TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
LOADOUT PROCEDURE
(BSL-PJ23151-R-02-LP)
CONTENTS
1.0 INTRODUCTION 3
2.0 SCOPE OF WORK 4
3.0 CARGO SPECIFICATIONS 5
4.0 ENVIRONMENTAL CONDITIONS 6
5.0 MANAGEMENT OF OPERATION 7
5.1 OPERATION COORDINATION 7
6.0 OPERATIONS ORGANISATION 8
6.1 ORGANISATION CHART 8
6.2 PERSONNEL RESPONSIBILITIES 9
6.3 COMMUNICATION STRUCTURE 10
7.0 SAFETY 11
7.1 PERSONAL PROTECTIVE EQUIPMENT 11
7.2 TOOLBOX MEETING 11
8.0 OPERATION SEQUENCES 12
8.1 BARGE PREPARATION ACTIVITIES (AT BOK SENG PIONEER YARD) 12
8.2 ARRIVAL OF BARGE (AT UTRACO YARD, BATAM, INDONESIA) 12
8.3 PRE-TRANSPORT ACTIVITIES 12
8.4 TRANSPORT CHECKLIST 13
8.5 PRE-RORO ACTIVITIES 13
8.6 PRE-RORO CHECKLIST 13
8.7 POSITIONING & JACKING OF TRAILER UNDERNEATH THE CARGO 13
8.8 LOAD-OUT OPERATION 14
8.9 BARGING OF CARGO (FROM UTRACO YARD, BATAM, INDONESIA TO PAX OCEAN YARD, INDONESIA) 15
8.10 DEMOBILISATION FROM SITE 15
9.0 APPENDIX 16
9.1 LASHING CALCULATION 16
9.2 TURNING PLAN 17
9.3 SEA FASTENING CALCULATION 18
9.4 BARGE DECK STRENGTH CALCULATION 19
9.5 BARGE GLOBAL STRENGTH CALCULATION 20
9.6 INTACT & DAMAGE STABILITY CALCULATION 21
9.7 TOWING MANUAL 22
9.8 CARGO DETAILS 23
9.9 BARGE GENERAL ARRANGEMENT DRAWING 24
9.10 BARGE CONSTRUCTION DRAWING 25
9.11 BARGE STABILITY BOOKLET 26
9.12 SUPPORT STOOL GENERAL ARRANGEMENT DRAWING 27
9.13 SUPPORT STOOL STRUCTURAL ANALYSIS 28
9.14 RO-RO RAMP GENERAL ARRANGEMENT DRAWING 29
9.15 RO-RO RAMP STRUCTURAL ANALYSIS 30
9.16 TRANSPORTATION CHECKLIST 31
9.17 BARGING CHECKLIST 32
9.18 RISK ASSESSMENT 33
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |2
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking, internal shifting,
and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia. Cargoes will then be sailed to
Pax Ocean Yard, Indonesia where lift-off operation (by others) will be carried out.
The aim of this document is to provide an overview on the proposed concept of handling to enable
the safe and smooth transportation of the cargo. Details of the cargo are stated in this document.
This document is originated from Bok Seng and refers essentially to the scope of works.
Engineering analysis of the transportation is included in this document. All relevant studies have
been performed for the cargo transportation for the above-mentioned analysis.
This document serves as a guide for our operation crew and third party to carry out the operation.
It is also intended to provide the owner and client the necessary information to review and approve
the operation.
Client to verify and ensure that all client’s provided data in this document are accurate and up to
date.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |3
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
Bok Seng
Client
Item Description
Note: The scope of work is preliminary and meant for method statement only (non-contractual)
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |4
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |5
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
➢ Loadout operation
➢ Sea Transportation
Note: Operation will not commence in the event of these are exceeded
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |6
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
Close coordination is required to ensure the operation can be carried out smoothly.
Relevant personnel from Bok Seng Pte Ltd and PT. Perkasa Lintas Arta will work closely
to address the following:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |7
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |8
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
In general, the responsibilities of the personnel involved in the operation consist of the
following. The following are preliminary and may change according to site situation.
The Project Manager is the representative for Bok Seng and responsible for
the entire operation. The Project Manager will be the key contact point
with client and is responsible to provide the services according to the
contract.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |9
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 10
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
7.0 Safety
The following measures will be implemented to ensure that the entire operation is
carried out in a safe manner.
The following personal protective equipment (PPE) shall be always worn during
operation:
A toolbox meeting shall be carried out prior to the start of operation. It could be
conducted by the Operations Manager, and/or the Transport Supervisor. The
purpose of the toolbox meeting is to brief every personnel involved in the
operation the works to be carried out and the safety aspects of the works. It is to
be reminded that safety is the top priority in the job site. At the end of the toolbox
meeting, all attendance shall sign off a toolbox record sheet.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 11
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
8.1.1 Pre-marking of barge deck for positioning of support stools. Trailer ro-
ro paths and set-down positioning of cargo on barge deck will also be
identified.
8.1.2 Removal of barge manhole covers.
8.1.3 Perform gas free for those tanks that has direct hot work and check for
gas level with gas meter.
8.1.4 Weld support stools, and d-rings on barge.
8.1.5 Test and check that all ballast pumps are fully filled with diesel and are
functioning well.
8.1.6 Check that all mooring ropes, ballasting pumps hoses are in good
conditions.
8.1.7 Position the ballast pumps complete with the hoses at their designated
tanks and secure them.
8.3.1 Upon the arrival of the trailer to site, the equipment shall be checked to
ensure that no damage is present.
8.3.2 Assemble the trailer into configurations as shown in the transport
drawings.
8.3.3 Check that the hydraulic hoses are connected correctly, and hydraulic
valves / fittings are tightened to ensure no leakages.
8.3.4 Carry out a full functional test on the trailer.
8.3.5 Prior to operation, go through the trailer path and ensure that all
obstructions are cleared and suitable for transportation.
8.3.6 The transport path shall be levelled and compacted up to the allowable
tolerances of the trailer. Generally, it should be +/- 150mm. This will
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 12
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
To ensure that all operations are carried out in accordance with approved engineering
procedures, Transport Supervisor on site will complete a check list as the equipment is
assembled and tested. For this operation, the following points will be checked.
8.5.1 Conduct check and walk through from jetty to cargo jack down area and
ensure all obstacles are cleared.
8.5.2 Ensure the tugboat engine is on to hold the barge.
8.5.3 Ensure the barge is ready for roll-on operation.
8.6.1 Check and ensure the heavy portable ramps are properly secured to the
barge.
8.6.2 Check and ensure ballast pump are properly function for roro
operation.
8.6.3 Check, and ensure mooring line is properly tensioned.
8.6.4 Weather forecast shall be monitored prior loadout and shall be within
allowable limitations.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 13
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
8.7.4 With the proper alignment of the cargo CoG and trailer, commence
lashing of the cargo onto trailer.
8.7.5 Having completed above mentioned, cargo will be shifted to wharf for
the roll-on operation.
8.8.1 With the above in order, favourable weather condition, and at the
appropriate tide, the MWS/Client will start to issue instruction to roll-
on of the cargo onto barge. The load-out process will be carried out as
follows:
• The barge will be closely monitored for trim after each step
made. Draft at bow and/or stern shall be read through height
markings on barge to determine the trimming of the barge
during loadout. One ballast crew will be at stern side and one at
bow side to monitor the draft and sounding of the barge. The
ballast crew shall update to ballast engineer / operation
manager upon every step. Maximum operational trimming of
barge is 1 degree.
• The ballasting team shall monitor the sounding of tanks at every
step.
• Water will be pumped in/out of the ballast tank to maintain the
barge level to the wharf. Tidal water levels, height difference
between ramp and jetty shall be measured all throughout the
loadout operation and one delegate guy will be in place to
monitor the clearance.
• The Operations Manager, Transport Supervisor and Ballasting
Supervisor will correspond and work together throughout the
entire operation.
8.8.2 Once the cargo ‘cross-over’ onto the barge, the cargo will be moved
towards the final jack down location while the barge trim is closely
monitored, and ballasting performed accordingly.
8.8.3 Upon positioning of Cargo at the pre-designated location on the barge.
The cargo will be slowly lowered down onto the pre-allocated support
stools.
8.8.4 Commence sea fastening according to sea fastening plan, securing the
cargo to the barge.
8.8.5 Ballasting shall continue to achieve sail-away draft and trim upon
completion of sea fastening. Soundings will be checked upon
completion.
8.8.6 Properly secure barge manhole covers after seafastening, and ballasting
are completed.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 14
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
8.9 Barging of Cargo (from Utraco Yard, Batam, Indonesia to Pax Ocean Yard,
Indonesia)
8.9.1 Upon client’s acceptance by the MWS and issuance of COA, barge will
be towed to Pax Ocean Yard, Indonesia.
8.9.2 Upon client’s acceptance of the operation, the team will demobilise all
operational equipment on site and proceed with necessary
housekeeping.
8.10.1 Upon client’s acceptance of the operation, the team will demobilise all
operational equipment on site and proceed with necessary
housekeeping.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 15
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
9.0 Appendix
9.1 Lashing Calculation
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 16
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
LASHING CALCULATION
(BSL-PJ23151-C-06-LC)
CONTENTS
1.0 INTRODUCTION 3
2.0 DESIGN CODES AND STANDARDS 4
2.1 CODE OF SAFE PRACTICE FOR CARGO STOWAGE AND SECURING, INTERNATIONAL MARITIME ORGANIZATION, 2011 4
3.0 CARGO SPECIFICATIONS 5
4.0 LASHING CALCULATION 6
4.1 SECURING MODULE P1 TO TRAILER 6
4.1.1 LASHING ARRANGEMENT 6
4.1.2 SUMMARY OF FORCES FOR SECURING MODULE P1 TO TRAILER 8
4.2 SECURING MODULE S1 TO TRAILER 9
4.2.1 LASHING ARRANGEMENT 9
4.2.2 SUMMARY OF FORCES FOR SECURING MODULE S1 TO TRAILER 11
5.0 APPENDIX 12
5.1 TRANSPORTATION PLAN WITH LASHING ARRANGEMENT 12
5.2 LASHING GEAR CERTIFICATES 13
5.3 TRAILER DRAWING 14
5.4 TRAILER SPECIFICATIONS 15
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |2
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking, internal shifting,
and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia. Cargoes will then be sailed to Pax
Ocean Yard, Indonesia where lift-off operation (by others) will be carried out.
This report summarises the acceleration results caused by the motion of the trailer with cargo during
transportation. The analysis is to ensure that the lashing is adequate to resist the accelerations
during the transportation.
Client to verify and ensure that all client’s provided data in this document are accurate and up to
date.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |3
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |4
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |5
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
5T lashings will be used to secure the cargo in both transverse and longitudinal directions.
Lashing calculation is based on 2x20 axle lines SPMT.
CARGO DETAILS
Weight of the cargo 511.48 MT
Lashing capacity 5.00 MT (5T Loadbinder & Chain)
Coefficient of Friction 0.10
Frictional Medium Steel-Timber
TRAILER DETAILS
Type of Trailers SPMT
No of Axlelines 2 x 20
ROAD INCLINATIONS
Longitudinal Road Gradient 1.72 deg 3%
Transverse Road Gradient 1.72 deg 3%
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |6
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
WIND FORCE
Wind Speed 10.00 m/s
Mass Density of Air 1.228 kg/m3
Longitudinal Wind Force 10.24 kN
Transverse Wind Force 21.88 kN
LASHING ARRANGEMENT
Transverse Plane Angle, α 13.3 deg
Longitudinal Plane Angle, β 58.0 deg
Longitudinal Force Value, fx 0.85
Lashing Quantity 8.0 no.
Lashing Securing Force 34.00
Securing Force due to Friction 51.12
Total Securing Force 85.12
Conclusion Safe!
LASHING ARRANGEMENT
Transverse Plane Angle, α 13.3 deg
Longitudinal Plane Angle, β 58.0 deg
Longitudinal Force Value, fx 0.85
Lashing Quantity 8.0 no.
Lashing Securing Force 34.00 MT
Securing Force due to Friction 51.12 MT
Total Securing Force 85.12 MT
Conclusion Safe!
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |7
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
LASHING ARRANGEMENT
Transverse Plane Angle, α 13.5 degree
Longitudinal Plane Angle, β 68.1 degree
Longitudinal Force Value, fy 0.39
Lashing Quantity 8.0 no.
Lashing Securing Force 15.60 MT
Securing Force due to Friction 51.1 MT
Total Securing Force 66.7 MT
Conclusion Safe!
The securing forces shown are lashing securing forces and additional securing forces
due to friction.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |8
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
5T lashings will be used to secure the cargo in both transverse and longitudinal directions.
Lashing calculation is based on 2x20 axle lines SPMT.
CARGO DETAILS
Weight of the cargo 429.18 MT
Lashing capacity 5.00 MT (5T Loadbinder & Chain)
Coefficient of Friction 0.10
Frictional Medium Steel-Timber
TRAILER DETAILS
Type of Trailers SPMT
No of Axlelines 2 x 20
ROAD INCLINATIONS
Longitudinal Road Gradient 1.72 deg 3%
Transverse Road Gradient 1.72 deg 3%
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |9
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
WIND FORCE
Wind Speed 10.00 m/s
Mass Density of Air 1.228 kg/m3
Longitudinal Wind Force 10.42 kN
Transverse Wind Force 23.39 kN
LASHING ARRANGEMENT
Transverse Plane Angle, α 5.3 deg
Longitudinal Plane Angle, β 78.7 deg
Longitudinal Force Value, fx 0.99
Lashing Quantity 4.0 no.
Lashing Securing Force 19.80
Securing Force due to Friction 42.90
Total Securing Force 62.70
Conclusion Safe!
LASHING ARRANGEMENT
Transverse Plane Angle, α 5.3 deg
Longitudinal Plane Angle, β 78.7 deg
Longitudinal Force Value, fx 0.99
Lashing Quantity 4.0 no.
Lashing Securing Force 19.80 MT
Securing Force due to Friction 42.90 MT
Total Securing Force 62.70 MT
Conclusion Safe!
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 10
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
LASHING ARRANGEMENT
Transverse Plane Angle, α 4.6 degree
Longitudinal Plane Angle, β 84.1 degree
Longitudinal Force Value, fy 0.12
Lashing Quantity 4.0 no.
Lashing Securing Force 2.40 MT
Securing Force due to Friction 42.9 MT
Total Securing Force 45.3 MT
Conclusion Safe!
The securing forces shown are lashing securing forces and additional securing forces
due to friction.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 11
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
5.0 Appendix
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 12
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
A
- 30796(L) 14415(W)
1 2 3 4 5 6 7 8 9
2695 3055 3830 3285
4200
14570
5620
1270
COG: 511.48t
11569(H)
COG: 511.48t
TIMBER
PACKING
4450
3880
3880
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600 3024 3975
1500
149 149 264 264
4200 10120 12560 5320 3177 2430 4569 2430 1810
20 X 1400 = 28000
VIEW-A
SIDE VIEW GROUP A
GROUP B
6m CHAINS
5470 8530
WLL = 5.00 T
LOAD BINDERS
WLL = 6.80 T
14570
3024
1607
1270
COG: 511.48t
3975
5620
GROUP C
PLAN VIEW
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3.
BS Logistics Hub. Singapore 639405.
NOTE:
T : + 65 6416 1999 F : + 65 6862 0507
www.bokseng-ipl.com
1. MAX. STROKE OF SCHEUERLE IS 700mm. IN NORMAL TRAVELING CONDITION, SUSPENSION IS SET AT MID STROKE (1500mm)
CLIENT:
FOR EQUAL STROKE OF 350mm UP AND DOWN PT. PERKASA LINTAS ARTA
2. CHAIN LEVER BLOCKS/LOAD BINDERS ARE USED TO TIE DOWN THE CARGO ONTO THE TRAILER DURING TRANSPORTATION.
PROJECT:
3. THE DIMENSIONS OF MODULE P-1 : 30.796m(L) x 14.415m(W) x 11.569m(H) , @ 511.48T
MARINE TRANSPORTATION OF MODULES
CARGO DRAWING AND LCG & VCG ARE BASED ON LIFTING PLAN PROVIDED BY CLIENT.
TITLE:
4. STRUCTURAL INTEGRITY OF CARGO TO BE VERIFIED BY CLIENT FOR SUITABILITY TO BE SUPPORTED AND LASHED AT THE TRANSPORT PLAN FOR MODULE P-1
PROPOSED LOCATIONS.
DRAWING NO: SHEET NO SCALE SIZE
5. THE DRAWING IS PREPARED BASED ON THE INFORMATION PROVIDED BY THE CLIENT. CLIENT TO VERIFY AND ENSURE THAT
ALL CLIENT'S PROVIDED DATA IN THIS DOCUMENT ARE ACCURATE AND UP TO DATE. 1/1 1:160 A3
13/09/23 01 REVISED AS PER CLIENT COMMENTS DY OS VR BSL-PJ23151-D-01-TP
6. PLYWOOD WILL BE USED BETWEEN CARGO & TRAILER FOR FRICTIONAL RESISTANCE.
THIS DRAWING IS THE EXCLUSIVE PROPERTY OF BOK SENG LOGISTICS PTE LTD AND SHALL BE
7. GROUND TO BE SUITABLY STRENGTHENED & LEVELED FOR THE TRANSPORT OPERATION. 11/07/23 00 ISSUED FOR PRELIMINARY REVIEW PP VR VR
TREATED CONFIDENTIAL. NO PART OF IT MAY BE COPIED OR DISTRIBUTED TO A THIRD PARTY
DATE REV DESCRIPTION DRAWN CHECKED APPROVED WITHOUT THE WRITTEN PERMISSION OF BOK SENG LOGISTICS PTE LTD.
31418 (L) 14000(W)
A
-
3830 3055 3315
13250 11870
4200
COG: 429.18t
COG: 429.18t
12124(H)
TIMBER
6330
6330
5155 5045
PACKING
5000
3238 3357
2500 3140 3140 3140 3140 3140 3140 3140 3140 2130
141
141 748 748
750 250
448 1800
1052
1500
537 537
4200 20 AXLE LINES x 1400 = 28000 1668 949 2430 4165 2430 551
SIDE VIEW VIEW-A
GROUP B 6m CHAINS
4200 9800
GROUP A WLL = 5.00 T
LOAD BINDERS
WLL = 6.80 T
3234
2208
COG: 429.18t
3357
GROUP C
PLAN VIEW
Bok Seng Logistics Pte Ltd
NOTE:
No. 5 Tuas Avenue 3.
BS Logistics Hub. Singapore 639405.
1. MAX. STROKE OF SCHEUERLE IS 700mm. IN NORMAL TRAVELING CONDITION, SUSPENSION IS SET AT MID STROKE (1500mm) T : + 65 6416 1999 F : + 65 6862 0507
FOR EQUAL STROKE OF 350mm UP AND DOWN www.bokseng-ipl.com
2. CHAIN LEVER BLOCKS/LOAD BINDERS ARE USED TO TIE DOWN THE CARGO ONTO THE TRAILER DURING TRANSPORTATION. CLIENT:
3. THE DIMENSIONS OF MODULE S-1 : 31.418m(L) x 14.000m(W) x 12.124m(H) , @ 429.18T PT. PERKASA LINTAS ARTA
CARGO DRAWING AND LCG & VCG ARE BASED ON LIFTING PLAN PROVIDED BY CLIENT. PROJECT:
4. STRUCTURAL INTEGRITY OF CARGO TO BE VERIFIED BY CLIENT FOR SUITABILITY TO BE SUPPORTED AND LASHED AT THE MARINE TRANSPORTATION OF MODULES
PROPOSED LOCATIONS. TITLE:
5. THE DRAWING IS PREPARED BASED ON THE INFORMATION PROVIDED BY THE CLIENT. CLIENT TO VERIFY AND ENSURE THAT TRANSPORT PLAN FOR MODULE S-1
ALL CLIENT'S PROVIDED DATA IN THIS DOCUMENT ARE ACCURATE AND UP TO DATE.
DRAWING NO: SHEET NO SCALE SIZE
6. PLYWOOD WILL BE USED BETWEEN CARGO & TRAILER FOR FRICTIONAL RESISTANCE.
7. GROUND TO BE SUITABLY STRENGTHENED & LEVELED FOR THE TRANSPORT OPERATION. BSL-PJ23151-D-02-TP 1/1 1:160 A3
13/09/23 01 REVISED AS PER CLIENT COMMENTS DY OS VR
THIS DRAWING IS THE EXCLUSIVE PROPERTY OF BOK SENG LOGISTICS PTE LTD AND SHALL BE
10/07/23 00 ISSUED FOR PRELIMINARY REVIEW KZ VR VR
TREATED CONFIDENTIAL. NO PART OF IT MAY BE COPIED OR DISTRIBUTED TO A THIRD PARTY
DATE REV DESCRIPTION DRAWN CHECKED APPROVED WITHOUT THE WRITTEN PERMISSION OF BOK SENG LOGISTICS PTE LTD.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 13
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-06-LC
Project : Marine Transportation of Modules Rev. : 00
Title : Lashing Calculation for Modules P1 and S1 Date : 13th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 14
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
5330
1100
2430 2430 470 2430
1450 1450
670 3 X 1400 = 4200
2640 4 X 1400 = 5600
350 *
350 *
2840
1500
1500
870
870
620 830 620 620 830 620
2340
2640
4 AXLE - LINES 3 AXLE - LINES
Z150 DE POWER PACK (PPU) ONE AXLE LINE
1100
670 1400
6 x 1400 = 8400
4200
2310
SPECIFICATION Z350 DA POWER PACK Z150 DE POWER PACK PER AXLE LINE
DEAD WEIGHT (mt) 7.2 4.0 4
PAYLOAD (mt) - - 36
PERMISSIBLE TOTAL WEIGHT (mt) - - 40
TOTAL NO. OF PENDULUM AXLES 80 40 -
NO. OF PENDULUM AXLES WITH DRIVE 26 16 -
POWER [KW/rpm] 350/1800 147/2.400 -
HYDRAULIC TANK - VOLUME [L] 800 420 - 28/02/18 01 ISSUED FOR PRELIMINARY REVIEW SA VR VR
HYDRAULIC TANK - AVAILABLE VOLUME [L] 520 250 - 21/12/15 00 ISSUED FOR PRELIMINARY REVIEW SA VR VR
FUEL TANK - AVAILABLE VOLUME [L] 400 170 - DATE REV DESCRIPTION DRAWN CHECKED APPROVED
FRONT - WHEEL REAR - WHEEL ISOMETRIC VIEW
STEERING STEERING Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3.
BS Logistics Hub. Singapore 639405.
T : + 65 6416 1999 F : + 65 6862 0507
www.bokseng-ipl.com
CLIENT:
BOK SENG LOGISTICS PTE LTD
PROJECT:
HEAVY HAULAGE
TITLE:
SCHEUERLE SPMT GENERAL ARRANGEMENT DRAWING
DRAWING NO: SHEET NO SCALE SIZE
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 15
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 17
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
6441 74559
9000 72000
81000
65
89
R8
80
59
R8
2
R7659
2
R7659
P1
S1
12600
40000
81000
S1
TURNING OF MODULE S-1
40000
Bok Seng Logistics Pte Ltd
TURNING OF MODULE P-1 No. 5 Tuas Avenue 3.
BS Logistics Hub. Singapore 639405.
NOTE: T : + 65 6416 1999 F : + 65 6862 0507
www.bokseng-ipl.com
1.MAX. STROKE OF SCHEUERLE IS 700mm. IN NORMAL TRAVELING CONDITION, SUSPENSION IS SET AT MID STROKE (1500mm) FOR EQUAL STROKE OF 350mm UP AND DOWN CLIENT:
PT. PERKASA LINTAS ARTA
2.CHAIN LEVER BLOCKS/LOAD BINDERS ARE USED TO TIE DOWN THE CARGO ONTO THE TRAILER DURING TRANSPORTATION.
3.THE DIMENSIONS OF MODULES ARE PROJECT:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 18
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
SEA FASTENING CALCULATION
(BSL-PJ23151-C-01-SF)
CONTENTS
1.0 INTRODUCTION 3
2.0 DESIGN CODES AND STANDARDS 4
2.1 CODE OF SAFE PRACTICE FOR CARGO STOWAGE AND SECURING, INTERNATIONAL MARITIME ORGANIZATION, 2011 4
2.2 DNVGL-ST-N001 MARINE OPERATIONS AND MARINE WARRANTY 4
2.3 AMERICAN WELDING SOCIETY, AWS D1. 1:2000, STRUCTURAL WELDING CODE FOR STEEL, SECTION 2, “DESIGN OF WELDING
CONNECTIONS” 4
3.0 DESIGN CRITERIA 5
3.1 MOTION CRITERIA 5
3.1.1 ROLL AMPLITUDE 5
3.1.2 PITCH AMPLITUDE 5
3.1.3 HEAVE ACCELERATION 5
3.2 ENVIRONMENTAL CRITERIA 5
3.2.1 WIND 5
4.0 BARGE SPECIFICATIONS 6
4.1 BARGE DIMENSION 6
5.0 CARGO SPECIFICATIONS 7
6.0 ACCELERATION CALCULATION 8
6.1 ACCELERATION CALCULATION FOR MODULE P1 8
6.2 ACCELERATION CALCULATION FOR MODULE S1 10
6.3 ACCELERATION CALCULATION FOR SPMT 12
7.0 SEA FASTENING CALCULATION 14
7.1 SEA FASTENING CALCULATION FOR MODULE P1 14
7.1.1 SECURING MODULE P1 TO BARGE DECK 14
7.1.2 SUMMARY OF LASHING SECURING FORCES 15
7.1.3 SECURING SUPPORT STOOL TO BARGE DECK 16
7.2 SEA FASTENING CALCULATION FOR MODULE S1 18
7.2.1 SECURING MODULE S1 TO BARGE DECK 18
7.2.2 SUMMARY OF LASHING SECURING FORCES 19
7.2.3 SECURING SUPPORT STOOL TO SUPPORT STOOL 20
7.2.4 SECURING SUPPORT STOOL TO BARGE DECK 22
7.3 SEA FASTENING CALCULATION FOR SPMT 24
7.3.1 SECURING SPMT TO BARGE DECK 24
7.3.2 SUMMARY OF LASHING SECURING FORCES 25
8.0 APPENDIX 26
8.1 SEA FASTENING PLAN 26
8.2 SEA FASTENING EQUIPMENT CERTIFICATES (SAMPLE) 27
8.3 SEA FASTENING EQUIPMENT STRUCTURAL ANALYSIS 28
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |2
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking, internal shifting,
and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia. Cargoes will then be sailed to
Pax Ocean Yard, Indonesia where lift-off operation (by others) will be carried out.
This report summarizes the acceleration results caused due to the motion responses by the barge
with cargo. The analysis is to ensure that the sea fastening is adequate to resist all loads during the
voyage. The motion and environmental criteria considered in the calculation is in accordance with
guidelines specified by the relevant marine warranty surveyor.
