HBNS FIELD - VISUAL INSPECTION REPORT

Page 1/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air

Overview and Nameplate

Inspected/Reported by Reviewed by Accepted by GB

BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - VISUAL INSPECTION REPORT

Page 2/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air

External Inspection Check List


A –Acceptable; U – Unacceptable; NA – Not Applicable; NI – Not Inspected
No Item A U NA NI Remark
1 EXTERNAL VISUAL INSPECTION (ON-STREAM)

Ladders, Stairs, Platforms and


1.1
Walkways

1.1.1 Check for corrosion X


1.1.2 Check for broken parts X
1.1.3 Check for tightness of bolts X
1.1.4 Check the condition of paint or galvanized material X
1.1.5 Check the wear of ladder rungs X
1.1.6 Check the security of handrails X

Check the condition of flooring on platforms and


1.1.7 X
walkways

1.2 Foundations

Check for deterioration such as spalling, cracking,


1.2.1 X See page 4/7
exposed steel reinforcement and settling

1.2.2 Concrete pier X See page 4/7


1.2.3 Steel/concrete cradles X

1.2.4 Crevice corrosion between the shell & the steel cradles X

1.3 Anchor/ Structural Bolts


1.3.1 Check for corrosion, cracking and tightness X See Page 4/7
1.4 Concrete Supports

Check for deterioration such as spalling,


1.4.1 X See page 4/7
cracking,exposed steel reinforcement and settling

Check the opening between concrete supports and a


1.4.2 X
vessel (for possible crevice corrosion)

1.5 Steel Supports

Check for, corrosion, distortion, cracking and other


1.5.1 X See page 4/7
anomalies

1.5.2 Load-carrying beams for buckling or excessive deflection X

Piping attachement to vessle for evedence of distortion


1.5.3 X
due to pipe movement

Fireproofing on support beams and skirts for bulging


1.5.4 X
and rust (possible corrosion)

1.6 Nozzles and Flanges

1.6.1 Inspection for vibration, distortion, cracking and leaks X

1.6.2 Condition of bolts and nuts X


1.6.3 Flanges alignment X
1.6.4 Reinforcing pad, weep holes for plugging or leaking X
1.7 Grounding Connections

Verify that good electrical contact is


1.7.1 X See page 4/7
maintained

Inspected/Reported by Reviewed by Accepted by GB

BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - VISUAL INSPECTION REPORT

Page 3/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air

External Inspection Check List


A –Acceptable; U – Unacceptable; NA – Not Applicable; NI – Not Inspected
No Item A U NA NI Remark
1.8 Auxiliary Equipment

Inspection of equipment such as gage connections,float


1.8.1 X
wells, sight glasses, and safety valves

1.8.2 Possible vibration of the parts X


1.8.3 Dissimilar metal (galvanic corrosion) X

Valves for correcte rating, body and hand wheel


1.8.4 X
condition

1.9 Protective Coating and Insulation

Condition of protective coating for rust spots, blisters


1.9.1 X See Page 4/7
and film lifting

Condition of insulation and its supporting clips, angles,


1.9.2 X
bands, and wires for corrosion and breakage

1.10 External Metal Surface

Inspect for corrosion, leaks, cracks, buckles, bulges,


1.10.1 X
laminations, deformations and mechanical damages

1.10.2 Name plate available readable X


1.11 Other Anomalies X

Observation

Only components of the areas of interest were checked and reported in this checklist.
The inspection has been performed as per ITP Number : GBM-DM-TPL-0002

Inspected/Reported by Reviewed by Accepted by GB

BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - VISUAL INSPECTION REPORT

Page 4/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air

Photos & Remarks

Photo 01 Photo 02

Photo 03 Photo 04

Photo 05 Photo 06
Remarks:
- Coating damages were observed (photos 01 & 02).
- Two Accumulator's supports found without fixing bolts (photo 03). Electrical grounding Accumulator to the metallic platform was not found.
- Valve and top head found to be in good condition (photo 04).
- Cracks and damages observed in the concrete supports ( photo 05).
- Walkways and ladders are in good status (photo 6).

