Items Description of Activities


A General Requirements
1.1
1.2
1.3
1.4
B Panels,Breakers and Enclosures
2
2.1
2.2
2.3
2.4
2.5
C Wires / Cables
3.1
3.2
3.3
3.4
D Wiring Method,Conduits and Cable Tray
4.1
4.2
4.3
4.4
E Others etc. ( Pls Specify)
5.1
5.2
5.3
F Punch List/Testing and Commissioning
6.1

TERMS AND CONDITIONS:


Completion : Twenty-five (25) working days upon receipt of P.O. and Initial Payment.
Payment : Thirty-percent (30%) downpayment, Seventy-percent (70%) upon completion.
Validity : 15 days from date hereof.

We trust our proposal will merit your favorable response. Should you need additional information,
please feel free to contact us. We are looking forward to serve you.

Very truly yours,

Allysa Mae M. Madelo


Operations Manager
Qty Units Total

Payment.
pon completion.

tional information,
Project Name :
Location :
Subject :
Date :

Items Description of Activities Qty Units Total


A Troubleshooting and repair of the following:
1.1 Programmable logic control repair and troubleshooting
1.2 Inputs and outputs check
1.3 Sequence test and repair
1 lot 65,000
1.4 Wiring layout and repair
1.5 Proximity switches and counters check
1.6 Testing and commissioning
Total 65,000
Non-VAT -
Grand total 65,000

TERMS AND CONDITIONS:


Completion : Twenty (20) working days upon receipt of P.O. and Initial Payment.
Payment : Fifty-percent (50%) downpayment, Fifty-percent (50%) upon completion.
Validity : 5 days from date hereof.

We trust our proposal will merit your favorable response. Should you need additional information,
please feel free to contact us. We are looking forward to serve you.

Very truly yours,

Allysa Mae M. Madelo


Operations Manager
Project Title:
Project Owner:
Project Location:
Scope: Bill of Materials

Items Description Qty Units Unit Cost


A General Requirements
1.1 Mobilization /Demobilization lot
1.2 Site Supervision lot
1.3 Health, Safety & Good Housekeeping lot
1.4 Testing andd Commissioning lot

B Panel and Enclosure


2.1 Nema 4x,Stainless Steel,Deadfront lot
2.2 400AT,400AF,3P, lgt
Branch
2.3 70AT,100AF,3P,440V,60HZ. pc
2.4 50AT,100AF,440V,3P,60HZ pc
2.5 40AT,100AF,440V,3P,60HZ. pcs
2.6 30AT,100AF,440V,3P,60HZ. pcs

C Wires and other Cables


3.1 250 sq.mm thhn cu.conductor RYB mtrs
3.2 125 sq mm thhn cu.conductor RYB mtrs
3.3 30 sq mm thhn cu conductor Green mtrs

D Roughing Inns/ Conduits and Trays


4.1 300 mm x 100 mm x2400 mm Ladder type lgt
Cable Tray,Hotdip Galvanized
4.2 Liquidtight Flexible conduit 80 mm Dia. mtrs
4.3 Liquidtight Flexible conduit 50 mm Dia. mtrs
4.4 80 mm diameter imc conduit IMC lgt
4.5 50 mm diameter imc conduit IMC lgt
4.6 80 mm straight connector LQT pcs
4.7 50 mm straight connector LQT pcs
4.8 Pull box (500mm x 300mm x 500mm) pc
4.9 Unistrut lgt
5.0 80 mm diameter pvc pipe lgt
E Others (Please Specify)
5.1 Electrical Tape lgt
5.2 Threaded Rod /Welding Rod lgt
Total
Non-VAT
Grand Total

TERMS AND CONDITIONS:


Completion : Twenty-five (25) working days upon receipt of P.O. and Initial Payment.
Payment : Thirty-percent (30%) downpayment, Seventy-percent (70%) upon completion.
Validity : 15 days from date hereof.
We trust our proposal will merit your favorable response. Should you need additional information,
please feel free to contact us. We are looking forward to serve you.

Very truly yours,

Allysa Mae M. Madelo


Operations Manager
Material
Labor Cost Total Cost
Cost

al Payment.
upon completion.
dditional information,

You might also like