Place: Cnc workshop Date of Assessment: 8/11/2022

Name of Assessor: Youssef said Mohamed 221011748 Date of Review: 11/11/2022

Action
Who might be Risk Risk Action by
Hazards List Risk Severity Existing controls Additional controls by Done
harmed and how? Likelihood Rating whom?
when?

Entenglemente workers and Moderate Rare Low  Worker must  Information, Supervisor Months
studentes report to the instruction
3 1 3 and training 3
inguries such as employer any
broken bones serious or for workers.
and dislocations. imminent
 The provision manger Week
danger.
of stop and
1
emergency
 Wear suitable stop controls.
clothing, eye
protection  Keep the area worker
Days

and around the 2


footwear. machine
clear and free
 The lighting
of
around the obstructions.
equipment
is suitable
and
sufficient.
Noise Workers and Minor Rare Very low  Change speed  Reduction of Supervisor 2 days
students risk noise at and
2 1 2 source
ringing in the  Screens or worker
ear. absorption
walls  Change
equipment or manger
process 3 weeks

 Suitable  Relocate
warning worker
equipment 3 Days
signs

cutting Workers and Minor Rare very low  Must be wear  Welfare manger Month
students risk safety gloves (including first
2 1 2 1
sharp edges can in case aid).
cause cuts and  Work  Personal
severing injuries equipmemt protective
manger Month
used for equipment. 1
specified .  The
 Ensuring that provision
sutiable of stop and
waring emergency
marking s top
controls.
Impact workers and Moderate unlikely moderate  Audible  Separation of manger months
students injuries 3 2 6 warning of pedestrians 2
such as broken approach and vehicles.
bones and signals
severing injuries ,particularly
for reversing .
hand tool wokers and insignificant Rare very low  Avoid  Training for
students risk 1 1 1 situations mitigating Supervisor 1 week
sharp pointed that require ergonomic and worker
parts can cause twisting or hazards,
stabbing or bending the strategies to
puncture the neck. improve a
skin workstation
layout, and
stress-
reduction
exercises.
 Reducing
highly
2 Days
repetitive
Worker
movements

electrical Workers and catastrophic Rare moderate  Check that  Machinery has
students risk 5 1 5 socket an accessible
manger 1 month
electrical shock outlets are switch to cut
and burns from not off the power
contact with live overloaded quickly in an
parts emergency
 Ensure there
are no trailing  Switch off and
cables. unplug worker 1 Day
appliances
before
cleaning or
adjusting
them.
Dust workers and Major Unlikely mode  Natural  Air should be manger Weeks
students risk 4 2 rte ventilation filtered and 2
dizziness and can 8  Must be discharged to
cause serious wearthe a safe place
long term dust mask  Establish a
 Local preventive manager
damage to the
exhaust maintenance Weeks
lungs.
ventilation program. 2
 Good  Rceduction of
house keep the number
of
employesse
exposed to a
strict
minimum.
Enjection of workers and Minor Unlikely Low4  Wear  Prohibit eating worker Day
parts students injuries 2 2 stuitable ,drinking in 1
in body clothing working area .
,face,eyes ,eye  The guarding worker
protection of dangerous Day
 Enforced parts of work 1
speed equipment.
limits.
Chuck (for fixed the work )

Working table (spoilboard )

z
y Gantry

Spindle (heart of any cnc machine)


x

Frame (supports the machine)

Cnc control (executes g-code)