Safe Work Procdure/JSA

Cuttack Cement Works

Form# ABG/CB/SHE/4001.01 Rev# Effective Date.

Safe Working Procdure For- Scaffolding Erection Page…..…..of…..….

DEPARTMENT Civil DOC NO.


NAME OF
SECTION/LOCATION : switch yard &control room&Mrss GDCL
WORKING AGENCY :

JOB TITLE SCAFOLLING ERECTION WORK ORDER NO.

JOB START DATE- End Date:

CONDITIONS OF REFERANCE TO
ACTIVITIES PERSONS DOCUMENTS/CRIT
SL. NO (SEQUENCE OF HAZARDS SAFETY PRECAUTIONS RESPONSIBLE TOOLS AND
WORKS) NAME & PS NO TACKLES ERIA AND
REQUIRED REMARKS
OK/NOT OK
Pipe shifting to work Personal injury due to slip & Walkway should be even.
1 pankaj pal
place trip hazard Shoulder Pad should be use during manual shifting.
OK
Personal injury due to fall of
Safety shoes & cotton hand gloves is must. pankaj pal
material
OK

1.Base plate/sole plate should use


Joint of standard to Scaffolding can collapse due 2.Coupler & pipe should check properly.
2 pankaj pal
transome by coupler. to faulty erection. 3.Joint pin should be use to joint the scaffolding pipe.
4.Rust/Bend pipe should not use.
OK
Hand injury due to damage 1.Hand tools should check properly
pankaj pal
wrench 2.All job specic PPE to be provided to workers.
OK

1.Platfrom jali must tie properly


2.Hand railing & mid railing must be provide. 3.Person should
personal injury due to fall
3 Making of platform. used full body harness . pankaj pal
from height.
4.Only trained workers to be engaged for the job

OK
1.Person can fall while 1.Hold & use the side post of ladder while accending & decending.
Placing of ladder on accending & decending on
4 pankaj pal
platform ladder. 2.ladder should fasten properly at platform. 3.Ladder should
2.Ladder can slip. placing in 75⁰ angle at ground.
OK

Taking material to 1.material should not stack at platform


5 Fall of material from height. pankaj pal
platform. 2.All tools to be secured at height.
OK

1.Inspected FBH must be use during working at height.


1.Fall of person from height
2.Hand tools should kept with fasten with rope.
2.Material can
6 Use of scaffold pankaj pal
fall from height.
3.Scaffolding should certified by authorized person.
3.scaffolding can collapse
4.Scaffolding-tag system should be followed.

OK

Any hazard

DEPARTMENTAL
WORKING AGENCY/ CONTRACTOR REPRESENTATIVE.
REPRESENTATIVE

NOTE:
1 THIS SAFE WORK PROCEDURE SHALL BE PREPARED BY OWNER DEPARTMENT COUNTERSIGNED BY WORKING AGENCY/ CONTRACTOR REPRESENTATIVE .

2 SEQUENCE OF WORK SHALL INVOLVE STEP BY STEP JOBS.

3
ALL POSSIBLE HAZARDS INCLUDING PROXIMITY HAZARDS SHALL BE IDENTIFIED.

4
WITH CHANGE IN WORKING CONDITION, THE PROCEDURE SHALL BE AMENDED AND PERSONS SHALL BE TRAINED ACCORDINGLY.

BEFORE START OF THE JOB INDUCTION GIVEN TO PERSONS ENGAGED AT SITE BY DEPARTMENTAL REPRESENTATIVE AND SUBSEQUENT DAILY INDUCTION
SHALL BE GIVEN BY WORKING AGENCY .
5

SAFETY OFFICER CAN VERYFY AS PART OF AUDIT ON ADEQUECY AND LEEVL OF COMPLIANCE TO THIS SWP.
6
TENTATIVE JOB IS DEFINED AS NON ROUTINE JOB WHICH IS BEING UNDERTAKEN EITHER BY CONTRACTOR OR COMPANY EMPLOYEE ON DEMAND BASIS AND
7
FOR WHICH THERE IS NO ANY PROCEDURE IN QS/EHS SYSTEM.

Team Members Prepared By Reviewed By Approved By

Name pankaj pal

Signature

Date
Designation Manager
Agency GDCL UTCL