675.0 1753.9 437.0

d. Earthwork & Stonework Excavation m3 14343.8 - 4126.6 7222.6 2994.6

e. 4000PSI Concrete Precast m3 287.6 77.5 169.2 40.9

f. 3000PSI Concrete Cast-in-situ m3 452.4 121.8 266.1 64.4

g. Cement Mortar m3 103.4 27.9 60.8 14.7

h. Grade 420 rebar kg 60198.9 16214.2 35416.4 8568.3

4.7 Super-elevation Drainage


Provide materials for the construction of Super-elevation Drainage.

a. 4000PSI Concrete Precast m3 -

b. 2000PSI Concrete Cast-in-situ m3 -

c. 4000PSI Concrete Cast-in-situ m3 -

d. Earthwork & Stonework Excavation m3 -

e. M7.5 Mortar Rubble m3 -

f. φ315U-PVC Pipe m -

g. Gravel Cushion m3 -

h. Grade 420 rebar kg -

4.8 Construct Collecting Well and Manhole

Construct collecting well and manhole by concrete in urban section. including all necessary
excavation, backfilling and all other incidentals required as per design and specification.

a. 3000Psi Concrete Cast-in-situ m3

b. Sand Backfilling m3

c. φ900 HDPE Pipe m

d. Earthwork & Stonework Excavation m3

e. Earth Backfilling m3

f. G420 kg

g. Cast iron covers Nr


-

Carried to Summary #REF!

BQ/5
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860
BILL NO. 5A: ROADS AND PAVEMENT
Longhill Bypass

5.1 Preparation of Formation

Allow for scarifying, shaping, rolling, mixing of imported material required and for compaction as
a.
specified.
m2 -

5.2 Sub-Base Material - graded crushed stone

150-400mm thick graded crushed stone sub-base spread, levelled, watered, thoroughly mixed and
well compacted as specified including grading and rolling to falls and cross falls.
m2 163348.4 - 60939.5 51647.2 50761.7

5.3 Base Material - graded crushed stone

150-400mm thick graded crushed stone base spread, levelled, watered, thoroughly mixed and well
compacted as specified including grading and rolling to falls and cross falls.
m2 139674.0 - 52894.7 44576.6 42202.7

5.4 Apply Prime Coat


Provide and apply prime coat as specified on prepared surface of cement stabilized macadam base
including clearing surface, sanding, spraying primer coat at the rate of 0.7 - 1.5 litres per square m2 129740.0 - 42960.7 44576.6 42202.7
meter.

5.5 Apply Seal Coat

Used for cement stabilization of the top surface of gravel base, the lower sealing layer should be laid
after the oil spraying is finished, and the whole section of the top surface of the base should be laid.
m2 140291.1 - 53511.7 44576.6 42202.7

5.6 Asphaltic Concrete Above Overlay

Provide asphaltic concrete mix and deliver to site including setting out, spreading of mix, rolling,
removing of dust or deleterious material with mechanical sweeper and for all other incidentals
necessary for completing the work as specified (8.4m 2/tonne @ 40mm thick)

a. 40mm Thick AC-16 m2 124238.5 - 41478.0 42642.0 40118.5

5.7 Asphaltic Concrete Middle Overlay

Provide asphaltic concrete mix and deliver to site including setting out, spreading of mix, rolling,
removing of dust or deleterious material with mechanical sweeper and for all other incidentals
necessary for completing the work as specified (6.0m 2/tonne @ 50mm thick)

a. 50mm Thick AC-20 m2 124238.5 - 41478.0 42642.0 40118.5

5.8 Apply Tack Coat


Provide and apply tack coat as specified on prepared surface of Asphaltic concrete overlay including
clearing surface, spraying tack coat
m2 124238.5 - 41478.0 42642.0 40118.5

5.9 Treatment of Soft verge


Provide soil and deliver to site including setting out, compact and for all other incidentals necessary
for completing the work as specified.And provide spraying seeds and curbstone.

a. Earth-up m3 3385.2 - 1252.5 912.2 1220.5

b. Spraying seeds m2 3021.2 - 1234.0 581.8 1205.4

c. 4000PSI concrete precast curbstone m3 199.8 - 55.5 63.9 80.4

5.10 Side Drainage of Pavement


Provide materials for side drainage of pavement.