Client to verify and ensure that all client’s provided data in this document are accurate and up to
date.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |3
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
The sea fastening calculation is performed using the following codes and standards as applicable:
2.1 Code of Safe Practice for Cargo Stowage and Securing, International Maritime
Organization, 2011
2.3 American Welding Society, AWS D1. 1:2000, Structural Welding Code for Steel,
Section 2, “Design of Welding Connections”
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |4
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
Heave = ± 0.1g
3.2.1 Wind
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |5
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |6
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |7
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
BARGE INFORMATION
Barge Length 330.00 ft 100.58 m
Barge Width 100.00 ft 30.48 m
Barge Depth 18.00 ft 5.49 m
INPUT PARAMETERS
Max. Roll Angle 5.00 degree
Max. Pitch Angle 2.50 degree
Heave Acceleration 0.10 g m/s^2
Period of motion 10.00 sec
Draft of Barge 1.87 m
Cargo Weight 511.48 Mt
Transverse Dist. To Barge CL 0.00 m
Longi. Dist. To Pitch CL 16.23 m
Cargo VCG to Deck 6.12 m
Cargo Length in Longi. 30.80 m
Cargo Width in Trans. 14.42 m
Cargo Height to Deck 12.01 m
Min. Uplift arm in Trans. 4.72 m
Min. Uplift arm in Longi. 7.58 m
WIND FORCES
Air Specific Gravity 0.00129 t/m³
Wind Speed 15.00 m/s
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |8
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
TOTAL FORCES
Roll + Heave + Wind
Total Transverse Force 722.35 kN
Total Vertical Force 5498.38 kN.m
UPLIFT MOMENT
Transverse
Maximum transverse moment -16376.82 kNm
No Transverse Tipping
Longitudinal
Maximum longitudinal moment -32859.47 kNm
No Longitudinal Tipping
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |9
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
BARGE INFORMATION
Barge Length 330.00 ft 100.58 m
Barge Width 100.00 ft 30.48 m
Barge Depth 18.00 ft 5.49 m
INPUT PARAMETERS
Max. Roll Angle 5.00 degree
Max. Pitch Angle 2.50 degree
Heave Acceleration 0.10 g m/s^2
Period of motion 10.00 sec
Draft of Barge 1.87 m
Cargo Weight 429.18 Mt
Transverse Dist. To Barge CL 0.24 m
Longi. Dist. To Pitch CL 17.25 m
Cargo VCG to Deck 8.59 m
Cargo Length in Longi. 31.42 m
Cargo Width in Trans. 14.00 m
Cargo Height to Deck 12.58 m
Min. Uplift arm in Trans. 5.12 m
Min. Uplift arm in Longi. 12.04 m
WIND FORCES
Air Specific Gravity 0.00129 t/m³
Wind Speed 15.00 m/s
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 10
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
TOTAL FORCES
Roll + Heave + Wind
Total Transverse Force 658.03 kN
Total Vertical Force 4617.23 kN.m
UPLIFT MOMENT
Transverse
Maximum transverse moment -13233.70 kNm
No Transverse Tipping
Longitudinal
Maximum longitudinal moment -44090.11 kNm
No Longitudinal Tipping
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 11
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
BARGE INFORMATION
Barge Length 330.00 ft 100.58 m
Barge Width 100.00 ft 30.48 m
Barge Depth 18.00 ft 5.49 m
INPUT PARAMETERS
Max. Roll Angle 5.00 degree
Max. Pitch Angle 2.50 degree
Heave Acceleration 0.10 g m/s^2
Period of motion 10.00 sec
Draft of Barge 1.87 m
Cargo Weight 87.20 Mt
Transverse Dist. To Barge CL 3.60 m
Longi. Dist. To Pitch CL 18.58 m
Cargo VCG to Deck 0.71 m
Cargo Length in Longi. 32.20 m
Cargo Width in Trans. 2.43 m
Cargo Height to Deck 1.25 m
Min. Uplift arm in Trans. 1.20 m
Min. Uplift arm in Longi. 13.29 m
WIND FORCES
Air Specific Gravity 0.00129 t/m³
Wind Speed 15.00 m/s
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 12
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
TOTAL FORCES
Roll + Heave + Wind
Total Transverse Force 117.76 kN
Total Vertical Force 948.18 kN.m
UPLIFT MOMENT
Transverse
Maximum transverse moment -834.99 kNm
No Transverse Tipping
Longitudinal
Maximum longitudinal moment -10556.66 kNm
No Longitudinal Tipping
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 13
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
Lashing wires are proposed to be used to secure the cargo from transverse and longitudinal sliding
forces. Minimum securing angle conditions are used for conservative analysis.
TRANSVERSE LASHING
GENERAL INFORMATION
Sling MBL 22.00 Mt (18mm Wire)
Sling CS 9.78 Mt (CS = MBL/2.25)
Other Lashing Items SWL 9.70 Mt (Shackles = 12Mt,
Turnbuckles = 9.7Mt)
CS 9.70 Mt
Coefficient of friction 0.00
Friction Medium
WIRE ARRANGEMENT - A
Transverse Plane, α 36.40 degree
Longitudinal Plane, β 0.00 degree
Transverse Force Value, fy 0.80
Wires quantity 16.00 no.
Wire height 1.51 m
Wire horizontal distance 2.05 m
Wire securing force 124.92 Mt
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 14
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
LONGITUDINAL LASHING
GENERAL INFORMATION
Sling MBL 22.00 Mt (18mm Wire)
Sling CS 9.78 Mt (CS = MBL/2.25)
Other Lashing Items SWL 9.70 Mt (Shackles = 12Mt,
Turnbuckles = 9.7Mt)
CS 9.70 Mt
Coefficient of friction 0.00
Friction Medium
WIRE ARRANGEMENT - A
Transverse Plane, α 40.50 degree
Longitudinal Plane, β 90.00 degree
Longitudinal Force Value, fy 0.76
Wires quantity 8.00 no.
Wire height 1.51 m
Wire horizontal distance 1.77 m
Wire securing force 59.01 Mt
Total Securing Force 59.01 Mt
Skew Load Factor 1.50
Total Longitudinal Sliding Force 54.92 Mt
Anti Tipping Moment 613.90 kNm
Tipping Moment -32859.47 kNm
Conclusion Safe!
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 15
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
Welding strips will be used to secure the support stools to the barge deck from transverse and
longitudinal sliding forces.
GENERAL INFORMATION
Allowable Compression/Tension
0.66 Fy 155.10 N/mm2
Allowable Combined
0.60 Fy 141.00 N/mm2
TRANSVERSE SECURING
WELDING
Weld Strip Height 25.00 mm
Transverse Sliding Force 722.35 kN
No. of Weld Strip 32.00
Max.Sliding Force per Strip 22.57 kN
Welding length/side 100.00 mm
No. of sides welding 1.00
Welding Length 100.00 mm
Welding Leg Length 8.00 mm
Welding Throat Thickness 5.67 mm
Weld Area 567.38 mm²
Section Modulus of Weld 9456.26 mm³
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 16
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
LONGITUDINAL SECURING
WELDING
Weld Strip Height 25.00 mm
Longitudinal Sliding Force 359.17 kN
No. of Weld Strip 32.00
Max.Sliding Force per Strip 11.22 kN
Welding length/side 100.00 mm
No. of sides welding 1.00
Welding Length 100.00 mm
Welding Leg Length 8.00 mm
Welding Throat Thickness 5.67 mm
Weld Area 567.38 mm²
Section Modulus of Weld 9456.26 mm³
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 17
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
Lashing wires are proposed to be used to secure the cargo from transverse and longitudinal sliding
forces. Minimum securing angle conditions are used for conservative analysis.
TRANSVERSE LASHING
GENERAL INFORMATION
Sling MBL 22.00 Mt (18mm Wire)
Sling CS 9.78 Mt (CS = MBL/2.25)
Other Lashing Items SWL 9.70 Mt (Shackles = 12Mt,
Turnbuckles = 9.7Mt)
CS 9.70 Mt
Coefficient of friction 0.00
Friction Medium
WIRE ARRANGEMENT - A
Transverse Plane, α 41.20 degree
Longitudinal Plane, β 51.40 degree
Transverse Force Value, fy 0.47
Wires quantity 24.00 no.
Wire height 2.22 m
Wire horizontal distance 2.23 m
Wire securing force 109.28 Mt
Total Securing Force 109.28 Mt
Skew Load Factor 1.50
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 18
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
LONGITUDINAL LASHING
GENERAL INFORMATION
Sling MBL 22.00 Mt (18mm Wire)
Sling CS 9.78 Mt (CS = MBL/2.25)
Other Lashing Items SWL 9.70 Mt (Shackles = 12Mt,
Turnbuckles = 9.7Mt)
CS 9.70 Mt
Coefficient of friction 0.00
Friction Medium
WIRE ARRANGEMENT - A
Transverse Plane, α 39.00 degree
Longitudinal Plane, β 25.50 degree
Longitudinal Force Value, fy 0.33
Wires quantity 24.00 no.
Wire height 2.22 m
Wire horizontal distance 2.74 m
Wire securing force 77.89 Mt
Total Securing Force 77.89 Mt
Skew Load Factor 1.50
Total Longitudinal Sliding Force 49.72 Mt
Anti Tipping Moment 543.30 kNm
Tipping Moment -44090.11 kNm
Conclusion Safe!
The summary of securing forces and sliding forces are tabled as follows:
Transverse Longitudinal
Total Securing Force by Wires (Mt) 109.28 77.89
Total Securing Force (Mt) 109.28 77.89
Total Sliding Force (Mt) 100.62 49.72
Conclusion
Total Transverse Securing Force > Total Transverse Sliding Force (SAFE)
Total Longitudinal Securing Force > Total Longitudinal Sliding Force (SAFE)
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 19
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
Module S1 has 20 supports total. 15 supports have 1 layer of support stools and 5 supports have 4
layers of support stools. The 4 layers of support stools shall be secured by bolts and each layer shall
have 4 bolts. Bolting check are as follows:
GENERAL INFORMATION
TRANSVERSE SECURING
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 20
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
LONGITUDINAL SECURING
Welding strips will be used to secure the support stools to the barge deck from transverse and
longitudinal sliding forces.
GENERAL INFORMATION
Allowable Compression/Tension
0.66 Fy 155.10 N/mm2
Allowable Combined
0.60 Fy 141.00 N/mm2
TRANSVERSE SECURING
WELDING
Weld Strip Height 25.00 mm
Transverse Sliding Force 658.03 kN
No. of Weld Strip 40.00
Max.Sliding Force per Strip 16.45 kN
Welding length/side 100.00 mm
No. of sides welding 1.00
Welding Length 100.00 mm
Welding Leg Length 8.00 mm
Welding Throat Thickness 5.67 mm
Weld Area 567.38 mm²
Section Modulus of Weld 9456.26 mm³
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 22
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
LONGITUDINAL SECURING
WELDING
Weld Strip Height 25.00 mm
Longitudinal Sliding Force 325.17 kN
No. of Weld Strip 40.00
Max.Sliding Force per Strip 8.13 kN
Welding length/side 100.00 mm
No. of sides welding 1.00
Welding Length 100.00 mm
Welding Leg Length 8.00 mm
Welding Throat Thickness 5.67 mm
Weld Area 567.38 mm²
Section Modulus of Weld 9456.26 mm³
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 23
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
Turnbuckles are proposed to be used to secure the SPMT from transverse and longitudinal sliding
forces. Minimum securing angle conditions are used for conservative analysis.
TRANSVERSE LASHING
GENERAL INFORMATION
(Shackles = 12Mt,
SWL 9.70 Mt Turnbuckles = 9.7Mt)
Coefficient of friction 0.00
WIRE ARRANGEMENT - A
Transverse Plane, α 57.10 degree
Longitudinal Plane, β 45.00 degree
Transverse Force Value, fy 0.38
Wires quantity 4.00 no.
Wire height 1.08 m
Wire horizontal distance 0.70 m
Wire securing force 14.90 Mt
Total Securing Force 14.90 Mt
Total Transverse Sliding Force 12.00 Mt
Anti Tipping Moment 60.42 kNm
Tipping Moment -834.99 kNm
Conclusion Safe!
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 24
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
LONGITUDINAL LASHING
GENERAL INFORMATION
(Shackles = 12Mt,
SWL 9.70 Mt Turnbuckles = 9.7Mt)
Coefficient of friction 0.00
WIRE ARRANGEMENT - A
Transverse Plane, α 54.00 degree
Longitudinal Plane, β 39.00 degree
Longitudinal Force Value, fy 0.37
Wires quantity 4.00 no.
Wire height 1.08 m
Wire horizontal distance 0.79 m
Wire securing force 14.35 Mt
Total Securing Force 14.35 Mt
Total Longitudinal Sliding Force 5.02 Mt
Anti Tipping Moment 56.92 kNm
Tipping Moment -10556.66 kNm
Conclusion Safe!
The summary of securing forces and sliding forces are tabled as follows:
Transverse Longitudinal
Total Securing Force by Wires (Mt) 14.90 14.35
Total Securing Force (Mt) 14.90 14.35
Total Sliding Force (Mt) 12.00 5.02
Conclusion
Total Transverse Securing Force > Total Transverse Sliding Force (SAFE)
Total Longitudinal Securing Force > Total Longitudinal Sliding Force (SAFE)
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 25
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
8.0 Appendix
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 26
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
MODULE P-1 MODULE S-1
CoG - 511.48T CoG - 429.18T
MODULE P-1
CoG - 511.48T
DETAIL-4 DETAIL-5
DETAIL-3
DETAIL-2 DETAIL-1
A B
(ITEM - C)
WIRE ROPE CLIPS
(ITEM - B) SHACKLE
SWL = 12.0T (ITEM - E)
(ITEM - A) C-HOOK
MIN. BREAKING LOAD = 22.0T
SWL = 10.00T
SUITABLE FITTINGS ARE USED TO 12/09/23 01 REVISED AS PER CLIENT COMMENTS DY OS VR
CLIP THE WIRE ROPE TERMINAL
(ITEM - B) SHACKLE 23/08/23 00 ISSUED FOR PRELIMINARY REVIEW DY OS VR
SWL = 12.00T DATE REV DESCRIPTION DRAWN CHECKED APPROVED
(ITEM - F) TURNBUCKLE (ITEM - C)
(ITEM - F) TURNBUCKLE WORKING LOAD LIMIT = 9.7T WIRE ROPE CLIPS
Bok Seng Logistics Pte Ltd
WORKING LOAD LIMIT = 9.7T No. 5 Tuas Avenue 3.
(ITEM - D) BS Logistics Hub. Singapore 639405.
MIN. BREAKING LOAD = 22.0T T : + 65 6416 1999 F : + 65 6862 0507
SUITABLE FITTINGS ARE USED TO www.bokseng-ipl.com
(ITEM - G) LASHING "D" RING
CLIP THE WIRE ROPE TERMINAL CLIENT:
SWL - 10.00 T PT. PERKASA LINTAS ARTA
(ITEM - G) (ITEM - F) TURNBUCKLE PROJECT:
LASHING "D" RING WORKING LOAD LIMIT = 9.7T MARINE TRANSPORTATION OF MODULES
SWL - 10.00 T (ITEM - G) TITLE:
SEA FASTENING PLAN FOR MODULE P-1 AND S-1
DECK LASHING "D" RING
SWL - 10.00 T DRAWING NO: SHEET NO SCALE SIZE
PLAN VIEW
(MARKING PLAN FOR SUPPORTS)
BOLT M22
4 NOS PER LAYER
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 27
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-C-01-SF
Project : Marine Transportation of Modules Rev : 01
Title : Sea Fastening Calculation for Modules P1 and S1 Date : 12th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 28
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
CONTENTS
1.0 INTRODUCTION 3
2.0 DESIGN CODES AND STANDARDS 4
2.1 ANSI/AISC 360-05, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, LOAD
RESISTANCE FACTOR DESIGN. 4
2.2 NOBLE DENTON : GUIDELINES FOR MARINE TRANSPORTATIONS (0030/ND) 4
3.0 DESIGN PARAMETERS 5
3.1 LOAD CALCULATION 5
3.1.1 LOAD ANGLED AT 45 DEGREES 5
3.1.2 LOAD ANGLED AT 30 DEGREES 5
4.0 SOFTWARE DESCRIPTION 6
5.0 MATERIAL YIELD STRENGTH & ALLOWABLE STRESSES 7
5.1 MATERIAL YIELD STRENGTH 7
5.1.1 GENERAL 7
5.2 ALLOWABLE STRESSES 8
5.2.1 STRUCTURE – GRADE 235 8
6.0 FEM ANALYSIS INPUT 9
6.1 FEM MODEL 9
6.2 BOUNDARY CONDITION 11
6.3 LOAD CASE 12
6.3.1 LOAD CASE 1: FORCE ANGLED AT 45 DEGREES 12
6.3.2 LOAD CASE 2: FORCE ANGLED AT 30 DEGREES 13
7.0 FEM ANALYSIS RESULTS 14
7.1 PLATE STRESS ANALYSIS 14
7.1.1 LOAD CASE 1: FORCE ANGLED AT 45 DEGREES 14
7.1.2 LOAD CASE 2: FORCE ANGLED AT 30 DEGREES 14
7.2 NODE DISPLACEMENT 15
8.0 PADEYE DESIGN CHECK 16
8.1 PADEYE DESIGN 16
9.0 CONCLUSION 16
10.0 APPENDIX 20
10.1 C-HOOK GENERAL ARRANGEMENT DRAWING 20
10.2 MILL CERTIFICATE 21
10.3 STAAD PRO RESULTS 22
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |2
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
1.0 Introduction
Purpose of this document is to indicate results for C-Hook structural analysis to withstand the
design forces while being used as a sea fastening equipment.
This report summarizes results for the analysis of the C-Hook and verifies that the structural
capacity is adequate to withstand the designed forces with 1.60 times factor of safety using LRFD
code.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |3
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
The structural analysis is performed using the following codes and standards as applicable:
2.1 ANSI/AISC 360-05, Specification for Structural Steel Buildings, American Institute of
Steel Construction, Load Resistance Factor Design.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |4
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
The C-Hook Design is assumed to take 10T Load with minimum angle of 30 degrees as
shown below. Safety Factor of 1.6 is also considered in the analysis.
P a g e |5
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
STAAD.Pro V8i is being used for the structural analysis to determine the structure designed
has adequate capacity.
STAAD.Pro V8i is a comprehensive and integrated finite element analysis and design
offering, including a state-of-the-art user interface, visualization tools, and international
design codes. It is capable of analyzing any structure exposed to static loading, a dynamic
response, soil-structure interaction, wind, earthquake, and moving loads. STAAD.Pro V8i is
FEM analysis and design tool for any type of project including towers, culverts, plants,
bridges, stadiums, and marine structures.
The software supports modelling of truss and beam members, plates, solids, linear and non-
linear cables and curvilinear beams. Loading of the models could then be carried out by
applying applicable forces.
STAAD.Pro V8i performs code checking and supports a wide range of international
recognized design codes.
For plate members, the analysis is completed using the von Mises Criterion to assess the
structure against failure. The von Mises stress is used to predict yielding of materials under
any loading condition. In this case, a material is said to start yielding when its von Mises
stress reaches a critical value known as the yield strength. This criterion takes both shear
and normal stresses into account to develop a combined equivalent stress. According to the
von Mises Criterion, the structure will not fail as long as the combined equivalent stress is
less than the yield strength of the material.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |6
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |7
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
Steel plates are conservatively assumed to be mild steel with minimum yield
strength of 235 N/mm2. The allowable stress of the material is factored with the
applicable safety factor in accordance to the values specified by AISC – LRFD codes as
follows:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |8
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
The structure is generated into STAAD Pro FEM Model by plate modeling method.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e |9
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 10
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
The C-Hook is clamped into the I-beam with rubber in between for friction resistance. Pin
support is used as shown below.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 11
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
Two load cases are considered in this analysis. First is force angled at 45 degrees. Second is
force angled at 30 degrees. Conservatively, point load is applied on the structure.
Refer to “Load Parameters” of this report for the values of Design Load.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 12
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
Refer to “Load Parameters” of this report for the values of Design Load.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 13
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 14
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
Maximum node displacement in this analysis is from Load Case 2 (Force angled at 30
degrees) is 0.733mm.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 15
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
PADEYE DIMENSION
ALLOWABLE STRESS
Yield Stress 235.00 N/mm²
Allowable Tensile 141.00 N/mm²
Allowable Bending 155.10 N/mm²
Allowable Shear 94.00 N/mm²
Allowable Bearing 211.50 N/mm²
Allowable Combined 155.10 N/mm²
DESIGN FORCE
Vertical Load 10.00 Mt
Design Force 10.00 Mt
98.10 kN
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 16
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
BEARING STRESS
Bearing Area 1350.00 mm²
Bearing Load 98.10 kN
Bearing Stress 72.67 N/mm²
Stress Ratio 0.34
Conclusion Safe!
SHEAR STRESS
Shear Area 1350.00 mm²
Shear Load 98.10 kN
Shear Stress 36.33 N/mm²
Stress Ratio 0.39
Conclusion Safe!
TENSILE STRESS
Tensile Area 2700.00 mm²
Tensile Load 98.10 kN
Tensile Stress 36.33 N/mm²
Stress Ratio 0.26
Conclusion Safe!
IN PLANE BENDING
Moment of Inertial 8437500.00 mm⁴
Section Modulus 112500.00 mm³
Bending Moment 6376.50 kN*mm
Bending Stress 56.68 N/mm²
Stress Ratio 0.37
Conclusion Safe!
OUT OF PLANE
BENDING
Moment of Inertial 337500.00 mm⁴
Section Modulus 22500.00 mm³
Bending Moment 318.83 kN*mm
Bending Stress 14.17 N/mm²
Stress Ratio 0.09
Conclusion Safe!
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 17
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
WELD STRESSES
Shear Load 98.10 kN
Welding Leg Length 10.00 mm
Throat Thickness 7.14 mm
Length of Weld 250.00 mm
Area of Weld 1785.71 mm²
Section Modulus of Weld 9300595.24 mm³
Shear stress 54.94 N/mm²
Combined Stress Ratio 0.58
Conclusion Safe!
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 18
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
Conclusion
Based on the above analysis and calculations, Max von mis of 187 MPa is less than the
allowable combined stress of 211.5 MPa. Padeye Design also passed against relevant design
code.
In conclusion, the structure is safe for use based on the above-mentioned input.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 19
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
9.0 Appendix
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 20
ISOMETRIC VIEW
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 21
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM05001-C-04-CH
Project : Marine Rev. : 00
: 265mm X 250mm C-Hook Structural Date : 20th Aug 2018
Title
Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
P a g e | 22
Job No Sheet No Rev
BSL-EM05001-C-04-CH 1 00
Part
Software licensed to
Job Title 265mm X 250mm C-Hook Analysis Ref
By SC Date20-Aug-18 Chd VR
Client Bok Seng Logistics Pte Ltd File C-Hook (250mm by Date/Time
265mm).std 20-Aug-2018 10:09
Job Information
Engineer Checked Approved
Name: SC VR
Date: 20-Aug-18
Print Time/Date: 20/08/2018 10:09 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 1 of 2
Job No Sheet No Rev
BSL-EM05001-C-04-CH 2 00
Part
Software licensed to
Job Title 265mm X 250mm C-Hook Analysis Ref
By SC Date20-Aug-18 Chd VR
Client Bok Seng Logistics Pte Ltd File C-Hook (250mm by Date/Time
265mm).std 20-Aug-2018 10:09
Reactions
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(N) (N) (N) (kNm) (kNm) (kNm)
58 1:LC1: 10T ANGLED
-156
LOAD
E+3 AT 45
147
DEG
E+3 -0.000 0.000 0.000 0.000
2:LC2: 10T ANGLED
-273
LOAD
E+3 AT 30
204
DEG
E+3 -0.000 0.000 0.000 0.000
155 1:LC1: 10T ANGLED
10.2
LOAD
E+3 AT 17.7
45 DEG
E+3 0.000 0.000 0.000 0.000
2:LC2: 10T ANGLED
36.3
LOAD
E+3 AT 29.6
30 DEG
E+3 0.000 0.000 0.000 0.000
158 1:LC1: 10T ANGLED
12.4
LOAD
E+3 AT-4.44
45 DEG
E+3 0.000 0.000 0.000 0.000
2:LC2: 10T ANGLED
37.5
LOAD
E+3 AT-18.2
30 DEG
E+3 0.000 0.000 0.000 0.000
161 1:LC1: 10T ANGLED
5.61
LOAD
E+3 AT-23.2
45 DEG
E+3 0.000 0.000 0.000 0.000
2:LC2: 10T ANGLED
17.7
LOAD
E+3 AT-64.5
30 DEG
E+3 0.000 0.000 0.000 0.000
172 1:LC1: 10T ANGLED
16.4
LOAD
E+3 AT-26.4
45 DEG
E+3 -0.000 0.000 0.000 0.000
2:LC2: 10T ANGLED
45.1
LOAD
E+3 AT-72.1
30 DEG
E+3 0.000 0.000 0.000 0.000
Print Time/Date: 20/08/2018 10:09 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 2 of 2
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 19
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
BARGE DECK STRENGTH CALCULATION
(BSL-PJ23151-C-02-DS)
CONTENTS
1.0 INTRODUCTION 3
2.0 DESIGN CODES AND STANDARDS 4
2.1 DNVGL-ST-N001 MARINE OPERATIONS AND MARINE WARRANTY 4
3.0 DESIGN CRITERIA 5
3.1 MOTION CRITERIA 5
3.1.1 ROLL AMPLITUDE 5
3.1.2 PITCH AMPLITUDE 5
3.1.3 HEAVE ACCELERATION 5
3.2 ENVIRONMENTAL CRITERIA 5
3.2.1 WIND 5
4.0 BARGE SPECIFICATIONS 6
4.1 BARGE DIMENSION 6
5.0 CARGO SPECIFICATIONS 7
6.0 ACCELERATION CALCULATION 8
6.1 ACCELERATION CALCULATION FOR P1 8
6.2 ACCELERATION CALCULATION FOR S1 10
7.0 BARGE DECK STRENGTH CALCULATION 12
7.1 BARGE DECK STRENGTH CALCULATION FOR P1 12
7.2 BARGE DECK STRENGTH CALCULATION FOR S1 13
8.0 CONCLUSION 14
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |2
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking, internal shifting,
and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia. Cargoes will then be sailed to
Pax Ocean Yard, Indonesia where lift-off operation (by others) will be carried out.
This report summarizes results for the barge deck strength calculation to support the cargoes
during the turning of barge and verify against the classification approved barge deck strength.
Client to verify and ensure that all client’s provided data in this document are accurate and up to
date.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |3
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
The barge deck strength calculation is performed using the following codes and standards as
applicable:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |4
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
Heave = ± 0.1g
3.2.1 Wind
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |5
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |6
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |7
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
BARGE INFORMATION
Barge Length 330.00 ft 100.58 m
Barge Width 100.00 ft 30.48 m
Barge Depth 18.00 ft 5.49 m
INPUT PARAMETERS
Max. Roll Angle 5.00 degree
Max. Pitch Angle 2.50 degree
Heave Acceleration 0.10 g m/s^2
Period of motion 10.00 sec
Draft of Barge 1.87 m
Cargo Weight + Grillage Weight 525.24 Mt
Transverse Dist. To Barge CL 0.00 m
Longi. Dist. To Pitch CL 16.23 m
Cargo VCG to Deck 6.12 m
Cargo Length in Longi. 30.80 m
Cargo Width in Trans. 14.42 m
Cargo Height to Deck 12.01 m
Min. Uplift arm in Trans. 4.72 m
Min. Uplift arm in Longi. 7.58 m
WIND FORCES
Air Specific Gravity 0.00129 t/m³
Wind Speed 15.00 m/s
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |8
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
TOTAL FORCES
Roll + Heave + Wind
Total Transverse Force 683.65 kN
Total Vertical Force 5185.32 kN
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |9
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
BARGE INFORMATION
Barge Length 330.00 ft 100.58 m
Barge Width 100.00 ft 30.48 m
Barge Depth 18.00 ft 5.49 m
INPUT PARAMETERS
Max. Roll Angle 5.00 degree
Max. Pitch Angle 2.50 degree
Heave Acceleration 0.10 g m/s^2
Period of motion 10.00 sec
Draft of Barge 1.87 m
Cargo Weight + Grillage Weight 459.28 Mt
Transverse Dist. To Barge CL 0.24 m
Longi. Dist. To Pitch CL 17.25 m
Cargo VCG to Deck 8.59 m
Cargo Length in Longi. 31.42 m
Cargo Width in Trans. 14.00 m
Cargo Height to Deck 12.58 m
Min. Uplift arm in Trans. 5.12 m
Min. Uplift arm in Longi. 12.04 m
WIND FORCES
Air Specific Gravity 0.00129 t/m³
Wind Speed 15.00 m/s
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 10
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
TOTAL FORCES
Roll + Heave + Wind
Total Transverse Force 647.24 kN
Total Vertical Force 4537.97 kN
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 11
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
In total, there will be 16 nos. of supports using 1 layer of 2.0m x 1.0m support stools.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 12
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
In total, there will be 20 nos. of supports. 15 supports will be using 1 layer of 2.0m x 1.0m support
stool and 5 supports will be using 4 layers of 2.0m x 1.0m support stool
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 13
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-02-DS
Project : Marine Transportation of Modules Rev. : 00
Title : Barge Deck Strength Calculation for Modules P1 and S1 Date : 29th August 2023
8.0 Conclusion
Based on the above calculations, the exerted load on the deck is within the Classification Approved
barge deck rating of 20T/m², which is safe for the sea transportation.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 14
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 20
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
BARGE GLOBAL STRENGTH CALCULATION
(BSL-PJ23151-C-04-GS)
CONTENTS
1.0 INTRODUCTION 3
2.0 DESIGN CODES AND STANDARDS 4
2.1 DNVGL-ST-N001 MARINE OPERATIONS AND MARINE WARRANTY 4
2.2 DNVGL-RU-SHIP RULES FOR CLASSIFICATION (SHIPS) 4
3.0 DESIGN CRITERIA 5
3.1 ENVIRONMENTAL CRITERIA 5
3.1.1 WAVE HEIGHT 5
4.0 CARGO SPECIFICATIONS 6
5.0 BARGE SPECIFICATIONS 7
5.1 BARGE DIMENSION 7
5.2 BARGE LIGHTSHIP AND COG 7
6.0 SOFTWARE 8
6.1 SOFTWARE DESCRIPTION 8
6.2 BARGE MODEL 8
7.0 BARGE GLOBAL STRENGTH RESULTS SUMMARY 9
7.1 SAILING - INTACT CASE 9
8.0 BARGE GLOBAL STRENGTH ANALYSIS 10
8.1 SAILING – INTACT CASE 10
8.1.1 HOGGING CONDITION 10
8.1.2 SAGGING CONDITION 13
9.0 APPENDIX 16
9.1 BARGE SECTIONAL MODULUS 16
9.2 BARGE ALLOWABLE BENDING AND SHEAR PROPERTIES 17
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |2
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking, internal shifting,
and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia. Cargoes will then be sailed to
Pax Ocean Yard, Indonesia where lift-off operation (by others) will be carried out.
