LEAK PROOF START-UP
It will be the responsibility of DESCON to ensure leak proof start-up of the Plant /
Equipment after completion of Maintenance / Servicing / Inspection activities
during the Shutdown. Following procedure will be adopted as minimum:
1. Job Supervisor shall re-check that all type of flange surface have
been cleaned properly using wire brush, emery paper, high pressure
water, solvent or specified method.
3. Job Supervisor shall ensure that new gasket of correct material and
rating as specified by BOROUGE in material reservation sheet is
used.
5. Job Supervisor shall check that stud bolts / nuts are properly
tightened in cross way configuration to ensure that gasket has been
completely pressed all around the casketed surface of the flange.
9. BOROUGE Operation will carry out Service Test / Leak Test with the