a. Cement Mortar m3 56.7 - 15.1 28.7 12.9

b. Φ50 PVC pipe m 4005.4 - 1345.7 1608.4 1051.3

BQ/6
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 5A: ROADS AND PAVEMENT (Cont'd)


Longhill Bypass

5.11 Treatment of Connection Section at Bridgehead


Provide bridgehead subgrade transition section pavement structure material.

a. 4000PSI cast-in-situ concrete embedded plate m3 21.00 - 10.5 10.5

b. Graded macadam(thickness 10cm) m2 220.00 - 110 110

c. Glass fiber geogrid m2 90.00 - 45 45

d. HRB335 Rebar kg 226.00 - 113 113

5.12 Cement Concrete Pavement

Provide cement concrete mix and deliver to site including setting out, spreading of mix, rolling,
removing of dust or deleterious material with mechanical sweeper and for all other incidentals
necessary for completing the work as specified (260mm thick)

a. 260mm Thick 5000Psi Cement Concrete m2 9760.0 9760.0

b. 4000Psi Concrete Embedded Plate m3 95.2 95.2

c. 4000PSI concrete precast m3

d. 4000PSI concrete curb m3

e. G420 kg 47188.0 47188.0

5.13 Milling Asphalt Surface 5cm m2

Carried to Collection -

COLLECTION

From page BQ/10 -

From page BQ/11 (above) -

Carried to Summary #REF!

BQ/7
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES 4TH FLOOR NORTH,COURTLEIGH CORPORATE CENTRE
8 ST. LUCIA AVE •KINGSTON 5• JAMAICA
Montego Bay Perimeter Road
Project
ITEM DESCRIPTION UNIT QUANTITY RATE AMOUNT ($) ④LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 6A: SLOPE PROTECTION


Longhill Bypass

6.1 Green Slope Protection - Grass Planting

Provide all necessary material, labour & tools to construct grass planting as directed.

a. Grass planting m2 165358.1 - 48387.5 62255.9 54714.7

b. Topsoil m 2
165358.1 - 48387.5 62255.9 54714.7

6.2 Green Slope Protection - 3D Geo-net Grass Planting

Provide all necessary material, labour & tools to construct grass planting as directed.

a. Grass planting m2 -

b. 3D geo-net m2 -

c. Topsoil m2 -

d. Φ8 rebar U-type nail kg -

e. Square stake Pcs -

6.3 Mortar rubble for slope protection on bridgehead

Provide all necessary material, labour & tools to construct mortar rubble for slope protection.

a. M7.5 mortar rubble m3 -

b. Sand gravel m3 -

c. Earthwork excavation m3 -

d. 3000Psi Rubble Concrete m3

e. Φ80mm PVC Pipe m


-
6.4 Construct Maintenance Step
Provide all necessary material, labour & tools to construct maintenance step.

a. M7.5 mortar rubble m3 1362.00 437.1 620.7 304.2

d. Earthwork excavation m3 1910.40 603.9 881.0 425.4

6.5 Construct Curb


Provide all necessary material, labour & tools to construct curb. -

a. 3000 PSI rubble concret m3 3598.4 - 814.3 1397.7 1386.4

b. 4000Psi Concrete cast in suit m3

c. Macadam inverted filter m3 973.9 - 197.2 216.8 560.0

d. Φ80 PVC pipe m 468.2 101.7 142.5 224.0

e. Earthwork excavation m3 1145.5 253.0 420.0 472.5

f. G420 kg 1269.1 1269.1


-
6.6 Retaining wall
Provide all necessary material, labour & tools to construct wall.

a. 3000 PSI rubble concret m3 216.50 216.5

b. Macadam inverted filter m3 33.60 33.6

c. Φ80 PVC pipe m 72.00 72.0

d. Earthwork excavation m3 259.50 259.5

e. 4000Psi Concrete m3

f. M7.5 Mortar Rubble m3 24.00 24.0

g. G420 kg 676.66 676.7

h. Clay layer m3 6.00 6.0

6.7 Mortar Rubble for Slope Protection


Provide all necessary material, labour & tools to construct mortar rubble for slope protection.

a. M7.5 mortar rubble m3

b. Sand gravel m3

c. Earthwork excavation m3

d. Φ80 PVC pipe m

e. Filtration geotextile m3

BQ/8
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUANTITY ④ LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860