This report summarizes results for the barge global strength analysis for Modules P1 and S1. The
analysis is to ensure that it has adequate longitudinal strength during towage. It is verified against
the guidelines specified by the relevant marine warranty surveyor.
Client to verify and ensure that all client’s provided data in this document are accurate and up to
date.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |3
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
The barge global strength calculation is performed using the following codes and standards as
applicable:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |4
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Environmental criteria used in the analysis are obtained from DNVGL-ST-N001. The criteria
are as follows:
Hsig = 2.00 m
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |5
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |6
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Item Name Total Mass Long. Arm from Trans. Arm from Vert. Arm
(mt) Amidships(m) (+fwd) CL (m) from keel(m)
Lightship 2593 -0.058 0.000 3.127
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |7
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
6.0 Software
Hydromax is being used for the Intact and Damage Stability analysis. The software is
developed by FormSys, an Australian company which is specialised in 3D modeling, analysis
and design software. Specialist areas of application include naval architecture and
shipbuilding.
The software includes intact and damaged stability for a range of analysis methods including
upright hydrostatics, large angle stability, equilibrium analysis, KN tables and cross curves,
limiting KG and longitudinal strength analysis.
Barge model is created using Maxsurf software which is also a product of Formsys and is
compatible for with Hydromax for hydrostatic analysis. Maxsurf handles the creation of the
sculptured surfaces that make up the exterior of a ship’s hull.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |8
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Maximum Allowable
Maximum Allowable
Bending Bending
Conditions Shear Force Shear force Conclusion
Moment Moment
(tonne force) (tonne force)
(tonne.m) (tonne.m)
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |9
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Loadcase - Sailing
Damage Case - Intact
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Simulate fluid movement
Analysis performed in Sinusoidal waves
Wavelength = 100.8 m; Wave Height = 3.72 m; Wave Phase Offset = 0.5
Item Name Quantity Unit Mass Total Unit Total Long. Aft. Fwd. Trans. Vert.
tonne Mass Volume Volume Arm Limit Limit Arm Arm
tonne m^3 m^3 m m m m m
Lightship 1 2593.000 2593.000 -0.058 -50.400 50.400 0.000 3.127
Total 2593.000 -0.058 0.000 3.127
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 10
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Item Name Quantity Unit Mass Total Unit Total Long. Aft. Fwd. Trans. Vert.
tonne Mass Volume Volume Arm Limit Limit Arm Arm
tonne m^3 m^3 m m m m m
P7 5% 370.436 18.522 361.401 18.070 -9.982 -10.883 0.165
CP7 5% 381.078 19.054 371.783 18.589 -9.995 -3.853 0.141
CS7 5% 381.078 19.054 371.783 18.589 -9.995 3.853 0.141
S7 5% 370.436 18.522 361.401 18.070 -9.982 10.883 0.165
P8 5% 370.182 18.509 361.153 18.058 -18.982 -10.864 0.167
CP8 5% 381.011 19.051 371.718 18.586 -18.995 -3.855 0.142
CS8 5% 381.011 19.051 371.718 18.586 -18.995 3.855 0.142
S8 5% 370.182 18.509 361.153 18.058 -18.982 10.864 0.167
P9 5% 443.161 22.158 432.352 21.618 -28.869 -10.808 0.173
CP9 5% 456.979 22.849 445.833 22.292 -28.920 -3.856 0.145
CS9 5% 456.979 22.849 445.833 22.292 -28.920 3.856 0.145
S9 5% 443.161 22.158 432.352 21.618 -28.869 10.808 0.173
P10 40% 361.970 144.788 353.141 141.257 -38.582 -11.260 1.251
CP10 5% 375.625 18.781 366.463 18.323 -37.990 -3.848 0.190
CS10 5% 375.625 18.781 366.463 18.323 -37.990 3.848 0.190
S10 45% 361.970 162.886 353.141 158.914 -38.595 11.283 1.386
P11 5% 180.872 9.044 176.460 8.823 -44.097 -11.218 1.194
CP11 5% 188.205 9.410 183.614 9.181 -44.065 -3.835 1.160
CS11 5% 188.205 9.410 183.614 9.181 -44.065 3.835 1.160
S11 5% 180.872 9.044 176.460 8.823 -44.097 11.218 1.194
Total 6.72% 15759.313 1059.443 15374.939 1033.603 -10.149 0.196 0.571
90 4 120
Allow .Allow
Shear. Moment
3
60 80
Moment x10^3 tonne.m
Mass
2
Shear x10^3 tonne
30 40 Moment 25.188
1
Load t/m
Grounding
Damage/NBV
0 0 0
Shear -0.786
-1 Buoyancy
-30 -40
Net Load
-2
-60 -80 Allow . Moment
-3
Allow . Shear
-90 -4 -120
-60 -40 -20 0 20 40 60
Long. Pos. m
Name Long. Pos. Mass Buoyancy Grounding Damage/NBV Net Load Shear Moment
m t/m t/m t/m t/m t/m x10^3 tonne x10^3 tonne.m
HMSt1 -50.400 17.929 0.000 0.000 0.000 17.929 0.000 0.000
HMSt2 -50.400 25.912 0.000 0.000 0.000 25.912 0.000 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 11
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Name Long. Pos. Mass Buoyancy Grounding Damage/NBV Net Load Shear Moment
m t/m t/m t/m t/m t/m x10^3 tonne x10^3 tonne.m
HMSt3 -50.299 25.912 0.000 0.000 0.000 25.912 0.003 0.000
HMSt4 -50.296 25.912 0.000 0.000 0.000 25.912 0.003 0.000
HMSt5 -49.986 25.911 0.000 0.000 0.000 25.911 0.011 0.002
HMSt6 -49.470 25.911 0.000 0.000 0.000 25.911 0.024 0.011
HMSt7 -48.752 25.909 0.000 0.000 0.000 25.909 0.043 0.035
HMSt8 -47.832 25.908 0.000 0.000 0.000 25.908 0.067 0.085
HMSt9 -46.716 25.906 0.000 0.000 0.000 25.906 0.095 0.176
HMSt10 -45.409 30.430 0.000 0.000 0.000 30.430 0.130 0.323
HMSt11 -43.914 46.465 0.000 0.000 0.000 46.465 0.188 0.558
HMSt12 -42.240 58.540 0.000 0.000 0.000 58.540 0.277 0.945
HMSt13 -40.391 64.779 -4.301 0.000 0.000 60.478 0.389 1.560
HMSt14 -38.377 66.293 -9.296 0.000 0.000 56.997 0.507 2.463
HMSt15 -36.205 66.222 -14.513 0.000 0.000 51.709 0.626 3.696
HMSt16 -33.884 34.616 -20.946 0.000 0.000 13.670 0.728 5.279
HMSt17 -31.424 34.425 -28.562 0.000 0.000 5.863 0.752 7.103
HMSt18 -28.835 34.222 -37.236 0.000 0.000 -3.013 0.756 9.059
HMSt19 -26.127 34.008 -46.727 0.000 0.000 -12.719 0.734 11.080
HMSt20 -23.312 72.219 -56.570 0.000 0.000 15.649 0.735 13.117
HMSt21 -20.401 67.915 -66.517 0.000 0.000 1.398 0.760 15.303
HMSt22 -17.406 63.486 -76.160 0.000 0.000 -12.673 0.743 17.563
HMSt23 -14.340 59.942 -85.067 0.000 0.000 -25.125 0.684 19.761
HMSt24 -11.215 55.320 -92.783 0.000 0.000 -37.463 0.586 21.753
HMSt25 -8.044 50.630 -98.930 0.000 0.000 -48.301 0.450 23.404
HMSt26 -4.840 47.004 -103.087 0.000 0.000 -56.083 0.281 24.582
HMSt27 -1.615 34.874 -105.093 0.000 0.000 -70.219 0.070 25.162
HMSt28 -0.101 34.699 -105.224 0.000 0.000 -70.525 -0.036 25.188
HMSt29 0.000 34.687 -105.222 0.000 0.000 -70.535 -0.043 25.186
HMSt30 0.101 34.675 -105.211 0.000 0.000 -70.536 -0.050 25.181
HMSt31 1.615 34.483 -104.745 0.000 0.000 -70.262 -0.157 25.024
HMSt32 4.840 57.559 -101.946 0.000 0.000 -44.387 -0.367 24.160
HMSt33 8.044 58.285 -96.997 0.000 0.000 -38.711 -0.499 22.768
HMSt34 11.215 57.742 -90.051 0.000 0.000 -32.308 -0.612 21.002
HMSt35 14.340 57.209 -81.521 0.000 0.000 -24.312 -0.700 18.947
HMSt36 17.406 57.880 -71.796 0.000 0.000 -13.917 -0.757 16.705
HMSt37 20.401 57.368 -61.335 0.000 0.000 -3.967 -0.784 14.392
HMSt38 23.312 56.872 -50.583 0.000 0.000 6.289 -0.780 12.109
HMSt39 26.127 57.900 -39.972 0.000 0.000 17.928 -0.744 9.956
HMSt40 28.835 57.303 -29.737 0.000 0.000 27.567 -0.683 8.020
HMSt41 31.424 47.966 -20.262 0.000 0.000 27.704 -0.607 6.352
HMSt42 33.884 32.968 -11.993 0.000 0.000 20.975 -0.564 4.909
HMSt43 36.205 36.095 -5.076 0.000 0.000 31.019 -0.501 3.669
HMSt44 38.377 35.574 -0.143 0.000 0.000 35.431 -0.429 2.659
HMSt45 40.391 33.974 0.000 0.000 0.000 33.974 -0.358 1.867
HMSt46 42.240 28.083 0.000 0.000 0.000 28.083 -0.300 1.260
HMSt47 43.914 45.099 0.000 0.000 0.000 45.099 -0.239 0.801
HMSt48 45.409 29.334 0.000 0.000 0.000 29.334 -0.185 0.487
HMSt49 46.716 25.751 0.000 0.000 0.000 25.751 -0.150 0.268
HMSt50 47.832 61.529 0.000 0.000 0.000 61.529 -0.115 0.118
HMSt51 48.752 61.528 0.000 0.000 0.000 61.528 -0.058 0.038
HMSt52 49.470 25.736 0.000 0.000 0.000 25.736 -0.024 0.011
HMSt53 49.986 25.735 0.000 0.000 0.000 25.735 -0.011 0.002
HMSt54 50.296 25.735 0.000 0.000 0.000 25.735 -0.003 0.000
HMSt55 50.299 25.735 0.000 0.000 0.000 25.735 -0.003 0.000
HMSt56 50.400 25.735 0.000 0.000 0.000 25.735 0.000 0.000
HMSt57 50.400 17.806 0.000 0.000 0.000 17.806 0.000 0.000
HMSt58 50.400 0.000 0.000 0.000 0.000 0.000 0.000 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 12
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Loadcase - Sailing
Damage Case - Intact
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Simulate fluid movement
Analysis performed in Sinusoidal waves
Wavelength = 100.8 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Aft. Fwd. Trans. Vert.
tonne Mass Volume Volume Arm Limit Limit Arm Arm
tonne m^3 m^3 m m m m m
Lightship 1 2593.000 2593.000 -0.058 -50.400 50.400 0.000 3.127
Total 2593.000 -0.058 0.000 3.127
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 13
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Item Name Quantity Unit Mass Total Unit Total Long. Aft. Fwd. Trans. Vert.
tonne Mass Volume Volume Arm Limit Limit Arm Arm
tonne m^3 m^3 m m m m m
CS8 5% 381.011 19.051 371.718 18.586 -18.927 3.855 0.142
S8 5% 370.182 18.509 361.153 18.058 -18.921 10.864 0.167
P9 5% 443.161 22.158 432.352 21.618 -28.782 -10.809 0.173
CP9 5% 456.979 22.849 445.833 22.292 -28.823 -3.856 0.145
CS9 5% 456.979 22.849 445.833 22.292 -28.823 3.856 0.145
S9 5% 443.161 22.158 432.352 21.618 -28.782 10.809 0.173
P10 40% 361.970 144.788 353.141 141.256 -38.573 -11.260 1.251
CP10 5% 375.625 18.781 366.463 18.323 -37.936 -3.848 0.190
CS10 5% 375.625 18.781 366.463 18.323 -37.936 3.848 0.190
S10 45% 361.970 162.886 353.141 158.914 -38.587 11.283 1.386
P11 5% 180.872 9.044 176.460 8.823 -44.095 -11.218 1.194
CP11 5% 188.205 9.410 183.614 9.181 -44.063 -3.835 1.160
CS11 5% 188.205 9.410 183.614 9.181 -44.063 3.835 1.160
S11 5% 180.872 9.044 176.460 8.823 -44.095 11.218 1.194
Total 6.72% 15759.313 1059.443 15374.939 1033.603 -10.099 0.196 0.571
90 4 120
Allow .Allow
Shear. Moment
3
60 80
Moment x10^3 tonne.m
Mass
2
Shear x10^3 tonne
Net Load
30 40
1
Load t/m
Grounding
Damage/NBV
0 0 0
Shear -0.850 Moment -21.301
-1
-30 -40
-2
-60 -80 Allow . Moment
-3 Buoyancy
Allow . Shear
-90 -4 -120
-60 -40 -20 0 20 40 60
Long. Pos. m
Name Long. Pos. Mass Buoyancy Grounding Damage/NBV Net Load Shear Moment
m t/m t/m t/m t/m t/m x10^3 tonne x10^3 tonne.m
HMSt1 -50.400 17.929 0.000 0.000 0.000 17.929 0.000 0.000
HMSt2 -50.400 25.912 0.000 0.000 0.000 25.912 0.000 0.000
HMSt3 -50.299 25.912 0.000 0.000 0.000 25.912 0.003 0.000
HMSt4 -50.296 25.912 0.000 0.000 0.000 25.912 0.003 0.000
HMSt5 -49.986 25.911 -0.516 0.000 0.000 25.396 0.011 0.002
HMSt6 -49.470 25.911 -15.827 0.000 0.000 10.084 0.020 0.010
HMSt7 -48.752 25.909 -26.754 0.000 0.000 -0.844 0.023 0.026
HMSt8 -47.832 25.908 -40.254 0.000 0.000 -14.347 0.016 0.044
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 14
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
Name Long. Pos. Mass Buoyancy Grounding Damage/NBV Net Load Shear Moment
m t/m t/m t/m t/m t/m x10^3 tonne x10^3 tonne.m
HMSt9 -46.716 25.906 -56.259 0.000 0.000 -30.353 -0.009 0.049
HMSt10 -45.409 30.398 -73.256 0.000 0.000 -42.858 -0.059 0.006
HMSt11 -43.914 46.495 -89.137 0.000 0.000 -42.642 -0.123 -0.129
HMSt12 -42.240 58.279 -101.415 0.000 0.000 -43.136 -0.193 -0.394
HMSt13 -40.391 64.621 -104.794 0.000 0.000 -40.173 -0.269 -0.821
HMSt14 -38.377 66.306 -101.675 0.000 0.000 -35.370 -0.344 -1.439
HMSt15 -36.205 66.417 -95.999 0.000 0.000 -29.582 -0.415 -2.266
HMSt16 -33.884 34.216 -89.175 0.000 0.000 -54.959 -0.486 -3.303
HMSt17 -31.424 34.217 -81.269 0.000 0.000 -47.051 -0.611 -4.656
HMSt18 -28.835 34.218 -72.394 0.000 0.000 -38.176 -0.721 -6.385
HMSt19 -26.127 34.219 -62.748 0.000 0.000 -28.529 -0.812 -8.465
HMSt20 -23.312 71.868 -52.491 0.000 0.000 19.377 -0.827 -10.815
HMSt21 -20.401 67.795 -42.095 0.000 0.000 25.700 -0.761 -13.131
HMSt22 -17.406 63.605 -32.029 0.000 0.000 31.576 -0.676 -15.286
HMSt23 -14.340 59.588 -22.783 0.000 0.000 36.805 -0.571 -17.201
HMSt24 -11.215 55.215 -14.831 0.000 0.000 40.384 -0.451 -18.800
HMSt25 -8.044 50.778 -8.518 0.000 0.000 42.260 -0.319 -20.023
HMSt26 -4.840 46.617 -4.196 0.000 0.000 42.421 -0.184 -20.829
HMSt27 -1.615 34.745 -1.942 0.000 0.000 32.803 -0.070 -21.229
HMSt28 -0.101 34.691 -1.643 0.000 0.000 33.048 -0.020 -21.297
HMSt29 0.000 34.687 -1.640 0.000 0.000 33.048 -0.017 -21.299
HMSt30 0.101 34.683 -1.637 0.000 0.000 33.046 -0.014 -21.301
HMSt31 1.615 34.612 -1.829 0.000 0.000 32.783 0.036 -21.284
HMSt32 4.840 57.945 -3.822 0.000 0.000 54.124 0.151 -20.997
HMSt33 8.044 58.137 -7.867 0.000 0.000 50.270 0.319 -20.241
HMSt34 11.215 57.848 -13.890 0.000 0.000 43.957 0.468 -18.988
HMSt35 14.340 57.563 -21.546 0.000 0.000 36.017 0.593 -17.324
HMSt36 17.406 57.761 -30.491 0.000 0.000 27.271 0.691 -15.348
HMSt37 20.401 57.488 -40.264 0.000 0.000 17.224 0.758 -13.173
HMSt38 23.312 57.223 -50.377 0.000 0.000 6.846 0.793 -10.910
HMSt39 26.127 57.689 -60.375 0.000 0.000 -2.686 0.799 -8.663
HMSt40 28.835 57.308 -69.738 0.000 0.000 -12.430 0.779 -6.522
HMSt41 31.424 48.174 -78.178 0.000 0.000 -30.004 0.728 -4.561
HMSt42 33.884 33.367 -85.679 0.000 0.000 -52.311 0.610 -2.910
HMSt43 36.205 35.927 -92.127 0.000 0.000 -56.199 0.486 -1.636
HMSt44 38.377 35.579 -97.472 0.000 0.000 -61.893 0.358 -0.717
HMSt45 40.391 34.133 -100.371 0.000 0.000 -66.239 0.230 -0.124
HMSt46 42.240 28.282 -96.283 0.000 0.000 -68.000 0.106 0.188
HMSt47 43.914 45.067 -83.343 0.000 0.000 -38.276 0.017 0.281
HMSt48 45.409 29.367 -64.532 0.000 0.000 -35.166 -0.039 0.263
HMSt49 46.716 25.752 -45.184 0.000 0.000 -19.431 -0.076 0.186
HMSt50 47.832 61.529 -29.403 0.000 0.000 32.127 -0.083 0.094
HMSt51 48.752 61.528 -17.060 0.000 0.000 44.467 -0.047 0.034
HMSt52 49.470 25.736 -7.479 0.000 0.000 18.257 -0.022 0.011
HMSt53 49.986 25.735 0.000 0.000 0.000 25.735 -0.011 0.002
HMSt54 50.296 25.735 0.000 0.000 0.000 25.735 -0.003 0.000
HMSt55 50.299 25.735 0.000 0.000 0.000 25.735 -0.003 0.000
HMSt56 50.400 25.735 0.000 0.000 0.000 25.735 0.000 0.000
HMSt57 50.400 17.806 0.000 0.000 0.000 17.806 0.000 0.000
HMSt58 50.400 0.000 0.000 0.000 0.000 0.000 0.000 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 15
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-04-GS
Project : Marine Transportation of Modules Rev. : 01
: Barge Global Strength Calculation for Modules P1 Date : 11th September 2023
Title
and S1
9.0 Appendix
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 16
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
30495
1002
1002 28491 1002
SHEAR AREA
MOMENT OF INERTIA : X: 1.35 x 1013 mm4
Y: 1.84 x 1014 mm4
MAT ION
FO R
SECTION MODULUS, KEEL
SECTION MODULUS, DECK FO R IN
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 17
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Doc. No. : BSL-EM01001-C-02-AP
Project : Barge BS27 Rev. : 00
Title : Allowable Bending and Shear Properties for BS- Date : 11/9/23
27
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 21
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
INTACT AND DAMAGE STABILITY CALCULATION
(BSL-PJ23151-C-03-ID)
CONTENTS
1.0 INTRODUCTION 4
2.0 DESIGN CODES AND STANDARDS 5
2.1 DNVGL-ST-N001 MARINE OPERATIONS AND MARINE WARRANTY 5
3.0 DESIGN CRITERIA 6
3.1 ENVIRONMENTAL CRITERIA 6
3.1.1 WIND 6
3.1.2 WAVE 6
4.0 BARGE STABILITY CRITERIA 7
4.1 INTACT STABILITY 7
4.1.1 INTACT RANGE OF STABILITY 7
4.1.2 METACENTRIC HEIGHT 7
4.1.3 THE RANGE OF TRANSVERSE STABILITY 7
4.2 INTACT DYNAMIC STABILITY 8
4.2.1 AREA UNDER RIGHTING MOMENT 8
4.2.2 GUIDANCE FOR CALCULATING HEELING MOMENT 8
4.3 DAMAGE STABILITY 8
4.3.1 MINIMUM STABILITY 8
4.3.2 COMPARTMENT DAMAGE 9
4.3.3 LOSS OF WATER 9
4.4 DAMAGE DYNAMIC STABILITY 9
4.4.1 RIGHTING MOMENT AND HEELING MOMENT 9
4.4.2 GUIDANCE FOR CALCULATING HEELING MOMENT 9
4.4.3 WIND VELOCITY 9
4.4.4 RISK ASSESSMENT 10
5.0 CARGO SPECIFICATIONS 11
6.0 BARGE SPECIFICATIONS 12
6.1 BARGE DIMENSION 12
6.2 BARGE LIGHTSHIP AND COG 12
7.0 SOFTWARE 13
7.1 SOFTWARE DESCRIPTION 13
7.2 BARGE MODEL 13
8.0 INTACT & DAMAGE STABILITY RESULTS SUMMARY 14
8.1 INTACT STABILITY 14
8.2 DAMAGE STABILITY 14
9.0 INTACT & DAMAGE STABILITY ANALYSIS 15
9.1 EQUILIBRIUM CALCULATION 15
9.2 INTACT STABILITY 17
9.3 DAMAGE STABILITY 21
9.3.1 DAMAGE CASE 1 – BALLAST TANK NO.1 (P) 21
9.3.2 DAMAGE CASE 2 – BALLAST TANK NO.2 (P) 25
9.3.3 DAMAGE CASE 3 – BALLAST TANK NO.3 (P) 29
9.3.4 DAMAGE CASE 4 – BALLAST TANK NO.4 (P) 33
9.3.5 DAMAGE CASE 5 – BALLAST TANK NO.5 (P) 37
9.3.6 DAMAGE CASE 6 – BALLAST TANK NO.6 (P) 41
9.3.7 DAMAGE CASE 7 – BALLAST TANK NO.7 (P) 45
9.3.8 DAMAGE CASE 8 – BALLAST TANK NO.8 (P) 49
9.3.9 DAMAGE CASE 9 – BALLAST TANK NO.9 (P) 53
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |2
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |3
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking, internal shifting,
and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia. Cargoes will then be sailed to
Pax Ocean Yard, Indonesia where lift-off operation (by others) will be carried out.
This report summarizes results for the barge intact and damage stability analysis for Modules P1
and S1. The analysis is to ensure that it has adequate stability during towage. It is verified against
the guidelines specified by the relevant marine warranty surveyor.
Client to verify and ensure that all client’s provided data in this document are accurate and up to
date.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |4
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
The intact stability calculation is performed using the following codes and standards as applicable:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |5
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
3.1.1 Wind
3.1.2 Wave
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |6
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
The barge stability criteria during towage are obtained from LOC’s guidelines. The criteria are as
follows:
The Intact stability or intact range of stability is the range between 0° heel or trim
and the angle at which the righting arm (GZ) becomes negative.
The initial apparent metacentric height, GM0, shall be greater than 0.15m and should
be greater than 1.0m. The calculation of GM0 shall include adequate margins for
computational and other inaccuracies.
The intact range of transverse static stability should not be less than 36 degrees
(Table 11-10 Intact stability range in DNVGL-ST-N001).
A range of static stability less than 36 degrees will not normally be accepted.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |7
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
The Area under the righting moment curve and the wind heeling moment (or
wind moment) curve should be calculated up to an angle of heel which is the
least of:
4.2.1.1 The angle corresponding to the second intercept of the two curves
4.2.1.2 The Angle of down flooding
Guidance on how to derive the wind heeling moment curve reference is made with
IMO Intact Stability Code 2008 for all types of ships covered by IMO instruments.
The wind velocity to compute the wind heeling moment curve should be the
1-minute sustained wind for the operation with return periods as defined in
section 11.10.3.2. Wind velocity considered in the design was selected
independently being nature voyage defined is under weather restricted operation
and considering greater than 10m/s as recommended.
As a minimum, the barge should have sufficient stability and reserve buoyancy to
remain afloat at a waterline below any opening where progressive flooding may
occur with any one compartment adjacent to see the sea flooded.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |8
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Damage to any compartment above the intact waterline that could lead to loss of
stability should be considered when assessing damage stability.
The loss of water from a full compartment should be considered if it gives a more
severe result than the flooding of a compartment.
The area under the righting moment curve should be not less than the area under
the wind heeling moment curve
The area under the righting moment curve and the wind heeling moment curve
should be calculated from equilibrium up to an angle of heel which is the least of:
4.4.2.1 The angle corresponding to the second intercept of the two curves.
4.4.2.2 The Angle of down flooding
The wind velocity used to compute the overturning moment curve should be 26 m/s.
If the design wind velocity used for the intact calculation, as defined in Section
11.10.4.2 is less than 26 m/s, this design wind velocity should be used instead.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e |9
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 10
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 11
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Total Mass Long. Arm from Trans. Arm from Vert. Arm
(mt) Amidships(m) (+fwd) CL (m) from keel(m)
Lightship 2593 -0.058 0.000 3.127
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 12
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
7.0 Software
Hydromax is being used for the Intact and Damage Stability analysis. The software is
developed by FormSys, an Australian company which is specialised in 3D modeling, analysis
and design software. Specialist areas of application include naval architecture and
shipbuilding.
The software includes intact and damaged stability for a range of analysis methods including
upright hydrostatics, large angle stability, equilibrium analysis, KN tables and cross curves,
limiting KG and longitudinal strength analysis.
Barge model is created using Maxsurf software which is also a product of Formsys and is
compatible for with Hydromax for hydrostatic analysis. Maxsurf handles the creation of the
sculptured surfaces that make up the exterior of a ship’s hull.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 13
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 14
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 15
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 16
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - Intact
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 17
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 38.652 m
9
Max GZ = 6.475 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.823 -6.460 -5.199 0.006 5.212 6.472 5.834 4.453 2.745 0.876 -1.054 -2.968 -4.799
Area under 151.47 89.455 28.263 0.0117 28.402 89.658 152.01 203.86 240.03 258.22 257.36 237.19 198.30
GZ curve 44 1 1 0 6 46 71 39 84 28 87 92
from zero
heel m.deg
Displacem 4877 4877 4877 4877 4877 4877 4877 4877 4877 4877 4877 4877 4877
ent t
Draft at FP -0.585 0.713 1.615 1.957 1.615 0.713 -0.586 -2.212 -4.396 -7.737 -14.001 -31.989 n/a
m
Draft at AP -0.435 0.719 1.477 1.773 1.477 0.719 -0.434 -1.877 -3.824 -6.810 -12.428 -28.638 n/a
m
WL Length 100.80 100.72 99.403 93.570 99.403 100.72 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 0 0 0 0 0 1 1 1 2 2
Beam max 12.271 16.071 30.080 30.500 30.080 16.071 12.271 9.168 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2326.8 2365.6 2564.6 3100.7 2564.7 2366.0 2327.5 2325.3 2324.7 2325.0 2326.0 2327.5 2328.2
Area m^2 72 22 65 27 06 79 85 75 20 09 33 44 43
Waterpl. 1046.4 1444.8 2169.5 2896.5 2169.5 1444.9 1046.4 813.41 682.16 603.14 555.64 530.01 521.82
Area m^2 86 97 31 62 41 06 86 3 8 7 6 9 8
Prismatic 0.651 0.574 0.468 0.453 0.468 0.574 0.651 0.698 0.728 0.748 0.761 0.768 0.772
coeff. (Cp)
Block 0.458 0.406 0.277 0.447 0.277 0.406 0.458 0.548 0.645 0.688 0.720 0.740 0.746
coeff. (Cb)
LCB from -1.130 -1.119 -1.111 -1.108 -1.110 -1.121 -1.131 -1.151 -1.161 -1.171 -1.180 -1.183 -1.173
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 18
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
zero pt.
(+ve fwd)
m
LCF from 0.128 0.015 -0.382 0.212 -0.382 0.015 0.128 0.087 0.049 0.018 -0.008 -0.028 -0.042
zero pt.
