CONDITIONS OF REFERANCE TO
ACTIVITIES PERSONS DOCUMENTS/CRIT
SL. NO (SEQUENCE OF HAZARDS SAFETY PRECAUTIONS RESPONSIBLE TOOLS AND
WORKS) NAME & PS NO TACKLES ERIA AND
REQUIRED REMARKS
OK/NOT OK
Pipe shifting to work Personal injury due to slip & Walkway should be even.
1 pankaj pal
place trip hazard Shoulder Pad should be use during manual shifting.
OK
Personal injury due to fall of
Safety shoes & cotton hand gloves is must. pankaj pal
material
OK
OK
1.Person can fall while 1.Hold & use the side post of ladder while accending & decending.
Placing of ladder on accending & decending on
4 pankaj pal
platform ladder. 2.ladder should fasten properly at platform. 3.Ladder should
2.Ladder can slip. placing in 75⁰ angle at ground.
OK
OK
Any hazard
DEPARTMENTAL
WORKING AGENCY/ CONTRACTOR REPRESENTATIVE.
REPRESENTATIVE
NOTE:
1 THIS SAFE WORK PROCEDURE SHALL BE PREPARED BY OWNER DEPARTMENT COUNTERSIGNED BY WORKING AGENCY/ CONTRACTOR REPRESENTATIVE .
3
ALL POSSIBLE HAZARDS INCLUDING PROXIMITY HAZARDS SHALL BE IDENTIFIED.
4
WITH CHANGE IN WORKING CONDITION, THE PROCEDURE SHALL BE AMENDED AND PERSONS SHALL BE TRAINED ACCORDINGLY.
BEFORE START OF THE JOB INDUCTION GIVEN TO PERSONS ENGAGED AT SITE BY DEPARTMENTAL REPRESENTATIVE AND SUBSEQUENT DAILY INDUCTION
SHALL BE GIVEN BY WORKING AGENCY .
5
SAFETY OFFICER CAN VERYFY AS PART OF AUDIT ON ADEQUECY AND LEEVL OF COMPLIANCE TO THIS SWP.
6
TENTATIVE JOB IS DEFINED AS NON ROUTINE JOB WHICH IS BEING UNDERTAKEN EITHER BY CONTRACTOR OR COMPANY EMPLOYEE ON DEMAND BASIS AND
7
FOR WHICH THERE IS NO ANY PROCEDURE IN QS/EHS SYSTEM.
Signature
Date
Designation Manager
Agency GDCL UTCL