BILL NO. 8: TRAFFIC FACILITIES

8.1 Concrete Barrier


Provide all necessary material, labour & tools, mixing, transporting,
pouring and maintaining the concrete, cutting, bending, placing and
colligating steel bar and all work required to complete concrete barrier
as specified.

a. New Jersey Barrier m

b. Roadside Barrier m 115.00 115.0

8.2 W-Beam&Thrie-beam Steel Guardrail


Provide all necessary material, labour & tools, transporting, installing
and all work required to complete W-beam&Thrie-beam steel guardrail
as specified

a. Gr-A m

b. Gr-SB m

c. Gr-Am m

8.3 W-Beam&Thrie-beam Steel Guardrail Terminal Ends or Transition


Provide all necessary material, labour & tools, transporting, installing
and all work required to complete W-beam&Thrie-beam steel guardrail
terminal ends or transition as specified

a. AT1 处

b. AT2 处

c. BT1 处

d. BT2 处

e. DT1 处

f. TR1 处

g. TR3 处

8.4 Moveable Guardrail


Provide all necessary material, labour & tools, transporting, installing
m
and all work required to complete Moveable guardrail as specified

8.5 Toll station Fence


Provide all necessary material, labour & tools, transporting, installing
m
and all work required to completeToll station Fence as specified

8.6 Single Column Traffic Sign


Provide all necessary material, labour & tools, transporting, installing
and all work required to complete single column traffic sign as specified

a. 48×60inch 个
2-Φ0.9m 个
b. octagon 36inch 个
octagon 0.9m 个
c. 48×102inch 个
Φ0.9m 个
d. 48×72inch 个
octagon 0.9m+Φ0.9m 个
e. 48×48inch 个
1.56×1.56m 个
f. 72×60inch 个
0.9×0.9m 个
g. 64×60inch 个
0.4×0.6m 个
h. 28×14inch 个
1.3×0.76+0.215×0.76m 个
i. 36×36inch 个
0.9×0.9+1.3×0.5m 个
j. 36×36+30×15inch 个
1.5×2.0m 个
L. 0.9×0.9+1.3×0.65m 个
M. 1.35×0.54 个
8.7 Double Column Traffic Sign
Provide all necessary material, labour & tools, transporting, installing
and all work required to complete double column traffic sign as specified

a. 207×141+96×30inch 个
2.6×2.5m 个
b. 140×133+96×30inch 个
1.92×1.163m 个
c. 210×174inch 个
2.6×1.0m 个

d. 210×197inch 个
2.1×1.4m 个
e. 86×61inch 个
3.455×1.5m 个
f. 146×48inch 个
3.5×2.35m 个
g. 90×40.25inch 个
1.9×2.0m 个
h. 114×48inch 个
1.84×0.72m 个
i. 96×48inch 个
CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUANTITY ④ LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000 ⑥ LHK58+965-LHK62+860


2.1×1.145m 个
j. 80×48inch 个
2.575×2.02m 个
L. 2.4×1.145m 个
M. 2.575×2.17m 个
N. 2.6×2.0m 个
O. 2.413×3.35m 个
P. 3.3×1.2m
8.8 Door-frame Traffic Sign
Provide all necessary material, labour & tools, transporting, installing
and all work required to complete double column traffic sign as specified

a. 264×176inch 个

8.9 Door-frame Traffic Sign


Provide all necessary material, labour & tools, transporting, installing
and all work required to complete double column traffic sign as specified

a. 36×36inch 个
1.94×0.563m 个
b. 50×40inch 个
c. Φ35inch 个
Φ0.9m 个
d. 48×36inch 个

8.10 Kilometer sign、highway boundary stone


Provide all necessary material, labour & tools, transporting, installing
and all work required to complete double column traffic sign as specified
a. Kilometer sign 个

b, highway boundary stone 个

8.11 Hot-melt Pavement Tarffic Marking

Provide all necessary material, labour & tools, spraying and all work
required to complete hot-melt pavement marking as specified

a. Ordinary marking m2

b. Deceleration vibration marking m2

c. Facade Marking (Reflective Film) m2

d. Facade Marking (Reflective Paint) m2

8.12 Raised Pavement Markers


Provide all necessary material, labour & tools, purchasing, installing and
all work required to complete raised pavement marking as specified

a. Single face NR

b. Double face NR

8.13 Fence
Provide all necessary material, labour & tools, purchasing, installing and
m
all work required to complete fence as specified.
a. Barbed wire fence m

b. Welded Mesh Fence m

8.14 Anti-throwing Network


Provide all necessary material, labour & tools, purchasing, installing and
m
all work required to complete Anti-throwing Network as specified.