(+ve fwd)
m
Max deck 30.000 20.000 10.000 0.1050 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 1 0 3 3 0 1 2 3 4 3 2 0
deg
Trim angle 0.0853 0.0031 -0.0787 -0.1050 -0.0787 0.0035 0.0860 0.1906 0.3250 0.5272 0.8940 1.9040 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 19
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 20
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 1
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P1 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
P1 Damaged
CP1 5% 192.010 9.600 187.327 9.366 44.088 -3.396 1.015 275.116 Maximum
CS1 5% 192.010 9.600 187.327 9.366 44.088 3.396 1.015 275.116 Maximum
S1 5% 146.058 7.303 142.495 7.125 43.999 10.537 1.345 176.508 Maximum
P2 5% 356.065 17.803 347.380 17.369 37.730 -10.647 0.292 333.123 Maximum
CP2 5% 375.753 18.788 366.589 18.329 38.060 -3.644 0.195 346.874 Maximum
CS2 5% 375.753 18.788 366.589 18.329 38.060 3.644 0.195 346.874 Maximum
S2 5% 356.065 17.803 347.380 17.369 37.730 10.647 0.292 333.123 Maximum
P3 5% 440.906 22.045 430.153 21.508 28.647 -10.800 0.197 401.767 Maximum
CP3 5% 456.407 22.820 445.275 22.264 28.750 -3.790 0.149 416.248 Maximum
CS3 5% 456.407 22.820 445.275 22.264 28.750 3.790 0.149 416.248 Maximum
S3 5% 440.906 22.045 430.153 21.508 28.647 10.800 0.197 401.767 Maximum
P4 5% 369.164 18.458 360.160 18.008 18.877 -10.856 0.179 334.806 Maximum
CP4 5% 380.782 19.039 371.494 18.575 18.893 -3.821 0.144 346.874 Maximum
CS4 5% 380.782 19.039 371.494 18.575 18.893 3.821 0.144 346.874 Maximum
S4 5% 369.164 18.458 360.160 18.008 18.877 10.856 0.179 334.806 Maximum
P5 5% 369.950 18.498 360.927 18.046 9.877 -10.880 0.171 334.806 Maximum
CP5 5% 380.970 19.048 371.678 18.584 9.893 -3.835 0.141 346.874 Maximum
CS5 5% 380.970 19.048 371.678 18.584 9.893 3.835 0.141 346.874 Maximum
S5 5% 369.950 18.498 360.927 18.046 9.877 10.880 0.171 334.806 Maximum
P6 5% 444.726 22.236 433.879 21.694 -0.006 -10.898 0.164 401.767 Maximum
CP6 5% 457.348 22.867 446.194 22.310 0.000 -3.849 0.139 416.248 Maximum
CS6 5% 457.348 22.867 446.194 22.310 0.000 3.849 0.139 416.248 Maximum
S6 5% 444.726 22.236 433.879 21.694 -0.006 10.898 0.164 401.767 Maximum
P7 5% 370.436 18.522 361.401 18.070 -9.893 -10.883 0.165 334.806 Maximum
CP7 5% 381.078 19.054 371.783 18.589 -9.897 -3.853 0.140 346.874 Maximum
CS7 5% 381.078 19.054 371.783 18.589 -9.897 3.853 0.140 346.874 Maximum
S7 5% 370.436 18.522 361.401 18.070 -9.893 10.883 0.165 334.806 Maximum
P8 5% 370.182 18.509 361.153 18.058 -18.893 -10.864 0.167 334.806 Maximum
CP8 5% 381.011 19.051 371.718 18.586 -18.897 -3.855 0.142 346.874 Maximum
CS8 5% 381.011 19.051 371.718 18.586 -18.897 3.855 0.142 346.874 Maximum
S8 5% 370.182 18.509 361.153 18.058 -18.893 10.864 0.167 334.806 Maximum
P9 5% 443.161 22.158 432.352 21.618 -28.742 -10.810 0.173 401.767 Maximum
CP9 5% 456.979 22.849 445.833 22.292 -28.778 -3.856 0.145 416.248 Maximum
CS9 5% 456.979 22.849 445.833 22.292 -28.778 3.856 0.145 416.248 Maximum
S9 5% 443.161 22.158 432.352 21.618 -28.742 10.810 0.173 401.767 Maximum
P10 40% 361.970 144.788 353.141 141.256 -38.569 -11.260 1.251 334.806 Maximum
CP10 5% 375.625 18.781 366.463 18.323 -37.914 -3.848 0.190 346.874 Maximum
CS10 5% 375.625 18.781 366.463 18.323 -37.914 3.848 0.190 346.874 Maximum
S10 45% 361.970 162.886 353.141 158.914 -38.584 11.283 1.386 334.806 Maximum
P11 5% 180.872 9.044 176.460 8.823 -44.094 -11.218 1.194 248.452 Maximum
CP11 5% 188.205 9.410 183.614 9.181 -44.062 -3.835 1.160 275.097 Maximum
CS11 5% 188.205 9.410 183.614 9.181 -44.062 3.835 1.160 275.097 Maximum
S11 5% 180.872 9.044 176.460 8.823 -44.094 11.218 1.194 248.452 Maximum
Total 6.74% 15613.255 1052.140 15232.444 1026.478 -10.452 0.270 0.565 14858.713
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 21
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Specified
Module P-1 1 511.480 511.480 -16.226 0.000 11.623 0.000 User
Specified
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.737 m
9
Max GZ = 6.471 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.712 -6.326 -5.011 0.119 5.209 6.470 5.838 4.462 2.759 0.895 -1.032 -2.944 -4.772
Area under 147.02 86.190 26.650 0.2167 28.895 90.068 152.45 204.36 240.64 259.00 258.33 238.40 199.77
GZ curve 27 6 8 5 0 05 51 89 37 77 60 41
from zero
heel m.deg
Displacem 4869 4869 4869 4869 4869 4869 4869 4869 4869 4869 4869 4869 4869
ent t
Draft at FP 0.026 1.110 1.840 2.021 1.606 0.692 -0.618 -2.260 -4.466 -7.840 -14.165 -32.329 n/a
m
Draft at AP -0.760 0.513 1.366 1.743 1.481 0.730 -0.418 -1.851 -3.787 -6.754 -12.339 -28.453 n/a
m
WL Length 100.80 100.80 99.634 93.636 99.388 100.71 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 2 2 7 0 0 1 1 2 2 2
Beam max 12.278 16.071 29.745 30.500 30.075 16.071 12.302 9.195 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2377.0 2411.1 2604.9 3101.3 2562.9 2363.5 2324.8 2322.6 2321.9 2322.2 2323.2 2324.7 2325.4
Area m^2 60 16 06 45 44 79 88 38 67 95 75 42 90
Waterpl. 1046.5 1453.3 2159.4 2854.4 2162.7 1444.3 1046.4 813.37 682.13 603.11 555.61 529.98 521.79
Area m^2 93 13 60 00 97 06 76 7 5 4 5 7 6
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 22
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
Prismatic 0.637 0.562 0.459 0.450 0.467 0.574 0.651 0.698 0.728 0.748 0.761 0.768 0.771
coeff. (Cp)
Block 0.450 0.400 0.277 0.444 0.277 0.406 0.457 0.546 0.645 0.687 0.720 0.737 0.743
coeff. (Cb)
LCB from -1.124 -1.141 -1.149 -1.180 -1.176 -1.191 -1.203 -1.225 -1.236 -1.248 -1.257 -1.261 -1.249
zero pt.
(+ve fwd)
m
LCF from 0.149 0.236 -0.602 -0.305 -0.519 0.000 0.127 0.084 0.045 0.013 -0.014 -0.035 -0.049
zero pt.
(+ve fwd)
m
Max deck 30.002 20.002 10.003 0.1583 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 3 4 5 2 0 1 3 4 5 4 2 0
deg
Trim angle -0.4465 -0.3391 -0.2690 -0.1583 -0.0710 0.0215 0.1137 0.2324 0.3855 0.6168 1.0381 2.2023 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 23
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 24
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 2
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P2 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 25
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.147 m
9
Max GZ = 6.46 m at 20 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.516 -6.115 -4.827 0.254 5.205 6.460 5.832 4.460 2.760 0.900 -1.023 -2.932 -4.758
Area under 141.30 82.529 24.982 0.4611 29.523 90.532 152.84 204.71 240.99 259.38 258.78 238.96 200.46
GZ curve 07 9 3 0 0 55 15 33 26 77 04 28
from zero
heel m.deg
Displacem 4859 4859 4859 4859 4859 4859 4859 4859 4859 4859 4859 4859 4859
ent t
Draft at FP 0.704 1.501 1.984 2.080 1.597 0.667 -0.656 -2.317 -4.547 -7.959 -14.357 -32.727 n/a
m
Draft at AP -1.035 0.360 1.319 1.721 1.484 0.740 -0.402 -1.827 -3.753 -6.702 -12.254 -28.278 n/a
m
WL Length 100.81 100.80 99.712 93.705 99.373 100.71 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 1 6 2 0 1 1 2 3 3 3
Beam max 12.307 16.072 29.527 30.500 30.070 16.071 12.340 9.229 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2446.8 2470.1 2639.4 3107.0 2560.8 2359.9 2321.0 2318.6 2317.9 2318.2 2319.3 2320.7 2321.5
Area m^2 92 36 91 78 15 75 00 88 37 90 11 81 31
Waterpl. 1036.6 1433.7 2135.2 2833.4 2151.8 1443.4 1046.4 813.33 682.09 603.07 555.57 529.94 521.75
Area m^2 13 80 91 35 63 45 61 4 6 5 7 9 8
Prismatic 0.618 0.548 0.451 0.446 0.467 0.574 0.650 0.698 0.728 0.748 0.761 0.768 0.771
coeff. (Cp)
Block 0.438 0.392 0.275 0.441 0.277 0.405 0.455 0.544 0.645 0.687 0.717 0.734 0.739
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 26
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.123 -1.177 -1.218 -1.240 -1.253 -1.268 -1.282 -1.307 -1.318 -1.332 -1.342 -1.346 -1.333
zero pt.
(+ve fwd)
m
LCF from -0.186 -0.324 -0.998 -0.463 -0.716 -0.017 0.125 0.080 0.039 0.006 -0.022 -0.044 -0.058
zero pt.
(+ve fwd)
m
Max deck 30.011 20.008 10.006 0.2041 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 1 9 9 2 0 2 5 6 6 5 3 0
deg
Trim angle -0.9883 -0.6482 -0.3782 -0.2041 -0.0639 0.0411 0.1438 0.2782 0.4514 0.7144 1.1950 2.5271 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 27
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 28
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 3
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P3 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 29
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.127 m
9
Max GZ = 6.458 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.509 -6.198 -5.003 0.002 5.184 6.456 5.830 4.460 2.762 0.903 -1.018 -2.926 -4.750
Area under 145.28 86.122 27.325 0.0045 28.112 89.163 151.41 203.27 239.55 257.97 257.41 237.64 199.21
GZ curve 32 8 9 8 4 07 34 91 26 73 45 43
from zero
heel m.deg
Displacem 4855 4855 4855 4854 4855 4855 4855 4855 4855 4855 4855 4855 4855
ent t
Draft at FP 0.518 1.247 1.797 1.956 1.586 0.666 -0.657 -2.319 -4.550 -7.963 -14.363 -32.738 n/a
m
Draft at AP -0.812 0.543 1.421 1.773 1.485 0.735 -0.410 -1.838 -3.769 -6.726 -12.292 -28.356 n/a
m
WL Length 100.80 100.80 99.639 93.566 99.354 100.71 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 7 2 2 0 1 1 2 2 3 3
Beam max 12.137 16.072 29.755 30.500 30.063 16.071 12.344 9.233 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2453.8 2452.6 2609.4 3099.8 2557.6 2358.4 2319.4 2317.0 2316.3 2316.6 2317.7 2319.2 2319.9
Area m^2 02 01 83 49 49 90 18 88 93 84 12 28 32
Waterpl. 991.58 1380.0 2109.3 2829.2 2166.2 1443.1 1046.4 813.33 682.09 603.07 555.57 529.94 521.75
Area m^2 4 66 89 17 40 04 60 1 4 3 5 8 6
Prismatic 0.617 0.552 0.457 0.451 0.467 0.573 0.650 0.698 0.728 0.748 0.760 0.768 0.771
coeff. (Cp)
Block 0.443 0.394 0.275 0.445 0.277 0.405 0.454 0.544 0.644 0.687 0.717 0.734 0.740
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 30
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.152 -1.207 -1.222 -1.250 -1.247 -1.260 -1.274 -1.299 -1.310 -1.323 -1.334 -1.338 -1.325
zero pt.
(+ve fwd)
m
LCF from -1.414 -1.402 -1.201 -0.463 -0.425 -0.015 0.125 0.080 0.040 0.007 -0.021 -0.043 -0.058
zero pt.
(+ve fwd)
m
Max deck 30.006 20.003 10.002 0.1040 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 5 4 2 2 0 2 5 6 6 5 3 0
deg
Trim angle -0.7557 -0.4001 -0.2135 -0.1040 -0.0574 0.0388 0.1403 0.2730 0.4437 0.7030 1.1766 2.4892 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 31
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 32
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 4
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P4 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM FSM Type
tonne Mass Volume Volume Arm Arm Arm tonne.m
tonne m^3 m^3 m m m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 33
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM FSM Type
tonne Mass Volume Volume Arm Arm Arm tonne.m
tonne m^3 m^3 m m m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Layers) Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.315 m
9
Max GZ = 6.459 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.562 -6.210 -4.981 0.077 5.189 6.458 5.830 4.459 2.759 0.899 -1.024 -2.933 -4.759
Area under 145.03 85.557 26.779 0.1396 28.541 89.573 151.85 203.70 239.97 258.35 257.74 237.90 199.39
GZ curve 23 9 4 2 9 25 90 48 03 18 19 29
from zero
heel m.deg
Displacem 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858
ent t
Draft at FP 0.145 1.098 1.761 1.977 1.597 0.683 -0.632 -2.281 -4.495 -7.882 -14.233 -32.468 n/a
m
Draft at AP -0.535 0.672 1.465 1.773 1.479 0.723 -0.428 -1.865 -3.808 -6.784 -12.386 -28.550 n/a
m
WL Length 100.80 100.80 99.642 93.610 99.369 100.71 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 2 1 5 0 1 1 1 2 2 2
Beam max 11.983 16.072 29.767 30.500 30.067 16.071 12.322 9.213 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2436.7 2447.7 2612.6 3111.7 2558.7 2359.7 2320.6 2318.4 2317.7 2318.0 2319.0 2320.5 2321.2
Area m^2 68 50 40 14 89 07 59 25 95 88 69 82 85
Waterpl. 1005.6 1397.2 2123.5 2844.8 2166.8 1443.4 1046.4 813.36 682.12 603.09 555.60 529.97 521.78
Area m^2 79 00 17 83 39 04 69 0 0 9 0 3 2
Prismatic 0.622 0.554 0.457 0.450 0.467 0.573 0.650 0.698 0.728 0.748 0.760 0.768 0.771
coeff. (Cp)
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 34
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
Block 0.452 0.395 0.275 0.444 0.277 0.405 0.455 0.545 0.645 0.687 0.719 0.736 0.742
coeff. (Cb)
LCB from -1.141 -1.156 -1.176 -1.190 -1.187 -1.199 -1.211 -1.234 -1.244 -1.256 -1.266 -1.270 -1.258
zero pt.
(+ve fwd)
m
LCF from -0.640 -0.683 -0.793 -0.224 -0.407 -0.002 0.127 0.082 0.043 0.011 -0.016 -0.037 -0.051
zero pt.
(+ve fwd)
m
Max deck 30.001 20.001 10.001 0.1158 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 7 2 4 2 0 2 3 5 5 4 2 0
deg
Trim angle -0.3861 -0.2420 -0.1687 -0.1158 -0.0670 0.0230 0.1159 0.2362 0.3903 0.6240 1.0496 2.2263 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 35
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 36
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 5
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P5 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 37
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.991 m
9
Max GZ = 6.461 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.525 -6.103 -4.751 0.377 5.276 6.458 5.830 4.459 2.759 0.899 -1.024 -2.933 -4.759
Area under 139.84 81.062 23.931 0.6835 30.562 91.881 154.14 206.00 242.27 260.64 260.03 240.19 201.68
GZ curve 17 0 1 0 3 28 49 01 64 78 76 80
from zero
heel m.deg
Displacem 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858
ent t
Draft at FP 0.027 1.101 1.820 2.040 1.623 0.691 -0.619 -2.262 -4.467 -7.841 -14.167 -32.333 n/a
m
Draft at AP -0.322 0.797 1.523 1.795 1.481 0.715 -0.441 -1.884 -3.836 -6.825 -12.452 -28.686 n/a
m
WL Length 100.80 100.80 99.724 93.777 99.420 100.71 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 0 0 6 0 0 1 1 2 2 2
Beam max 11.798 16.072 29.507 30.500 30.088 16.071 12.312 9.204 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2453.6 2479.5 2654.9 3162.7 2568.9 2359.6 2320.6 2318.4 2317.7 2318.0 2319.0 2320.5 2321.2
Area m^2 26 27 55 28 53 73 14 18 10 49 56 62 70
Waterpl. 1039.8 1446.5 2145.2 2882.4 2128.6 1443.4 1046.4 813.37 682.13 603.11 555.61 529.98 521.79
Area m^2 34 18 87 82 04 07 73 3 3 2 3 5 4
Prismatic 0.619 0.548 0.450 0.444 0.465 0.573 0.650 0.698 0.728 0.748 0.760 0.768 0.771
coeff. (Cp)
Block 0.457 0.392 0.275 0.438 0.276 0.405 0.456 0.545 0.644 0.687 0.720 0.738 0.744
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 38
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.133 -1.139 -1.142 -1.151 -1.157 -1.164 -1.175 -1.197 -1.206 -1.218 -1.227 -1.231 -1.219
zero pt.
(+ve fwd)
m
LCF from 0.060 -0.030 -0.487 -0.270 -0.562 0.006 0.127 0.084 0.045 0.014 -0.013 -0.033 -0.047
zero pt.
(+ve fwd)
m
Max deck 30.000 20.000 10.001 0.1393 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 4 6 4 3 0 1 3 4 4 4 2 0
deg
Trim angle -0.1982 -0.1730 -0.1685 -0.1393 -0.0803 0.0137 0.1015 0.2146 0.3590 0.5777 0.9751 2.0721 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 39
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 40
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 6
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P6 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 41
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.911 m
9
Max GZ = 6.472 m at 18.2 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.455 -6.008 -4.547 0.619 5.455 6.456 5.830 4.460 2.762 0.903 -1.019 -2.926 -4.751
Area under 135.28 77.267 21.620 1.1236 32.797 94.956 157.09 208.98 245.26 263.68 263.12 243.34 204.91
GZ curve 99 3 2 6 4 16 61 46 03 33 83 43
from zero
heel m.deg
Displacem 4854 4854 4854 4854 4854 4854 4854 4854 4854 4854 4854 4854 4854
ent t
Draft at FP -0.149 1.004 1.797 2.044 1.649 0.697 -0.609 -2.247 -4.445 -7.808 -14.114 -32.223 n/a
m
Draft at AP 0.010 1.010 1.650 1.858 1.510 0.703 -0.459 -1.911 -3.874 -6.882 -12.543 -28.876 n/a
m
WL Length 100.80 100.78 99.793 93.912 99.489 100.71 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 0 3 8 0 0 1 1 1 2 2
Beam max 11.615 16.072 29.433 30.500 29.975 16.071 12.307 9.199 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2480.7 2508.8 2692.2 3186.5 2588.8 2358.3 2319.2 2317.0 2316.3 2316.6 2317.6 2319.1 2319.8
Area m^2 34 36 81 93 25 26 10 10 61 70 30 15 61
Waterpl. 1046.6 1471.7 2177.6 2887.7 2104.2 1443.1 1046.4 813.38 682.14 603.12 555.62 529.99 521.80
Area m^2 10 74 07 63 62 11 76 4 2 1 2 5 4
Prismatic 0.613 0.542 0.444 0.439 0.461 0.573 0.650 0.698 0.728 0.747 0.760 0.768 0.771
coeff. (Cp)
Block 0.461 0.389 0.273 0.434 0.275 0.405 0.456 0.545 0.644 0.687 0.719 0.739 0.745
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 42
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.137 -1.125 -1.115 -1.120 -1.126 -1.125 -1.136 -1.157 -1.165 -1.176 -1.185 -1.188 -1.177
zero pt.
(+ve fwd)
m
LCF from 0.133 0.035 -0.328 -0.191 -0.390 0.014 0.128 0.085 0.047 0.016 -0.009 -0.030 -0.044
zero pt.
(+ve fwd)
m
Max deck 30.000 20.000 10.000 0.1061 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 1 0 3 3 0 1 2 3 3 3 2 0
deg
Trim angle 0.0904 0.0038 -0.0839 -0.1061 -0.0789 0.0034 0.0857 0.1909 0.3244 0.5264 0.8927 1.9017 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 43
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 44
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 7
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P7 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 45
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.933 m
9
Max GZ = 6.459 m at 20 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.521 -6.113 -4.818 0.277 5.221 6.459 5.831 4.459 2.759 0.899 -1.024 -2.933 -4.759
Area under 141.09 82.315 24.815 0.5031 29.743 90.825 153.11 204.97 241.24 259.62 259.02 239.18 200.67
GZ curve 94 5 6 2 3 91 83 96 86 26 36 40
from zero
heel m.deg
Displacem 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858 4858
ent t
Draft at FP -0.478 0.788 1.660 1.975 1.614 0.709 -0.591 -2.220 -4.407 -7.752 -14.023 -32.033 n/a
m
Draft at AP 0.173 1.085 1.644 1.832 1.472 0.697 -0.468 -1.926 -3.896 -6.915 -12.596 -28.986 n/a
m
WL Length 100.80 100.73 99.601 93.723 99.397 100.72 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 2 6 0 0 0 1 1 1 1 1
Beam max 11.931 16.072 29.700 30.500 30.077 16.071 12.290 9.184 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2451.6 2474.2 2641.2 3169.3 2562.5 2359.6 2320.6 2318.3 2317.7 2318.0 2319.0 2320.5 2321.2
Area m^2 89 79 06 04 94 21 98 93 01 81 51 16 61
Waterpl. 1031.0 1429.2 2133.6 2890.6 2145.0 1443.4 1046.4 813.40 682.16 603.13 555.63 530.01 521.82
Area m^2 66 32 07 11 68 17 81 4 1 9 9 2 2
Prismatic 0.620 0.550 0.453 0.446 0.466 0.573 0.650 0.698 0.728 0.747 0.760 0.768 0.771
coeff. (Cp)
Block 0.453 0.393 0.274 0.440 0.277 0.405 0.457 0.546 0.644 0.687 0.719 0.741 0.747
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 46
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.136 -1.108 -1.086 -1.077 -1.085 -1.086 -1.096 -1.115 -1.123 -1.133 -1.141 -1.144 -1.134
zero pt.
(+ve fwd)
m
LCF from 0.300 0.203 -0.196 0.005 -0.300 0.023 0.129 0.087 0.050 0.020 -0.006 -0.026 -0.039
zero pt.
(+ve fwd)
m
Max deck 30.001 20.000 10.000 0.0810 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 6 6 0 3 0 1 2 3 3 2 1 0
deg
Trim angle 0.3701 0.1689 -0.0087 -0.0810 -0.0805 -0.0068 0.0699 0.1671 0.2899 0.4753 0.8106 1.7316 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 47
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 48
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 8
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P8 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 49
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.616 m
9
Max GZ = 6.461 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.562 -6.236 -5.028 0.009 5.190 6.459 5.831 4.460 2.760 0.899 -1.024 -2.933 -4.759
Area under 146.14 86.535 27.408 0.0170 28.194 89.284 151.55 203.42 239.69 258.08 257.47 237.63 199.13
GZ curve 47 9 1 8 8 90 72 97 16 73 97 07
from zero
heel m.deg
Displacem 4858 4858 4858 4858 4859 4858 4858 4858 4858 4858 4858 4858 4858
ent t
Draft at FP -0.684 0.673 1.607 1.958 1.617 0.717 -0.579 -2.201 -4.379 -7.711 -13.957 -31.897 n/a
m
Draft at AP 0.266 1.057 1.588 1.772 1.459 0.689 -0.481 -1.945 -3.924 -6.956 -12.662 -29.122 n/a
m
WL Length 100.80 100.71 99.463 93.571 99.394 100.72 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 3 4 1 0 0 0 1 1 1 1
Beam max 12.131 16.071 29.940 30.500 30.072 16.071 12.281 9.175 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2432.1 2439.2 2602.1 3100.7 2558.8 2359.5 2320.5 2318.3 2317.7 2318.0 2318.9 2320.5 2321.2
Area m^2 32 51 66 86 23 90 59 58 75 82 94 22 66
Waterpl. 998.20 1390.9 2118.2 2850.2 2167.1 1443.4 1046.4 813.41 682.17 603.15 555.65 530.02 521.83
Area m^2 9 00 42 41 18 23 84 8 4 2 1 5 4
Prismatic 0.625 0.557 0.460 0.451 0.467 0.573 0.650 0.698 0.728 0.747 0.760 0.768 0.771
coeff. (Cp)
Block 0.448 0.397 0.275 0.446 0.277 0.405 0.457 0.547 0.644 0.687 0.719 0.742 0.748
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 50
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.125 -1.080 -1.052 -1.040 -1.042 -1.050 -1.059 -1.077 -1.084 -1.094 -1.101 -1.105 -1.095
zero pt.
(+ve fwd)
m
LCF from 1.049 0.793 0.073 0.508 -0.363 0.031 0.129 0.089 0.052 0.022 -0.003 -0.022 -0.035
zero pt.
(+ve fwd)
m
Max deck 30.003 20.001 10.000 0.1057 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 3 0 0 4 0 0 1 2 2 2 1 0
deg
Trim angle 0.5402 0.2186 -0.0104 -0.1057 -0.0900 -0.0161 0.0555 0.1454 0.2585 0.4288 0.7358 1.5767 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 51
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 52
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 9
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P9 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 53
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 37.376 m
9
Max GZ = 6.459 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.456 -6.131 -4.950 0.044 5.186 6.457 5.831 4.461 2.763 0.904 -1.018 -2.926 -4.751
Area under 143.56 85.021 26.829 0.0812 28.329 89.371 151.64 203.51 239.81 258.23 257.69 237.92 199.49
GZ curve 49 1 7 2 5 07 62 55 95 15 22 12
from zero
heel m.deg
Displacem 4854 4854 4854 4855 4855 4854 4855 4855 4854 4854 4854 4854 4854
ent t
Draft at FP -0.993 0.512 1.552 1.951 1.624 0.729 -0.561 -2.174 -4.339 -7.652 -13.862 -31.700 n/a
m
Draft at AP 0.753 1.321 1.682 1.790 1.449 0.672 -0.507 -1.984 -3.980 -7.039 -12.795 -29.396 n/a
m
WL Length 100.81 100.68 99.425 93.592 99.399 100.72 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 1 7 3 0 0 0 0 1 1 1
Beam max 12.308 16.072 29.910 30.500 30.071 16.071 12.269 9.165 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2463.0 2466.1 2616.1 3115.9 2557.5 2358.2 2319.1 2316.9 2316.3 2316.7 2317.6 2319.1 2319.8
Area m^2 30 87 88 19 17 82 70 64 97 11 40 94 90
Waterpl. 1001.5 1385.2 2109.6 2847.8 2166.6 1443.1 1046.4 813.43 682.19 603.16 555.66 530.04 521.85
Area m^2 65 67 10 39 56 37 88 7 2 9 8 1 1
Prismatic 0.618 0.553 0.458 0.450 0.467 0.573 0.650 0.697 0.727 0.747 0.760 0.768 0.771
coeff. (Cp)
Block 0.438 0.395 0.275 0.445 0.277 0.405 0.457 0.547 0.644 0.687 0.719 0.744 0.750
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 54
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.130 -1.053 -1.004 -0.984 -0.984 -0.990 -0.997 -1.014 -1.019 -1.027 -1.034 -1.037 -1.029
zero pt.
(+ve fwd)
m
LCF from 1.345 1.293 0.405 0.742 -0.345 0.044 0.130 0.091 0.055 0.026 0.002 -0.016 -0.029
zero pt.
