Subject: FAULT REPORT OF AIR CONDITIONERS INSTALLED AT MSU MULTAN

It is submitted that 04 x air conditioners having cooling capacity i.e. (3 x 7.5 installed and 01
x 10 Ton) at NTC MSU Multan are being used for the proper control of the temperature of the EWSD
switch Room & smooth working of the system. These air conditioners are being used around the clock
for the temperature control of the EWSD switch room.

2. A pair of air conditioners will be used with the start of the summer season for the proper
control of the temperature of the EWSD switch room as the most sensitive equipment i.e. EWSD MSU
complete, Banning Rectifier, Soft Switch with Rectifier, UMG/NGN, and DWDM, BRAS, MX104
Router and data equipment has been installed in the switch room.

3. At present 02 x air conditioners are faulty the log book of the air conditioners of MSU
Multan is attached. The air conditioner Technician was called to find out the cause and he has asked
that compressors of 02 x Air Conditioners (Having Capacity 7.5 Ton i.e Air conditioner no 01 & 02) have
been burnt. For the repair of 01 x air conditioner following is required: -
 Repairing of Compressor (Motor, Pistons)
 R-22 Gas 8 Kg
 Compressor Oil 4 Liter
 Dry Filter
 Gas Accumulator

4. The estimated cost (Reference quotation is attached) of the above-mentioned work is


Rs. 240,000/-. Therefore, keeping in view, the above-narrated facts, it is submitted that approval for the
Repair & maintenance of the subject air conditioners may kindly be accorded, please
Submitted for accord of approval, please.

(Syed Ibn-e-Ali Abidi)


Assistant Divisional Engineer
(Int/Sw)NTC Multan

Central Telephone Exchange Dera Adda Multan


061-9200004 061-9200011
NATIONAL TELECOMMUNICATION CORPORATION Ministry of Information
Technology & Telecom
Office of the Assistant Divisional Engineer (Int/Sw)) NTC Multan

No. ADE-XMN-ML/Air Conditioner/2021-22/ 02


Dated:25-03-2022
To: Divisional Engineer NTC Multan
From: Assistant Divisional Engineer (Int/Sw) NTC Multan

Subject: SANCTION OF ENG-27


Kindly find enclosed herewith Eng-27 bearing no. ADE-XMN-ML/Air
Conditioner/2021-22/ Dated: -03-2022 amounting to Rs. 24,952/- (Twenty-Four Thousand
Nine Hundred Fifty-Two Only) regarding “Routine Maintenance of Air Conditioner Unit
no.01,02,03 & 04 installed at EWSD switch Room NTC Multan” along with all relevant documents
for pre-audit/sanction, please
Regards,
(Syed Ibn-e-Ali Abidi)
Assistant Divisional Engineer
(Int/Sw)NTC Multan

JUSTIFICATION
Central Telephone Exchange Dera Adda Multan
061-9200004 061-9200011
NATIONAL TELECOMMUNICATION CORPORATION Ministry of Information
Technology & Telecom
Office of the Assistant Divisional Engineer (Int/Sw)) NTC Multan

Air conditioners Detail

Air conditioner Make : SABRO


Capacity : 2 x 7.5 Ton and 01 x 10 Ton

Present Status

04 x air conditioners having cooling capacity i.e (3 x 7.5 installed and 01 x 10 Ton) at NTC MSU Multan
are being used for the proper control of temperature of EWSD switch Room & smooth working of the
system. These air conditioners are being used round the clock for the temperature control of EWSD
switch room. It is pertinent to mention here that said Air conditioners units were installed on
01-06-2001, so the air conditioners have completed the useful life.

Routine Maintenance

The complete service of air conditioners is essentially required interest of NTC for the proper control
of temperature of EWSD switch room as the most sensitive equipment i.e EWSD MSU complete,
Baning Rectifier, Soft Switch with Rectifier, UMG/NGN, DWDM, BRAS, MX104 Router and data
equipment is also installed in switch room. The proper control of temperature is quite essential for the
smooth functioning above mentioned equipment as the summer season has to be started.
No technical difficulty is being anticipated during the execution of work

(Syed Ibn-e-Ali Abidi)


Assistant Divisional Engineer
(Int/Sw)NTC Multan

Central Telephone Exchange Dera Adda Multan


061-9200004 061-9200011
NATIONAL TELECOMMUNICATION CORPORATION Ministry of Information
Technology & Telecom
Office of the Assistant Divisional Engineer (Int/Sw)) NTC Multan

