Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air
BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - VISUAL INSPECTION REPORT
Page 2/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air
1.2 Foundations
1.2.4 Crevice corrosion between the shell & the steel cradles X
BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - VISUAL INSPECTION REPORT
Page 3/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air
Observation
Only components of the areas of interest were checked and reported in this checklist.
The inspection has been performed as per ITP Number : GBM-DM-TPL-0002
BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - VISUAL INSPECTION REPORT
Page 4/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air
Photo 01 Photo 02
Photo 03 Photo 04
Photo 05 Photo 06
Remarks:
- Coating damages were observed (photos 01 & 02).
- Two Accumulator's supports found without fixing bolts (photo 03). Electrical grounding Accumulator to the metallic platform was not found.
- Valve and top head found to be in good condition (photo 04).
- Cracks and damages observed in the concrete supports ( photo 05).
- Walkways and ladders are in good status (photo 6).
BENZAHI.H/BOUCHAMA.M V K Singh
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_VT-RV-EXT_V00
HBNS FIELD - Ultrasonic Thickness Examination Report
Page 5/7
Report No HBNS-01-INSP-1608 Contract No SC_4032720-20
Inspection Date 3/18/24 Client Groupement Berkine
Equipment TAG ACC-FV-K4-201B-10 Location Gas Process/Process Utilities-Air
Ultrasonic Testing
ACC-FV-K4-201B-10
Ultrasonic Thickness Examination Report
Client Contract No Test procedure Start Inspection Date End Inspection Date Inspection Duration (Hrs) Report Number Page n°
Calibration Calib.
Testing Gain Calibration
P & ID n° Couplant Ref Gain (db) Amplitude Distance Surface Condition Coating/Painting Painting / Coating THK (mm) Material
(db) Reflector Size
(%) Reading (mm)
Calibration Frequency
Make/Model Serial n° Make/Model Crystal Size (mm) Serial number Type/Serial n° Material/Thickness Type/Length
due date (MHz)
Pulse echo
Dual Lemo /
GE/DMS GO + GOPLS19120115 9/10/2024 DA-501 12.5 5 69859 5-step block / 69252 CS /5-25 Step Wedge
1500mm
INSPECTION DATA
Wall Thickness Measurement (WT) WT loss
Equipment/ Minimum Maximum Severity Remarks
Feature Component Nominal 12 O'clock 3 O'clock 6 O'clock 9 O'clock
Feature type component Thickness Thickness mm %
Number type WT (mm) (mm) (mm) (mm) (mm)
Size mm mm
S1 Vessel 14 Head 7.22 7.10 7.10 7.10 0.12 1.66% OK Crown
S2 Vessel 14 Head 7.30 7.14 7.14 7.14 0.16 2.19% OK knuckle
S3 Vessel 14 Shell 7.56 7.38 7.60 8.31 8.02 7.38 8.31 0.18 2.38% OK
S4 Vessel 14 Bottom 7.20 7.08 7.08 7.08 0.12 1.67% OK knuckle
S5 Vessel 14 Bottom 7.10 7.06 7.06 7.06 0.04 0.56% OK Crown
5 0 0 0 /
Inspection Summary
UT scanning over upper and lower heads Four quadrilateral locations & center location
UT scanning over each shell course, four quadrilateral locations
All the nominal thicknesses are taken from the Vail plant
All readings are in mm.
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_UTM-RV_V00
Ultrasonic Thickness Examination Report
Client Contract No Test procedure Start Inspection Date End Inspection Date Inspection Duration (Hrs) Report Number Page n°
Calibration Calib.
Testing Gain Calibration
P & ID n° Couplant Ref Gain (db) Amplitude Distance Surface Condition Coating/Painting Painting / Coating THK (mm) Material
(db) Reflector Size
(%) Reading (mm)
Calibration Frequency
Make/Model Serial n° Make/Model Crystal Size (mm) Serial number Type/Serial n° Material/Thickness Type/Length
due date (MHz)
Pulse echo
Dual Lemo /
GE/DMS GO + GOPLS19120115 9/10/2024 DA-501 12.5 5 69859 5-step block / 69252 CS /5-25 Step Wedge
1500mm
Drawing /Photo
`
S1
S2
S3
S4
S5
BENZAHI.H/BOUCHAMA.M V K Singh
NDT LEVEL II NDT LEVEL III HBNS-Ing Inspection
LAST UPDATE : 24/05/2023 RA-IIA_UTM-RV_V00