(+ve fwd)
m
Max deck 30.011 20.004 10.000 0.0914 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 2 5 3 5 0 0 1 1 2 1 1 0
deg
Trim angle 0.9923 0.4596 0.0743 -0.0914 -0.0993 -0.0321 0.0306 0.1081 0.2042 0.3484 0.6065 1.3092 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 55
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 56
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 10
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P10 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 57
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.768 -6.395 -5.106 0.027 4.984 6.200 5.567 4.199 2.506 0.658 -1.246 -3.129 -4.924
Area under 149.34 87.903 27.514 0.0485 27.345 85.954 145.61 194.85 228.55 244.45 241.53 219.60 179.28
GZ curve 49 0 9 3 2 63 04 28 87 80 52 55
from zero
heel m.deg
Displacem 4732 4732 4732 4732 4732 4732 4732 4732 4732 4732 4732 4732 4732
ent t
Draft at FP -0.969 0.485 1.523 1.951 1.702 0.883 -0.320 -1.804 -3.794 -6.835 -12.543 -28.965 n/a
m
Draft at AP 0.391 1.222 1.688 1.785 1.272 0.339 -1.014 -2.741 -5.074 -8.651 -15.375 -34.735 n/a
m
WL Length 100.80 100.68 99.375 93.581 99.427 100.75 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 7 1 5 2 3 3 4 5 5 5
Beam max 12.410 16.071 29.974 30.500 30.074 16.071 12.696 9.499 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2404.1 2435.0 2608.1 3110.5 2522.3 2314.4 2272.8 2270.7 2270.2 2270.5 2271.4 2272.9 2273.6
Area m^2 95 40 94 89 25 22 89 26 00 31 73 20 49
Waterpl. 1041.1 1436.9 2122.8 2841.1 2122.5 1433.2 1046.5 813.69 682.42 603.38 555.87 530.22 522.02
Area m^2 98 24 65 68 33 51 50 3 7 3 0 7 2
Prismatic 0.615 0.545 0.448 0.439 0.460 0.567 0.644 0.692 0.722 0.742 0.755 0.762 0.766
coeff. (Cp)
Block 0.431 0.388 0.268 0.434 0.272 0.399 0.436 0.522 0.638 0.681 0.713 0.738 0.756
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 58
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -0.088 -0.022 0.014 0.030 0.055 0.062 0.072 0.095 0.114 0.126 0.133 0.134 0.125
zero pt.
(+ve fwd)
m
LCF from 0.273 0.236 0.411 1.009 0.485 0.274 0.147 0.126 0.105 0.093 0.086 0.080 0.073
zero pt.
(+ve fwd)
m
Max deck 30.006 20.003 10.000 0.0941 10.002 20.002 30.001 40.001 50.001 60.001 70.001 80.000 90.000
inclination 8 7 4 9 0 8 7 6 3 0 5 0
deg
Trim angle 0.7730 0.4187 0.0942 -0.0941 -0.2443 -0.3091 -0.3941 -0.5325 -0.7274 -1.0317 -1.6097 -3.2760 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 59
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 60
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Loadcase - Sailing
Damage Case - DCase 11
Free to Trim
Specific gravity = 1.025; (Density = 1.025 tonne/m^3)
Compartments Damaged -
P11 Perm:95%
Fluid analysis method: Use corrected VCG
Analysis performed in Sinusoidal waves
Wavelength = 49.03 m; Wave Height = 3.72 m; Wave Phase Offset = 0
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
Lightship 1 2593.000 2593.000 -0.058 0.000 3.127 0.000 User
Specified
Total 2593.000 -0.058 0.000 3.127 0.000
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 61
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Item Name Quantity Unit Mass Total Unit Total Long. Trans. Vert. Total FSM Type
tonne Mass Volume Volume Arm Arm Arm FSM
tonne m^3 m^3 m m m tonne.m
SS (1 Layer) 31 0.860 26.660 1.344 0.442 5.765 0.000 User
Specified
SS (4 Layers) 5 3.440 17.200 17.940 -5.464 6.287 0.000 User
Specified
SPMT 1 174.400 174.400 18.579 -0.301 6.214 0.000 User
Specified
Ramps 6 9.210 55.260 48.416 0.000 6.552 0.000 User
Specified
Ballast 1 10.000 10.000 0.000 0.000 6.150 0.000 User
Pumps Specified
Total 1224.180 4.382 -0.195 11.241 0.000
12
3.1.2.4: Initial GMt GM at 0.0 deg = 38.302 m
9
Max GZ = 6.473 m at 19.1 deg.
6
GZ m
-3
-6
-9
-20 0 20 40 60 80
Heel to Starboard deg.
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
GZ m -5.651 -6.256 -4.917 0.178 5.218 6.472 5.842 4.469 2.767 0.904 -1.021 -2.932 -4.760
Area under 144.73 84.534 25.838 0.3226 29.206 90.403 152.81 204.77 241.13 259.57 259.01 239.19 200.68
GZ curve 66 1 2 3 3 44 87 31 55 16 28 10
from zero
heel m.deg
Displacem 4868 4868 4868 4867 4868 4868 4868 4868 4868 4868 4868 4868 4868
ent t
Draft at FP -0.992 0.456 1.474 1.911 1.617 0.726 -0.565 -2.181 -4.350 -7.668 -13.889 -31.757 n/a
m
Draft at AP 0.333 1.213 1.758 1.866 1.472 0.693 -0.475 -1.936 -3.911 -6.937 -12.633 -29.062 n/a
m
WL Length 100.80 100.67 99.333 93.667 99.403 100.72 100.80 100.80 100.80 100.80 100.80 100.80 100.80
m 7 6 3 0 0 0 1 1 1 1
Beam max 12.458 16.071 29.972 30.500 30.079 16.071 12.262 9.159 7.174 6.347 5.850 5.583 5.500
extents on
WL m
Wetted 2390.0 2425.3 2616.5 3171.6 2563.5 2362.8 2324.2 2321.9 2321.2 2321.6 2322.6 2324.1 2324.8
Area m^2 74 52 24 11 09 86 27 67 35 51 28 37 33
Waterpl. 1046.3 1455.3 2163.2 2910.5 2156.7 1444.1 1046.4 813.43 682.18 603.16 555.66 530.03 521.84
Area m^2 03 69 75 99 92 89 89 4 8 6 5 8 8
Prismatic 0.636 0.562 0.460 0.449 0.467 0.574 0.651 0.698 0.728 0.748 0.760 0.768 0.771
coeff. (Cp)
Block 0.443 0.400 0.275 0.443 0.277 0.406 0.458 0.548 0.645 0.687 0.720 0.743 0.749
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 62
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
Heel to -30.0 -20.0 -10.0 0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0
Starboard
deg
coeff. (Cb)
LCB from -1.146 -1.097 -1.053 -1.043 -1.036 -1.038 -1.047 -1.064 -1.071 -1.080 -1.088 -1.091 -1.082
zero pt.
(+ve fwd)
m
LCF from 0.096 -0.297 -0.321 0.534 -0.123 0.033 0.130 0.090 0.053 0.024 -0.001 -0.020 -0.033
zero pt.
(+ve fwd)
m
Max deck 30.006 20.003 10.001 0.0253 10.000 20.000 30.000 40.000 50.000 60.000 70.000 80.000 90.000
inclination 4 9 3 3 0 0 1 2 2 2 1 0
deg
Trim angle 0.7527 0.4301 0.1617 -0.0253 -0.0829 -0.0188 0.0514 0.1389 0.2494 0.4153 0.7141 1.5317 -1.#IND
(+ve by
stern) deg
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 63
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-03-ID
Project : Marine Transportation of Modules Rev. : 01
Title : Intact & Damage Stability Calculation for Modules Date : 11th September 2023
P1 and S1
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 64
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 22
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
TRANSPORTATION MANUAL
FOR MODULES P1 AND S1
TOWING MANUAL
(BSL-PJ23151-R-01-TM)
CONTENTS
1.0 INTRODUCTION 4
2.0 DEFINITIONS AND ABBREVIATIONS 5
2.1 REFERENCE DEFINITIONS 5
2.1.1 BARGE 5
2.1.2 BOLLARD PULL (BP) 5
2.1.3 TOWLINE PULL REQUIRED (TPR) 5
2.1.4 TOWAGE 5
2.1.5 TOWING EQUIPMENT 5
2.1.6 TUG EFFICIENCY (TE) 5
2.1.7 TUG 5
2.1.8 WIND SPEED 5
3.0 DESIGN CODES AND STANDARDS 6
3.1 DNV RULES FOR PLANNING OF EXECUTION OF MARINE OPERATION – DNVGL-ST-N001 6
4.0 DESIGN CRITERIA 7
4.1 ENVIRONMENTAL CRITERIA 7
4.1.1 WAVE HEIGHT 7
4.1.2 WIND 7
4.1.3 CURRENT 7
5.0 CARGO SPECIFICATIONS 8
6.0 TUG & BARGE SPECIFICATIONS 9
6.1 TUG DIMENSION 9
6.2 BARGE DIMENSION 9
6.3 BARGE LIGHTSHIP AND COG 9
7.0 GENERAL INFORMATION 10
7.1 CONTACT DETAILS 10
7.1.1 MARINE WARRANTY SURVEYOR 10
7.1.2 CLIENT 10
7.1.3 TRANSPORTER 10
7.2 RESPONSIBILITIES 10
7.3 PREPARATION 11
7.4 OPERATIONS 11
7.4.1 DEPARTING UTRACO YARD, BATAM, INDONESIA 11
7.4.2 APPROACHING PAX OCEAN YARD, INDONESIA 11
8.0 TOWING ROUTES 12
8.1 TOW ROUTE (NOT FOR NAVIGATIONAL USE. FOR REFERENCE ONLY) 12
9.0 TUG REPORTING FREQUENCY 13
9.1 DEPARTURE AND ARRIVAL 13
10.0 CONTINGENCY & EMERGENCY 14
10.1 IN ADVERSE WEATHER 14
10.2 IN AN EMERGENCY 14
11.0 APPENDIX 15
11.1 PASSAGE PLAN 15
11.2 BOLLARD PULL CALCULATION 16
11.3 TOWING ARRANGEMENT 17
11.4 TOWING GEAR CERTIFICATES 18
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |2
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |3
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
1.0 Introduction
Bok Seng Logistics Pte Ltd is engaged by PT. Perkasa Lintas Arta to perform jacking,
internal shifting, and roll-on of Modules P1 and S1 in Utraco Yard, Batam, Indonesia.
Cargoes will then be sailed to Pax Ocean Yard, Indonesia where lift-off operation (by
others) will be carried out.
This report summarises results for the towing resistance calculation and verifies if
the towing tug has adequate bollard pull to hold the barge under the specified
weather condition. Environmental criteria specified by the relevant Marine Warranty
Surveyor are used to calculate the towing resistance.
The tug efficiency depends on the bollard pull, sea state parameters, and towing
speed. This is calculated in accordance with guidelines of Marine Warranty Surveyor
and factored accordingly when verified against the towing resistance.
This document also provides details of the tug and barge used for this towage.
Information including general towing route, waypoints, route distance and contact
persons’ particulars are also indicated in this report.
The procedure covers the period from the beginning of the voyage from Utraco Yard,
Batam, Indonesia to Pax Ocean Yard, Indonesia until the barge has been secured at
its above specified destination.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |4
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
2.1.1 Barge
2.1.4 Towage
2.1.7 Tug
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |5
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
The bollard pull calculation is performed using the following codes and standards as
applicable:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |6
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
The following environmental criteria have been input for the bollard pull
calculation.
Hsig = 2.0 m
4.1.2 Wind
4.1.3 Current
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |7
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |8
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
Item Name Total Mass Long. Arm from Trans. Arm from Vert. Arm
(mt) Amidships(m) (+fwd) CL (m) from keel(m)
Lightship 2593 -0.058 0.000 3.127
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e |9
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
Company : TBA
Contact Person : TBA
Mobile Number : TBA
Email : TBA
7.1.2 Client
7.1.3 Transporter
7.2 Responsibilities
Competent Towing Master, normally being the master of the towing vessel, will be
in-charge of the towage.
The Towing Master will be responsible for the towage. In preparation for the
towage, the Towing Master will follow good seamanship and judgment, acceptable
industry practices and the latest guidelines by International Collision Regulations and
Local regulations.
The Towing Master will also consider what regulations are applicable during the
towage, as well as ensure that all relevant safety measures as he find necessary are
implemented.
Nothing in this manual shall set aside or limit the Towing Master’s and responsibility
in accordance with Maritime Law and local regulations / authorities.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 10
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
7.3 Preparation
The Towing Master shall not proceed with the towing operation until he has
satisfactory inspected the tow.
The Towing Master will not commence the towing operation unless the
environmental conditions prevailing, and forecast, will allow in achieving safe sea
room where the tow is not endangered by any navigational hazards.
Weather forecast will be provided prior departure, and tow may proceed only if the
conditions are within the design criterion stated in this manual. It is subjective to
Towing Master decision.
Towing Master may obtain the weather forecast from National Environmental
Agency, Singapore, Meteorological Department for weather forecasts at website
www.nea.gov.sg prior to departure.
7.4 Operations
Tug “BS Ocean” Towing Master to ensure that sufficient path is clear for manoeuvre
when departing Utraco Yard, Batam, Indonesia. Once clear, “BS Ocean” Towing
Master may slowly release tow wire to sufficient length to commence towing
operation.
Prior to approaching Pax Ocean Yard, Indonesia, “BS Ocean” Towing Master will
reduce speed. “BS Ocean” will lay down anchor at anchorage area at Pax Ocean Yard,
Indonesia.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 11
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
The loaded barge “BS 27”, towed by tug “BS Ocean” from Utraco Yard, Batam,
Indonesia, shall in general, follow the route above. Nevertheless, the final decision of
which route to take and how to conduct the passage must lie with the Tug Master.
The estimated towing time is about 3.0 hours & 26 minutes at a tow speed of 3.3
knots. During the entire voyage, Tug Master will have to keep vigilant by constantly
reviewing the weather information provided to him. The Tug Master must appraise
the traffic situation and navigate with extreme caution for this intended route.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 12
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
Prior to commence towing, the tow master will need to have a favourable weather
forecast for the intended route and to follow port authority procedures. Upon
commencement of tow operation, Towing Master will have to contact the
appropriate personnel giving an update of departure details. During the towing
operation, the Towing Master will provide a regular update of tow progress, e.g.,
ETA, tow speed, status of tow, weather condition etc.
During the towing passage, the Towing Master will have to keep a log report with
the following information:
The Towing Master needs to forward this daily progress report, as listed in above to
Bok Seng Logistics Pte Ltd / PT. Perkasa Lintas Arta for their references.
If towing route include transiting through the Singapore Straits, Towing Master
should comply with the STRAITREP from the Singapore Maritime Authority.
The Towing Master will have to report to the Marine Port Authority on Ch. 68 for
navigation reporting and of their intended destination.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 13
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
When adverse weather is predicted, the Towing Master will decide on:
If conditions predicted are of a severe nature, the Towing Master will immediately
inform the personnel as listed in the above-mentioned contact details, the nearest
Rescue Co-ordination Centre, of precautions taken and intentions, and kept them
regularly informed of development and proceedings.
If weather condition of severe nature is predicted, the Towing Master will, at his
discretion, consider the possibility of seeking sheltered water or altering course to
give the centre a widest berth possible.
• altering course
• reducing speed
10.2 In an Emergency
In all cases, the arrangements for recovering the tow, should it break adrift, should
be made in accordance with good seamanship, bearing in mind the seasonal weather
conditions and area of operations.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 14
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
11.0 Appendix
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 15
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Safety and Environmental Management System
SEMS Section 7
Attachment 7.6
Sea Passage Plan Rev: 00
BOK SENG ASIA PTE LTD 01 March 2018
Declaration
- This Sea Passage Plan has been prepared in accordance with the requirements to SEMS Sect 7.6.9
- Passage Plan checklist and procedures has been completed and carried out accordingly with all Officers
and Engineers involved have been briefed.
- All voyage Charts and Publications have been corrected up to NTM Wk No. 35 / 23
Cristiyanto Kamaruddin
Name of Chief Officer Name of Master
MASTERS’S
WAY POINT(WP) TRACK LINE INSTRUCTIONS /
DIST. FIX
FIX TIDAL SPECIAL
CHART TO GO INTVL
WP LAT / ETA TO Expect. DIST. TO METHOD CURRENT PROCEDURES/
NO. Parallel index CO. UKC (TTL) (Max)
No. LONG NXT WP SPEED NXT WP HAZARDS OF
SPECIAL CONCERN.
VISUAL FLOOD
Target: º
01º11.00N/ RADAR SLACK
4041 401 104º00.00 Range: nm 11.3 nm GPS EBB
E SIGHTING SET:
OTHER DRIFT:
310º 3.3 1.6 nm 18,5 VISUAL FLOOD
Target: 201º
01º12.00N/ RADAR SLACK
4041 402 103º58.80 1H 00M Range: 2.45 nm 27.9 nm GPS EBB
E SIGHTING SET:
OTHER DRIFT:
258º 3.3 3.4 nm 21
VISUAL FLOOD
Target:180 º
01º11.30N/ RADAR SLACK
4041 403 103º55.50 1H 30M 26.4 nm GPS EBB
Range: 1.50 nm
E SIGHTING SET:
204º 3.3 2.7 nm 19.3 OTHER DRIFT:
VISUAL FLOOD
Target:244 º
01º08.80N/ RADAR SLACK
4041 GPS EBB
404 103º54.40 0H 25M Range:2.24 nm 24.4 nm
3937 SIGHTING SET:
E
OTHER DRIFT:
198º 3.3 1.6 nm 15,7 VISUAL FLOOD
Target: 263
01º07.20N/ RADAR SLACK
3937 405 103º53.90 0H 35M Range:2.25 nm 22.8 nm GPS EBB
E SIGHTING SET:
OTHER DRIFT:
211º 3.3 1.4 nm 21 VISUAL FLOOD
Target: 296
01º06.00N/ RADAR SLACK
3937 406 103º53.20 1H 06M Range: 3.36 nm 17.8 nm GPS EBB
E SIGHTING SET:
OTHER DRIFT:
168º 3.3 0.4 nm 20.5
VISUAL FLOOD
Target: 248
01º05.55N/ RADAR SLACK
3937 407 103º53.25 2H 10M Range: 10.5 GPS EBB
E SIGHTING SET:
OTHER DRIFT:
REFERENCES / REMARKS
NOTE: 1. Attachments 7.6A & 7.6B to be attached together. 2. To dispatch a copy to office and one copy to retain onboard. 3. On completion of the checklist an entry to be made in the deck log book
“Preparation for Sea Passage Plan being carried out as per SEMS Attachment 7.6.”
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 16
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-05-BP
Project : Marine Transportation of Modules Rev. : 01
Title : Bollard Pull Calculation for Modules Date : 15/9/23
P1 and S1
BARGE INFORMATION
Barge Length 330.00 ft 100.58 m
Barge Breadth 100.00 ft 30.48 m
Barge Depth 18.00 ft 5.49 m
Barge Draft 6.02 ft 1.84 m
INPUT PARAMETERS
ENVIRONMENTAL CRITERIA
Wind Speed, Vw 29.16 knots
(1 min. mean velocity at 10m above sea level) 15.00 m/s
Current Speed, Vc 0.50 m/s
Significant Wave Height, Hs 2.00 m
CURRENT FORCE
3
Mass Density of Water 1.025 t/m
Drag Coefficient of Barge, Cd 1.0
2
Underwater Transverse section area, Af 56.0 m
Current force, Fc 7.2 kN
WIND FORCES
Mass Density of Air 0.001225 t/m3
Ht. above sea 2
Description Wind Area (m ) Cs CH Wind force (kN)
level
Barge 0m - 15.3 m 111.3 1.0 1.0 15.3
Modules 0m - 15.3 m 164.7 1.0 1.0 22.7
Modules 15.3m - 30.5 m 13.0 1.0 1.1 2.0
Cargo 30.5m - 46.0 m 0.0 1.0 1.2 0.0
Total 40.0
SHAPE COEFFICIENT, Cs
Bow form 0.5
Barge front 1.0
Beam 1.5
Sides of buildings 1.5
Cylindrical sections 0.5
Spherical sections 0.5
Overall projected area of platform 1.0
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or distributed to a third party without the written permission of Bok Seng Logistics
Pte Ltd. Page 1 of 2
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-C-05-BP
Project : Marine Transportation of Modules Rev. : 01
Title : Bollard Pull Calculation for Modules Date : 15/9/2023
P1 and S1
TUG INFORMATION
Tug Length 28.56 m
Tug Breadth 9.00 m
Tug Depth 4.60 m
BOLLARD PULL
where LOA = towing vessel length overall in metres ( using 45 for LOAs 45 m)
BP = static continous bollard pull in tonnes (with BP > 20 tonnes & 100 for BP 100 tonnes)
Hs = significant wave height ( with 1 Hs 5)
CONCLUSION
TPR is > Towing Resistance
Tug Bollard Pull is ADEQUATE
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or distributed to a third party without the written
permission of Bok Seng Logistics Pte Ltd. Page 2 of 2
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 17
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
07
CHAFFING CHAIN
46mm x 5.6m 07
PL = 85.0T CHAFFING CHAIN
QTY - 2 NOS 56mm x 6.0m
MBL= 247.71T
SHACKLE QTY - 2 NOS
SWL = 55.0T
QTY - 2 NOS
SHACKLE
BRIDLE WIRE SWL = 55.0T
56mm x 25.0m QTY - 2 NOS
MBL = 236.0T
BRIDLE WIRE
QTY - 2 NOS
56mm x 25.0m SHACKLE
MBL = 236.0T SWL = 55.0T
SHACKLE
QTY - 2 NOS QTY - 3 NOS
SWL = 25.0T
QTY - 1 NO
SHACKLE
SHACKLE PENNANT WIRE
SWL = 55.0T + 85.0T
SWL = 55.0T + 85.0T 64mm x 18m
QTY - 2 NOS
SHACKLE QTY - 2 NOS MBL = 301.0T
SWL = 55.0T
QTY - 1 NO SHACKLE
SOLAR POWER NAVIGATION LIGHT SWL = 55.0T
PENNANT WIRE 0
64mm x 18m 560 600 TOWING WIRE
0
MBL = 301.0T 42mm x 1000m
00 250 Proof Load = 26.92T
250 00
07 07
BS OCEAN
SHACKLE
BOLLARD PULL CAPACITY - 26.50T
SWL = 55.0T DELTA PLATE
QTY - 3 NOS SWL = 80.0T
SMIT BRACKET
BARGE BS27 SWL =203.9T
DELTA PLATE QTY = 2 NOS
SWL = 55.0T BLACK DIAMOND
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 18
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 19
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc. No. : BSL-PJ23151-R-01-TM
Project : Marine Transportation of Modules Rev. : 01
Title : Towing Manual for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied or P a g e | 20
distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 23
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
FOREL FPSO TIME
CHARTER
6
Page, Section Status
No. Comment Response Agreed Resolution
Drawing/Doc Ref, etc O/C*
Comment from HTS
7
10
Level 2
3
Module P1
1
Level 1
2
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Module P1
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
1 of
HSB ASTM A325 LOCATION : SYSTEM :
Module P1 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
3072.3 7848.0
1572.3
2695
A
3055
22206.0
B
14245.0
3830
7267.0
C
4318.5
3285
D
Up Dn
6010
270 1257
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
29220
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Floor Deck Level 1 (22.206)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
2 of
HSB ASTM A325 LOCATION : SYSTEM :
Floor Deck Level 1 (22.206) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
26656.0
2695
Deck plate 6mm
3055
B
14245.0
Dn Up
3830
10170
C
3285
6280
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Floor Deck Level 2 (26.656)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
3 of
HSB ASTM A325 LOCATION : SYSTEM :
Floor Deck Level 2 (26.656) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
20616.7
Dn
30856.0
2695
Deck plate 6mm
3055
B
14245
3830
10170
C
3285
D
1380
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Floor Deck Level 3 (30.856)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
4 of
HSB ASTM A325 LOCATION : SYSTEM :
Floor Deck Level 3 (30.856) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
A
3055
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
B
3830
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
C
3285
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
D
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
29220
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Structure Plan Leg (Column)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
5 of
HSB ASTM A325 LOCATION : SYSTEM :
Structure Plan Leg (Column) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
29220
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
A
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
3055
B
1915
3830
12" Sch 80 12" Sch Std 12" Sch Std 12" Sch 80 12" Sch 80
1915
C
3285
D
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
25120
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Structure Plan Level 1 (Column)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
6 of
HSB ASTM A325 LOCATION : SYSTEM :
Structure Plan Level 1 (Column) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
29220
A
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
3055
B
3830
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
3285
D
12" Sch 80 12" Sch 80 12" Sch 80 12" Sch 80
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
25120
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Structure Plan Level 2 (Column)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
7 of
HSB ASTM A325 LOCATION : SYSTEM :
Structure Plan Level 2 (Column) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W24X76
W12X35
W24X76
W24X76
W24X76
W24X76
W12X35
2695
W24X76
W24X76
W24X76
W24X76
922 1300 918
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
A
624.9
W24X76 W24X76 W24X76 W24X76
W12X35
W12X35
1596
W12X35
W12X35
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35
W24X76
3055
2430.1
W24X76
W24X76
W24X76
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
B
1069 1127 944
1432
W12X35
14245.0
3274.7
W12X35
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35
3830
1200
W12X35
W12X35
555.3
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
C
2203.5 W24X76 W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35
3285
W24X76
1636.8
W24X76
W24X76
1434
W24X76
W24X76
W12X35
W12X35
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35
1380
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
500
W24X76 W24X76
29220
Insert Plate
500
1 2 3 4 5 6 7 8 9
Typical Insert Plate
Reference
Area lifting
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
1
Main Beam Level 1 Main Beam Level 1 (22.200)
1 : 100
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
8 of
HSB ASTM A325 LOCATION : SYSTEM :
Main Beam Level 1 (22.200) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
W18X50
W18X50
W18X50
W18X50
W18X50
W12X35
W12X35
W12X35
W12X35
2695
2695
W18X50 W18X50 W18X50 W18X50 W18X50 W18X50
A
500.0
500
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
3055
3055
2555
W12X35
W12X35
W12X35
W12X35
W18X50
W18X50
W12X35
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
B
900
1915
1915
1015
W18X50 W18X50 W18X50 W18X50 W18X50 W18X50
3830
10170
W18X50
W12X35
W12X35
W12X35
1218
1218
W12X35 W12X35 W12X35 W12X35
1915
1915
C
W12X35
W12X35
W18X50
W12X35
W12X35
W18X50
W18X50
W12X35
W12X35
2560
2560
W12X35
980 1537
W12X35 W12X35 W12X35 W12X35
3285
3285
1327
W12X35
W12X35
W12X35
1422
772
W18X50 W18X50 W18X50 W18X50 W18X50 W18X50
D
W12X35
W18X50
W18X50
W12X35
W12X35
W18X50
W12X35
W18X50
W18X50
W12X35
1380
500
3140 3140 3140 3140 3140 3140 2600
W18x50 W18x50
500
Insert Plate
1 2 3 4 5 6 7 8 9
Typical Insert Plate
Reference
Area lifting
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Main Beam Level 2 (26.650)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
9 of
HSB ASTM A325 LOCATION : SYSTEM :
Main Beam Level 2 (26.650) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W24X76
W24X76
W24X76
W24X76
W24X76 W24X76 W24X76 W24X76 W24X76
A W12X35
500
1533
1616
W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
3055
1435
W12X35
W12X35
W12X35
W24X76
W24X76
W12X35
W24X76
W24X76
W12X35
B
3437
W12X35
1919
W24X76 W24X76 W24X76 W24X76 W24X76
3830
10170
1228
W12X35
W24X76
2114
W12X35
W24X76
W12X35
W12X35
W12X35
W24X76
W24X76
W12X35
5200
W12X35 W12X35 W12X35 W12X35 W12X35
391
W12X35
3285
1467
W24X76 W24X76 W24X76 W24X76 W24X76
D
W12X35
W24X76
W12X35
W12X35
W24X76
W12X35
W24X76
W24X76
W12X35
1380
W12X35 W12X35 W12X35 W12X35 W12X35
740 2400 1470 8680 3136 1674 3140 3140 3140 2600
3140 3140 3140 3140 3140 3140 3140 3140 2600 1541
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Main Beam Level 3 (30.850)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
10 of
HSB ASTM A325 LOCATION : SYSTEM :
Main Beam Level 3 (30.850) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
954
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
2695
871
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
871
A
1018
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
3055
1018
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
827.5 631.5
W8X15
1018
B
765
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
765
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
3830
1150
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
