Installation and configurations of network Equipment Router & Switch completed. IT& Cyber 21-23/01/23 (Router, Switch and Firewall. Firewall to be completed by 24/01/23 WAN services providers have been Installation, configurations and establishment of Comsys, Vodafone, informed and are waiting for the go 23-24/01/23 Connectivity(all WAN providers) Dimension ,Bank ahead by bank to act ,pending approval from BOG We have requested for the WAN IP’s Comsys, from the providers. Test Connectivity Test Connectivity between head office and DR Vodafone ,Dimension and 24/01/23 will be completed by 25/01/23 whilst Bank Pending approval from BOG. Real time replication is happening currently to the DR. database. We Ensure replicated data to DR servers is at par with will confirm the state data on the last DataCell & Bank 24/01/23 production day of relocation before shutting down of the servers. Pending BOG approval The system & DB team to shut down the DB and the DataCell & Bank 24/07/23 Pending BOG approval application and Hardware. Boxing of servers and equipment’s for transportation DataCell & Bank 24/01/23 Pending BOG approval Hand over the equipment to Administration for IT and Administration 24/01/23 Pending BOG approval transporting At MainOne System to confirm waybills against delivered IT and Administration 24/01/23 Pending BOG approval equipment’s The system & DB team to power the servers, DataCell & Bank 24 /01/23 Pending BOG approval DB ,application and Hardware Comsys, Test Connectivity between DR and head office for 24-25/01/23 Vodafone ,Dimension and Pending BOG approval performance Bank Post Relocation BCP testing Bank 11/02/23 Pending After relocation