Soni Solar Power And Chemiclas Pvt. Ltd.

Check List for Bio CNG Project:

Sr. Description Comment Remark


No
A) TECHNICAL
1 Plant Capacity 2000 Kg/Day
2 Net Land Required With NA
3 Without NA
4 Type wise Raw Material Considered
5 Type wise Raw Material Quantity
6 Napier Grass Varity
7 Napier Grass Yield per crop per acre
8 Water Requirement for Napier Grass
9 Napier Grass Specification
10 Cost Of Production for Napier Grass
11 Napier Grass Cost including Harvesting &
Transport
12 Cow Dung Specification
13 Cow Dung Cost
14 Mixing Ratio of Cow Dung to Napier
15 Raw Water Requirement % Feed
16 Recycle water % Feed
17 Preparation of Feed
18 Preparatory devices
19 Feed Specification
20 Feed Pre Treatment
21 Type of Digester
22 Volume of Digester
23 Retention Time
24 Digester Temperature
25 Liquid Volume of Digester
26 Gas Volume of Digester
27 Digester Pressure Minimum
Maximum
28 Type of Agitator
29 No. Of Agitators
30 Raw Bio Gas % Feed
31 Raw Bio Gas Specification
32 Raw Bio Gas compressor capacity
33 Raw Bio Gas compressor Type
34 Raw Bio Gas Purification system
35 Technology Adopted for Raw Bio Gas
Purification
36 H2S Separator capacity
37 Gas Speci. After H2S Separator
38 CO2 Separator Capacity
39 Gas Speci. After CO2 Separator
40 Demoisturizer Capacity
41 Gas Speci. After Demoisturizer
42 Type of Regeneration (Puri. Equipments)
43 Chemicals for Regeneration
44 Purified CNG Specification
45 Purified CNG % Feed
46 Purified CNG Storage
47 Digester Liquid Discharge % Feed
48 Liquid Discharge holding tank Volume
49 Liquid Discharge Specification
50 Type of Press Filter
51 Liquid Manure % Feed
52 Solid Manure % Feed
53 Solid Manure Specification
54 Disposal of Liquid Manure
55 Cost of Production (Liquid Manure)
56 Cost of Production (Solid Manure)
57 Total Power Consumption Kw
58 Total Water Consumption KLtr
59 Manpower Requirements
60 Vehicles Requirements
61 List of Machinery & Equipments with Capacity
& Specification
62 Process Flow Chart
63 Detail Operation Procedure
64 Mass Balance
B) Commercial
1 Eligibility Criteria
2 Net Project Costs
3 List of Licenses , Approvals & Certificates
4 LOI Procedure
5 Bank Lone availability
6 Rate of Interests
7 Margin Money
8 Financial Analysis Report
9 CAPEX
10 OPEX
11 Agreement
12 Pay Back Period
13 Rate of CNG
14 Rate of Liquid Manure
15 Rate of solid Manure
16 Other Expenses
17 CAGR
18 Break Even Point
19 Internal Rate of Return
20 Cost / Benefit Ratio