Inspected/Reported by Reviewed by Accepted by GB

BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - Ultrasonic Thickness Examination Report

Page 5/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air

Ultrasonic Testing
ACC-FV-K4-201B-10
Ultrasonic Thickness Examination Report

Client Contract No Test procedure Start Inspection Date End Inspection Date Inspection Duration (Hrs) Report Number Page n°

GROUPEMENT Berkine SC_4032720-20 GBF-36-PRC-0010-A1 3/18/2024 3/18/2025 1 HBNS-01-INSP-1608 6/7

Piping System / Equip


Tested equipment Line number / Equip Tag Location /Plant Corrosion Loop Corrosion Allowance (mm) Drawing number
description

Vessel ACC-FV-K4-201B-10 Air Accumulator Gas Process/Process Utilities-Air CL-42-A-Air 3

Calibration Calib.
Testing Gain Calibration
P & ID n° Couplant Ref Gain (db) Amplitude Distance Surface Condition Coating/Painting Painting / Coating THK (mm) Material
(db) Reflector Size
(%) Reading (mm)

Water 40 36 10 80 30 As clean Yes Carbon Steel

UT Equipment Transducer Calibration Block Cable Technique

Calibration Frequency
Make/Model Serial n° Make/Model Crystal Size (mm) Serial number Type/Serial n° Material/Thickness Type/Length
due date (MHz)
Pulse echo
Dual Lemo /
GE/DMS GO + GOPLS19120115 9/10/2024 DA-501 12.5 5 69859 5-step block / 69252 CS /5-25 Step Wedge
1500mm

INSPECTION DATA
Wall Thickness Measurement (WT) WT loss
Equipment/ Minimum Maximum Severity Remarks
Feature Component Nominal 12 O'clock 3 O'clock 6 O'clock 9 O'clock
Feature type component Thickness Thickness mm %
Number type WT (mm) (mm) (mm) (mm) (mm)
Size mm mm
S1 Vessel 14 Head 7.22 7.10 7.10 7.10 0.12 1.66% OK Crown
S2 Vessel 14 Head 7.30 7.14 7.14 7.14 0.16 2.19% OK knuckle
S3 Vessel 14 Shell 7.56 7.38 7.60 8.31 8.02 7.38 8.31 0.18 2.38% OK
S4 Vessel 14 Bottom 7.20 7.08 7.08 7.08 0.12 1.67% OK knuckle
S5 Vessel 14 Bottom 7.10 7.06 7.06 7.06 0.04 0.56% OK Crown

Severe Medium Minor


Total TML's Remark / Observation
WT Loss >50% 3mm or 25%≤WT Loss<50% 10 % ≤WT Loss < 25% or 3mm

5 0 0 0 /

Inspection Summary

UT scanning over upper and lower heads Four quadrilateral locations & center location
UT scanning over each shell course, four quadrilateral locations
All the nominal thicknesses are taken from the Vail plant
All readings are in mm.

Inspected/Reported by Reviewed by Accepted by GB

BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_UTM-RV_V00
Ultrasonic Thickness Examination Report

Client Contract No Test procedure Start Inspection Date End Inspection Date Inspection Duration (Hrs) Report Number Page n°

GROUPEMENT Berkine SC_4032720-20 GBF-36-PRC-0010-A1 3/18/2024 3/18/2025 1 HBNS-01-INSP-1608 7/7

Piping System / Equip


Tested equipment Line number / Equip Tag Location /Plant Corrosion Loop Corrosion Allowance (mm) Drawing number
description

Vessel ACC-FV-K4-201B-10 Air Accumulator Gas Process/Process Utilities-Air CL-42-A-Air 3

Calibration Calib.
Testing Gain Calibration
P & ID n° Couplant Ref Gain (db) Amplitude Distance Surface Condition Coating/Painting Painting / Coating THK (mm) Material
(db) Reflector Size
(%) Reading (mm)

Water 40 36 10 80 30 As clean Yes Carbon Steel

UT Equipment Transducer Calibration Block Cable Technique

Calibration Frequency
Make/Model Serial n° Make/Model Crystal Size (mm) Serial number Type/Serial n° Material/Thickness Type/Length
due date (MHz)
Pulse echo
Dual Lemo /
GE/DMS GO + GOPLS19120115 9/10/2024 DA-501 12.5 5 69859 5-step block / 69252 CS /5-25 Step Wedge
1500mm

Drawing /Photo

`
S1

S2

S3

S4

S5

Inspected/Reported by Reviewed by Accepted by GB

BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_UTM-RV_V00