You are on page 1of 15

Republic of the Philippines Issued Date : 11.01.

19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00 A
C Palompon, Leyte Reviewed by : QAM T
I COLLEGE OF MARITME EDUCATION Approved by : CPR V
I Marine Transportation Department Form ID No. : QF-DCM-029 T
Y
SHEET FT1-01
Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
About the keel
About the center line
Trim
Learning Outcomes  LO1.9: Calculate the following: given LBP and LCF, Displacement and weight added/ removed
- Bodily sinkage/rise
- Change of trim
- Change of draft aft and forward
- Trim
- GMʟ

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
1.0 Random individual performance-based presentation. Topics will be based on this set of
exercises. Accomplished FT-01-08 exercises can be used during the random presentation.
Initial Condition

Objectives
Assessment HPS = 30 pts
RUBRIC 5 4 3 2 1

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

ACTIVITY SHEET FT1-02


Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
About the keel
About the center line
Trim
Learning Outcomes  LO1.9: Calculate the following: given LBP and LCF, Displacement and weight added/ removed
- Bodily sinkage/rise
- Change of trim
- Change of draft aft and forward
- Trim
- GMʟ

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
1. What is heel?
2. Describe when or how a ship would have a heel.
3. Make an illustration of heel.
4. What is a list?
5. Describe when or how a ship would have a list.
Initial Condition 6. Make an illustration of list.
7. Differentiate heel and list with respect to trim and stability of the ship.
8. What is trim?
9. How a ship would have a trim by the head?
10. How a ship would have a trim by the aft?
11. Make an illustration of trim.
Objectives
Assessment HPS = 30 pts
RUBRIC 5 4 3 2 1
Resultant list +/- 0.0 +/- 0.1 +/- 0.2 +/- 0.3 +/- 0.4

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair

Activity Sheet FT1-02


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

Name: _________________________________________ Date _________ Score _________

NOTE: Write your answer/s here.

ACTIVITY SHEET FT1-03


Title List And Trim
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
About the keel
About the center line
Trim
Learning Outcomes  LO1.9: Calculate the following: given LBP and LCF, Displacement and weight added/ removed
- Bodily sinkage/rise
- Change of trim
- Change of draft aft and forward
- Trim
- GMʟ

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
A ship 6,600 tons displacement has a KM = 7.5 m, KG = 6.8 m. and is floating upright. A weight of 80 ton on
board is shifted 11.3 m transversely. Find the resultant list.
Initial Condition

Objectives
Assessment HPS = 35 pts
RUBRIC 5 4 3 2 1
Resultant list +/- 0.0 +/- 0.1 +/- 0.2 +/- 0.3 +/- 0.4

Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair

Activity Sheet FT1-03

Name: _________________________________________ Date _________ Score _________


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

NOTE: Write your answer/s here.

ACTIVITY SHEET FT1-04


Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

KUP KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
About the keel
About the center line
Trim
Learning Outcomes  LO1.9: Calculate the following: given LBP and LCF, Displacement and weight added/ removed
- Bodily sinkage/rise
- Change of trim
- Change of draft aft and forward
- Trim
- GMʟ

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
A ship 8000 tons displacement has a KM = 7.2 m, KG = 6.0 m. and is floating upright. A weight of 80 ton on
board is shifted 13.3 m transversely. Find the resultant list.
Initial Condition

1. Students must be able to calculate the required water plane area and TPC in the given problem
Objectives
with highest accuracy using Simpson’s Second Rule.
Assessment (Lecture) HPS = 35 pts
RUBRIC 5 4 3 2 1
Resultant list +/- 0.0 +/- 0.1 +/- 0.2 +/- 0.3 +/- 0.4

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair

Activity Sheet FT1-04

Name: _________________________________________ Date _________ Score _________

NOTE: Write your answer/s here.


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

ACTIVITY SHEET FT1-05


Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
Learning Outcomes  LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
About the keel
About the center line
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

Trim

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
MV PIT is floating in an upright position. Her displacement is 6789 tons, KM = 7.2 M, KG = 6.0 m.

She is to load the following:


400 tons cargo KG 4.5 m and center of gravity 5.6 m to starboard of the centerline.
300 tons cargo KG 1.2 m and center of gravity 3.7 m to port of the centerline.
Initial Condition
Discharge 109 tons KG 2.5 m and center of gravity 3.7 m to port of the centerline.

