Daily Safety

Project Name:
Date Inspection :

Item Safety and Health Issues and Concerns

1. Poor Housekeeping
1
Improper arrangement of materials onsite
2. Incomplete PPE ( No Hardhat )
Wrong delivery point of concrete mixer truck.
2 Congestion point of supervisor, workers, delivery of
materials and other equipments at site.

Incomplete bracing/support of scaffolding. Overload


3
capacity at the platform.
Welding in improper place, no protective screens to
4
protect other workers from welding hazards

accumulation of fire, no fire extinguisher placed on


5
the working area
Ergonomic Hazard , improper lifting of materials,
6
Improper posture

Working area no scaffold, worker no body harness


7
(PPE) .- safety officer, worker
8 No warning signs for excavation, No barricades

Prepared by:

Acknowledge by:

Approved by:
Daily Safety and Health Observation
Attach Photo reference

PICTURE
PICTURE

PICTURE
PICTURE
h Observation Report
Action Required/Control Measures Resolution Date

1.Material should be in laydown area

2.Worker must wear proper PPE (Hardhat) October 27, 2023

3. Issuance of Permit to work


1. Concrete delivery must be poured not
more than 2hr on site from mixer truck.
October 27, 2023
2. Construction site must have designated lay
area for tools, equipment and materials.

1. Officers and workers must follow the


complete setup of scaffolding and
knowledgeable enough on the weight
capacity of scaffolding.
October 27, 2023
2. Fall Protection equipment shall be provided
on any scaffold 2m or more above ground.
1. Goggles fitted with specially tinted lenses
must be worn during oxy-fuel cutting,
welding and brazing.

2. Warn workers in the area before you strike October 27, 2023
an arc.

3. Set up protective screens to shield other


workers from the light you generate.

1. Evaluate all potential ignition sources and


take corrective action.
October 27, 2023
2. Sufficient and suitable firefighting
equipment at strategic area
1. Provide lifting cart.
2. Provide training to workers about proper October 27, 2023
lifting techniques.

1. Worker must be oriented regarding on


safety on working at heights.
October 27, 2023
2. Provision of scaffolds
1. The top of the walls of an excavation
more than 2.0 m. (6 ft.) deep shall be
October 27, 2023
barricated to a height of at least 1 m. (3 ft.) to
prevent the fall of workers.
Responsible for corrective Action

The worker, supervisor in charge and to


monitor and validate by safety officer.
CM, Safety Officer, material supplier

Officer in charge, job performer.


Worker and job performer

Project in Charge
Worker and job performer, supervisor

Safety Officer, Worker


Project in Charge, Worker