No Description Jumlah Unit Harga per unit Total Harga JASA FRONT END ENGINEERING DESIGN (FEED) STUDI UNTUK KEGIATAN FULL 1 PRODUCTION FACILITIES (FPF) di Lapangan RBG Blok I . 1 LS FILL BY VENDOR FILL BY VENDOR
Nilai Total Perjanjian FILL BY VENDOR
PEMBULATAN : FILL BY VENDOR TERBILANG : Note: 1. Net price Not including tax 2. Location : Site Location Grobogan, Central Java Jakarta, 2024
Tanda tangan, Cap dan Materai
Nama : PT (Nama Direktur sesuai Akte) FORM PENAWARAN KOMERSIAL JASA FRONT END ENGINEERING DESIGN (FEED) STUDI UNTUK KEGIATAN FULL PRODUCTION FACILITIES (FPF) di Lapangan RBG Blok I
Estimasi Harga (IDR)
No Description Jumlah Unit A B C=AxB (Weight Factor) (Harga per unit) (Total Harga) JASA FRONT END ENGINEERING DESIGN (FEED) STUDI UNTUK KEGIATAN FULL 1 PRODUCTION FACILITIES (FPF) di Lapangan RBG Blok I .
1.1 PROJECT MANAGEMENT 1 LS 5% FILL BY VENDOR FILL BY VENDOR
1.2 PROCESS 1 LS 11% FILL BY VENDOR FILL BY VENDOR 1.3 PROCESS SAFETY 1 LS 7% FILL BY VENDOR FILL BY VENDOR 1.4 MECHANICAL 1 LS 12% FILL BY VENDOR FILL BY VENDOR 1.5 PIPING 1 LS 7% FILL BY VENDOR FILL BY VENDOR 1.6 ELECTRICAL 1 LS 12% FILL BY VENDOR FILL BY VENDOR 1.7 INSTRUMENT 1 LS 13% FILL BY VENDOR FILL BY VENDOR 1.8 CIVIL & STRUCTURAL 1 LS 17% FILL BY VENDOR FILL BY VENDOR 1.9 FLOWLINE 1 LS 10% FILL BY VENDOR FILL BY VENDOR 1.10 OPTIONAL DOCUMENTS 1 LS 5% FILL BY VENDOR FILL BY VENDOR
Nilai Total Perjanjian FILL BY VENDOR
PEMBULATAN : FILL BY VENDOR
TERBILANG : FILL BY VENDOR
Note: 1. Net price Not including tax 2. Location : Site Location Grobogan, Central Java Jakarta, 2024
A Case Study Analysis of The Montreal (CANADA) Chapter of The Hells Angels Outlaw Motorcycle Club (HAMC) (1995-2010) : Applying The Crime Business Analysis Matrix (CBAM)