No. ADE-XMN-ML/Air Conditioner/2021-22/03


Dated: 30-03-2022

WORK ORDER
For Routine Maintenance of Air Conditioners 2 x7.5 Ton & 01 x 10 Ton Cabinet Type
Installed at EWSD Switch Room NTC MSU Multan

1. OFFER NO. : No. Nil, Dated: 22-03-2022


2. SUPPLIER : M/s Al-Khair Enterprises,
Near Jamia Masjid Zikrya, Neelam Street, Vehari Road
Multan.
3. DESCRIPTION OF ITEM : Complete Service of 2 x 7.5 Ton Cabinet Type Air
Conditioners & 01 x 10 Ton Cabinet Type Air Conditioner
and Gas R-22 charging in Air Conditioners to maintain the
Gas Pressure.
4. PRICE : The total price is PKR 24,952/- (Pak Rupees Twenty-Four
Thousand Nine Hundred Fifty-Two Only)
5. DELIVERY SCHEDULE : The Contractor will be bound to complete the work within
01 x day from the date of issuance of work order.
6. LATE DELIVERY CHARGES LD charges @ 0.5% of the bill amount per week will be
imposed in case of delay in completion of work up to
maximum of 10% of value of delivered items.
7. MODE OF PAYMENT : a) 100 % payment of provided Services will be made to the
supplier after receipt of the bill in triplicate along with PST
invoice. The firm will mention NTN number of both
supplier and purchaser on the invoice. (NTC NTN
#1218153-6). Taxes shall be deducted as per Govt. policy in
vogue.
(b) Payment will be made by Regional Director NTC Multan
through crossed cheque.
8. ULTIMATE CONSIGNEE : The item will be delivered to the ultimate consignee at the
below mentioned address who will arrange payment
Assistant Divisional Engineer (Int/Sw) NTC Multan
Central Telephone Exchange, Dera Adda, Multan.

(SYED IBN-E-ALI ABIDI)


Assistant Divisional Engineer
(Int/Sw) NTC Multan

To:
M/s Al-Khair Enterprises,
Near Jamia Masjid Zikrya, Neelam Street,
Vehari Road Multan
Copy to: -
Assistant Director (Accounts) NTC Multan.

Central Telephone Exchange Dera Adda Multan


061-9200004 061-9200011
NATIONAL TELECOMMUNICATION CORPORATION Ministry of Information
Technology & Telecom
Office of the Assistant Divisional Engineer (Int/Sw)) NTC Multan

No. ADE-XMN-ML/Air Conditioner/2021-22/04


Dated: 01-04-2022
To: Divisional Engineer NTC Multan
From: Assistant Divisional Engineer (Int/Sw) NTC Multan

Subject: WORK COMPLETION REPORT

It is to inform that M/s Al-Khair Enterprises, Multan Cantt has completed work
for “Routine Maintenance of Air Conditioners 2 x 7.5 Ton & 01 x 10 Ton Cabinet Type Installed at
EWSD Switch Room NTC MSU Multan” on dated 31-03-2022.
Submitted for information, please
Regards,

(SYED IBN-E-ALI ABIDI)


Assistant Divisional Engineer
(Int/Sw)NTC Multan

Central Telephone Exchange Dera Adda Multan


061-9200004 061-9200011
NATIONAL TELECOMMUNICATION CORPORATION Ministry of Information
Technology & Telecom
Office of the Assistant Divisional Engineer (Int/Sw)) NTC Multan

No. ADE-XMN-ML/Air Conditioner/2021-22/05


Dated: 01-04-2022

To: Divisional Engineer NTC Multan


From: Assistant Divisional Engineer (Int/Sw) NTC Multan

Subject: PAYMENT OF BILL

Kindly find enclosed herewith bill no. 08, Dated: 31-03-2022 amounting to

Rs.24,952/- from M/s Al-Khair Enterprises, Multan on account of Routine Maintenance of Air

Conditioners 2 x 7.5 Ton & 01 x 10 Ton Cabinet Type Installed at EWSD Switch Room NTC MSU

Multan “along with all relevant documents.

Submitted for payment as per NTC policy, please

Regards,

(SYED IBN-E-ALI ABIDI)


Assistant Divisional Engineer
(Int/Sw)NTC Multan

Central Telephone Exchange Dera Adda Multan


061-9200004 061-9200011

You might also like