W8X15
1150
C
1095
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
3285
1095
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
W8X15
1785
D
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
W8X15
W8X15
1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
29220
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Secondary Beam Level 1 (22.200)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
11 of
HSB ASTM A325 LOCATION : SYSTEM :
Secondary Beam Level 1 (22.200) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
910
910
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
898
A
2247
1020
W8X15 W8X15
W8X15 W8X15 W8X15
3055
1020
W8X15 W8X15
853
W8X15 W8X15 W8X15
1015
853
W8X15 W8X15
B 900
900
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
3830
10170
2233
3513
W8X15 W8X15
1280
C W8X15 W8X15 W8X15 W8X15 W8X15
1280
W8X15 W8X15 W8X15
3285
711
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
1509
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Secondary Beam Level 2 (26.650)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
12 of
HSB ASTM A325 LOCATION : SYSTEM :
Secondary Beam Level 2 (26.650) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
3124 3860 14456 1541
W8X15
W8X15
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
W8X15
604 552
700
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
956
956
A
725
725
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
1263
1500
3055
3055
W8X15 W8X15
W8X15 W8X15 W8X15 W8X15 W8X15
W8X15
994
830
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
B
921
921
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
1864
1864
3830
3830
10170
W8X15 W8X15
870
W8X15 W8X15 W8X15 W8X15 W8X15
853
W8X15 W8X15 W8X15 W8X15 W8X15
1120
W8X15
W8X15 W8X15
1897
3285
3285
1125
W8X15 W8X15
W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
1040
1408
D
690
704
8680
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Secondary Beam Level 3 (30.850)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
13 of
HSB ASTM A325 LOCATION : SYSTEM :
Secondary Beam Level 3 (30.850) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Level 3 Level 3
30850.0 30850.0
4200
4200
Level 2 Level 2
26650.0 26650.0
4450
4450
Level 1 Level 1
22200.0 22200.0
1800
1800
Column Leg Column Leg
20400.0 20400.0
1200
1200
Upper deck Upper deck
19200.0 19200.0
3285 3830 3055 2695 3055 3830 3285 1380
14245.0
D C B A A B C D
4200
Level 2
26650.0
11650
4450
Level 1
22200.0
1800
Column Leg
20400.0
1200
Upper deck
29220 2400
19200.0
2600 3140 3140 3140 3140 3140 3140 3140 3140 1500
9 8 7 6 5 4 3 2 1
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Looking Starboard
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
15 of
HSB ASTM A325 LOCATION : SYSTEM :
Looking Starboard 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Level 3
30850.0
4200
Level 2
26650.0
10450
4450
Level 1
22200.0
1800
Column Leg
20400.0
Upper deck
19200.0 1500 3140 3140 3140 3140 3140 3140 3140 3140 2600
29220
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Looking Port
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
16 of
HSB ASTM A325 LOCATION : SYSTEM :
Looking Port 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Level 1 W24X76 W24X76 W24X76 W24X76 W24X76
22200.0
0 Pip Pipe 0 Pip
h4 e h 40 ch 4 e
1800
6" S " Sc 6" 6" S
" Sc c 6 Sch 6" S ch 4
Pi pe 6 h 40 Pipe 40
P ip
e 0
Column Leg
20400.0
1200
Upper deck
19200.0 2695 3055 3830 3285 1380
14245
Level 1
22200.0 W24X76 W24X76 W24X76 W24X76 W24X76 Grid 2
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
2
1800
1 : 100
Column Leg
20400.0 Level 3 W24X76
1200
Upper deck 30850.0 W24X76 W24X76 W24X76
Pip
1420
e6
40
Pip
19200.0 2695 3055 3830 3285 1380 ch 4
ch 4
0 S ch
"S
ch
e6
e 6"
6" S
0
ch
"S
6" S Pip
40
ch
e
e
Pip
14245 Pip
40
W12X35 W12X35
4200.0
4200
1807 1513 1650 1650 1650 1900
Grid 1
12" Sch 80
12" Sch 80
12" Sch 80
1
1 : 100
Level 2 Level 2
W18X50 W18X50 W18X50
26650.0 W18X50 W18X50 W18X50 W18X50 26650.0
4450.0
Pip
4450
4450
Pipe
e1
Pipe
2S T
10S
10S
TD
TD
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
temporary support
Level 1 Level 1
22200.0 W24X76 W24X76 W24X76 W24X76 W24X76 22200.0 W24X76 W24X76 W24X76 W24X76 W24X76
12" Sch 80
12" Sch 80
0 Pip 0 Pip
h 40
1800.0
h4 e ch 4 e
1800
1800
1800
6" S " Sc 6" S
6 " Sc c h 40 6 6" S ch 4
Pip
e Pipe P ip
e 0
Column Leg Column Leg
20400.0 1018 1018 1018 1095 1090 1100 20400.0
1200.0
1200
1200
Upper deck Upper deck
2695 3055 3830 3285 1380.0 2695 3055 3830 3285
19200.0 19200.0
14245.0 14245.0
A B C D A B C D
Grid 3 Grid 4
3 4
1 : 100 1 : 100
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Grid 1,2,3 & 4
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
17 Of
HSB ASTM A325 LOCATION : SYSTEM :
Grid 1,2,3 & 4 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Level 1
22200.0 W24X76 W24X76 W24X76 W24X76 W24X76
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
1800
Column Leg
20400.0
1200
Upper deck
19200.0 2695 3055 3830 3285 1380
14245
Grid 5
1
1 : 100
Level 3 Level 3 W12X35 W24X76 W12X35 W24X76 W12X35 W24X76 W12X35
40
Pip
e S ch
0 Pip
ch
e6
e6
e 6"
6" S
"S
"S
Pip
ch
ch
e
Pip
40
40
W12X35 W12X35
4200
4200
1807 1513 1650 1650 1650 1900
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
Level 2 Level 2 W12X35 W18X50 W12X35 W18X50 W12X35 W18X50 W12X35
11650
11650
Temporary Support
12" Sch Std
4450
4450
Pipe
10S
TD
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
Pip
1800
1800
40 Pipe Pip
ch e 6" S ch 4
0
6" Sc h 40 e 6" S
6" S c h 40 6" S Sch
e 6" ch 4
Pip
e Pipe 40
P ip 0
Column Leg Column Leg
20400.0 20400.0
1200
1200
Upper deck Upper deck
19200.0 2695 3055 3830 3285 1380 19200.0 2695 3055 3830 3285 1380
14245.0 14245
A B C D
A B C D
Reference
Grid 6 Grid 7
ID-F-BU-SS0-SPC-GN-00-0003_R2
2 Grid 5 6 & 7 3
P2104-VD-PROS1-HS-CAL-0002_S1
1 : 100 1 : 100
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
18 of
HSB ASTM A325 LOCATION : SYSTEM :
Grid 5 6 & 7 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
4970 5200
0 Pipe
ch 4 6" S
6" S ch 4
Pipe
3140
0
Bracing Level 3
3
1 : 100
400
Level 3 Level 3
30850.0 W24X76 W24X76 W24X76 W24X76
30850.0 W24X76 W24X76 W24X76 W24X76
Pipe 6" Sch 40 Pipe 6" Sch 40
4200
4200
Level 2 Level 2
26650.0 W18X50 W18X50 W18X50 W18X50 26650.0 W18X50 W18X50 W18X50 W18X50
12" Sch 80
11650
11650
12" Sch 80
Pip
STD e12
e12 STD
4450
4450
Pipe
Pipe
Pip
10S
10S
TD
TD
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
Level 1 Level 1
22200.0 W24X76 W24X76 W24X76 W24X76 W24X76 22200.0
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
1800
1800
40 Pipe 6" S 6" S
Sch 6" e 6" c h 40 e 6" ch 4
Pip e 6" Sch
40 Pip P ip 0
Column Leg Column Leg
20400.0 20400.0
1200
1200
Upper deck Upper deck
19200.0 2695 3055 3830 3285 19200.0 2695.0 3055.0 3830.0 3285.0 1380.0
14245.0 14245.0
A B C D A B C D
Grid 8 Grid 9
1 2
Reference
1 : 100 1 : 100
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Grid 8 & 9
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
19 Of
HSB ASTM A325 LOCATION : SYSTEM :
Grid 8 & 9 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Level 3
30850.0 W24X76 W24X76 W24X76 W24X76 W24X76
Pi p
4200
e12
STD
TD S
Pipe
e1 2
1 2 ST TD
12 S
P ip
D Pipe
Level 2
26650.0 W18X50 W18X50 W18X50 W18X50 W18X50
4450
Pipe
12S
TD
TD
1 2S
Pipe
Level 1
22200.0 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
1800
Column Leg
20400.0
1200
Upper deck
19200.0 2600 3140 3140 3140 3140 3140 3140 3140 3140
27720
9 8 7 6 5 4 3 2 1
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Grid A-D
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
20 Of
HSB ASTM A325 LOCATION : SYSTEM :
Grid A-D 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Pip
e1 2ST
D
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
Pipe
10S
TD
W24X76 W24X76 W24X76 W24X76 W24X76
1800
1018 1018 1018
1095 1090 1100
1380.0
2695 3055 3830 3285
14245.0
A B C D
Typ
12" Sch 80
12" Sch 80
12" Sch 80
12" Sch 80
Pipe
10S
TD
19 190 19
1800
Box Transportation
1
1 : 20 1018 1018 1018
1095 1090 1100
1380.0
2695 3055 3830 3285
14245.0
A B C D
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Support Transportation
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
21 Of
HSB ASTM A325 LOCATION : SYSTEM :
Support Transportation 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
Level 3
30850.0
3
22 of 26
Level 2
26650.0
/16
2X3
L2X
90.00°
L2X
2X3
/16
00°
Level 1
45.
22200.0
Column Leg
4
Typ
4
20400.0 EL-90 sr
400
1 : 100 19200.0 Ma Typ
4
Pipe1-1/2STD
Pipe1-1/2STD
STD
1/2
e1-
400
Pip
Pipe1-1/2STD
PL 100 x 6
End Plate 65 x3 11 .5
C8X 0
16
EQ
C8X11.5
C8X11.5
Ma EQ EQ
x1
EQ
Grating 32 x 5 00
0 Max 3000
12" Sch 80
Typ Plate 18mm
Detail Column Type 1 Level 1
2A R1
1 : 25 Plate 18mm
22200.0
0D R 25
Stiffner
Typ
R1 Stiffner
Column type 2
R1 3
Section 3B
R1
6 3B
Typ
6
1 : 25
3C
C1 23 of 26
Detail Column Type 1 (Top) 3B
Plate 18mm
2B
Typcal Leg 1 : 25 6
23 of 26
A Plate 18mm 6
Typ
12" Sch 80
500 Level 3
30850.0 W24X76 W24X76
Plate 18mm W24X76 W24X76
Stiffner
500
12" Sch 80
4B
6
Typ 23 of 26
6
Level 1
Level 1
22200.0 500
R1 22200.0
12" Sch 80
6 6 Plate 18mm
Typ W24X76 W24X76 Typ
6 6
18
500
6 R3
W24X76 W24X76 Typ W12X35
6 6
Typ
6
607
12" Sch 80
R1
W24X76
18
Plate 18mm
Column Leg Plate 18mm
Section 1A Column type 1
1A 2 20400.0
Section 2C Column type 3 Detail Column Type 3 Section 4B
1 : 25 2C 4 4A 4B
1 : 25 1 : 25 1 : 25
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Typical Connection (Column)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
23 of
HSB ASTM A325 LOCATION : SYSTEM :
Typical Connection (Column) 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
6
Typ 6
R1 6 Typ W24X76
6
W24X76
R1 R1 2B
24 of 26
W12X35 W12X35
W12X35 W12X35
1B
W24X76 W24X76
24 of 26
W24X76
W24X76 W24X76
R3
6
Typ
6
R1-R1 Connection R1-R1 Section R1-R1 R1-R3 Connection R1-R3 Section R1-R3
1 1A 1B 2 2A 2B
1 : 25 1 : 25 1 : 25 1 : 25
3B
24 of 26
6
6 W18X50 Typ
Typ R1 6
6
W8X15 W8X15
W8X15 W8X15
R3 W12X35 W12X35 R3
Main Beam
4B
6
6 Typ 24 of 26
Typ 6
6
R2-R3 Connection R2-R3 Section R2 Main Beam-R4 Conn Secondary Beam Section R4-Main Beam
3 3A 3B 4 4A 4B
1 : 25 1 : 25 1 : 25 1 : 25
6A
24 of 26
W24X76 Level 3
6
Level 1 Typ 30850.0
6 375 W24X76 W24X76
22200.0
0D 6
Typ
12" Sch 80
W24X76 6 Pip
e 6" S
Pipe 6" Sch 40
ch 4
12" Sch 80
0
h4
0 Pip
e 6 6 Pipe 6" Sch 40
6 " Sc 211 6" S
c Typ Typ
Pip
e h 40 6 6
6 6 W12X35 W12X35
40.0
Typ Typ
6 6
12" Sch 80
Column Leg 6
0°
Typ
20400.0 6
462
38 50
7.0
0 Typ
52
42
4 0D
38
1196
Insert Plate
734
Insert Plate
8°
31.9
Typical Lifting Lug
40.9
2
6°
1 : 20
R 25
5.9
0
63.
.4
462
ø1
5610
06
0D
ø4
46.
1°
1196
37.5
90°
734
5250
12560.0 2
25 Of 26
1200
LocationLifting Lug P1
1
1 : 100
4 8 View lifting Lug Lifting Lug
4 5
1 : 20
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Lifting Lug P1
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 0D 30/05/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 13/01/23 IFA Issued For Appoval EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 09/12/22 Re-IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE P1 Sheet
TITTLE :
25 Of
HSB ASTM A325 LOCATION : SYSTEM :
Lifting Lug P1 26
WELDING AWS D.1.1 E70XX ELECTRODE. Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 0D
2A
26 Of 26 50.0 490 50.0 50 816 50
50.0 816 50.0 Typ
Plate 64 mm
SolePlate
Soleplate
50.0
Typ Plate 19mm
Plate 19mm
Plate 19mm
490
2.1 2B Typ Typ
26 Of 26 26 Of 26
50.0
A W 24 x 76 W 24 x 76
1101.75 1101.75
2.1 2A 2B
1 : 20 1 : 20 1 : 20
3055
2203.5
R1 2C
B 26 Of 26
6267 50.0 490.0 50.0 816.0 50.0
50.0 816.0 50.0
2.2 SolePlate SolePlate
3497.5
50.0
26 Of 26 2D Typ
3830
Typ
26 Of 26
Plate 19mm Plate 19mm
490.0
R1
1101.75 1101.75
Typ
C Typ
2203.5
R1 1 : 20
D
Plate 64mm
3140 3140
Plate 18mm
4 5 6
6
Comment from HTS
Page, Section Status
No. Comment Response Agreed Resolution
Drawing/Doc Ref, etc O/C*
7
10
Level 2
3
Module S1
1
Level 1
2
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Module S1
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : ID-F-FT-P-MES002-B01-00032 REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
B
3830
C
10200
3055
D
3315
Dn
1570 Up
2500 3140 3140 3140 3140 3140 3140 3140 3140 940 2849
28560
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Floor Deck Level 1 (22.206)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : ID-F-FT-P-MES002-B01-00032 REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
B
C 3830
Dn
Up
10200
3055
D 1616
3140
2500 3140 3140 3140 3140 3140 3140 3140 3140 940 2854
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Floor Deck Level 2 (27.206)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Dn
1900
B
3830
C
3055
D
3315
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Floor Deck Level 3 (31.106)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
1900
B Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
3830
C Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
10200
3055
D Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
3315
2500 3140 3140 3140 3140 3140 3140 3140 3140 940
28560
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Column Leg
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
B Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
1136
Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
787
C
10200
D Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
2500 3140 3140 3140 3140 3140 3140 3140 3140 940
25120
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Column Level 1
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
1900
B Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
H
3830
786.6
Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
C
3055
D Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80
Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 Pipe12 Sch 80 D'
2500 3140 3140 3140 3140 3140 3140 3140 3140 940
28560
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Column Level 2
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
B
W12X35
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
3830
1046.69
W12X35
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
C
868.56
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35
10200
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
3055
W12X35
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
D
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
3315
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W24X76
W12X35
W24X76
W12X35
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
D' 815.00
1570.00 1570.00
2500 3140 3140 3140 3140 3140 3140 3140 3140 940
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Main Beam Level 1 (22.200)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
3140.00 3140.00 2004.41 1135.59 3140.00 3140.00 3140.00 3140.00 940.00
1522
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
3830
1522
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
C
1921 W12X35 W12X35 W12X35 W12X35 W12X35
10200.00
W12X35
W12X35
W12X35
W12X35
W12X35
3055
W12X35
W12X35
W12X35
W12X35
1921
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
1615
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Main Beam Level 2 (27.200)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
1570 1570 4710 1570 1570 1570 1570 1570 1570 1570 940
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
1900
1900
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
B
780
741
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
3830
3830
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
3055
3055
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
D
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
3315
3315
827
872
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
W12X35
1900
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Main Beam Level 3 (31.100)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
1250 1250 1370 1770 1570 1570 1570 1570 1570 1570 1570 1570 1570 1570 1570 1570 1570
B
957.5
L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8
848
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15 630
1915.0
L5X5X3/8
W8X15
L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
556 556
1721.3
W8X15
L5X5X3/8 L5X5X3/8 W8X15 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
10200
1527.5
L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
D
1598.8
W8X15
W8X15
L5X5X3/8 L5X5X3/8 W8X15 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 W8X15 W8X15 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
785 378
W8X15
1624.2
L5X5X3/8 L5X5X3/8
W8X15
W8X15
L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8 L5X5X3/8
W8X15
W8X15 W8X15
L5X5X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
855.8
W8X15
W8X15
815.00
L5X5X3/8
L5X5X3/8
W8X15
W8X15
W8X15
W8X15
1570.00 1570.00
W8X15
2500 3140 3140 3140 3140 3140 3140 3140 3140 940 1556 1241
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Secondary Beam Level 1 (22.200)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
1570 1570 1570 1570 3140 1570 1570 1570 1570 1570 1570 1570 1570 940
760.8
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
1521.7
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
173.7 1547.5
L4X4X3/8
L4X3X3/8
W8X15
L4X4X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
482.19
C L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 W8X15 W8X15 W8X15
L4X3X3/8
W8X15
W8X15
1097.13
W8X15
W8X15
W8X15
W8X15
W8X15
1920.8
L4X3X3/8 W8X15 W8X15 W8X15 W8X15 W8X15 W8X15
138
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
960.5
D
818.7
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
1600.0
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
896.3
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Secondary Beam Level 2 (27.200)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
1570 1570 4710 1570 1570 1570 1570 1570 1570 1570 940
1001
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
1900
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
899
W8X15
B
742
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
922 417 898 694
1522
3830
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
1739
W8X15
C L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
1921.58
W8X15
W8X15
W8X15
W8X15
W8X15
12100
1921
3055
L4X3X3/8 L4X3X3/8 L4X3X3/8 W8X15 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
960
D
600
W8X15
789
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
1616
3315
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
910
668
W8X15
908
L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8 L4X3X3/8
W8X15
W8X15
W8X15
W8X15
W8X15
W8X15
1900
992
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Secondary Beam Level 3 (31.100)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 3 Level 3
31400 31400
4200
Level 2 Level 2
27200 27200
11000
5000
Level 1 Level 1
22200 22200
1800
D C B B C D
Side AFT SIde FWD
1 2
1 : 100 1 : 100
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
View (AFT & FWD)
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 3
31400
4200
Level 2
27200
11000
5000
Level 1
22200
1800
Column Leg
20400
940
Upper deck
1136 19200
3140 3140 3140 3140 3140 3140 3140 3140 2500
9 8 7 6 5 4 3 2 1
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Looking Port
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 3
31400
Level 2
27200
Level 1
22200
Column Leg
940
20400
Upper deck
19200
2500 3140 3140 3140 3140 3140 3140 3140 3140
1 2 3 4 5 6 7 8 9
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Looking Starboard
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 2
W12X35 W12X35 W12X35
27200
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Level 1 Level 1
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
22200 22200
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pip
Pipe12 Sch 80
Pipe 0
6 Sc ch 4 e6 Sch h 40
Pipe
h 40 e 6S 4 6 Sc
6 Sc Pipe Pip Pipe
P ip 0 Pipe
h 40 6 Sc
Sch
4 0 e6 h 40 6 Sc
h 40
e6
Sch 6 Sc h 40
Column Leg Pip 4 0 Pipe Column Leg
20400 20400
Upper deck Upper deck
3315 3055 3830 1900 19200 19200
3315 3055 3830
12100
10200 1900
D C B D C B
Grid 1 Grid 2
1 2
1 : 100 1 : 100
Level 3 W12X35 W12X35 W8X15 W8X15W12X35 W12X35 W12X35
Level 3
W12X35 W12X35 W12X35 W12X35 W12X35
31400 31400
3055 787 3043
Pipe12 Sch 80
Pipe12 Sch 80
Level 2
W12X35 W12X35 W12X35
27200 Level 2
W12X35 W8X15 W12X35 W12X35
L4X4X3/8 27200
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Level 1
W24X76 W24X76 W24X76
22200 Level 1
W24X76 W24X76 W24X76
Pipe Pip Pipe 22200
6 Sc
Sch
4 0 e6 h 40 6 Sc
h 40 Sch 6 Sc h 40
Pipe12 Sch 80
e6 4 Pipe Pipe
P ip 0 Column Leg h 40
Pip 0 Pipe
Pipe12 Sch 80
6 Sc
h 40 Sc
e6 Sch ch 4 6 Sc
e6 4 Pip e6 S h 40
P ip 0
20400 Column Leg
Upper deck 20400
786.6 19200 Upper deck
3315 3055 3830 1900
19200
10200 3315 3055 3830 1900
12100
D C B
D C B
Reference Grid 4-5-6-8-9 Grid 5
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
3
1 : 100
Grid 1-9 4
1 : 100
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
W24X76
750
Typ
Typ
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Level 2 19 190 19
W12X35 W12X35 W12X35
27200 228
Detail Box
2
1 : 20
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
W24X76 W24X76 W24X76 Level 1
750 22200
601 1000 1000 793 W24X76
787 20400
W24X76
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Grid 3-7
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 3
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
31400
Pip
Pipe
Std
Std
e1
4200
2S
12
12
12 S
td
Pipe
Pipe
d t
Level 2
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
27200
11000
5000
Pipe
Pipe
Std
Std
12
12
12
12 S
Pipe
Pipe
Std
td
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Level 1
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
22200
Pipe12 Sch 80
1800
40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip
e6 e6 e6 e6 e6 e6 e6 e6
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40
Upper deck
19200
940 3140 3140 3140 3140 3140 3140 3140 3140 2500
9 8 7 6 5 4 3 2 1
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Grid B
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 1
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76
22200 W12X35
40 P ip P ip 0 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40
e6 0 e6 e6
Sch Sch ch 4 Sch ch 4 e6
Sch Sch e6 Sch Sch Sch
e6
Sch Sch e6 Sch
e6
Sch Sch
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Sch e6
P ip
e6 40 e6 S 40 e6 S 40 P ip
e6 40 P ip
e6 40 P ip
e6 40 P ip
Sch
P ip
e6 40 Pip
e6
Column Leg P ip P ip 40
20400
Upper deck
19200
940 3140 3140 3140 3140 3140 3140 3140 3140 2500
28560
9 8 7 6 5 4 3 2 1
Grid B
1
1 : 100
Level 3
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
31400
Level 2
W12X35 W12X35 W12X35 W12X35 W12X35 W12X35 W12X35
27200
Pipe12 Sch 80
Pipe12 Sch 80
Level 1
W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W24X76 W12X35
22200
P ip P ip P ip P ip P ip P ip P ip P ip
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
Pipe12 Sch 80
40 e6 40 e6 40 e6 40 e6 40 e6 40 e6 40 e6 40 e6
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
e6 Sch Sch
Column Leg P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40 P ip 40
20400
Upper deck
19200 2004
940 3140 3140 3140 C1 3140 C1 3140 3140 3140 3140 2500
28560
9 8 7 6 5 4 3 2 1
Grid C
Reference 2
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
1 : 100 Grid C-D
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Level 3
31400
Level 2
27200
Ladder
1
1 : 100
Level 1
22200
3
20 of 24
Column Leg
20400
Upper deck
4
C 200 x 80
C 200 x 80
Pipe1-1/2STD
19200 EL 90 Sr Typ
4
Grating 32 x 5mm
00
x 20 Pipe1-1/2STD
FB 65 x 3 Ma
D
ST
1/2
400
e1-
D
Pip
ST
1/2
e1-
Pipe1-1/2STD
1200
Pip
Pipe1-1/2STD Pipe1-1/2STD
Pipe1-1/2STD
Pipe1-1/2STD
Pipe1-1/2STD
Ma
400
x1
C 200 x 80
C 200 x 80
300
00
0
Pipe1-1/2STD Pipe1-1/2STD
PL 100 x 6mm
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
500
PLate 18mm Plate 18mm
Pipe12 Sch 80
X76
W24
500
W12 X35
X35 W 12
3B
X35 W12 21 of 24
W12 X35
W24
X76
W24
X76 Column Type 2 3C
3 21 of 24
X76 W24
W 24 X76
Detail Column Type 1 (Top)
2A Detail Column Type 2
1 : 25 Typ 3A
1 : 25
Pipe12 Sch 80
Pipe
Plate 18mm
6S
Typ
40
ch 4
Level 3
Sch
0
18
e6
Pip
Pipe6 31400
Sch 40
Pipe12 Sch 80
W12X35 W12X35
572
W12X35 W12X35
Plate 18mm
Typical Leg Stiffner
Typ
1
W12 X35
X35 W 12
Plate 18m Typ
W24X76
W12
X35 X35 Level 2
W12
Section 3B
W24X76 W24X76
Typ
27200
3B W24X76 W24X76
500
W12X35 W12X35 1 : 25 18 18
Section 3C
W24X76
3C
Detail Leg Level 1 1 : 25
1A
1 : 25 500
22200
Typ
Typ
Level 1 W24X76 W24X76 4B
Pipe12 Sch 80
Pipe12 Sch 80
22200 21 of 24 Typ
Pipe12 Sch 80
Plate 18mm
W24 Level 1
X76
Pipe12 Sch 80
Pipe12 Sch 80
Typ Plate 18mm
X76 Typ
W12 X76 22200
W24 X35
W 24
W24 W12X35
W24X76 W24X76 X76
W12
X35
X76
W 24 4 0
Sch
Typ Pipe P ip
e6 W24X76 Typ
0
Pipe
Pipe12 Sch 80
6 Sc
ch 4
h 40
6S
6S
ch 4
Pipe
0
0
ch 4
Pipe6 Sch 40
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
W12X35
W24X76
R1 Typ Typ
R2
W12X35
W12X35 W12X35 R2 W12X35
W12X35 W12X35
1B
22 of 24
2B
R2 22 of 24
W24X76
R1-R2 Connection R1-R2 Section R1-R2 R2-R2 Connection R2-R2 Section R2-R2
1 1A 1B 2 2A 2B
1 : 25 1 : 25 1 : 25 1 : 25
W24X76
W8X15
R3 L5X5X3/8 L5X5X3/8
6 6
Typ Typ
6 W12X35 6 A1
W12X35
R3 R2 W8X15
W8X15 W8X15
L4X3X3/8
L4X3X3/8 L4X3X3/8
Pipe12 Sch 80
Pipe12 Sch 80
0 P ip
ch 4 e6
Sch
e6 S 40
P ip Pip
e6 Sch h 40
6 Sc
38.0
4 0 Pipe
215
Pipe12 Sch 80
6 6
0°
Typ Typ
6 6
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
Typ
500
466
38 424 38
Typ
1200
237.5
89
52
734
237.5
B
2
23 of 24
Typical Lifting Lug View Lifting Lug
2 3
1 : 20 1 : 20
10200
1200
6
06 R 25
63
ø1
ø4
1200
264
28
8
12560.0
Reference
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Lifting Lug S1
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
816
370 50
490 696
Typ
50
Plate 64mm
370 Plate 18mm
6 Level 1
Typ
6 22200
Plate 18mm
4x1-1/4" UNC 2B-THRU
Plate 18mm
696
Plate 18mm
Plate 18mm
W24X76
Typ
Typ
2A
24 of 24 CL
C Typ Typ
1105
Plate 18mm
50
1105
Typ Typ
6597
370
2-D
D 2.2 24 of 24
24 of 24
Section 2-C Section 2-D
2-C 2-D
2-C
1 : 20 1 : 20
24 of 24
3140 3140 3140
4x1-1/4"
UNC 2B-THRU
Plate 64mm
Reference
Typical Sole Plate
ID-F-BU-SS0-SPC-GN-00-0003_R2
P2104-VD-PROS1-HS-CAL-0002_S1
Layout Sole Plate A
Noted
1. ALL DIMENSIONS ARE IN MILLIMETERS U.N.O
2. ALL COORDINATES AND ELEVATIONS ARE IN METERS U.N.O. PROJ.TITTLE : FOREL FPSO TIME CARTER
3. MATERIAL 1 11/04/23 AFC Approved For Construction EJ ATJ AH
DISCIPLINE
Main Beam / Plate TYPE I (S355 JR / A572-GR50) STRUCTURE
0C 14/01/23 IFA Issued For Approvall EJ ATJ AH SUB-DISCIPLINE :
Coulumn & Leg TYPE I (API X52)
Secondary Beam TYPE III (A-36) 0B 15/12/22 IFC Re-Issued For Comment EJ ATJ AH DOCUMENT TYPE : GA DRAWING
MEDCO GROUP OWNER : AREA :
Deck Plate TYPE III (A-36)
STAIRS TYPE III (A-36) 0A 24/11/22 IFC Issued For Comment EJ ATJ AH PROJECT DELIVERY OFFSHORE FOREL BARONANG STRUCTURE MODULE S1 Sheet
TITTLE :
WELDING AWS D.1.1 E70XX ELECTRODE Lead ENG LEAD FOREL FPSO
Rev Date Status DESCRIPTION By Check ENG MNGR DRAWING NO (MEDCO) : Author REV
ENG. POJECT NO :
CLIENT A3 CAD DRAWING DO NOT AFTER MANUALLY CAD FILE : DRAWING NO (CONSORTIUM) : PP2104-VD-PROS1-HS-DWG-0002 1
FOREL FPSO TIME
CHARTER
6
Page, Section Status
No. Comment Response Agreed Resolution
Drawing/Doc Ref, etc O/C*
Comment from HTS
7
10
Printed initials in the approval boxes confirm that the document has been signed.
