GAS TESTING
ر ا زات إ
Authorized By
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 2 of 13
GAS TESTING
ر ا زات إ
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 3 of 13
REVISION RECORD
The custodian of this procedure is the QHSE Manager and any suggested changes to this procedure or
queries about the applicability of it should be addressed to him. He is also responsible for co-coordinating
periodic reviews of this procedure, which will take place every two years.
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 4 of 13
Amendment Record
Incorporated By
Amendments
Name Signature Date
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 5 of 13
AMENDMENT PROPOSAL
From: Tel.:
Manual(s):
Section(s):
Page(s) Affected:
Details:
Upon Completion Please Return This Form To: HSE General Manager
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 6 of 13
DISTRIBUTION LIST
Copy No. Holder Location
1 Chairman & Managing Director Main Office
2 General Manager & Managing Director Main Office
3 Assistant Chairman for Operations Main Office
4 Deputy Operations General Manager Main Office
5 Exploration General Manager Main Office
6 Deputy Exploration General Manager Main Office
7 QHSE General Manager/ Deputy Main Office
8 Finance General Manager Main Office
9 Deputy Finance General Manager Main Office
10 Petroleum Engineering General Manager Main Office
11 Materials General Manager Main Office
12 Deputy Materials General Manager Main Office
13 Administration General Manager Main Office
14 Contracts & Tenders General Manager Main Office
15 Projects General Manager Main Office
16 Deputy Projects General Manager Main Office
17 Drilling & Work Over General Manager Main Office
18 Security General Manager Main Office
19 Internal Audit General Manager Main Office
20 Legal Affair General Manager Main Office
21 Information Technology Assistant General Manager Main Office
22 Maintenance Assistant General Manager Main Office
23 Medical Department Manager Main Office
24 Fields General Manager Fields
25 Deputy Fields General Manager Fields
26 Production Department Manager Fields
27 QHSE Department Manager Fields
28 Construction Department Manager Fields
29 Maintenance Department Manager Fields
30 Medical Department Manager Fields
31 Security Department Manager Fields
32 Projects Department Manager Fields
33 Administration Department Manager Fields
34 Materials Department Manager Fields
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 7 of 13
TABLE OF CONTENTS
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 8 of 13
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 9 of 13
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 10 of 13
• Prior to all hot work in hazardous areas, and ،p ذ D و، ة7- اU طF% اL F1 R ل% أى أJ !FG + # •
thereafter, as specified on the work permit. .+% )* "G L ﻣ د: ھ%A
• As specified on any other Work Permits. . ى1 ا+% " ر*) اG أىL ﻣ د: ھ%A •
• Gas Tests may also have to be carried out to show Fرة آﻣ:"D HZ%* h ز ظ& ر أ3 رات ا1 ] إG • *'\ أن
that it is safe to break containment in a أو، :D Aاد ھ رو:ﻣ ى: G ت و.F ! اpL
hydrocarbon system, or to show that it is safe to :D Aاد ا & رو:% ل ا1 إدFرة آﻣ:"D HZ%* h ظ& ر أ
introduce hydrocarbons into a system. . ت% إ ا
4-3 Types of Gas Tests رات ا ز اع إF2 أ٣-٤
Gas tests can be segregated into 3 general areas and U * ، ﻣU طF ﻣ3 ز إ3 رات ا1 إ+"L HZ%*
with respect to Tests for Flammable Gas it is H % 5 ن ا:ZG &] أن% اHل ﻣ * اR زات3 رات ا1xD
important that the two values (% by vol and % of LEL)
bل ا ا دH ﻣ٪'] و *:q% اCF ا٪)
are not confused.
Gas Testing for onshore applications can be .( :%n )ﻣ:.ﻣ
segregated into 3 areas: :U طF ﻣ3 " & إL HZ%* * ا+% اHA ز ﻣ3 ر ا1إ
• Test for Oxygen, where the proportion of Oxygen in L H 'CA ا C ء7 * ] إz ،H 'CA ر ا1• إ
the atmosphere tested is given as a percentage by
. ]' اz H* ﻣ:q ﻣCFA ى:' ف اj3 ا
volume (v/v).
.% زات ا3 < اA G ،ل D 5 زات ا3 رات ا1• إ
• Tests for Flammable Gas, where the concentration
of flammable gas in the atmosphere tested can be : 7Rا:D رھ1 إHZ%* ى:' ف اj3 اL ل
given by: . (LEL) ل ا ا دH ﻣC -
- A percentage of the Lower Explosive Limit (LEL), .]' اz H ﻣ5 7 ﻣC -
or
- Absolute percentage by volume (v/v).
• Testing for Toxic Gas (like H2S) where the أنz H = * ا & روA +[ ﻣ ﻣC زات ا3 ر ا1إ •
concentration of toxic gas in the atmosphere ن: ﻣ+Z '<ءD س إﻣ5ُ* :' اL ﻣC زات ا3 < اA G
tested would be indicated either in parts per / " ة# \ و ود ا ضZ ﻣ ﻣ+Z ام3 =<ء أو ﻣ
million (ppm) or in milligrams per cubic meter (mg
. F اد ﻣ:% += * ا:ط
/ m3) for Short / Long Term Exposure Limits (STEL
/ LTEL) for particular substances.
