Project : Biomass Plan Nestle - Kejayan

Trans. No : TBI11N02-AEI-T-VII-23-550
Ref. No : -
Date : 4-Jul-23

DOCUMENT TRANSMITTAL
Page : 1 of 1

To : BECIS CC : Mr. Rada Hangga


Biomass Plant Nestle
Kejayan

CP :

Attn. : Mr. Joannes Tarigan

From : PT. ASUKA ENGINEERING INDONESIA

The Following : Print Original Copies Email Multi Copy

Are transmitted herewith for : For Approval As Built For Clarification Reference

For Information For Review Confirmation As Final

The Document are : Preliminary For Construction Sign Reply is Required

No. Document No. Rev. No. Quantity Size TITTLE REMARK

NOTIFICATION OF INSPECTION

NoI - Visual Inspection Before Start Primer Coat, Epoxy Coating Floor Boiler
1 TBI11N02-CIVIL-NOI-AEI-086 1 A4
House

Remark : Please send back this cover letter to Asuka Signatured :


After the receipt has been signed.

M. FAJRIN HANANY AFIFF

Signature :
Received not required

Receipt required (Please aknowladge receipt on the duplicate and return) Name :

Possition :

Date :