The originals are held within Information Management.
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (P1)
Revision Sheet
Table of Contents
General ......................................................................................................................................................... 4
1.1 Introduction ................................................................................................................................... 4
1.2 Objectives ......................................................................................................................................... 4
2. GENERAL AND HSE REQUIREMENTS ................................................................................................. 5
2.1 Definitions ..................................................................................................................................... 5
2.2 Abbreviations ................................................................................................................................ 5
2.3 Units .............................................................................................................................................. 6
2.4 Language ...................................................................................................................................... 6
2.5 Health, Safety and Environment ....................................................................................................... 6
3. REFFERENCES, CODES, AND STANDARDS ....................................................................................... 7
3.1 Project Specification ..................................................................................................................... 7
3.2 Abbreviations ................................................................................................................................ 7
4. EXECUTIVE SUMMARY .......................................................................................................................... 8
4.1 Global Axis System .......................................................................................................................... 8
4.2 Topside Weight Summary ............................................................................................................ 8
4.3 CoG Location for Lift Weight ......................................................................................................... 9
4.4 CoG Location for Transportation Loadout Weight ...................................................................... 10
4.5 CoG Location for Operating Weight............................................................................................ 11
4.6 CoG Location for Dry Weight ...................................................................................................... 12
5. REFERENCES ........................................................................................................................................ 13
6.DEFINITION WEIGHT ............................................................................................................................. 14
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (P1)
General
1.1 Introduction
The Forel field is an offshore oil field prospects located in Block B of Natune Sea, 24 km of Northwest
Belanak and has 300 feet water depth in average. Forel field was discoverd in 1984 by Forel-1A well
exploration drilling and followed by the Forel-2 well in 1985, while the Bronang field is a gas-producing
field located 40 km to the northwest of Belanak Field or 70 km to the Southwest from teh Hang Tah
MoGPU. Bronang field was discovered in 1993 by Bronang-1 well exploration drilling Forel field
development require gas injection source for pressure maintenance and lifting gas to the reservoir.
Gas lift source is also required to optimize Forel’s crude oil production. The requirement of gas injection
and gas lift at Forel will be supplied by Bronang field.
The design of Forel and Bronang field production facilities are dry tree concept where all production
weels will be placed on a wellhead platform (WHP) that is designed unmanned with the concept of the
Minimum Facility Platfrom (MFP) which is designed with a simple technology system but has a high
level of reliability and requires minimum intervention and maintenance.
Forel MFP will be routed to Floating Production, Storage and Offloading (FPSO) via multiphase flexible
pipeline for further processing to meet crude oil market requirement, while the gas is boosted to meet
the gas lift and gas injection pressure requirement. The Bronang production will be also routed to FPSO
via Forel WHP to supply gas injection at initial production phase and fuel gas throughout Forel
production lifetime.
1.2 Objectives
The objective this report is to provide a Weight Report in monitoring weight and centre of
gravity during Engineering, Procurement, Construction, Installation and Commissioning
(EPCIC), covers only for Meliwis WHP Topside Structure. Weights are split into base weight
and factored weights that contain allowance, which shall be applied accordingly to the status
of the information of the item. Factored weights are expected to change according to design
status throughout the engineering phase and form the basis for all the structural design and
installations related operation.
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (P1)
2.2 Abbreviations
AISC American Institute of Structural Construction
API American Petroleum Institute
AWS American Welding Society
BS British Standards
DnV Det Norske Veritas
EPCI Engineering Procurement Construction and Installation
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (P1)
2.3 Units
The international system of units (SI) shall be used in all documentations.
2.4 Language
All documentation and correspondence shall be in English language
3.2 Abbreviations
Structural material shall be manufactured in accordance with the latest edition of the following Codes
and Standards:
2
Edition/Rev/
No. Doc. No Description
Year
1 API RP 2A – Recommended Practice for Planning, Designing, and 2007
WSD Constructing Fixed Offshore Platform – Working Stress
Design.
2 DNV RP B401 Recommended Practice for Cathodic Protection Design 2010
3 NACE SP0176 Standart Practice Corrosion Control of Submerged Areas 2007
of Permanently Installed Steel Offshore Structures
Associated with Petroleum Production
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (P1)
4. EXECUTIVE SUMMARY
4.1 Global Axis System
All centres of gravity calculations are computed in relation to a set of global co-ordinates for
each part of module platform. All discipline component centres of gravity co-ordinates are
to be input assuming the Platform Datum Reference [meter], as illustrated below:
The coordinate system for gas compression module at Leg D1 with elevation level + 22.20
- X positive defines at row D1 towards to row D9
- Y Positive defines at row D1 towards to row A1
- Z Positive defines vertical up Upper Deck
5. REFERENCES
6.DEFINITION WEIGHT
Table 6.1 Definitions
Terms Meanings
Base Weight is calculated take-off from SACS model, CAD drawings, PDMS
weight/Calculated and disciplinary inputs, estimates from other project and excludes any
Weight contingency.
Dry Weight Weight of a component or assembly in their dry installed condition.
Operating Weight Dry weight plus contents weight if there is any during operating
conditions.
Allowance A quantitative estimate expressed as a percentage of a Weight Item’s
Base Weight
Equipment Item A piece of tagged equipment in the Master Equipment List (MEL), Safety
Equipment List (SEL), Instrument Index, Electrical Equipment List, Bulk
Equipment List (BEL),etc.
Ship Loose Items/ Weight of a component or assembly which will be installed offshore.
Offshore Installed
Items
Future Item An uninstalled tagged or bulk item identified on the P&IDs or layouts
for future.
Factored Weight The Base Weight factored to Contingency (include ESC & Allowance)
Transportation/ Factored weight for all items above skid beam or trailer load distribution
Loadout Weight grillages as module crosses over fabrication yard wharf.
FOREL FPSO TIME
CHARTER
6
Page, Section Status
No. Comment Response Agreed Resolution
Drawing/Doc Ref, etc O/C*
Comment from HTS
7
10
Printed initials in the approval boxes confirm that the document has been signed.
The originals are held within Information Management.
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (S1)
Revision Sheet
Table of Contents
General ......................................................................................................................................................... 4
1.1 Introduction ................................................................................................................................... 4
1.2 Objectives ......................................................................................................................................... 4
2. GENERAL AND HSE REQUIREMENTS ................................................................................................. 5
2.1 Definitions ..................................................................................................................................... 5
2.2 Abbreviations ................................................................................................................................ 5
2.3 Units .............................................................................................................................................. 6
2.4 Language ...................................................................................................................................... 6
2.5 Health, Safety and Environment ....................................................................................................... 6
3. REFFERENCES, CODES, AND STANDARDS ....................................................................................... 7
3.1 Project Specification ..................................................................................................................... 7
3.2 Abbreviations ................................................................................................................................ 7
4. EXECUTIVE SUMMARY .......................................................................................................................... 8
4.1 Global Axis System .......................................................................................................................... 8
4.2 Topside Weight Summary ............................................................................................................ 9
4.3 CoG Location for Lift Weight ......................................................................................................... 9
4.4 CoG Location for Transportation Loadout Weight ...................................................................... 10
4.5 CoG Location for Operating Weight............................................................................................ 11
4.6 CoG Location for Dry Weight ...................................................................................................... 12
5. REFERENCES ........................................................................................................................................ 13
6.DEFINITION WEIGHT ............................................................................................................................. 14
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (S1)
General
1.1 Introduction
The Forel field is an offshore oil field prospects located in Block B of Natune Sea, 24 km of Northwest
Belanak and has 300 feet water depth in average. Forel field was discoverd in 1984 by Forel-1A well
exploration drilling and followed by the Forel-2 well in 1985, while the Bronang field is a gas-producing
field located 40 km to the northwest of Belanak Field or 70 km to the Southwest from teh Hang Tah
MoGPU. Bronang field was discovered in 1993 by Bronang-1 well exploration drilling Forel field
development require gas injection source for pressure maintenance and lifting gas to the reservoir.
Gas lift source is also required to optimize Forel’s crude oil production. The requirement of gas injection
and gas lift at Forel will be supplied by Bronang field.
The design of Forel and Bronang field production facilities are dry tree concept where all production
weels will be placed on a wellhead platform (WHP) that is designed unmanned with the concept of the
Minimum Facility Platfrom (MFP) which is designed with a simple technology system but has a high
level of reliability and requires minimum intervention and maintenance.
Forel MFP will be routed to Floating Production, Storage and Offloading (FPSO) via multiphase flexible
pipeline for further processing to meet crude oil market requirement, while the gas is boosted to meet
the gas lift and gas injection pressure requirement. The Bronang production will be also routed to FPSO
via Forel WHP to supply gas injection at initial production phase and fuel gas throughout Forel
production lifetime.
1.2 Objectives
The objective this report is to provide a Weight Report in monitoring weight and centre of
gravity during Engineering, Procurement, Construction, Installation and Commissioning
(EPCIC), covers only for Meliwis WHP Topside Structure. Weights are split into base weight
and factored weights that contain allowance, which shall be applied accordingly to the status
of the information of the item. Factored weights are expected to change according to design
status throughout the engineering phase and form the basis for all the structural design and
installations related operation.
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (S1)
2.2 Abbreviations
AISC American Institute of Structural Construction
API American Petroleum Institute
AWS American Welding Society
BS British Standards
DnV Det Norske Veritas
EPCI Engineering Procurement Construction and Installation
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (S1)
2.3 Units
The international system of units (SI) shall be used in all documentations.
2.4 Language
All documentation and correspondence shall be in English language
3.2 Abbreviations
Structural material shall be manufactured in accordance with the latest edition of the following Codes
and Standards:
2
Edition/Rev/
No. Doc. No Description
Year
1 API RP 2A – Recommended Practice for Planning, Designing, and 2007
WSD Constructing Fixed Offshore Platform – Working Stress
Design.
2 DNV RP B401 Recommended Practice for Cathodic Protection Design 2010
3 NACE SP0176 Standart Practice Corrosion Control of Submerged Areas 2007
of Permanently Installed Steel Offshore Structures
Associated with Petroleum Production
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (S1)
4. EXECUTIVE SUMMARY
4.1 Global Axis System
All centres of gravity calculations are computed in relation to a set of global co-ordinates for
each part of module platform. All discipline component centres of gravity co-ordinates are
to be input assuming the Platform Datum Reference [meter], as illustrated below:
The coordinate system for gas compression module at Leg D1 with elevation level + 22.20
- X positive defines at row B1 towards to row B9
- Y Positive defines at row B1 towards to row A1
- Z Positive defines vertical up Upper Deck
Design Report ID-F-FT-SS0-DRT-FP-95-XXXX
WEIGHT CONTROL REPORT AND CENTER OF
GRAVITY GAS COMPRESION MODULE (S1)
5. REFERENCES
6.DEFINITION WEIGHT
Table 6.1 Definitions
Terms Meanings
Base Weight is calculated take-off from SACS model, CAD drawings, PDMS
weight/Calculated and disciplinary inputs, estimates from other project and excludes any
Weight contingency.
Dry Weight Weight of a component or assembly in their dry installed condition.
Operating Weight Dry weight plus contents weight if there is any during operating
conditions.
Allowance A quantitative estimate expressed as a percentage of a Weight Item’s
Base Weight
Equipment Item A piece of tagged equipment in the Master Equipment List (MEL), Safety
Equipment List (SEL), Instrument Index, Electrical Equipment List, Bulk
Equipment List (BEL),etc.
Ship Loose Items/ Weight of a component or assembly which will be installed offshore.
Offshore Installed
Items
Future Item An uninstalled tagged or bulk item identified on the P&IDs or layouts
for future.
Factored Weight The Base Weight factored to Contingency (include ESC & Allowance)
Transportation/ Factored weight for all items above skid beam or trailer load distribution
Loadout Weight grillages as module crosses over fabrication yard wharf.
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 24
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
PORT STBD
PROFILE VIEW
MIDSHIP SECTION
DECK PLAN
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 25
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
DECK STRINGER PLATE WITH MINIMUM WIDTH 1284 MM TO BE 22 MM (D)
0 1
-20
AR
0-M
d1 te
Da
98
608
ef 5
BILGE PLATE 20 MM (B)
rR
ette
aL
ham
oko
SY
AB e
Se
1 & 2 Only
0 1
-20
AR
0-M
d1 te
Da
98
608
ef 5
rR
ette
aL
ham
BKTS TO BE PROVIDED
FOR PILLAR (11.71M OFF CL) IN L650X150X14 ? TO BE CONSISTENT WITH SHEET 1/2
WBT AT EACH FRAME
TYPICAL
oko
HORI. GIRDER TO BE
INDICATED FOR EACH BHD
L600X150X12 ? SY
TO BE CONSISTENT WITH SHEET 1/2
AB e
Se
HORI. GIRDER TO BE
INDICATED FOR EACH BHD
WEB STIFF TO BE PROVIDED
AT EACH BOTTOM LONGL
DECK STRINGER PLATE 22 (D)
BILGE PLATE 20 (B)
WITHIN 0.4L AMIDSHIPS
SEE COMMENT ON DWG NO.
TO BE ADJUSTED WITH HH702-021-04
PILLAR'S FLANGE
BKT 600X16 W/
70 FLG
P. SIDE ONLY
L 200X2000X15 OR
L200X200X15 EQUIVALENTS
0 1 TYPICAL
L200X200X15
H PILLAR -20 L200X200X15 H 300X300X10/15
PILLAR OR
300X300X10/15
AR EQUIVALENTS
0-M
BKTS TO BE PROVIDED
IN WBT
d1
TO BE ADJUSTED WITH
PILLAR'S FLANGE
te
Da
GIRDERS' LOCATION TO
BE CONSISTENT
98
608
ef 5
rR
ette
aL
ham
oko
SY
AB e
BKT TO BE PROVIDED
Se
COLLAR PLATE
TO BE PROVIDED
03
0 1
-20
AR
0-M
d1 te
Da L200X200X20
OR EQUIVALENTS
98
608
ef 5
rR
ette
aL
ham
oko
SY
TO BE ADJUSTED WITH
PILLAR'S FLANGE
L200X200X24
OR EQUIVALENTS
AB e
Se
H300X300X10/15
L 200X200X20 H PILLAR 300X300X10/15
OR EQUIVALENTS OR EQUIVALENTS
TYPICAL
TO BE ADJUSTED WITH
PILLAR'S FLANGE
THE PENETRATED BOTTOM LONGLS,
SLOTS, COLLAR PLATES & WEB STIFFS
TO BE INDICATED
0 1
-20
AR L200X200X15
OR EQUIVALENTS
TYPICAL
0-M
d1 te
Da
98
608
ef 5
rR
ette
aL
ham
oko
SY
TO BE ADJUSTED WITH
PILLAR'S FLANGE
L200X200X15
OR EQUIVALENTS
TYPICAL
AB e
Se
L200X200X15
L200X200X15
H300X300X10/15
H PILLAR 300X300X10/15
OR EQUIVALENTS
TO BE ADJUSTED WITH
PILLAR'S FLANGE
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 26
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
BOW SECTION
MIDDLE SECTION
STERN SECTION
MTc
4 Immersion (TPc)
Draft m
KML
3
KMt
LCF
1
Displacement
0
0 3000 6000 9000 12000 15000 18000 21000 24000
Displacement t
-4 0 4 8 12 16 20 24 28
Long. centre from zero pt. (+ve fw d) m
0 100 200 300 400 500 600 700 800
KM trans. m
0 1000 2000 3000 4000 5000 6000 7000 8000
KM long. m
0 5 10 15 20 25 30 35 40
Immersion tonne/cm
30 60 90 120 150 180 210 240 270
Moment to trim tonne.m
6
4
Draft m
3
Block coeff. (Cb)
0
0.84 0.85 0.86 0.87 0.88 0.89 0.9 0.91 0.92 0.93
Coefficient
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 27
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
SECTIONAL DETAILS :
GRADE 35 CONCRETE
VOLUME = 0.17 m
SIDE VIEW FRONT VIEW DENSITY OF CONCRETE = 2400 kg/m
QUANTITY = 1 NO
COMPRESSIVE STRENGTH
SELF WEIGHT = 0.41 T
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 28
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
SUPPORT STOOL
STRUCTURAL STRENGTH ANALYSIS
(BSL- EU03002-C-03-SA)
CONTENTS
1. INTRODUCTION 4
2. DESIGN CODES AND STANDARDS 5
2.1 ANSI/AISC 360-05, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION,
ALLOWABLE STRESS DESIGN 5
2.2 DESIGN OF STRUCTURAL ELEMENTS CONCRETE, STEELWORKS MASONRY AND TIMBER DESIGNS TO BRITISH STANDARDS AND EURO
CODES 5
3. DESIGN PARAMETERS 6
3.1 LOADING FORCES 6
3.1.1 VERTICAL FORCE 6
4. SOFTWARE 8
4.1 SOFTWARE DESCRIPTION 8
5. MATERIAL YIELD STRENGTH & ALLOWABLE STRESSES 9
5.1 MATERIAL YIELD STRENGTH 9
5.1.1 GENERAL 9
5.1.2 PIPES 10
5.2 ALLOWABLE STRESSES 10
5.2.1 STRUCTURE – GRADE 275 10
6. CEMENT PROPERTIES 11
6.1 COMPRESSIVE STRENGTH TABLE 11
7. FEM ANALYSIS INPUT 12
7.1 FEM MODEL 12
7.1.1 SUPPORT STOOL STRUCTURE 12
7.2 BOUNDARY CONDITION 12
7.2.1 SUPPORT STOOL STRUCTURE 12
7.3 LOAD CASE 13
7.3.1 LOADS ON WHOLE SURFACE 13
7.3.2 BEAM 300 X1000 AT THE CENTRE TRANSVERSE 14
7.3.3 LOAD AT THE SIDE (1000 X 300) 15
7.3.4 BEAM 2000 X 300 AT CENTRE LONGITUDINAL 16
7.3.5 LOAD AT CONCRETE (428.8 X 653.6) 17
7.3.6 LOAD AT THE CENTRE (775.2 X 1000) 18
7.3.7 BEAM 1000 X 1000 AT THE CENTRE TRANSVERSE 19
7.3.8 BEAM 1000 X 500 AT THE CENTRE TRANSVERSE 20
8. FEM ANALYSIS RESULTS 21
8.1 PLATES 21
8.1.1 LOADS ON WHOLE SURFACE 21
8.1.2 BEAM 300 X1000 AT THE CENTRE TRANSVERSE 22
8.1.3 LOAD AT THE SIDE (1000 X 300) 23
8.1.4 BEAM 2000 X 300 AT CENTRE LONGITUDINAL 24
8.1.5 LOAD AT CONCRETE (428.8 X 653.6) 25
8.1.6 LOAD AT THE CENTRE (775.2 X 1000) 26
8.1.7 BEAM 1000 X 1000 AT THE CENTRE TRANSVERSE 27
8.1.8 BEAM 1000 X 500 AT THE CENTRE TRANSVERSE 28
8.2 SOLIDS 29
8.2.1 LOADS ON WHOLE SURFACE 29
8.2.2 BEAM 300 X1000 AT THE CENTRE TRANSVERSE 30
8.2.3 LOAD AT THE SIDE 31
8.2.4 BEAM 2000 X 300 AT CENTRE LONGITUDINAL 32
8.2.5 LOAD AT CONCRETE 33
P a g e |2
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e |3
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
1. Introduction
Purpose of this document is to indicate results for the structural strength analysis of the structure
to be used as a support stool, to be reviewed and endorsed by Professional Engineer prior to
fabrication and operation.
This report summarises results for the analysis of the structure and verify that the structural
capacity is adequate to withstand the designed forces due to loading operation. Loading forces are
applied based on weight of the cargo plus 1.6 times safety factor.
P a g e |4
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
The structural analysis is performed using the following codes and standards as applicable:
2.1 ANSI/AISC 360-05, Specification for Structural Steel Buildings, American Institute of
Steel Construction, Allowable Stress Design
2.2 Design of Structural Elements Concrete, steelworks masonry and timber designs to
British Standards and Euro codes
P a g e |5
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
3. Design Parameters
The design of the support structure has taken into account safety factor of 1.6 for vertical
force. Loading forces are summarised as follows:
P a g e |6
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
(a) Load on whole surface (b) Beam (300 x 1000) at centre transverse
c) Load at the side (300 x1000) (d) Beam (2000 x 300) at centre longitudinal)
(e) Load on concrete (428.8 x 653.6) (f) Load at the centre (775.2 x 1000)
(g) Beam (1000 x 1000) at centre transverse (h) Beam (1000 x 500) at centre transverse
P a g e |7
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
4. Software
STAAD.Pro V8i is being used for the structural analysis to determine the structure designed
has adequate capacity.
STAAD.Pro V8i is a comprehensive and integrated finite element analysis and design
offering, including a state-of-the-art user interface, visualization tools, and international
design codes. It is capable of analyzing any structure exposed to static loading, a dynamic
response, soil-structure interaction, wind, earthquake, and moving loads. STAAD.Pro V8i is
FEM analysis and design tool for any type of project including towers, culverts, plants,
bridges, stadiums, and marine structures.
The software supports modelling of truss and beam members, plates, solids, linear and non-
linear cables and curvilinear beams. Loading of the models could then be carried out by
applying applicable forces.
STAAD.Pro V8i performs code checking and supports a wide range of international
recognized design codes. In this analysis the structural members are analysed and checked
agains design code AISC-ASD.
For plate members, the analysis is completed using the von Mises Criterion to assess the
structure against failure. The von Mises stress is used to predict yielding of materials under
any loading condition. In this case, a material is said to start yielding when its von Mises
stress reaches a critical value known as the yield strength. This criterion takes both shear
and normal stresses into account to develop a combined equivalent stress. According to the
von Mises Criterion, the structure will not fail as long as the combined equivalent stress is
less than the yield strength of the material. Applicable safety factor in accordance to
AISC-ASD is included in the analysis.
P a g e |8
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
5.1.1 General
P a g e |9
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
5.1.2 Pipes
All structure is conservatively assumed to be mild steel with minimum yield strength
of 275N/mm2. The allowable stress of the material is factored with the applicable
safety factor in accordance to the values specified by AISC – ASD design codes as
follows:
P a g e | 10
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
6. Cement Properties
P a g e | 11
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
The whole structure and members are generated into STAAD Pro FEM Model by plate and
solid modeling method.
The structure will be erected simply supported on the ground without side restraints
except for frictional resistance. The boundary conditions are assumed as pin
supports.
P a g e | 12
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Eight load cases have been considered for the analysis of each of Support Stool.
P a g e | 13
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 14
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 15
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 16
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 17
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 18
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 19
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 20
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
8.1 Plates
Max Von Mis as per analysis for the ramp structure is 242.878 N/mm2.
P a g e | 21
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 238.281 N/mm2.
P a g e | 22
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 244.905 N/mm2.
P a g e | 23
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 237.567 N/mm2.
P a g e | 24
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 119.333 N/mm2.
P a g e | 25
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 244.384 N/mm2.
P a g e | 26
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 247.501 N/mm2.
P a g e | 27
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Max Von Mis as per analysis for the ramp structure is 240.311N/mm2.
P a g e | 28
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
8.2 Solids
Sige/Von Mises as per analysis for the ramp structure is 11.3901 N/mm2.
P a g e | 29
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 11.4821 N/mm2.
P a g e | 30
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 11.3393 N/mm2.
P a g e | 31
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 10.1492 N/mm2.
P a g e | 32
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 30.07 N/mm2.
P a g e | 33
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 11.483 N/mm2.
P a g e | 34
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 11.2737 N/mm2.
P a g e | 35
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
Sige/Von Mises as per analysis for the ramp structure is 10.9081 N/mm2.
P a g e | 36
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
P a g e | 37
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
9. Conclusion
Based on the above analysis and calculations, the Support Stool Structure maximum stresses
in each surface are within the allowable stress of 247.5 N/mm2 for plates and 31.5 N/mm2
for solids to withstand the design load in accordance to the relevant design code.
In conclusion, the structure is safe for use based on the above-mentioned input.
P a g e | 38
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EU03001-C-03-SS
Project : Multi Usage Rev. : 01
st
: Structural Strength Analysis for Support Date : 21 Nov 2017
Title
Stools
10. Appendix
P a g e | 39
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
SECTIONAL DETAILS :
GRADE 35 CONCRETE
VOLUME = 0.17 m
SIDE VIEW FRONT VIEW DENSITY OF CONCRETE = 2400 kg/m
QUANTITY = 1 NO
COMPRESSIVE STRENGTH
SELF WEIGHT = 0.41 T
P a g e | 40
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 1 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Job Information
Engineer Checked Approved
Name:
Date: 24-Mar-12
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 1 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 568 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Plate Thickness
Prop Node A Node B Node C Node D Material
(cm) (cm) (cm) (cm)
1 1.570 1.570 1.570 1.570 STEEL
2 1.570 1.570 1.570 1.570 STEEL
3 0.910 0.910 0.910 0.910 STEEL
4 0.910 0.910 0.910 0.910 STEEL
5 0.910 0.910 0.910 0.910 STEEL
6 0.910 0.910 0.910 0.910 STEEL
7 3.140 3.140 3.140 3.140 STEEL
8 3.140 3.140 3.140 3.140 STEEL
9 3.140 3.140 3.140 3.140 STEEL
10 3.140 3.140 3.140 3.140 STEEL
11 1.570 1.570 1.570 1.570 CONCRETE
12 1.570 1.570 1.570 1.570 STEEL
13 3.140 3.140 3.140 3.140 CONCRETE
Materials
Mat Name E ν Density α
(kN/mm2) (kg/m3) (/°C)
1 STEEL 205.000 0.300 7.83E+3 12E -6
2 STAINLESSSTEEL 197.930 0.300 7.83E+3 18E -6
3 ALUMINUM 68.948 0.330 2.71E+3 23E -6
4 CONCRETE 21.718 0.170 2.4E+3 10E -6
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 568 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 585 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Load Generators
There is no data of this type.
