Professional Documents
Culture Documents
Shortfill occured due to restriction flow of material through the gate point area in startup and Restart up times . Instructed
CORRECTIVE ACTION DETAILS to Operator to keep separately 5 Shots after each power failure and restartup, Training and Awareness given to Machine
Operator.
PREVENTIVE ACTION DETAILS Next 3 lot are to be checked 100% in dock Audit.
`
PREPARED BY APPROVED
BAPUJI BY KUNAL