Required:
1. Moments about the keel.
2. Moments about the centerline.
3. Final list.
Objectives
Assessment (Lecture) HPS = 30 pts
RUBRIC 5 4 3 2 1

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair

Activity Sheet FT1-05

Name: _________________________________________ Date _________ Score _________

NOTE: Write your answer/s here.


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

ACTIVITY SHEET FT1-06


Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
Learning Outcomes About the keel
About the center line
Trim

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
Initial Condition A ship is floating in an upright position. Her displacement is 7890 tons, KM = 7.3 M, KG = 6.1 m.
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

She is to load the following:


399 tons cargo KG 5.5 m and center of gravity 6.6 m to starboard of the centerline.
550 tons cargo KG 2.3 m and center of gravity 4.7 m to port of the centerline.

Discharge 99 tons KG 1.7 m and center of gravity 6.7 m to port of the centerline.

Required:
1. Moments about the keel.
2. Moments about the centerline.
3. Final list.
Objectives
Assessment (Lecture) HPS = 35 pts
RUBRIC 5 4 3 2 1
Resultant list +/- 0.0 +/- 0.1 +/- 0.2 +/- 0.3 +/- 0.4

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair

Activity Sheet FT1-06

Name: _________________________________________ Date _________ Score _________

NOTE: Write your answer/s here.


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

ACTIVITY SHEET FT1-07


Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
Learning Outcomes About the keel
About the center line
Trim

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
Initial Condition A ship is floating in an upright position. Her displacement is 9897 tons, KM = 6.9 M, KG = 6.2 m.

She is to load the following:


576 tons cargo KG 6.3 m and center of gravity 5.9 m to starboard of the centerline.
439 tons cargo KG 3.7 m and center of gravity 3.1 m to port of the centerline.

Discharge 139 tons KG 2.1 m and center of gravity 5.7 m to port of the centerline.
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

Required:
1. Moments about the keel.
2. Moments about the centerline.
3. Final list.
Objectives
Assessment HPS = 55 pts
RUBRIC 5 4 3 2 1
Resultant list +/- 0.0 +/- 0.1 +/- 0.2 +/- 0.3 +/- 0.4

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair
Activity Sheet FT1-07

Name: _________________________________________ Date _________ Score _________

NOTE: Write your answer/s here.


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

ACTIVITY SHEET FT1-08


Title List And Trim

Duration +/- 30 minutes


Competence A-II/2 F3.C1: Control trim, stability and stress
KUP: A-II/2 F3.C1.KUP 2: Knowledge of the effect on trim and stability of a ship in the event of damage to
KUP
and consequent flooding of a compartment and countermeasures to be taken
Performance

Required
 LO1.7: Differentiate between the heel and list with respect to trim and stability of the
ship
 LO1.8: Create a table of moments:
About the keel
About the center line
Trim
Learning Outcomes  LO1.9: Calculate the following: given LBP and LCF, Displacement and weight added/ removed
- Bodily sinkage/rise
- Change of trim
- Change of draft aft and forward
- Trim
- GMʟ

Teaching Aids Multimedia, Laptop, desktop, internet/wifi


Teaching-Learning Hydrostatic Particulars / Stability Calculation books
Paraphernalia
Given: ships’ displacement = 12,456 tons, KM = 6.9 m, KG = 6.0 m. A weight of 50 tons is yet to be loaded
with the ship’s own lifting gear. The weight is to be placed first on deck on the inshore side (KG 7.9 m and
center of gravity 5.6 m out from the centerline). When the lifting gear plumbs the quay its head is 14.5 m
above the keel and 11 m out from the centerline.
Initial Conditions
Determine:
1. Calculate the maximum list during the operation.
2. Illustrate the lifting operation.

Objectives
Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

Assessment (Lecture) HPS = 55 pts


RUBRIC 5 4 3 2 1
Resultant list +/- 0.0 +/- 0.1 +/- 0.2 +/- 0.3 +/- 0.4

Standard: 70% passing of HPS


Debriefing

Prepared by: Reviewed by Approved by:

GREGORIO S. OCHAVILLO LEONIL G. MAKIPUTIN JOEY L. CABALQUINTO


Instructor Asst. Dept. Chair Dept. Chair

Activity Sheet FT1-08

Name: _________________________________________ Date _________ Score _________

NOTE: Write your answer/s here.


Republic of the Philippines Issued Date : 11.01.19
PALOMPON INSTITUTE OF TECHNOLOGY Revision No : 00
Palompon, Leyte Reviewed by : QAM
COLLEGE OF MARITME EDUCATION Approved by : CPR
Marine Transportation Department Form ID No. : QF-DCM-029

You might also like