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 585 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 586 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 586 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 587 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 587 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 588 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 588 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 589 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 589 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 590 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 590 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 591 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 591 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 592 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 592 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 593 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 593 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 594 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 594 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 595 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 595 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 596 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 596 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 597 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 597 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 598 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 598 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 599 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 599 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 600 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 600 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 601 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 601 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 602 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 602 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 603 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 603 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 604 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 604 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 605 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 605 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 606 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 606 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 607 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 607 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 608 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 608 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 609 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 609 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 610 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 610 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 611 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 611 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 612 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 612 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 613 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 613 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 614 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 614 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 615 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 615 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 616 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 616 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 617 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 617 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 618 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 618 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 619 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 619 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 620 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 620 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 621 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 621 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 622 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 622 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 623 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 623 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 624 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 624 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 625 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 625 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 626 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 626 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 627 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 627 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 628 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 628 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 629 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 629 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 630 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 630 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 631 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Y -1.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 631 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 632 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 632 of 634
Job No Sheet No Rev
BSL-PJ11024-C-02-SA 633 00
Part
Software licensed to
Job Title SUPPORT STOOL Ref
By Date24-Mar-12 Chd
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kNm) (kNm) (kNm)
Max FX 13781 5:LOAD CASE 5 (LOAD ON CONCRETE)
8.501 23.597 0.000 0.000 0.000 0.000
Min FX 14066 5:LOAD CASE 5 (LOAD ON CONCRETE)
-8.543 23.662 0.000 0.000 0.000 0.000
Max FY 14026 5:LOAD CASE 5 (LOAD
-4.887
ON CONCRETE)
77.802 2.886 0.000 0.000 0.000
Min FY 13719 8:LOAD CASE 8 ( BEAM
-0.158
1000X500 AT THE CENTRE
-3.153 -0.388 TRANSVERSE)
0.000 0.000 0.000
Max FZ 13990 5:LOAD CASE 5 (LOAD
-3.347
ON CONCRETE)
51.072 13.912 0.000 0.000 0.000
Min FZ 16021 5:LOAD CASE 5 (LOAD4.762
ON CONCRETE)
54.494 -14.050 0.000 0.000 0.000
Max MX 13707 1:LOAD CASE 1 (LOAD
-0.002
ON WHOLE
-0.053
SURFACE)0.001 0.000 0.000 0.000
Min MX 13707 1:LOAD CASE 1 (LOAD
-0.002
ON WHOLE
-0.053
SURFACE)0.001 0.000 0.000 0.000
Max MY 13707 1:LOAD CASE 1 (LOAD
-0.002
ON WHOLE
-0.053
SURFACE)0.001 0.000 0.000 0.000
Min MY 13707 1:LOAD CASE 1 (LOAD
-0.002
ON WHOLE
-0.053
SURFACE)0.001 0.000 0.000 0.000
Max MZ 13707 1:LOAD CASE 1 (LOAD
-0.002
ON WHOLE
-0.053
SURFACE)0.001 0.000 0.000 0.000
Min MZ 13707 1:LOAD CASE 1 (LOAD
-0.002
ON WHOLE
-0.053
SURFACE)0.001 0.000 0.000 0.000
Print Time/Date: 29/10/2012 16:31 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 633 of 634
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 29
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
12050
323
323 (H)
PLAN VIEW
VIEW - A
DETAIL- B
2000 2000 2000 2000 2000 2000
SECTION DETAILS :
BEAM UC 305 x 305 x 143 Kg/m
DEPTH 322.80mm
BREADTH 308.90mm
1544.5
FLANGE THICKNESS 22.86mm
WEB THICKNESS 13.97mm
280
ROOT RADIUS 15.20mm
70 QUANTITY 5 Nos
YIELD STRENGTH
PLAN VIEW
SELF WEIGHT 9.21 T
165
140
400
295
152.4
R50
25
ISOMETRIC VIEW
DETAIL - A DETAIL - B
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 30
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
CONTENTS
1.0 INTRODUCTION 3
2.0 DESIGN CODES AND STANDARDS 4
2.1 ANSI/AISC 360-05, SPECIFICATION FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION, LOAD
RESISTANCE FACTOR DESIGN 4
3.0 DESIGN PARAMETERS 5
3.1 MAXIMUM AXLES PER RAMP 5
3.1.1 SPMT 5
3.1.2 MULTI-AXLES TRAILER 6
3.2 LOAD CALCULATIONS 7
3.2.1 VERTICAL FORCES 7
3.2.2 HORIZONTAL FORCES 7
3.2.2.1 LONGITUDINAL LOAD 7
3.2.2.2 TRANSVERSE LOAD 8
4.0 SOFTWARE 9
4.1 SOFTWARE DESCRIPTION 9
5.0 MATERIAL YIELD STRENGTH & ALLOWABLE STRESSES 10
5.1 MATERIAL YIELD STRENGTH 10
5.1.1 GENERAL 10
5.2 YIELD STRESSES 11
6.0 FEM ANALYSIS INPUT 12
6.1 12M RO – RO RAMPS 12
6.2 BOUNDARY CONDITION 14
6.3 LOAD CASE 15
7.0 FEM ANALYSIS RESULTS 16
7.1 WHOLE STRUCTURE ANALYSIS 16
7.2 PIN STRENGTH CALCULATION 17
7.2.1 DESIGN PARAMETERS 17
7.2.1.1 BARGE SPECIFICATION 17
7.2.1.2 CARGO SPECIFICATION 17
7.2.1.3 ENVIRONMENTAL CRITERIA 17
7.2.1.3.1 WIND 17
7.2.1.3.2 CURRENT 17
7.2.1.3.3 WAVE HEIGHT 17
7.2.2 STRENGTH CHECK OF PINS 19
8.0 CONCLUSION 20
9.0 APPENDIX 21
9.1 12M X 1.54M HEAVY DUTY RO – RO RAMP GENERAL ARRANGEMENT DRAWING 21
9.2 12M X 1.54M HEAVY DUTY RO – RO RAMP FABRICATION DRAWING 22
9.3 SPMT GA DRAWING 23
9.4 MULTI-AXLES TRAILER GA DRAWING / CATALOGUE 24
9.5 STAAD PRO RESULTS 25
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |2
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
1.0 Introduction
Ro-Ro Ramps are used for roll on and roll off operations as a connection between the wharf and
barge. Three sets of 12m x 1.54m ramps are used in this analysis. One ramp is composed of 5 I-
beams on each set. Purpose of this document is to indicate results for 12m ramps structural
analysis to withstand the design forces.
This report summarises results for the analysis of the 12m ro-ro ramps and verifies that the
structural capacity is adequate to withstand the design laden trailer forces. The 3 sets of 12m ramps
are designed for 2.43m wide SPMT or 3m wide multi-axles with 1.6 times safety factor.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |3
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
The structural analysis is performed using the following codes and standards as applicable:
2.1 ANSI/AISC 360-05, Specification for Structural Steel Buildings, American Institute
of Steel Construction, Load Resistance Factor Design
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |4
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
3.1.1 SPMT
In the transverse direction each axle line of width 2.43m will be rolling on 3 sets of
ramps.
While in the longitudinal direction there will be maximum 9 axle lines resting on the
ramp at any one time with distance between axle lines of 1.4m.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |5
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
In the transverse direction each axle line of width 3.0m will be rolling on 3 sets of
ramps.
While in the longitudinal direction there will be maximum 8 axle lines resting on the
ramp at any one time with distance between axle lines of 1.51m.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |6
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
SPMT trailers, with maximum allowable load of 34T/ axle line on 12m ramp is greater
than that of multi-axle trailers like cometto with 28T / axle line. Trailer with
maximum capacity (SPMT trailer), is used in this analysis.
The design of the 12m ramps has conservatively assumed a load of 34T/axle line as
the vertical load, 10% for longitudinal sliding force and 5% for transverse sliding
force during transportation.
One axle line will pass through 3 sets of 12m ro-ro ramps. The forces are calculated
as follows:
= 1075.94 kN/m2
= 107.59 kN/m2
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |7
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
= 53.80 kN/m2
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |8
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
4.0 Software
STAAD.Pro V8i is being used for the structural analysis to determine the structure designed
has adequate capacity.
STAAD.Pro V8i is a comprehensive and integrated finite element analysis and design
offering, including a state-of-the-art user interface, visualization tools, and international
design codes. It is capable of analyzing any structure exposed to static loading, a dynamic
response, soil-structure interaction, wind, earthquake, and moving loads. STAAD.Pro V8i is
FEM analysis and design tool for any type of project including towers, culverts, plants,
bridges, stadiums, and marine structures.
The software supports modelling of truss and beam members, plates, solids, linear and non-
linear cables and curvilinear beams. Loading of the models could then be carried out by
applying applicable forces.
STAAD.Pro V8i performs code checking and supports a wide range of international
recognized design codes.
For plate members, the analysis is completed using the von Mises Criterion to assess the
structure against failure. The von Mises stress is used to predict yielding of materials under
any loading condition. In this case, a material is said to start yielding when its von Mises
stress reaches a critical value known as the yield strength. This criterion takes both shear
and normal stresses into account to develop a combined equivalent stress. According to the
von Mises Criterion, the structure will not fail as long as the combined equivalent stress is
less than the yield strength of the material.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e |9
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 10
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
Material of heavy duty ro-ro ramp is high tensile with minimum yield strength of
355N/mm2.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 11
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
The structure is made up of 15 units of UC 305 x 305 x 143kg/m beams. The whole structure
is generated into STAAD Pro FEM Model by plate modeling method. The following members
are input into the FEM model:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 12
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 13
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
The ramp with one end resting on the external ramp hinge is resisting horizontal forces as
well as compression in vertical direction. Thus, they are assigned as pinned supports.
The other end of the ramp, resting on the ground, is resisting compression force only. Thus,
boundary conditions are assigned as spring support. Frictional forces due to weight of ramp
and vertical forces are conservatively omitted in this analysis.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 14
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
Using SPMT trailers, maximum of 9 axle lines, 1.4m spaced, are in contact with the ramp.
With multi-axle trailers like Cometto (1.51m spaced axle lines) and K25 (1.50m spaced axle
lines), maximum of 8 axle lines are in contact with the ground.
Worst case is used in this analysis using the maximum no. of axle lines (using SPMT trailers).
Maximum vertical loads are keyed in, in contact with 9 axle lines. Longitudinal sliding force
and transverse sliding force have been considered during transportation.
Aside from these external forces, self weight of the beams has been considered.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 15
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 16
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
The 65mm diameter pins on the ramp, in contact with the external ramp hinge, are resisting
environmental forces in longitudinal direction. Maximum longitudinal force of 455.9kN with
1.6 safety factor is used to check the capacity of the pin. Below parameters are considered.
The following inputs are considered to calculate the maximum value of environmental
forces on longitudinal direction.
BS 27 is the largest barge of Bok Seng up to date and is being considered in this calculation.
Barge details are as follows.
Dimensions of the cargo considered are the maximum possible values. This will result to
maximum values of wind force.
Dimensions (m)
Cargo Qty
L W H
Cargo 1 1 98.0 45.0 20.0
7.2.1.3.1 Wind
7.2.1.3.2 Current
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 17
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
The design parameters above are used to calculate the current, wave and wind forces in
longitudinal direction.
GENERAL
INFORMATION
Barge Waterline Length 100.80 m
Barge Waterline Beam 30.50 m
Barge Depth 5.50 m
Draft of Barge 0.95 m
ENVIRONMENTAL
CRITERIA
Wind Speed, Vw 29.18 knots
(1 min. mean velocity at
10m above sea level) 15.00 m/s
Current Speed, Vc 0.50 m/s
Significant Wave Height, Hs 5.00 m
IN LONGITUDINAL DIRECTION
CURRENT FORCE
Mass Density of Water 1.025 t/m3
Shape Coefficient of Barge,
Cs 1.0
Projected Area to Current
Direction, Af 29.0 m2
Current force, Fc 3.7 kN
WAVE FORCE
Wave force, Fw 298.2 kN
WIND FORCE
Mass Density of Air 1.228 t/m3
Length Cs Wind
Description (Longi.) Breadth (Trans.) Height (Front) force (kN)
Barge 100.8 30.5 4.6 1.0 17.4
Cargo 98.0 45.0 20.0 1.0 136.5
Total 154.0
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 18
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 19
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
8.0 Conclusion
Based on the above analysis, the ramp’s maximum stresses of 215 MPa are within the
allowable stress of 319.5 MPa to withstand the design load in accordance to the relevant
design code. Pin strength of ramp is also sufficient to withstand maximum longitudinal
forces.
In conclusion, the structure is safe for use based on the above-mentioned input.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 20
Client : Bok Seng Logistics Pte Ltd Doc. No. : BSL-EM02001-C-04-RC
Project : Marine Rev. : 02
: 3 Sets of 12m X 1.54m Heavy Duty Ro-Ro Date : 08th January 2020
Title
Ramps Structural Strength Analysis
9.0 Appendix
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 21
12050
323
323 (H)
PLAN VIEW
VIEW - A
DETAIL- B
2000 2000 2000 2000 2000 2000
SECTION DETAILS :
BEAM UC 305 x 305 x 143 Kg/m
DEPTH 322.80mm
BREADTH 308.90mm
1544.5
FLANGE THICKNESS 22.86mm
WEB THICKNESS 13.97mm
280
ROOT RADIUS 15.20mm
70 QUANTITY 5 Nos
YIELD STRENGTH
PLAN VIEW
SELF WEIGHT 9.21 T
165
140
400
295
152.4
R50
25
ISOMETRIC VIEW
DETAIL - A DETAIL - B
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 22
2
1
3
2 1
4
5
1
5 9
4 4
10
2
8
6
7
4
6 ISOMETRIC VIEW
50
1545
309
323
SIDE VIEW SECTION A
A
DETAIL - D
PLAN VIEW
12
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 23
5330
1100
2430 2430 470 2430
1450 1450
670 3 X 1400 = 4200
2640 4 X 1400 = 5600
350 *
350 *
2840
1500
1500
870
870
620 830 620 620 830 620
2340
2640
4 AXLE - LINES 3 AXLE - LINES
Z150 DE POWER PACK (PPU) ONE AXLE LINE
1100
670 1400
6 x 1400 = 8400
4200
2310
SPECIFICATION Z350 DA POWER PACK Z150 DE POWER PACK PER AXLE LINE
DEAD WEIGHT (mt) 7.2 4.0 4
PAYLOAD (mt) - - 36
PERMISSIBLE TOTAL WEIGHT (mt) - - 40
TOTAL NO. OF PENDULUM AXLES 80 40 -
NO. OF PENDULUM AXLES WITH DRIVE 26 16 -
POWER [KW/rpm] 350/1800 147/2.400 -
HYDRAULIC TANK - VOLUME [L] 800 420 - 28/02/18 01 ISSUED FOR PRELIMINARY REVIEW SA VR VR
HYDRAULIC TANK - AVAILABLE VOLUME [L] 520 250 - 21/12/15 00 ISSUED FOR PRELIMINARY REVIEW SA VR VR
FUEL TANK - AVAILABLE VOLUME [L] 400 170 - DATE REV DESCRIPTION DRAWN CHECKED APPROVED
FRONT - WHEEL REAR - WHEEL ISOMETRIC VIEW
STEERING STEERING Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3.
BS Logistics Hub. Singapore 639405.
T : + 65 6416 1999 F : + 65 6862 0507
www.bokseng-ipl.com
CLIENT:
BOK SENG LOGISTICS PTE LTD
PROJECT:
HEAVY HAULAGE
TITLE:
SCHEUERLE SPMT GENERAL ARRANGEMENT DRAWING
DRAWING NO: SHEET NO SCALE SIZE
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 24
300
1175
750 1500 1500 1500 750 750 1500 1500 1500 1500 1500 750
6000 9000
4 AXLE LINES 6 AXLE LINES 531 531
900 900
1270 1270
900
900
3000
3000
3000
SINGLE PROFILE
900
900
POWER PACK SINGLE PROFILE SINGLE PROFILE
1900
1900
3000 400 1500
4900
ONE & HALF PROFILE
4900
4900
3000
3000
ONE AND HALF PROFILE ONE AND HALF PROFILE
3000 290 3000
6290
DOUBLE PROFILE
TYPE 4 AXLE LINES 6 AXLE LINES
AXLE ROWS 4 6
1645
1645
NO. OF WHEEL 32 48
AXLE SPACING mm. 1500 POWER PACK PPU Z340 TECHNICAL DATA SHEET
6290
6290
OVERALL WIDTH mm. 3000 COUPLING LENGTH (L x W x H) Approx. 4.32 x 2.85 x 0.83 M
PLATFORM LENGTH mm. 6000 9000 COUPLING LENGTH Approx. 4.20 M
+ 300
1645
1645
PLATFORM HEIGHT mm. 1175 - 300 DEAD WEIGHT Approx. 7.30 T
PAYLOADING CAPACITY tonnes. 111.6 (10KM/H) 167.8 (10KM/H) TITLING ANGLE OF PPU UPWARDS
GROSS WEIGHT tonnes. 125.2 187.8 MAX.64 NOS OF PENDULUM AXLES (32 AXLE LINES)
SUITABLE TO OPERATE A NUMBER OF AXLES
TURNING (INSIDE) mm. 2000 1500 MAX.20 NOS OF DRIVEN PENDULUM AXLES
TURNING (OUTSIDE) mm. 7200 6300 NUMBER OF CYLINDERS
PERFORMANCE 338 kW (460 PS) AT 1.100 - 1.500 RPM
TORQUE 2.000 Nm AT 1.100 - 1.500 RPM
DOUBLE PROFILE DOUBLE PROFILE COOLING SYSTEM LIQUID COOLING - CHARGE AIR COOLING
900
900
3000
3000
3000
SINGLE PROFILE
900
900
PRIME MOVER SINGLE PROFILE SINGLE PROFILE
1900
1900
4900
ONE & HALF PROFILE
4900
4900
3000
3000
3000 290 3000
ONE AND HALF PROFILE ONE AND HALF PROFILE 6290
DOUBLE PROFILE
885
TOW
BAR
290
875 875
1645
1645
MOTOR MOTOR
6290
6290
MOTOR MOTOR
TOW BAR
1645
1645
TYPE 4 AXLE LINES 6 AXLE LINES
AXLE ROWS 4 6
NO. OF WHEEL 32 48
TOW BAR
AXLE SPACING mm. 1500
OVERALL WIDTH mm. 3000
PLATFORM LENGTH mm. 6000 9000
+ 300
PLATFORM HEIGHT mm. 1175 - 300
PAYLOADING CAPACITY tonnes. 111.6 (10KM/H) 167.8 (10KM/H)
DOUBLE PROFILE DOUBLE PROFILE
GROSS WEIGHT tonnes. 125.2 187.8
TURNING (INSIDE) mm. 2000 1500
Bok Seng Logistics Pte Ltd
TURNING (OUTSIDE) mm. 7200 6300 No. 5 Tuas Avenue 3.
BS Logistics Hub. Singapore 639405.
T : + 65 6416 1999 F : + 65 6862 0507
www.bokseng-ipl.com
CLIENT:
BOK SENG LOGISTICS PTE LTD
PROJECT:
HEAVY HAULAGE
TITLE:
K25 KAMAG CONVENTIOANAL TRAILER GA DRAWING
DRAWING NO: SHEET NO SCALE SIZE
Technical data
Acc. to the
german
traffic 40 – 80
Travel speed 25 km/h 10 km/h 1 km/h
regulations km/h
(StVZO)
80 km/h
Payload 52,000 kg 72,000 kg 121,000 kg 167,800 kg 250,000 kg
Dead weight 20,000 kg
Total weight 72,000 kg 96,000 kg 141,000 kg 187,800 kg 270,000 kg
Axle load 12,000 kg 16,000 kg 23,500 kg 31,300 kg 45,000 kg
Platform dimensions approx. 9,000 x 3,000 mm
Coupling length approx. 9,000 mm
Platform height center approx. 1,175 mm
Axle compensation approx. +/- 300 mm
Platform height lowered approx. 875 mm
Steering / steering angle hydraulical-mechanical / approx. +/- 60°
Number of wheel bogies / braked 12 / 12
Braking force 522 kN
Standard accessories:
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd. P a g e | 25
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 1 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Job Information
Engineer Checked Approved
Name: AD GH TV
Date: 04-Jan-14
Plate Thickness
Prop Node A Node B Node C Node D Material
(in) (in) (in) (in)
1 0.902 0.902 0.902 0.902 STEEL
2 0.902 0.902 0.902 0.902 STEEL
3 0.902 0.902 0.902 0.902 STEEL
4 0.902 0.902 0.902 0.902 STEEL
5 0.902 0.902 0.902 0.902 STEEL
6 0.902 0.902 0.902 0.902 STEEL
7 0.902 0.902 0.902 0.902 STEEL
8 0.902 0.902 0.902 0.902 STEEL
9 0.902 0.902 0.902 0.902 STEEL
10 0.902 0.902 0.902 0.902 STEEL
11 0.551 0.551 0.551 0.551 STEEL
12 0.551 0.551 0.551 0.551 STEEL
13 0.551 0.551 0.551 0.551 STEEL
14 0.551 0.551 0.551 0.551 STEEL
15 0.551 0.551 0.551 0.551 STEEL
16 0.551 0.551 0.551 0.551 STEEL
17 0.551 0.551 0.551 0.551 STEEL
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 1 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 2 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Materials
Mat Name E ν Density α
(N/mm2) (kip/in3) (/°F)
1 STEEL 200E+3 0.300 0.000 6E -6
2 STAINLESSSTEEL 193E+3 0.300 0.000 10E -6
3 ALUMINUM 68.9E+3 0.330 0.000 13E -6
4 CONCRETE 21.7E+3 0.170 0.000 5E -6
Supports
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
14 Fixed Fixed Fixed - - -
15 Fixed Fixed Fixed - - -
18 Fixed Fixed Fixed - - -
20 Fixed Fixed Fixed - - -
22 Fixed Fixed Fixed - - -
667 - - - - - -
668 - - - - - -
669 - - - - - -
670 - - - - - -
671 - - - - - -
683 Fixed Fixed Fixed - - -
685 Fixed Fixed Fixed - - -
687 Fixed Fixed Fixed - - -
689 Fixed Fixed Fixed - - -
1217 - - - - - -
1218 - - - - - -
1219 - - - - - -
1220 - - - - - -
1232 Fixed Fixed Fixed - - -
1234 Fixed Fixed Fixed - - -
1236 Fixed Fixed Fixed - - -
1238 Fixed Fixed Fixed - - -
1766 - - - - - -
1767 - - - - - -
1768 - - - - - -
1769 - - - - - -
1781 Fixed Fixed Fixed - - -
1783 Fixed Fixed Fixed - - -
1785 Fixed Fixed Fixed - - -
1787 Fixed Fixed Fixed - - -
2315 - - - - - -
2316 - - - - - -
2317 - - - - - -
2318 - - - - - -
2330 Fixed Fixed Fixed - - -
2332 Fixed Fixed Fixed - - -
2334 Fixed Fixed Fixed - - -
2336 Fixed Fixed Fixed - - -
2864 - - - - - -
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 2 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 3 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Supports Cont...
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
2865 - - - - - -
2866 - - - - - -
2867 - - - - - -
2879 Fixed Fixed Fixed - - -
2881 Fixed Fixed Fixed - - -
2883 Fixed Fixed Fixed - - -
2885 Fixed Fixed Fixed - - -
3413 - - - - - -
3414 - - - - - -
3415 - - - - - -
3416 - - - - - -
3428 Fixed Fixed Fixed - - -
3430 Fixed Fixed Fixed - - -
3432 Fixed Fixed Fixed - - -
3434 Fixed Fixed Fixed - - -
3962 - - - - - -
3963 - - - - - -
3964 - - - - - -
3965 - - - - - -
3977 Fixed Fixed Fixed - - -
3979 Fixed Fixed Fixed - - -
3981 Fixed Fixed Fixed - - -
3983 Fixed Fixed Fixed - - -
4511 - - - - - -
4512 - - - - - -
4513 - - - - - -
4514 - - - - - -
4526 Fixed Fixed Fixed - - -
4528 Fixed Fixed Fixed - - -
4530 Fixed Fixed Fixed - - -
4532 Fixed Fixed Fixed - - -
5060 - - - - - -
5061 - - - - - -
5062 - - - - - -
5063 - - - - - -
5075 Fixed Fixed Fixed - - -
5077 Fixed Fixed Fixed - - -
5079 Fixed Fixed Fixed - - -
5081 Fixed Fixed Fixed - - -
5609 - - - - - -
5610 - - - - - -
5611 - - - - - -
5612 - - - - - -
5624 Fixed Fixed Fixed - - -
5626 Fixed Fixed Fixed - - -
5628 Fixed Fixed Fixed - - -
5630 Fixed Fixed Fixed - - -
6158 - - - - - -
6159 - - - - - -
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 3 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 4 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Supports Cont...
Node X Y Z rX rY rZ
(kN/mm) (kN/mm) (kN/mm) (kN-m/deg) (kN-m/deg) (kN-m/deg)
6160 - - - - - -
6161 - - - - - -
6173 Fixed Fixed Fixed - - -
6175 Fixed Fixed Fixed - - -
6177 Fixed Fixed Fixed - - -
6179 Fixed Fixed Fixed - - -
6707 - - - - - -
6708 - - - - - -
6709 - - - - - -
6710 - - - - - -
6722 Fixed Fixed Fixed - - -
6724 Fixed Fixed Fixed - - -
6726 Fixed Fixed Fixed - - -
6728 Fixed Fixed Fixed - - -
7256 - - - - - -
7257 - - - - - -
7258 - - - - - -
7259 - - - - - -
7271 Fixed Fixed Fixed - - -
7273 Fixed Fixed Fixed - - -
7275 Fixed Fixed Fixed - - -
7277 Fixed Fixed Fixed - - -
7805 - - - - - -
7806 - - - - - -
7807 - - - - - -
7808 - - - - - -
7820 Fixed Fixed Fixed - - -
7822 Fixed Fixed Fixed - - -
7824 Fixed Fixed Fixed - - -
7826 Fixed Fixed Fixed - - -
8354 - - - - - -
8355 - - - - - -
8356 - - - - - -
8357 - - - - - -
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 4 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 5 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 5 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 6 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 6 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 7 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 7 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 8 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 8 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 9 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 9 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 10 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 10 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 11 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 11 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 12 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 12 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 13 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 13 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 14 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 14 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 15 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 15 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 16 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 16 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 17 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 17 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 18 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 18 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 19 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 19 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 20 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 20 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 21 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 21 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 22 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Y -1.000
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 22 of 23
Job No Sheet No Rev
BSL-EQ11008-C-04-RC 23 00
Part
Software licensed to HP
Job Title 12m x 1.54m Heavy Duty Ro-Ro Ramps Ref BSL-EQ11008-C-04-RC
By AD Date04-Jan-14 Chd GH
Client Bok Seng Logistics Pte Ltd File 12m HDR with 15 Date/Time
beams.std 19-Mar-2014 11:03
Reaction Summary
Horizontal Vertical Horizontal Moment
Node L/C FX FY FZ MX MY MZ
(kN) (kN) (kN) (kN-m) (kN-m) (kN-m)
Max FX 4526 1:LOAD CASE 1 183.900 242.662 -4.173 0.000 0.000 0.000
Min FX 18 1:LOAD CASE 1 -137.225 2.284 -17.728 0.000 0.000 0.000
Max FY 4526 1:LOAD CASE 1 183.900 242.662 -4.173 0.000 0.000 0.000
Min FY 668 1:LOAD CASE 1 0.000 0.000 0.000 0.000 0.000 0.000
Max FZ 7826 1:LOAD CASE 1 -52.765 0.280 23.932 0.000 0.000 0.000
Min FZ 15 1:LOAD CASE 1 -106.466 0.088 -49.394 0.000 0.000 0.000
Max MX 14 1:LOAD CASE 1 -92.061 100.038 -19.394 0.000 0.000 0.000
Min MX 14 1:LOAD CASE 1 -92.061 100.038 -19.394 0.000 0.000 0.000
Max MY 14 1:LOAD CASE 1 -92.061 100.038 -19.394 0.000 0.000 0.000
Min MY 14 1:LOAD CASE 1 -92.061 100.038 -19.394 0.000 0.000 0.000
Max MZ 14 1:LOAD CASE 1 -92.061 100.038 -19.394 0.000 0.000 0.000
Min MZ 14 1:LOAD CASE 1 -92.061 100.038 -19.394 0.000 0.000 0.000
Print Time/Date: 19/03/2014 18:43 STAAD.Pro V8i (SELECTseries 2) 20.07.07.32 Print Run 23 of 23
Client : PT. Perkasa Lintas Arta Doc No : BSL-PJ23151-R-02-LP
Project : Marine Transportation of Modules Rev : 01
Title : Loadout Procedure for Modules P1 and S1 Date : 15th September 2023
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 31
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
Transportation Checklist
Before starting the transportation operation, the following factors have to be checked.
5. Diesel levels in the power pack are adequate for the operation.
7. Access under the load is suitable and the transport route is clear.
10. Local weather conditions checked to ensure that they are not going to
cause danger to the load or operating personnel.
_ _
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 32
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
Bok Seng Logistics Pte Ltd
No. 5 Tuas Avenue 3
BS Logistics Hub S (639405)
Tel: +65 64161999 Fax: +65 68610325
www.bokseng-IPL.com
Barging Checklist
Before starting the Ro-Ro operation, the following factors have to be checked.
2. Ensure the respective ballast tanks are filled with the pre-determined
amount of water.
4. Check and ensure the tugboat is in position with engine started and tie
up with the barge to assist to prevent barge from drifting/swelling.
5. Check and ensure the heavy portable ramps are properly secured
to the barge.
6. Check and ensure the mooring ropes are properly tied to the bollard
points.
This report is the exclusive property of Bok Seng Logistics Pte Ltd and shall be treated confidential. No part of it may be copied P a g e | 33
or distributed to a third party without the written permission of Bok Seng Logistics Pte Ltd.
BSL/RA/OPS/23100/R00
9. BALLASTING OF BARGE
16. HOUSEKEEPING
Likelihood Rare (1) Remote (2) Occasional (3) Frequent (4) Almost Certain (5)
Severity
Catastrophic (5) 5 10 15 20 25
Major (4) 4 8 12 16 20
Moderate (3) 3 6 9 12 15
Minor (2) 2 4 6 8 10
Negligible (1) 1 2 3 4 5
Low Risk (1-3) Acceptable • No additional risk control measures may be needed.
• Frequent review and monitoring of hazards are required to ensure that the risk level assigned is
accurate and does not increase over time.
Medium Risk (4-14) Moderately • A careful evaluation of the hazards should be carried out to ensure that the risk level is reduced to
Acceptable as low as reasonably practicable (ALARP) within a defined time period.
• Interim risk control measures, such as administrative controls or PPE, may be implemented while
longer term measures are being established.
• Management attention is required.
High Risk (>15) Not Acceptable • High Risk Level must be reduced to at least Medium Risk before work starts.
• There should not be any interim risk control measures. Risk control measures should not be
overly dependent on PPE.
• If practicable, the hazard should be eliminated before work starts.
• Management review is required before work starts.