8.15 Anti-bump barrel


Provide all necessary material, labour & tools, purchasing, installing and

all work required to complete Anti-bump barrel as specified.

8.16 Cattle Grid


Provide all necessary material, labour & tools, purchasing, installing and

all work required to complete Cattle Grid as specified.

8.17 Security gate


Provide all necessary material, labour & tools, purchasing, installing and

all work required to complete Security gate as specified.

Carried to Collection

COLLECTION

From page BQ/1

From page BQ/2 (above)


CHINA HARBOUR ENGINEERING COMPANY LIMITED
BILL OF QUANTITIES

ITEM DESCRIPTION UNIT QUANTITY ④ LHK67+000-LHK70+419.30 ⑤ LHK62+860-LHK67+000

BILL NO. 10: OTHER WORKS


1. Change ditch and road

10.1 Earthwork excavation m³ 30123.00 18817 4543

10.2 Earthwork filling m³ 16746.00 14166 441

10.3 Clay bound macadam pavement-20cm clay bound macadam m2 1125.00 522 423

10.4 Bituminous concrete pavement-40mm AC-13C m2 8291.75 4758 1200

10.5 Bituminous concrete pavement-16cm 5% cement stabilized macadam m2 8568.15 4916 1240

10.6 Bituminous concrete pavement-10cm gravel m2 8844.54 5075 1280

10.7 Drainage protection-mortar rubble m³ 664.00 397 89

10.8 Drainage protection-30cm sand-gravel cushion m³ 120.00 87

10.9 Change ditch-Φ0.9m Csp m 200.00 110 40

2. Escape Ramp

10.10 Earthwork excavation m³ 25980 25980

10.11 Earthwork filling m³ 15551 15551

10.12 Pea gravel road surface(400mm) m 2


996.56 996.6

10.13 Asphaltic Concrete Above Overlay(40mm AC-16) m 2


657.73 657.7

10.14 Asphaltic Concrete Middle Overlay(50mm AC-20) m 2


677.66 677.7

10.15 Apply Tack Coat m 2


677.66 677.7

10.16 Apply Prime Coat m2 1893.45 1893.5

10.17 Apply Seal Coat m2 1893.45 1893.5

10.18 Base Material - graded crushed stone(150mm) m2 1831.67 1831.7

10.19 Treatment of Soft verge

a. Earth-up m3 155.46 155.5

b. Spraying seeds m2 239.17 239.2

10.20 Drainage Ditch

a. M7.5 Mortar Rubble m3 128.14 128.1

b. Grassing m 2
235.42 235.4

c. Earthwork & Stonework Excavation m 3


235.42 235.4

10.21 Drainage Ditch for Platform

a. 3000PSI Concrete Precast m3 10.20 10.2

b. Earthwork & Stonework Excavation m3 7.65 7.65

10.22 Side Ditch

a. M7.5 Mortar Rubble 269.80 269.8

b. 3000PSI Concrete Precast 22.50 22.5

c. Earthwork & Stonework Excavation 335.50 335.5

10.23 Green Slope Protection - Grass Planting

a. Grass planting 1931.26 1931.26228394834


b. Topsoil 1931.26 1931.26228394834

10.24 Retaining wall

a. 3000 PSI rubble concret 1897.35 1897.35

b. Macadam inverted filter 226.31 226.305

c. Φ80 PVC pipe 416.50 416.5

d. Earthwork excavation 963.00 963

e. M7.5 Mortar Rubble 45.00 45

f. Embedded Rebar 1269.06 1269.056

g. Clay layer 13.50 13.5


3. Intersection

10.12 Earthwork excavation m³ 0

10.13 Earthwork filling m³ 1669 827

10.14 Bituminous concrete pavement-60mm AC-13C m 2


1174 561.6

10.15 Bituminous concrete pavement-15cm 5% cement stabilized macadam m 2


1299 631.8

10.16 Bituminous concrete pavement-15cm gravel m 2


1464 725.4

10.17 Change ditch-Φ0.9m Csp m 96 36


⑥ LHK58+965-LHK62+860

6763

2157

180

2334

2412

2490

178

33

50
842.2

612.8

666.8

738.8

60