4-4 Types of Portable Gas Testing Equipment F + س ا زات ا8 ةHI"اع أF2 أ٤-٤
Guidance from industrial hygienists should be taken to
ر1 F" ء ا " ا% H ا ر دات ﻣJ10G أن3 F*
choose which type is suitable for a given situation.
ر1 أ=&<ة إH ﻣH : =:* وF ﻣ \R F ﻣ:ع ھ: أى
Two types of portable gas testing instruments are
: * ل ا:5 اL h ﻣ- C% ا:% % ز ا3 ا
used onshore:
• Built in pump for sample withdrawal, in which, a F \ R &D ] * وا، F \ اC ' ﻣ ﻣ-n• ذات ﻣ
sample of the atmosphere being tested is drawn ] G *'\ أن. &R #ى و:' ف اj3 اH ﻣ-n% ا7Rا:D
through the instrument pump action. All initial gas ' رG وP ا:Z اHع ﻣ:F ا اJ&D ز ا و3 رات ا1 ? إ%=
tests should be done with this type of detector and أن3 F* *: \ طR D: ام أ- R] إG إذاh ا رة إ أ
it should be noted that where an extension tube is \'*) . ر1 إ= اء اF ب: ر '] ا اL J10G
used, the volume of the tube should be taken into +[%G C أن اH ﻣAN L A %A -n% \ اCG أن
account when the test is carried out. (i.e. care must . D: ا+1 داH ﻣdC ^ وR: اL دة:=:% اF ا
be taken to pump sufficient volume to ensure that
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 11 of 13
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 12 of 13
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021
GAS TESTING PETROSANNAN COMPANY
زات%&'ر ا%)*+إ ن%01 )*رو34ر5
Date: Aug 2021
PSC-HSE-OCP-14
Page 13 of 13
4-6-4 Prior to the introduction of Hydrocarbons :D Aاد ا & رو:% ل ا1 إد+ # ٤-٦-٤
Prior to the introducing of hydrocarbons, the system ^- )CA +% 3 F* ، :D Aاد ا & رو:% ل ا1 إ دة إد+ #
should be purged until the oxygen content level is 4% z H ﻣ+# أو أ٪4 : ھH 'CA ى ا: ى ﻣ: Cﻣ ة: او ا
or less by volume, this to be confirmed by testing. . ر 1 D AN * اJوھ ،]' ا
4-7 Testing Techniques ر #> ت اO ٧-٤
When gas testing for hot work: : F1 C ل ا% W ز3 ر ا1 إF
• Be aware that most vapors which are tested / a D اء:& اH ﻣ+5K أR 5% ة ا-D ] اt إ أن ﻣh • إ
measured heavier than air. Some examples of such /1.19= H2S / 1.0 = اء:& )ا: زات ھ3 ه اJا ﻣ[ ھ
gases are: (Air=1.0, H2S=1.19, CO2=1.53, HCI=1.27, نD ا و/ 2.11 = نG: ا/ 1.27= HCl /1.53 = CO2
Butane=2.11, Propane=1.55). Some gasses are +[اء ﻣ:& اH وز ً ﻣP1 زات ھ ا3 اa D / 1.55 =
however lighter than air such as (CO = 0.97, .(0.91 = H R ا،(CO = 0.97
Acetylene = 0.91).
• Pay special attention to covered sumps, drains, km* ا را:CG ت ا " ف و. G 73G ه إ • *'\ ا
lower ground, and any location where heavy vapors .h L 5K ة-D? أ%'G HZ%* z نZ وأى ﻣn!-F% ا
may accumulate.
• The gas test area shall include everywhere within L +1 ن داZ ﻣ+A L ز3 ر ا1 إ57F ﻣ+%.G • *'\ أن
50 ft of the hot work location. .H1 C ا+% ? ا#: ﻣH م ﻣ# 50 L C< ﻣ
• Consider possible atmosphere change between
subsequent gas tests, or changes in the process رات1 إH D خF% ا3G Zر إﻣ اL J1 • *'\ ا
within the work area. .+% ا57F ﻣ+1 ت دا% اL 3G أو، 5 j % ز ا3 ا
When gas testing for confined space entry: :\'* 5 3% اHA ل ا ﻣ:1 ز3 ر ا1 إF
• Test from outside the opening first, then as far
HZ%ﻣ "#أ ] إK ،ً•ت أو ! رج ا- اH ر ﻣ1• إ
inside as possible
.+1 ا اHﻣ
• Test pipes and any crack or opening in a tank
bottom .<ان- ع ا# L L " ع أوG \ وأىD اP 1 ر1• إ
• Test as low levels as possible when testing for زات3 ر1 إF نZ ر ا ﻣ# n!-F* ت ﻣ: C ر ﻣ1• إ
gasses that are heavier than air. .اء:& اH ﻣ+5Kا ھ أ
• Test as high levels as possible when testing for
ھ زات ا3 ر1 إF HZ%ى ﻣ: Cﻣ ر أ1• إ
gasses that are lighter than air.
.اء:& اH ﻣP1أ
Issue: 1 Issuance date: 01 June 2021 Rev.: 0 Rev. date: 01 Aug 2021