Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that
the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information).
Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while
completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant
resources section for this qualification on the NEBOSH website.
Part 1: Background
I talked to workers and check PPE which was provided insufficient talking to workers and checking
previous records help me to identified hazard without any controls so I decided to recommend
additional controls that may be required to control present hazard.
https://www.osha.gov/grain-handling
https://www.ukflourmillers.org/healthandsafety
Vibration Machine operators might 1) Stopped operating 1) Use of PPE should be 1 day
In vibrating be harmed. vibration transmitted mandatory for all workers.
separator area machinery without 2) Job rotation and frequent break 1 day HSE officer
vibrating Vibration is transmitted in wearing gloves. of workers should be 1 2 and 3
separator hands and arms when 2) TBT was conducted for supervise.
operates by operating machinery. awareness of vibration 3) Don’t operate machine by 1 day All staff
operator Excessive exposure can hazard. single operator for long term try workers
without affects the nerves, blood 3) Health surveillance was to change operator. 4
wearing PPE vessels, muscles and supervised. 4) Demonstrate healthy working 2 days
and exposed joints of the hand, wrist 4) PPE was provided to all environment for more
for long term. and arm causing hand- workers. productive work force.
arm vibration syndrome.
Confined Workers working in 1) Working improper way 1) Oxygen level should be record 1 day Site in-charge
space confined space without was stopped between19.5 to 23.5 than start 1234
In pulse dust PPE. immediately. work in confined space.
collector area Working in confined 2) TBT was conducted for 2) SCABA should be use with 1 day HSE manager
workers fixing space is dangerous awareness of confined oxygen cylinder if there is lack 5
big pulse tube because of the risk from space hazard. of oxygen in confined space.
without noxious fumes, reduced 3) Provide training to all 3) Use helmet with torch. 1 day
wearing PPE. oxygen levels, or a risk of workers. 4) Emergency response team and 1 day
fire. 4) Only authorized person receiver team should be
entry in confined space present at the top of confined
was implemented. space.
5) Permit to work system 5) Al activities should be carry out 1 day
was implemented. in the presence of HSE
6) Oxygen level tester and manager.
Noise Packing machine 1) All packing rust full 1) Rust full parts of machinery 2 days Mechanical
In packing operators and nearby noisy machine was should be lubricate while team
area packing workers. stopped for lubricating. lubricating lock out and tag out 1 2 and 3
machine In packing machine area 2) All doors ventilation and system should be implement to
create noise packing machines create windows was kept avoid fatality. HSE officer
due to rust full noise due to rust full parts opened to minimize 2) If rust full parts is damaged 2 days 4 and 5
parts. workers exposed for long noise. change it.
term will lead to hearing 3) Only authorized 3) Acoustical panel should be 3 days
loss, damaged to ear operators operates install to minimize noise.
drums, headache and packing machine. 4) Wearing ear muffs is 1 day
sleeping disorders. 4) TBT was conducted and mandatory.
PPE was provided to all 5) All activities should be check 2 days
workers. on daily basis.
5) Reduction in work time
job rotation and
frequent break was
supervised.
6) Health surveillance of
all workers was done as
per company policy.
Fire Mechanics and nearby 1) Rescue operation was 1) Fuel should be keep in closed 1 day Workshop In-
In mechanical workers working in start immediately. and packed tank and place in charge
workshop mechanical workshop 2) Injured workers shifted proper safe place. 12468
during harmed due to fire. to hospital immediately. 2) Provide separate smoking 1 day
lubricating Due to fire mechanics 3) Area was barricaded for point for smoking. HSE officer
heavy and nearby workers got investigation and record 3) Wrinkle system should be 3 days 7 and 9
1. (a) Provide & maintain workplace machinery, use work safe working methods which
without risks to health.
Financial argument
As per ice burg model, uninsured cost is 8 to 36 times greater than insured costs. Every accident
has some costs which is direct and indirect cost. Some of these cost may be insured but many
cannot. Accidents and ill health at work are extremely expensive and represent a huge, often
hidden, source of loss. Accidents increase insurance premium. When accident occurs direct costs
will by pay by company is first aid treatment, hospital treatment charges, workers sick pay, and
visible damaged to property equipment and product. While indirect cost is just like invisible that will
be appointing new labour, compensation of injured workers, loss of investigation time, reduction in
staff morale and decreasing number of clients, heavy fines from civil and criminal courts etc.
As per Pakistan factory act 1934 as amended to 1997 article 25. Precautions in case of fire
sub article 5 and 7 affirms that
(In every factory there shall be provided effective and clearly audible means of giving warning in
case of fire to every person employed therein)
Consideration of likelihood is high In packing area packing machine create noise due to rust full
parts, they work there almost 8 hours so high likelihood due to long term exposure.
Severity of being harm due to noise is Major In packing machine area packing machines create
noise due to rust full parts workers exposed for long term will lead to hearing loss, damaged to ear
drums, headache and sleeping disorders.
Types of ill health hearing loss, damaged to ear drums, headache and sleeping disorders.
70 workers are at risk.
Activity has been carried out in packing area workers exposed to noisy machine for long term might
be harm.
Risk is widespread and present for all workers who exposed to noise and working in packing area.
How effective the action is likely to be in
The intended impact of the action is Rust full parts of machinery should be lubricate while
controlling the risk. This should include:
lubricating lock out and tag out system should be implement to avoid fatality. If rust full parts is
the intended impact of the action; damaged change it. It will eliminate creating noise.
justification for the timescale that Justification for the timescale I have given is two days because working in noisy environment is
you indicated in your risk harm full for workers health so stop working and immediately maintaining all machine is necessary
assessment; and so it will take two days to maintain all packing machine.
whether you think the action will
fully control the risk I think the action will fully control the risk of noise.